Abstracts from MISTA 2009

ALL the MISTA proceedings are available here in pdf format.

In Proceedings

2009

  1. Abdullah, S; Turabieh, H; McCollum, B and Burke, E. K An Investigation of a Genetic Algorithm and Sequential Local Search Approach for Curriculum-based Course Timetabling Problems. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 727-731, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  2. Aziz, Z. Ab and Kendall, G An Investigation of an Ant-based Hyperheuristic for the Capacitated Vehicle Routing Problem. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 823-826, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  3. Beliën, J and Demeulemeester, E Integrated workforce staffing and scheduling: A case study at a major aircraft maintenance company. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 724-726, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  4. Berghman, L and Leus, R Solving a dock assignment problem as a three-stage flexible flow-shop problem. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 752-755, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  5. Bilgin, B; Causmaecker, P. D and Berghe, G. V. A Hyperheuristic Approach to Belgian Nurse Rostering Problems. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 683-689, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  6. Blazewicz, J; Machowiak, M and Oguz, C Approximation algorithm for berth and quay crane allocation problem with bounds. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 748-751, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  7. Borgulya, I Solving the Undirected Capacitated Arc Routing Problem with a memory based Method. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 827-830, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  8. Bozejko, W; Uchronski, M. and Wodecki, M Scatter search for a weighted tardiness flow shop problem. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 702-705, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  9. Bril, R. J; Cucu-Grosjean, L and Goossens, J Response time analysis in distributed real-time systems: An improvement based on best-case finalization time analysis. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 839-842, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  10. Burke, E. K; Curtois, T; Hyde, M; Kendall, G; Ochoa, G; Petrovic, S and Vázquez-Rodriguez, J. A HyFlex: A Flexible Framework for the Design and Analysis of Hyper-heuristics. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 790-797, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  11. Ciavotta, M; Ruiz, R and Minella, G New results for the multi-objective sequence dependent setup times °owshop problem. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 808-810, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  12. Côté, M. G. · J-F. and Potvin, J-Y. An Effective Heuristic for the Pickup and Delivery Traveling Salesman Problem with LIFO Loading and Multiple Stacks. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 831-833, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  13. Creemers, S; Reyck, B. D; Lambrecht, M and Leus, R Project scheduling with alternative technologies and stochastic activity durations. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 756-760, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  14. Fowler, J. W; Gul, S; Denton, B. T and Huschka, T. R Bi-Criteria Scheduling of an Outpatient Procedure Center. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 696-698, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  15. Gather, T and Zimmermann, J Exact methods for the resource levelling problem. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 811-820, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  16. Glass, C and Chakhlevitch, K Scheduling in a micro-biological laboratory: heuristics for sequencing food sample tests, to co-ordinate with production of perishable media materials. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 782-783, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  17. Gomes, M. C; Barbosa-Póvoa, A and Novais, A. Q Scheduling of job shop, make-to-order industries with recirculation and assembly: discrete versus continuous time models. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 802-807, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  18. Goossens, D. R and Spieksma, F. C .R Soccer schedules in Europe: an overview. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 715-717, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  19. Günther, H-O. An MILP-based approach to short-term production scheduling and lot sizing with major and minor setups: A case study from the beverage industry. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 741-743, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  20. Hamid, N. H. A; Kendall, G and Sagir, M Mathematical Modeling for Maximising Gate Receipt Problem. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 709-714, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  21. Haspeslagh, S; Causmaecker, P. D and Berghe, G. V. A multi-agent system handling personnel shortages in hospitals. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 693-695, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  22. Hurink, J. L; Kok, A.L; Paulus, J. J and Schutten, J. M. J Time-constrained project scheduling with adjacent resources. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 761-763, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  23. Hyde, M; Özcan, E and Burke, E. K Multilevel Search for Evolving the Acceptance Criteria of a Hyper-Heuristic. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 798-801, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  24. Juraszek, J; Pesch, E and Sterna, M Simulated Annealing Method for Maximizing Revenue on Parallel Machines. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 699-701, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  25. Katzensteiner, C. A. · S and Hartl, R. F A VNS-based solution approach for a flexible flow shop problem with limited buffer. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 706-708, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  26. Lazarev, A. A and Gafarov, E. R Estimation of absolute error for the resources-constrained project scheduling problem. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 671-678, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  27. Lehoux-Lebacque, V; Brauner, N and Finke, G Polynomial complexity of the cyclic identical coupled task problem. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 679-682, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  28. Lewis, R and Thompson, J Round-robin Sports Scheduling from a Graph Colouring Perspective: A Case Study in Rugby Union Scheduling. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 718-719, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  29. Lin, E. Y.H On the Effective Approach of Teaching Activity Scheduling in Project Management. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 764-764, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  30. Lĝkketangen, A; Haugen, K; Lanquepin, G and Olstad, A Using a set of fixed prices when solving Profit Maximization Capacitated Lot-Size Problems (PCLSP). Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 821-822, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  31. Maenhout, B and Vanhoucke, M Reactive Nurse Scheduling in Hospitals. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 690-692, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  32. McCollum, B; Kendall, G; McMullan, P and Goldrick, J. M Decision Support Systems for Tankering within the Airline Industry. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 837-838, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  33. McCollum, B; Kwan, R. S. K and McMullan, P. J Real World Optimisation through Spin Out Activity. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 778-781, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  34. Müller, T; Rudová, H. and Murray, K. Interactive Course Timetabling. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 732-736, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  35. Nobibon, F. T; Herbots, J and Leus, R Order acceptance and scheduling in a single-machine environment: exact and heuristic algorithms. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 772-774, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  36. Oguz, C and Narin, O Solving Berth Allocation Problem with Column Generation. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 744-747, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  37. Özcan, E and Burke, E. K Multilevel search for choosing hyper-heuristics. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 788-789, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  38. Özcan, E; Misir, M and Burke, E. K A self-organising hyper-heuristic framework. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 784-787, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  39. Parkes, A. J; McCollum, B.; McMullan, P and Burke, E. K Recent Work on Planning and Management of University Teaching Space. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 737-740, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  40. Pawlak, G and Rucinski, M Single machine re-entrant jobs scheduling in the car factory paint shop. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 775-777, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  41. Rudec, T; Baumgartner, A and Manger, R Speeding up the optimal off-line algorithm for solving the k-server problem. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 852-854, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  42. Ruiz, R and Naderi, B Variable Neighborhood Descent methods for the Distributed Permutation Flowshop Problem. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 834-836, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  43. Santos, C. A; Zhang, A; Gonzalez, M. T; Jain, S and Byde, A Workforce Planning and Scheduling for the HP IT Services Business. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 720-723, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  44. Weeks, K. O; Gao, H; Alidaee, B and Rana, D An Empirical Study of Impacts of Production Mix Efficiency, Product Route Efficiency on Operations Performance and Profitability: A Reverse Logistics Approach. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 765-767, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  45. Yomsi, P. M and Sorel, Y Schedulability Analysis for non Necessarily Harmonic Real-Time Systems with Precedence and Strict Periodicity Constraints using the Exact Number of Preemptions and no Idle Time. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 843-851, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  46. Zerola, M; Barták, R; Lauret, J and Sumbera, M Planning Heuristics for Efficient Data Movement on the Grid. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 768-771, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here