Citation

Steiner, G and Shabtay, D The Single-machine Earliness-tardiness Scheduling Problem With Due Date Assignment And Resource-dependent Processing Times. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 149-161, 2005.

Paper


Abstract

We study the earliness-tardiness scheduling problem on a single machine with due date assignment and controllable processing times. We analyze the problem with three different due date assignment methods and two different processing time functions. For each combination of these, we provide a polynomialtime algorithm to find the optimal job sequence, due date values and resource allocation minimizing an objective function which includes earliness, tardiness, due date assignment, makespan and total resource consumption costs.


pdf

You can download the pdf of this publication from here


doi

This publication does not have a doi, so we cannot provide a link to the original source

What is a doi?: A doi (Document Object Identifier) is a unique identifier for sicientific papers (and occasionally other material). This provides direct access to the location where the original article is published using the URL http://dx.doi/org/xxxx (replacing xxx with the doi). See http://dx.doi.org/ for more information



URL

This pubication does not have a URL associated with it.

The URL is only provided if there is additional information that might be useful. For example, where the entry is a book chapter, the URL might link to the book itself.


Bibtex

@INPROCEEDINGS{2005-149-161-P, author = {G. Steiner and D. Shabtay},
title = {The Single-machine Earliness-tardiness Scheduling Problem With Due Date Assignment And Resource-dependent Processing Times},
booktitle = {In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA},
year = {2005},
editor = {G. Kendall and L. Lei and M. Pinedo},
pages = {149--161},
note = {Paper},
abstract = {We study the earliness-tardiness scheduling problem on a single machine with due date assignment and controllable processing times. We analyze the problem with three different due date assignment methods and two different processing time functions. For each combination of these, we provide a polynomialtime algorithm to find the optimal job sequence, due date values and resource allocation minimizing an objective function which includes earliness, tardiness, due date assignment, makespan and total resource consumption costs.},
owner = {Faizah Hamdan},
timestamp = {2012.05.21},
webpdf = {2005-149-161-P.pdf} }