Scheduling of parallel machines with sequence-dependent batches and product incompatibilities in an automotive glass facility. In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA, pages 564-567, 2011.
Abstract
This paper is an extended abstract, so the entire paper is an abstract.
You can download the pdf of this publication from here
This publication does not have a doi, so we cannot provide a link to the original source
What is a doi?: A doi (Document Object Identifier) is a unique identifier for sicientific papers (and occasionally other material). This provides direct access to the location where the original article is published using the URL http://dx.doi/org/xxxx (replacing xxx with the doi). See http://dx.doi.org/ for more information
This pubication does not have a URL associated with it.
The URL is only provided if there is additional information that might be useful. For example, where the entry is a book chapter, the URL might link to the book itself.
@INPROCEEDINGS{2011-564-567-A, author = {A. J. Lozano and A. L. Medaglia},
title = {Scheduling of parallel machines with sequence-dependent batches and product incompatibilities in an automotive glass facility},
booktitle = {In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA},
year = {2011},
editor = {J. Fowler and G. Kendall and B. McCollum},
pages = {564--567},
note = {Abstract},
abstract = {This paper is an extended abstract, so the entire paper is an abstract.},
owner = {gxk},
timestamp = {2011.08.15},
webpdf = {2011-564-567-A.pdf} }