Bicriteria scheduling for contiguous and non contiguous parallel tasks. Annals of Operations Research, 159 (1): 97-106, 2008.
Selected
We study the problem of scheduling on k identical machines a set of parallel tasks with release dates and deadlines in order to maximize simultaneously two criteria, namely the Size (number of scheduled tasks) and the Weight (sum of the weights of scheduled tasks). If no task requires more than half of the machines, we construct schedules that are simultaneously approximations for the Size and the Weight by combining two approximate schedules, one for each parameter. We obtain existence results and polynomial time bicriteria approximation algorithms in contiguous and non contiguous models.
There is no pdf available for this paper. You might like to try to obtain the original source (see the doi, for example)
The doi for this publication is 10.1007/s10479-007-0282-1 You can link directly to the original paper, via the doi, from here
What is a doi?: A doi (Document Object Identifier) is a unique identifier for sicientific papers (and occasionally other material). This provides direct access to the location where the original article is published using the URL http://dx.doi/org/xxxx (replacing xxx with the doi). See http://dx.doi.org/ for more information
This pubication does not have a URL associated with it.
The URL is only provided if there is additional information that might be useful. For example, where the entry is a book chapter, the URL might link to the book itself.
@ARTICLE{2008-097-106-SI, author = {F. Baille and E. Bampis and C. Laforest and C. Rapine},
title = {Bicriteria scheduling for contiguous and non contiguous parallel tasks},
journal = {Annals of Operations Research},
year = {2008},
volume = {159},
pages = {97--106},
number = {1},
note = {Selected},
abstract = {We study the problem of scheduling on k identical machines a set of parallel tasks with release dates and deadlines in order to maximize simultaneously two criteria, namely the Size (number of scheduled tasks) and the Weight (sum of the weights of scheduled tasks). If no task requires more than half of the machines, we construct schedules that are simultaneously approximations for the Size and the Weight by combining two approximate schedules, one for each parameter. We obtain existence results and polynomial time bicriteria approximation algorithms in contiguous and non contiguous models.},
doi = {10.1007/s10479-007-0282-1},
owner = {user},
timestamp = {2012.05.25} }