Scheduling orders on either dedicated or flexible machines in parallel to minimize total weighted completion time. Annals of Operations Research, 159 (1): 107-123, 2008.
Selected
We are interested in the problem of scheduling orders for different product types in a facility with a number of machines in parallel. Each order asks for certain amounts of various different product types which can be produced concurrently. Each product type can be produced on a subset of the machines. Two extreme cases of machine environments are of interest. In the first case, each product type can be produced on one and only one machine which is dedicated to that product type. In the second case, all machines are identical and flexible; each product type can be produced by any one of the machines. Moreover, when a machine in this case switches over from one product type to another, no setup is required. Each order has a release date and a weight. Preemptions are not allowed. The objective is minimizing the total weighted completion time of the orders. Even when all orders are available at time 0, both types of machine environments have been shown to be NP-hard for any fixed number (same and equal 2) of machines. This paper focuses on the design and analysis of approximation algorithms for these two machine environments. We also present empirical comparisons of the various algorithms. The conclusions from the empirical analyses provide insights into the trade-offs with regard to solution quality, speed, and memory space.
There is no pdf available for this paper. You might like to try to obtain the original source (see the doi, for example)
The doi for this publication is 10.1007/s10479-007-0270-5 You can link directly to the original paper, via the doi, from here
What is a doi?: A doi (Document Object Identifier) is a unique identifier for sicientific papers (and occasionally other material). This provides direct access to the location where the original article is published using the URL http://dx.doi/org/xxxx (replacing xxx with the doi). See http://dx.doi.org/ for more information
This pubication does not have a URL associated with it.
The URL is only provided if there is additional information that might be useful. For example, where the entry is a book chapter, the URL might link to the book itself.
@ARTICLE{2008-107-123-SI, author = {J. Y.-T. Leung and H. Li and M. Pinedo},
title = {Scheduling orders on either dedicated or flexible machines in parallel to minimize total weighted completion time},
journal = {Annals of Operations Research},
year = {2008},
volume = {159},
pages = {107--123},
number = {1},
note = {Selected},
abstract = {We are interested in the problem of scheduling orders for different product types in a facility with a number of machines in parallel. Each order asks for certain amounts of various different product types which can be produced concurrently. Each product type can be produced on a subset of the machines. Two extreme cases of machine environments are of interest. In the first case, each product type can be produced on one and only one machine which is dedicated to that product type. In the second case, all machines are identical and flexible; each product type can be produced by any one of the machines. Moreover, when a machine in this case switches over from one product type to another, no setup is required. Each order has a release date and a weight. Preemptions are not allowed. The objective is minimizing the total weighted completion time of the orders. Even when all orders are available at time 0, both types of machine environments have been shown to be NP-hard for any fixed number (same and equal 2) of machines. This paper focuses on the design and analysis of approximation algorithms for these two machine environments. We also present empirical comparisons of the various algorithms. The conclusions from the empirical analyses provide insights into the trade-offs with regard to solution quality, speed, and memory space.},
doi = {10.1007/s10479-007-0270-5},
owner = {user},
timestamp = {2012.05.25} }