- Sahin, G. and Saridarq, F. D. The Balanced Path Problem in Crew Scheduling Applications. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 729-732, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Aharon, G Hierarchical Control Model for Several Stochastic Network Projects. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 800-800, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Barth, T.C; Bockman, F and Schafer, A Baggage Scheduling at Airports A framework for e?ciently allocating resources to flight events. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 599-602, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Belien, J and Mercy, A Building university course timetables with minimized resulting student flows. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 737-740, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Bergh, J. V. de; Belien, J; Leus, R and Nobibon, F. T. A resource loading problem in the aircraft line maintenance industry. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 580-583, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Berghman, L; Spieksma, F.C.R and T’Kindt, V Solving a time-indexed formulation by preprocessing and cutting planes. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 603-605, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Bitar, A; Dauzere-Peres, S and Yugma, C An unrelated parallel machine scheduling problem with auxiliary resources and sequence dependent setup times. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 718-720, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Blazewicz, J; Bouvry, P; Musial, J; Pecero, J. E and Trystram, D. Dual Discounting Functions for Internet Shopping Optimization Problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 667-669, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Bocquillon, R and Jouglet, A Minimizing the dissemination length in the one-datum-unit data transfer problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 587-589, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Brauner, N; Finke, G; Shafransky, Y and Sledneu, D Two extensions of Lawler’s min-max cost algorithm. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 790-794, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Bruecker, P. D; Demeulemeester, E; Belien, J and Bergh, J. V. d. Algorithms for building optimal aircraft maintenance personnel rosters. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 633-635, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Bykov, Y and Petrovic, S An initial study of a novel Step Counting Hill Climbing heuristic applied to timetabling problems. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 691-693, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Cerdeira, J. O; Lopes, I.C and Silva, E. C. Optimal scheduling of aircrafts engines repair process. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 620-623, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Ceschia, S and Schaerf, A The Dynamic Patient Admission Scheduling with Operating Room Constraints, Flexible Horizon, and Patient Delays. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 646-648, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Chen, C; Yao, R. He. F and Yang, Z Order acceptance and scheduling problem with time-dependent revenues. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 593-595, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Christiaens, J; Wauters, T; Wispelaere, A. D and Berghe, G. V. A heuristic approach to the prisoner transportation problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 786-789, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Clark, M.D and Parkes, A.J Heuristic Pruning Methods For The Robust Shortest Path Problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 767-769, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Coolen, K; Leus, R and Nobibon, F.T Complexity analysis of the discrete sequential search problem with group activities. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 670-672, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Cortes, R; Molina, P and Garcia-Sabater, J.P On the effect of complexity and uncertainty in ELSP. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 748-752, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Curran, D; Krogt, R. v. de; Little, J and Wilson, N Compilation of Maintenance Schedules based on their Key Performance Indicators for Fast Iterative Interaction. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 606-609, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Dauzere-Peres, S and Monch, L New MILP Formulations for Minimizing the Number of Tardy Jobs on a Single Batch Machine. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 687-690, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Dauzere-Peres, S; Shen, L and Neufeld, J.Sebastia Solving the Hybrid Job Shop Problem with Sequence Dependent Setups. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 741-743, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Davari, M; Demeulemeester, E; Leus, R and Nobibon, F. T Exact algorithms for single-machine scheduling with time windows and precedence constraints. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 656-658, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Deghdak, K; T'kindt, V and Bouquard, J-L. Evacuation Scheduling of a Town after a Natural Disaster: Time-indexed Formulations. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 680-683, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Earl, M Innovative teaching and the death of the utilisation survey. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 781-785, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Elhag, A and Özcan, E A Grouping Hyper-heuristic for Graph Colouring. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 770-773, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Ermis, G and Oguz, C Scheduling chains with constant time lags and variable release times on asingle machine. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 584-586, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- G., J. J. H.; G., M. J. G. and R., J. G. H. Use Matrixes Of Weighing for the scheduling in a sports Fantasy. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 694-702, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Gafarov, E.R; Dolgui, A and Lazarov, A.A Solution algorithms for the two-station single track railway scheduling problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 636-640, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Garra?a, M; Salassa, F; Vancroonenburg, W; Berghe, G. V. and Wauters, T A computational study of a stock cutting problem with sequence dependent cut losses. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 703-706, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Goossens, D. R and Spieksma, F. C. R Scheduling round robin tournaments for amateur sport leagues. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 596-598, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Guedes, A.F. M. and Tereso, A. P. Scheduling with MS Project: an add-in. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 707-710, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Han, J; Sadykov, R and Vanderbeck, F Parallel Machine Scheduling with Generalized Precedence Relations. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 733-736, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Hanzalek, Z and Hanen, C Grouping tasks to save energy in a cyclic wireless sensor network scheduling problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 721-724, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Haz?r, O and Kedad-Sidhoum, S Batch Sizing and Just-In-Time Scheduling: Analysis of Some Special Cases. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 757-761, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Ingels, J and Maenhout, B The Impact of Problem Characteristics on the Robustness of a Personnel Schedule: An Empirical Investigation. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 684-686, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Karim, A and Mourad, B Reentrance and exact time lag on flow shop scheduling problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 610-612, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Kellerer, H and Strusevich, V Fast Approximation Schemes for Boolean Programming and Scheduling Problems Related to Positive Convex Half-Product. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 577-579, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Kochaniková, B and Rudová, H Student Scheduling for Bachelor State Examinations. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 762-766, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Kristiansen, S; Mason, A and Stidsen, T.R Student Sectioning at High Schools in Denmark. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 628-632, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Kuhpfahl, J and Bierwirth, C A GRASP approach for the Job Shop Scheduling Problem with minimizing the Total Weighted Tardiness. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 613-616, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Lamas, P and Demeulemeester, E The stochastic resource-constrained project scheduling problem under different confidence levels. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 774-776, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Lancia, G and Serafini, P Scheduling teams for aircraft ground maintenance. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 649-651, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Lapčgue, T; Bellenguez-Morineau, O and Prot, D A large neighborhood search for the Shift Design Personnel Task Scheduling Problem with Equity. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 590-592, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Leoff, J; Ackermann, H and Kufer, K-H. Time-Hierarchical Scheduling A worst-case analysis of a rolling hierarchical approach for integrated production planning and scheduling i nmake-to-order environments. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 617-619, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Lykourentzou, I; Aggoune-Mtalaa, W; Vergados, D. J and Naudet, Y. Guiding wiki crowds through resource scheduling. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 753-756, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Maenhout, B and Vanhoucke, M An exact procedure for an integrated project staffing problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 673-675, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Mihaylov, M; Wauters, T and Berghe, G. V. A 3-phase approach to geographically distributed exam timetabling. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 725-728, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Muklason, A; Parkes, A. J; McCollum, B and Özcan, E Initial Results on Fairness in Examination Timetabling. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 777-780, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Nakamura, S; Chen, M and Nakayama, K Optimal Parallel Systems for Random Scheduling Times. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 573-576, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Roman, V; Premysl, S and Zdenek, H Roster Evaluation Based on the Classifiers for the Nurse Rostering Problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 744-747, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Sabar, N.R and Nazri, M.Z. A. An Iterated Local Search Algorithm for the Technician Routing and Scheduling Problems. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 641-645, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Smet, P and Berghe, G. V. A heuristic approach to an integrated personnel rostering and task assignment problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 664-666, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Turky, A. M; Abdullah, S; McCollum, B and Sabar, N. R An Evolutionary Hill Climbing Algorithm for Dynamic Optimisation Problems. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 795-799, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Vancroonenburg, W and Wauters, T Extending the late acceptance metaheuristic for multi-objective optimization. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 652-655, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Vansteenwegen, P and Mateo, M An efficient metaheuristic for the inventory orienteering problem and the single-vehicle cyclic inventory routing problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 659-663, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Verbeeck, C; Aghezzaf, E.-H and Vansteenwegen, P A fast solution method for the Time-Dependent Orienteering Problem with time windows. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 676-679, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Walcarius, P; Houbraken, M; Audenaert, P; Pickavet, M and Demeester, P Modeling Real-World Vehicle Routing Problems with Dependencies. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 711-713, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Walker, S and Zinder, Y New Solvable Cases of the Maximum Lateness Problem with Preemptions. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 714-717, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here
- Wei, W; Nobibon, F.T and Leus, R Optimal scheduling policies for diagnosing k-out-of-n systems with imperfect tests. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 624-627, 2013.
More details for this paper (incl. download information, abstract, bibtex is available here