Abstracts from MISTA 2005

ALL the MISTA proceedings are available here in pdf format.

In Proceedings

2005

  1. Adenso-Díaz, B; Bautista, J and Perira, J Approximate Solutions For A New Version Of The Car Sequencing Problem (abstract). In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 93-96, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  2. Adriaen, M; Causmaecker, P. D and Berghe, G. V. Course Timetabling Extended Tiles For University Timetabling. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 669-670, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  3. Aykin, T and McKenna, J. S Skills-Based Agent Scheduling at Call Centers. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 515-515, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  4. Balas, E Good Neighborhoods And Well-matched Neighborhoods. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 2-2, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  5. Balas, E; Simonetti, N and Vazacopoulos, A Job Shop Scheduling with Setup Times, Deadlines and Precedence Constrainsts. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 520-532, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  6. Bansal, N; Coppersmith, D and Sviridenko, M Improved Approximation Algorithms For Broadcast Scheduling. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 655-656, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  7. Bansal, N; Fleischer, L.; Kimbrel, T; Schieber, B; Sviridenko, M. and M. Mahdian, Algorithms for online buffer management. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 518-518, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  8. Baptiste, P and Pape, C. L Scheduling A Single Machine To Minimize A Regular Objective Function Under Setup Constraints. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 193-195, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  9. Barták, R and Cepek, O Incremental Propagation Rules For A Precedence Graph With Optional Activities And Time Windows. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 552-560, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  10. Bedoya-Valencia, L; Rodriguez-Velásquez, E and Rabadi, G A Genetic Algorithm with Random Keys Approach for the Job Shop Scheduling Problem with Earliness and Tardiness. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 745-745, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  11. Beliën, J and Demeulemeester, E Integrating nurse and surgery scheduling. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 408-409, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  12. Blazewicz, J; Machowiak, M; Cheng, T.C E and Oguz, C On a certain berth scheduling problem. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 694-697, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  13. Braeckmans, K; Demeulemeester, E and Herroelen, W Proactive Resource Allocation Heuristics For Robust Project Scheduling. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 322-323, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  14. Brucker, P and Kampmeyer, T Tabu Search Algorithms For Cyclic Machine Scheduling Problems with blocking. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 107-108, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  15. Bulbul, K Job Shop Scheduling With Earliness, Tardiness And Intermediate Inventory Holding Costs. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 188-192, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  16. Burke, E; Causmaecker, P. D; Maere, G. D; Mulder, J and Paelinck, M Forecasting Flight Schedule Robustness. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 698-700, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  17. Causmaecker, P. D; Demeester, P; Berghe, G. V. and Verbeke, B Systems Design For Scheduling Open Tools. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 40-41, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  18. Coffman, E Seamless Download Scheduling in Computer Networks. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 3-3, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  19. Doganis, P; Sarimveis, H; Alexandridis, A and Patrinos, P Optimal Production Scheduling For Dairy Industries. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 324-325, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  20. Drezet, LE and Billaut, JC A Predictive-reactive Approach For Rcpsp With Labour Constraints And Time-dependent Activities Requirements. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 671-672, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  21. Duin, C.W and Sluis, H.J. v. de Models For Adjacent Resource Scheduling. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 16-17, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  22. Duin, C.W and Sluis, H.J. v. de On The Complexity Of Adjacent Resource Scheduling. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 653-654, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  23. Eglese, R and Maden, W Vehicle Routing And Scheduling With Time Varying Travel Times. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 724-724, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  24. Fan, C; Kumar, M; Lei, L and Yang, J Scheduling The Production And Transportation Operations Subject To Dynamic Arrivals. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 701-701, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  25. Feng, G and Lau, H. C. Efficient Algorithms For Machine Scheduling Problems With Earliness And Tardiness Penalties. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 196-212, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  26. Fong, P. Y. and Piplani, R Combined Production and Distribution Scheduling of Ready-Mix Concrete. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 551-551, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  27. Foong, W. K.; Maier, H. R and Simpson, A. R Ant Colony Optimization for Power Plant Maintenance Scheduling Optimization:A Simplified Hydro Tasmania System. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 72-72, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  28. Fordyce, K; Burda, R; Degbotse, A; Milne, J; Morrison, J. R and Williamson, E Challenges in Matching Assets with Demand across All Supply Chain Management Decision Tiers in the IBM Microelectronics Division from Automated Fabs to Central Planning Engines to Collaborative Behavior (Work Arounds). In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 391-391, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  29. Fowler, J; Kutanoglu, E and Mason, S Multiple Orders Per Job Scheduling Problems. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 44-45, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  30. Fowler, J and Pfund, M Scheduling Wafer Fabrication Operations: State-of-the-practice And Future Needs. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 392-393, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  31. Geismar, H. N; Dawande, M and Sriskandarajah, C Approximations to Optimal k-unit Cycles for Dual Gripper Robot Cells. