Scheduling the Operations of an Integrated Production-Distribution Process. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 316-327, 2007.
Paper
We consider a variation of the integrated scheduling problem where the operations of a capacitated facility and a fleet of heterogeneous vessels must be sequenced to minimize the operating cost during a multi-period production and distribution process. We prove the NP-hardness of the problem, analyze the problem properties, and propose a partial linear-programming relaxation based heuristic approach. We also derive an error bound of this heuristic for a special case of the problem. Finally, the empirical observations on the computational performance of the heuristic under general cases are reported.
You can download the pdf of this publication from here
This publication does not have a doi, so we cannot provide a link to the original source
What is a doi?: A doi (Document Object Identifier) is a unique identifier for sicientific papers (and occasionally other material). This provides direct access to the location where the original article is published using the URL http://dx.doi/org/xxxx (replacing xxx with the doi). See http://dx.doi.org/ for more information
This pubication does not have a URL associated with it.
The URL is only provided if there is additional information that might be useful. For example, where the entry is a book chapter, the URL might link to the book itself.
@INPROCEEDINGS{2007-316-327-P, author = {L. Lei and W. Art Chaovalitwongse and S. Bora},
title = {Scheduling the Operations of an Integrated Production-Distribution Process},
booktitle = {In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France},
year = {2007},
editor = {P. Baptiste and G. Kendall and A. Munier-Kordon and F. Sourd},
pages = {316--327},
note = {Paper},
abstract = {We consider a variation of the integrated scheduling problem where the operations of a capacitated facility and a fleet of heterogeneous vessels must be sequenced to minimize the operating cost during a multi-period production and distribution process. We prove the NP-hardness of the problem, analyze the problem properties, and propose a partial linear-programming relaxation based heuristic approach. We also derive an error bound of this heuristic for a special case of the problem. Finally, the empirical observations on the computational performance of the heuristic under general cases are reported.},
owner = {user},
timestamp = {2012.05.21},
webpdf = {2007-316-327-P.pdf} }