Artigues, C and Feillet, D A branch and bound method for the job-shop problem with sequence-dependent setup times. Annals of Operations Research, 159 (1): 135-159, 2008.

Selected


Abstract

This paper deals with the job-shop scheduling problem with sequence-dependent setup times.We propose a new method to solve the makespan minimization problem to optimality. The method is based on iterative solving via branch and bound decisional versions of the problem. At each node of the branch and bound tree, constraint propagation algorithms adapted to setup times are performed for domain filtering and feasibility check. Relaxations based on the traveling salesman problem with time windows are also solved to perform additional pruning. The traveling salesman problem is formulated as an elementary shortest path problem with resource constraints and solved through dynamic programming. This method allows to close previously unsolved benchmark instances of the literature and also provides new lower and upper bounds.


pdf

There is no pdf available for this paper. You might like to try to obtain the original source (see the doi, for example)


doi

The doi for this publication is 10.1007/s10479-007-0283-0 You can link directly to the original paper, via the doi, from here

What is a doi?: A doi (Document Object Identifier) is a unique identifier for sicientific papers (and occasionally other material). This provides direct access to the location where the original article is published using the URL http://dx.doi/org/xxxx (replacing xxx with the doi). See http://dx.doi.org/ for more information



URL

This pubication does not have a URL associated with it.

The URL is only provided if there is additional information that might be useful. For example, where the entry is a book chapter, the URL might link to the book itself.


Bibtex

@ARTICLE{2008-135-159-SI, author = {C. Artigues and D. Feillet},
title = {A branch and bound method for the job-shop problem with sequence-dependent setup times},
journal = {Annals of Operations Research},
year = {2008},
volume = {159},
pages = {135--159},
number = {1},
note = {Selected},
abstract = {This paper deals with the job-shop scheduling problem with sequence-dependent setup times.We propose a new method to solve the makespan minimization problem to optimality. The method is based on iterative solving via branch and bound decisional versions of the problem. At each node of the branch and bound tree, constraint propagation algorithms adapted to setup times are performed for domain filtering and feasibility check. Relaxations based on the traveling salesman problem with time windows are also solved to perform additional pruning. The traveling salesman problem is formulated as an elementary shortest path problem with resource constraints and solved through dynamic programming. This method allows to close previously unsolved benchmark instances of the literature and also provides new lower and upper bounds.},
doi = {10.1007/s10479-007-0283-0},
owner = {user},
timestamp = {2012.05.25} }