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 326-326, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  32. Glass, C. A and Ng, D. S.T How to maximize rewards in an incentived made-to-order scheduling environment:. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 69-69, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  33. Gomes, M. C; Barbosa-Póvoa, A and Novais, A. Q Optimal Reactive Scheduling For Job Shop, Make-toorder Industries: A Mould Making Industry Case Study. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 46-46, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  34. Guirchoun, S; Souhkal, A and Martineau, P Complexity Results For Parallel Machine Scheduling Problems With A Server In Computer Systems. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 232-236, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  35. Keha, A and Fowler, J A Divide-and-merge Heuristic For Single Machine Weighted Tardiness Problem. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 186-187, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  36. Kelly, J. D. The Unit-Operation-Stock Superstructure (UOSS) and the Quantity-Logic-Quality Paradigm (QLQP) for Production Scheduling in the Process Industries. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 327-333, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  37. Kimbrel, T A survey on minimizing makespan for the preemptive job with two machine. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 337-339, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  38. Krasik, V; Leung, J; Pinedo, M and Zhang, J Inventory Control And Scheduling With Facilities In Parallel. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 740-742, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  39. Kwan, A. S. K; Laplagne, I and Kwan, R. S. K Building Robustness Into Train Driver Schedules. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 702-703, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  40. Lambrechts, O; Demeulemeester, E and Herroelen, W A Tabu-search Based Reactive Procedure For The Rcpsp With Stochastic Resource Availabilities. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 335-336, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  41. Laplagne, I; Kwan, R. S. K and Kwan, A. S. K Repair-cost-guided Local Search For Scheduling. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 109-110, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  42. Lau, H. Y. K; Zhaoa, Y and Pan, C Integrated Scheduling of Different Types of Handling Equipment at Automated Container Terminals. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 536-537, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  43. Lei, L; Park, S and Liu, S On the Capacitated Packing-Delivering Problem with a Fixed Route. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 70-70, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  44. Lenstra, J. K. Scheduling, a Critical Biography. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 4-4, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  45. Leung, J. M.Y and Wong, R. C.W Timetable Synchronization for Mass Transit. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 516-517, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  46. Leus, R and Herroelen, W Stable Single-machine Schedules. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 213-214, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  47. Maenhout, B and Vanhoucke, M An Electromagnetic Meta-heuristic For The Nurse Scheduling Problem. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 410-411, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  48. Maravelias, C. T A Decomposition Approach For Batch Scheduling In The Process Industry. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 66-67, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  49. Mason, S. J; Pfund, M and Fowler, J A Deterministic Scheduling Approach For Wafer Fabrication Facilities. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 42-43, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  50. Miller, T A Practitioner’s Approach To Distribution And Supply Chain Planning And Management. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 519-519, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  51. Miori, V. M A Dynamic Programming Approach To The Truckload Routing Problem Using A Triplet Formulation. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 725-738, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  52. Monkman, S. K; Morrice, D. J and Bard, J. F Scheduling Product Families In A High Volume, Flexible, Assemble-to-order Factory. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 394-395, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  53. Nikolakopoulos, A and Sarimveis, H A TSP Formulation Of The DNA Sequencing Problem. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 8-10, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  54. Pundoor, G and Chen, Z-L. Integrated Production-Distribution Scheduling to Optimize the Tradeoff between Order Delivery Performance and Total Cost. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 549-550, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  55. Rudová, H and Vlk, M Multi-Criteria Soft Constraints in Timetabling. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 11-15, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  56. Sarin, S. C and Nagarajan, B Analytic Evaluation of the Expectation and Variance of Different Performance Measures for Scheduling Jobs on a Single Machine under Processing Time Variability. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 744-744, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  57. Sarin, S. C; Wang, Y and Varadarajan, A Solving a Timetabling Problem using Benders’ Decomposition. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 673-675, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  58. Savourey, D; Jouglet, A and Baptiste, P Lower Bounds For Parallel Machine Scheduling. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 215-216, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  59. Sung, C.S; Lee, I. S; Yoon, S.H and Juhn, J. H Single Machine Product Scheduling With Outsourcing Allowed. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 340-340, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  60. Tanrisever, F and Kutanoglu, E Forming And Scheduling Jobs With Order Weights In Semiconductor Manufacturing. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 334-334, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  61. Vonder, S. V. d; Demeulemeester, E and Herroelen, W An Evaluation Of Exact And Suboptimal Procedures For Constructing Stable Project Schedules. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 341-342, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  62. Wang, Z and Xing, W Worst-case Analysis for Queueing Service Policies. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 533-535, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  63. Zribi, N; Kamel, A. E and Borne, P Job Shop Scheduling Problem With Multi-purpose Machines And Availability Constraints. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 217-231, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here