- Ackermann, H; Kufer, K-H.; Leithauser, N; Meyer, A and Velten, S. How to Unload Bulk Carriers Quickly? Mathematical Models to Identify Efficient Loading Patterns. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 772-775, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Adriaensen, S; Fathy, Y and Nowe, A On Task Scheduling Policies for Work-Stealing Schedulers. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 821-824, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Afifi, S and Moukrim, A Primal Heuristics for the Vehicle Routing Problem with Synchronized Visits. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 859-861, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Akhlaghi, V. E.; Gultekin, H and Coban, B Shortest k-unit Cycle in a Multiple Part-Type Robotic Cell. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 876-878, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Almakhla?, A and Knowles, J Iterated Local Search for the Generator Maintenance Scheduling Problem. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 708-742, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Arbaoui, T; Azouni, A; Bou?et, J-P. and Moukrim, A Student Scheduling Problem At Universite de Technologie de Compiegne. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 871-875, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Bagger, N-C. F.; Kristiansen, S; Sørensen, M and Stidsen, T.R Flow Formulation-based Model for the Curriculum-based Course Timetabling Problem. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 825-848, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Balasubramanian, H; Fowler, J and Keha, A The polynomial solvability of a bicriteria linear combination on parallel identical machines with release dates. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 902-904, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Baron, O; Berman, O; Berman, O; Krass, D and Wang, J Strategic Idling and Dynamic Scheduling in Open-Shop Service Network: Case Study and Analysis. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 604-605, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Barták, R and Vlk, M Resource Failure Recovery in Production Scheduling. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 852-858, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Baykasoglu, A and Ozsoydan, F.B A GRASP based approach to dynamic scheduling of parallel heat treatment furnaces in a manufacturing company. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 656-658, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Boudier, I.S; Glazebrook, K; Wright, M and Jennings, P Ant Colony Optimisation for a Job Shop with Flexible Maintenance. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 614-616, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Braune, R Packing-based approaches for a discrete malleable task schedulingproblem. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 888-891, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Bronnikov, S; Gushchina, V; Lazarev, A; Morozov, N; Sologub, A. and Yadrentsev, D Three approaches to solving the problem of cosmonauts’ training planning. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 750-754, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Bukata, L; Sucha, P and Hanzalek, Z A new lower bound for optimisation of energy consumption of robotic cells. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 662-665, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Chen, B; Co?man, E; Dereniowski, D and Kubiak, W Structural properties of an open problem in preemptive scheduling. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 673-676, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Choi, J.Y An Efficient simulated annealing for two-agent scheduling with exponential job-dependent position-based learning consideration. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 601-603, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Croce, F. D.; Garra?a, M; Shang, L and T’kindt, V A branch-and-reduce exact algorithm for the single machine total tardiness problem. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 879-881, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Deghdak, K and T’kindt, V A Decomposition Heuristic for a Bicriteria Evacuation Scheduling Problem. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 704-707, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Desrosiers, J; Gauthier, J.B and Lubbecke, M.E Vector space decomposition for linear programming. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 652-655, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Detienne, B; Sadykov, R and Tanaka, S The two-machine flowshop total completion time problem: A branch-and-bound based on Network-flow formulation. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 635-637, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Dios, M; Fernandez-Viagas, V; Perez-Gonzalez, P and Framinan, J. M Manufacturing Scheduling Systems: What are they made of?. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 768-771, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Dooren, D. V. De; Sys, T; Wauters, T and Berghe, G. V. Multi-objective energy-aware scheduling. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 946-948, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Drwal, M Complexity of minimizing the total flow time on parallel machines with interval data and minmax regret criterion. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 617-621, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Fernandes, F and Barbosa, A Solving the staff scheduling problem in a retail company. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 611-613, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Fernandez-Viagas, V; Dios, M; Perez-Gonzalez, P and Framinan, J.M A framework of constructive heuristics for permutation-type scheduling problems. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 764-767, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Fong, C-W.; Asmuni, H; Lam, W-; McCollum, B; McMullan, P and Kendall, G A Hybrid Swarm Algorithm for Post Enrollment Course Timetabling. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 931-942, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Gorczyca, M; Janiak, A and Lichtenstein, M A dynamic model of task processing for scheduling problems without additional resources. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 649-651, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Grigoreva, N.S Multiprocessor Scheduling with Inserted Idle Time to Minimize the Maximum Lateness. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 814-816, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Herding, R and Mönch, L Using Adaptive Large Neighborhood Search to Solve Parallel Machine Scheduling Problems with Dedications and Unequal Ready Times of the Jobs. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 817-820, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Herr, O and Goel, A Scheduling of jobs in the continuous casting stage of steel production. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 899-901, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Heßler, C and Deghdak, K The Discrete Parallel Machine Makespan Scheduling-Location Problem. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 659-661, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Hojati, M A Greedy-based Heuristic for Shift Minimization Personnel Task Scheduling Problem. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 949-951, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Horn, G Scheduling Time Variant Jobs on a Time Variant Resource. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 914-917, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Horvath, M and Kis, T Solving resource constrained shortest path problems with branch-and-cut. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 677-679, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Ingels, J and Maenhout, B A heuristic procedure to proactively increase employee substitutability and personnel roster robustness. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 669-672, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Ionescu, L and Kliewer, N Stability and Flexibility of Crew and Aircraft Schedules. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 785-787, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Karhi, S and Shabtay, D Online and semi-online scheduling of two job types on a set of multipurpose machines. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 626-628, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Kasirzadeh, A and Soumis, F An integrated simultaneous approach for pilots and copilots re-scheduling problem. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 943-945, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Kirchner, S and Lubbecke, M Appointment scheduling in hospitals Sequencing and scheduling using timeaggregation. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 849-851, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Knopp, S; Dauzere-Peres, S and Yugma, C Scheduling Complex Job-Shops using Batch Oblivious Disjunctive Graphs. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 788-793, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Lange, J Approaches to modeling job-shop problems with blocking constraints. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 645-648, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Lazarev, A; Arkhipov, D and Werner, F Single machine scheduling: finding the Pareto Set for jobs with equal processing times with respect to criteria Lmax and Cmax. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 797-800, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Levner, E and Elalouf, A A general technique for improving the complexity of FPTAS for scheduling problems. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 743-745, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Lindahl, M; Sørensen, M and Stidsen, T. R A Matheuristic for Curriculum-Based Course Timetabling. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 606-610, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Macedo, R; Benmansour, R; Urosevic, D; Artiba, A and Mladenovic, N. Scheduling preventive railway maintenance activities with resource constraints. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 782-784, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Maenhout, B; Burgelman, J and Vanhoucke, M A heuristic procedure for the personnel task re-scheduling problem. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 666-668, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Makatun, D; Lauret, J; Rudova, H and Sumbera, M Model for planning of distributed data production. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 699-703, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Marcke, K. Va and Ali, O Scheduling the operation of a phosphate pipeline for OCP: A Case Study. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 622-625, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Marszalkowski, J Budgeted Internet Shopping Optimization Problem (B-ISOP). In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 885-887, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Menezes, G. C.; Mateus, G. R. and Ravetti, M. G. Scheduling with incompatible jobs: model and algorithms. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 776-781, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Müller, M; Ostler, J and Wilke, P Comparison of EATTS and XHSTT - Towards a Uni?ed Description Language for Timetabling Problems. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 862-866, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Novak, A; Vaclav?k, R; Sucha, P and Hanzalek, Z Nurse Rostering Problem: Tighter Upper Bound for Pricing Problem in Branch and Price Approach. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 759-763, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Ostberg, P-O. and McCollum, B Heuristics and Algorithms for Data Center Optimization. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 921-927, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Pham, S and Causmaecker, P. D The Intermittent Traveling Salesman Problem. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 794-796, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Pillay, N Automated Design of the Developmental Approach for Solving the Examination Timetabling Problem. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 909-913, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Prajapat, N; Hutabarat, W; Tiwari, A and Pattacini, M Investigating Scheduling models for Power Plant Preventive Maintenance using Genetic Algorithm. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 591-595, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Riise, A; Lamorgese, L and Mannino, C Multi-level Benders Decomposition for Multi-modal Outpatient Scheduling in Hospitals. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 892-895, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Sahli, A; Carlier, J and Moukrim, A Lower bounds for Scheduling Problems with production and consumption of resources. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 680-682, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Sanchidri'an, T. B.; Artigues, C; S'anchez, A. G.; Mier, M. O. and Lopez, P Multimode Time-Constrained Scheduling Problems with Generalized Temporal Constraints and Labor Skills. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 809-813, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Schilde, M; Schneeberger, K and Doerner, K.F Variable Neighborhood Search for a Rich Production Planning Problem. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 896-898, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Seddik, Y and Hanzalek, Z Mixed-criticality scheduling with known probabilities. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 867-870, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Shabtay, D; Yedision, L and Lisovoy, A The resource dependent assignment problem with a convex assignment cost function and its relation to scheduling with controllable processing times. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 629-634, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Shang, L; Lente, C; Liedlo?, M and T’Kindt, V An exponential dynamic programming algorithm for the 3-machine ?owshop scheduling problem to minimize the makespan. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 755-758, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Shen, L and Gupta, J.N.D Family Scheduling in Flow Shop Manufacturing Systems with Batch Availability. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 746-749, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Shikata, Y and Hanayama, N Routing Strategy for Prioritized Limited Multi-server Processor-Sharing System that includes Servers with Various Capacities. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 596-600, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Smet, P and Berghe, G. V. Variable neighbourhood search for rich personnel rostering problems. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 928-930, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Soares, J.A; Santos, H.G; Baltar, D.D and To?olo, T.A.M LAHC applied to The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 905-908, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Stockwell-Alpert, E and Chung, C Fairness in employee scheduling. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 687-698, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Sucu, S; Leggate, A; Akartunah, K and Meer, R. V. De Modeling Uncertainty in Vessel Crew Scheduling. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 805-808, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Tan, Y; Monch, L and Fowler, J Scheduling Jobs in a Two-Stage Flexible Flow Shop with Batch Processing Machines. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 801-804, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- To?olo, T.A M; Wauters, T and Berghe, G. V. Time-based Decomposition Strategies for the Traveling Umpire Problem. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 918-920, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Volk, R; Hübner, F and Schultmann, F Robust multi-mode resource constrained project scheduling of building deconstruction under uncertainty. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 638-644, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Wachtel, G and Elalouf, A Floating Patients method based on scheduling algorithm for emergency department's service improvement. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 683-686, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here
- Weedon, R; Ahmadi, S and Critchley, M Optimisation of a Stagger Chart for Aviation Fleet Planning. In proceedings of the 7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), 25 - 28 Aug 2015, Prague, Czech Republic, pages 952-962, 2015.
More details for this paper (incl. download information, abstract, bibtex is available here