Multi-mode Resource-Constrained Project Scheduling of Semiconductor Equipment Install/Qual Process. In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA, pages 408-418, 2011.
Paper
Ramping up a semiconductor wafer fabrication (fab) facility is a challenging endeavor. One of the key components of this process is scheduling multiple resources to install and qualify capital intensive and sophisticated manufacturing equipment which is necessary to produce integrated circuits. We approach this problem by modeling it as a resource-constrained project scheduling problem (RCPSP). We extend the classical RCPSP model to handle special aspects of the semiconductor environment such as multiple resource calendars, time-varying resource constraints, alternative activity processing modes, controllable activity durations, etc. In order to illustrate the problem solving approach, we provide a mixed integer linear programming model and a simple computational example. We consider two objectives in the research: reducing project makespan and minimizing resource costs.
You can download the pdf of this publication from here
This publication does not have a doi, so we cannot provide a link to the original source
What is a doi?: A doi (Document Object Identifier) is a unique identifier for sicientific papers (and occasionally other material). This provides direct access to the location where the original article is published using the URL http://dx.doi/org/xxxx (replacing xxx with the doi). See http://dx.doi.org/ for more information
This pubication does not have a URL associated with it.
The URL is only provided if there is additional information that might be useful. For example, where the entry is a book chapter, the URL might link to the book itself.
@INPROCEEDINGS{2011-408-418-P, author = {J. Cheng and J. W. Fowler and E. F. Hertzler and J. D. Huff and K. G. Kempf},
title = {Multi-mode Resource-Constrained Project Scheduling of Semiconductor Equipment Install/Qual Process},
booktitle = {In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA},
year = {2011},
editor = {J. Fowler and G. Kendall and B. McCollum},
pages = {408--418},
note = {Paper},
abstract = {Ramping up a semiconductor wafer fabrication (fab) facility is a challenging endeavor. One of the key components of this process is scheduling multiple resources to install and qualify capital intensive and sophisticated manufacturing equipment which is necessary to produce integrated circuits. We approach this problem by modeling it as a resource-constrained project scheduling problem (RCPSP). We extend the classical RCPSP model to handle special aspects of the semiconductor environment such as multiple resource calendars, time-varying resource constraints, alternative activity processing modes, controllable activity durations, etc. In order to illustrate the problem solving approach, we provide a mixed integer linear programming model and a simple computational example. We consider two objectives in the research: reducing project makespan and minimizing resource costs.},
owner = {gxk},
timestamp = {2011.08.15},
webpdf = {2011-408-418-P.pdf} }