The two-machine flowshop total completion time problem: A branch-and-bound based on Network-flow formulation. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 635-637, 2015.
Abstract
This paper is an extended abstract, so the entire paper is an abstract.
You can download the pdf of this publication from here
This publication does not have a doi, so we cannot provide a link to the original source
What is a doi?: A doi (Document Object Identifier) is a unique identifier for sicientific papers (and occasionally other material). This provides direct access to the location where the original article is published using the URL http://dx.doi/org/xxxx (replacing xxx with the doi). See http://dx.doi.org/ for more information
This pubication does not have a URL associated with it.
The URL is only provided if there is additional information that might be useful. For example, where the entry is a book chapter, the URL might link to the book itself.
@INPROCEEDINGS{2015-635-637-A, author = {B. Detienne and R. Sadykov and S. Tanaka},
title = {The two-machine flowshop total completion time problem: A branch-and-bound based on Network-flow formulation},
booktitle = {In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic},
year = {2015},
editor = {Z. Hanzalek and G. Kendall and B. McCollum and P. Sucha},
pages = {635--637},
note = {Abstract},
abstract = {This paper is an extended abstract, so the entire paper is an abstract.},
owner = {Graham},
timestamp = {2017.01.16},
webpdf = {2015-635-637-A.pdf} }