Scheduling in Software Development Using Multiobjective Evolutionary Algorithms. In Selected papers from the 1st Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), pages 57-81, Springer, 2005.
Selected
We consider the problem of planning inspections and other tasks within a software development (SD) project with respect to the objectives quality (no. of defects), project duration, and costs. The considered model of SD processes comprises the phases of coding, inspection, test, and rework and includes assigning tasks to persons and generating a project schedule. Based on this model we discuss a multiobjective optimisation problem. For solving the problem (i.e., finding an approximation of the efficient set) we develop a multiobjective evolutionary algorithm. Details of the algorithm are discussed as well as results of its application to sample problems.
There is no pdf available for this paper. You might like to try to obtain the original source (see the doi, for example)
The doi for this publication is 10.1007/0-387-27744-7_4 You can link directly to the original paper, via the doi, from here
What is a doi?: A doi (Document Object Identifier) is a unique identifier for sicientific papers (and occasionally other material). This provides direct access to the location where the original article is published using the URL http://dx.doi/org/xxxx (replacing xxx with the doi). See http://dx.doi.org/ for more information
This pubication does not have a URL associated with it.
The URL is only provided if there is additional information that might be useful. For example, where the entry is a book chapter, the URL might link to the book itself.
@INBOOK{2005-057-081-SI, chapter = {Selected papers from the 1st Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA)},
pages = {57--81},
title = {Scheduling in Software Development Using Multiobjective Evolutionary Algorithms},
publisher = {Springer},
year = {2005},
editor = {G. Kendall and E. Burke and S. Petrovic and M. Gendreau},
author = {T. Hanne and S. Nickel},
note = {Selected},
abstract = {We consider the problem of planning inspections and other tasks within a software development (SD) project with respect to the objectives quality (no. of defects), project duration, and costs. The considered model of SD processes comprises the phases of coding, inspection, test, and rework and includes assigning tasks to persons and generating a project schedule. Based on this model we discuss a multiobjective optimisation problem. For solving the problem (i.e., finding an approximation of the efficient set) we develop a multiobjective evolutionary algorithm. Details of the algorithm are discussed as well as results of its application to sample problems.},
doi = {10.1007/0-387-27744-7_4},
owner = {gxk},
timestamp = {2012.05.29} }