Citation

Feng, G and Lau, H. C. Efficient algorithms for machine scheduling problems with earliness and tardiness penalties. Annals of Operations Research, 159 (1): 83-95, 2008.

Selected


Abstract

In this paper, we study the multi-machine scheduling problem with earliness and tardiness penalties and sequence dependent setup times. This problem can be decomposed into two subproblems—sequencing and timetabling. Sequencing focuses on assigning each job to a fixed machine and determine the job sequence on each machine. We call such assignment a semi-schedule. Timetabling focuses on finding an executable schedule from the semi-schedule via idle-time insertion. Sequencing is strongly NP-hard in general. Although timetabling is polynomial-time solvable, it can become a computational bottleneck if the procedure is executed many times within a larger framework. This paper makes two contributions. We first propose a quantum improvement to the computational efficiency of the timetabling algorithm. We then apply it within a squeaky wheel optimization framework to solve the sequencing and overall problem. Finally, we demonstrate the strength of our proposed algorithms by experiments.


pdf

There is no pdf available for this paper. You might like to try to obtain the original source (see the doi, for example)


doi

The doi for this publication is 10.1007/s10479-007-0284-z You can link directly to the original paper, via the doi, from here

What is a doi?: A doi (Document Object Identifier) is a unique identifier for sicientific papers (and occasionally other material). This provides direct access to the location where the original article is published using the URL http://dx.doi/org/xxxx (replacing xxx with the doi). See http://dx.doi.org/ for more information



URL

This pubication does not have a URL associated with it.

The URL is only provided if there is additional information that might be useful. For example, where the entry is a book chapter, the URL might link to the book itself.


Bibtex

@ARTICLE{2008-083-095-SI, author = {G. Feng and H. Chuin Lau},
title = {Efficient algorithms for machine scheduling problems with earliness and tardiness penalties},
journal = {Annals of Operations Research},
year = {2008},
volume = {159},
pages = {83--95},
number = {1},
note = {Selected},
abstract = {In this paper, we study the multi-machine scheduling problem with earliness and tardiness penalties and sequence dependent setup times. This problem can be decomposed into two subproblems—sequencing and timetabling. Sequencing focuses on assigning each job to a fixed machine and determine the job sequence on each machine. We call such assignment a semi-schedule. Timetabling focuses on finding an executable schedule from the semi-schedule via idle-time insertion. Sequencing is strongly NP-hard in general. Although timetabling is polynomial-time solvable, it can become a computational bottleneck if the procedure is executed many times within a larger framework. This paper makes two contributions. We first propose a quantum improvement to the computational efficiency of the timetabling algorithm. We then apply it within a squeaky wheel optimization framework to solve the sequencing and overall problem. Finally, we demonstrate the strength of our proposed algorithms by experiments.},
doi = {10.1007/s10479-007-0284-z},
owner = {user},
timestamp = {2012.05.25} }