Multi-skill Project Scheduling Problem and Total Productive Maintenance. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 608-610, 2007.
Abstract
This paper is an extended abstract,so the entire paper is an abstract.
You can download the pdf of this publication from here
This publication does not have a doi, so we cannot provide a link to the original source
What is a doi?: A doi (Document Object Identifier) is a unique identifier for sicientific papers (and occasionally other material). This provides direct access to the location where the original article is published using the URL http://dx.doi/org/xxxx (replacing xxx with the doi). See http://dx.doi.org/ for more information
This pubication does not have a URL associated with it.
The URL is only provided if there is additional information that might be useful. For example, where the entry is a book chapter, the URL might link to the book itself.
@INPROCEEDINGS{2007-608-610-A, author = {C. Pessan and O. Bellenguez-Morineau and E. Neron},
title = {Multi-skill Project Scheduling Problem and Total Productive Maintenance},
booktitle = {In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France},
year = {2007},
editor = {P. Baptiste and G. Kendall and A. Munier-Kordon and F. Sourd},
pages = {608--610},
note = {Abstract},
abstract = {This paper is an extended abstract,so the entire paper is an abstract.},
owner = {user},
timestamp = {2012.05.22},
webpdf = {2007-608-610-A.pdf} }