Full Papers and Abstracts from MISTA 2005

ALL the MISTA proceedings are available here in pdf format.

In Proceedings

2005

  1. Abdullah, S; Burke, E. K and McCollum, B An Investigation Of Variable Neighbourhood Search For University Course Timetabling. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 413-427, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  2. Adelson-Velsky, G; Gelbukh, A and Levner, E On Project Scheduling With And/or Precedence Constraints. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 597-606, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  3. Adenso-Díaz, B; Bautista, J and Perira, J Approximate Solutions For A New Version Of The Car Sequencing Problem (abstract). In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 93-96, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  4. Adriaen, M; Causmaecker, P. D and Berghe, G. V. Course Timetabling Extended Tiles For University Timetabling. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 669-670, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  5. Angel, E; Bampis, E and Pascual, F How good Are SPT Schedules For Fair Optimality Criteria. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 244-257, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  6. Armstrong, R; Lei, L and Gao, S A Zero-Inventory Production-Distribution Problem with Time-Window Constraints. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 428-444, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  7. Artigues, C; Buscaylet, F and Feillet, D Lower And Upper Bounds For The Job-shop Scheduling Problem With Sequence-dependent Setup Times. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 316-321, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  8. Aykin, T and McKenna, J. S Skills-Based Agent Scheduling at Call Centers. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 515-515, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  9. Baille, F; Bampis, E; Laforest, C and Rapine, C Bicriteria Parallel Task Scheduling. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 585-596, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  10. Balas, E Good Neighborhoods And Well-matched Neighborhoods. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 2-2, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  11. Balas, E; Simonetti, N and Vazacopoulos, A Job Shop Scheduling with Setup Times, Deadlines and Precedence Constrainsts. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 520-532, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  12. Balasubramanian, H; Fowler, J and Keha, A Bicriteria Scheduling Of Equal Length Jobs With Release Dates On Identical Parallel Machines. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 112-122, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  13. Bansal, N; Coppersmith, D and Sviridenko, M Improved Approximation Algorithms For Broadcast Scheduling. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 655-656, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  14. Bansal, N; Fleischer, L.; Kimbrel, T; Schieber, B; Sviridenko, M. and M. Mahdian, Algorithms for online buffer management. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 518-518, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  15. Baptiste, P and Pape, C. L Scheduling A Single Machine To Minimize A Regular Objective Function Under Setup Constraints. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 193-195, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  16. Barták, R and Cepek, O Incremental Propagation Rules For A Precedence Graph With Optional Activities And Time Windows. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 552-560, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  17. Bedoya-Valencia, L; Rodriguez-Velásquez, E and Rabadi, G A Genetic Algorithm with Random Keys Approach for the Job Shop Scheduling Problem with Earliness and Tardiness. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 745-745, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  18. Beliën, J and Demeulemeester, E Integrating nurse and surgery scheduling. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 408-409, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  19. Blazewicz, J; Machowiak, M; Cheng, T.C E and Oguz, C On a certain berth scheduling problem. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 694-697, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  20. Bose, S. K. and Bhattacharya, S A Heuristic Algorithm For Scheduling ‘blocked Out’ Units In Continuous Processing Industry : Preliminary Results. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 258-274, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  21. Bouibede-Hocine, K and T’kindt, V Enumeration Of Pareto Optima For Uniform Parallel Machine Scheduling With Two Criteria. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 123-131, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  22. Braeckmans, K; Demeulemeester, E and Herroelen, W Proactive Resource Allocation Heuristics For Robust Project Scheduling. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 322-323, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  23. Brucker, P and Kampmeyer, T Tabu Search Algorithms For Cyclic Machine Scheduling Problems with blocking. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 107-108, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  24. Brucker, P; Qu, R; Burke, E and Post, G A Decomposition, Construction And Post-processing Approach For Nurse Rostering. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 397-406, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  25. Bulbul, K Job Shop Scheduling With Earliness, Tardiness And Intermediate Inventory Holding Costs. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 188-192, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  26. Bunde, D. P Scheduling On A Single Machine To Minimize Total Flow Time With Job Rejections. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 562-572, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  27. Burke, E; Causmaecker, P. D; Maere, G. D; Mulder, J and Paelinck, M Forecasting Flight Schedule Robustness. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 698-700, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  28. Cai, X; Wu, X and Zhou, X Single-machine Scheduling With General Costs Under Compound-type Distributions. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 630-642, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  29. Causmaecker, P. D; Demeester, P; Berghe, G. V. and Verbeke, B Systems Design For Scheduling Open Tools. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 40-41, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  30. Coffman, E Seamless Download Scheduling in Computer Networks. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 3-3, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  31. Cucu, L and Sorel, Y Periodic real-time scheduling:from latency-based model to deadline-based model. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 344-352, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  32. Doganis, P; Sarimveis, H; Alexandridis, A and Patrinos, P Optimal Production Scheduling For Dairy Industries. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 324-325, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  33. Drezet, LE and Billaut, JC A Predictive-reactive Approach For Rcpsp With Labour Constraints And Time-dependent Activities Requirements. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 671-672, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  34. Duenas, A and Petrovic, D An Approach To Predictive-reactive Scheduling Of Parallel Machines Subject To Disruptions. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 74-91, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  35. Duin, C.W and Sluis, H.J. v. de Models For Adjacent Resource Scheduling. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 16-17, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  36. Duin, C.W and Sluis, H.J. v. de On The Complexity Of Adjacent Resource Scheduling. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 653-654, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  37. Eglese, R and Maden, W Vehicle Routing And Scheduling With Time Varying Travel Times. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 724-724, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  38. Erramilli, V and Mason, S. J Multiple Orders Per Job Batch Scheduling With Incompatible Jobs. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 48-64, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  39. Fan, C; Kumar, M; Lei, L and Yang, J Scheduling The Production And Transportation Operations Subject To Dynamic Arrivals. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 701-701, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  40. Feng, G and Lau, H. C. Efficient Algorithms For Machine Scheduling Problems With Earliness And Tardiness Penalties. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 196-212, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  41. Fong, P. Y. and Piplani, R Combined Production and Distribution Scheduling of Ready-Mix Concrete. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 551-551, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  42. Foong, W. K.; Maier, H. R and Simpson, A. R Ant Colony Optimization for Power Plant Maintenance Scheduling Optimization:A Simplified Hydro Tasmania System. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 72-72, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  43. Fordyce, K; Burda, R; Degbotse, A; Milne, J; Morrison, J. R and Williamson, E Challenges in Matching Assets with Demand across All Supply Chain Management Decision Tiers in the IBM Microelectronics Division from Automated Fabs to Central Planning Engines to Collaborative Behavior (Work Arounds). In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 391-391, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  44. Fowler, J; Kutanoglu, E and Mason, S Multiple Orders Per Job Scheduling Problems. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 44-45, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  45. Fowler, J and Pfund, M Scheduling Wafer Fabrication Operations: State-of-the-practice And Future Needs. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 392-393, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  46. Geismar, H. N; Dawande, M and Sriskandarajah, C Approximations to Optimal k-unit Cycles for Dual Gripper Robot Cells. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 326-326, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  47. Glass, C. A and Ng, D. S.T How to maximize rewards in an incentived made-to-order scheduling environment:. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 69-69, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  48. Gomes, M. C; Barbosa-Póvoa, A and Novais, A. Q Optimal Reactive Scheduling For Job Shop, Make-toorder Industries: A Mould Making Industry Case Study. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 46-46, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  49. Gordon, V. S and Tarasevich, A. A Heuristic Approaches To A Common Due Date Earliness-tardiness Scheduling Problem. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 132-139, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  50. Guirchoun, S; Souhkal, A and Martineau, P Complexity Results For Parallel Machine Scheduling Problems With A Server In Computer Systems. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 232-236, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  51. Hanen, C and Zinder, Y Scheduling UET-UCT task systems under the out-forest precedence constraints. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 445-452, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  52. Hanen, C and Zinder, Y The Worst-case Analysis of the Carey-Johnson Algorithm for preemptive tasks on m processors. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 453-470, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  53. Hendel, Y and Sourd, F The Single Machine Just-in-time Scheduling Problem With Preemptions. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 140-148, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  54. Herrmann, J. W A History Of Decision-making Tools For Production Scheduling. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 380-389, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  55. Huo, Y and Leung, J. Y-T. Online Scheduling Of Precedence Constrained Tasks. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 573-584, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  56. Jampani, J; Mason, S. J and Erramilli, V Single Machine Multiple Orders Per Job Scheduling Using Column Generation. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 539-547, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  57. Karaesmen, I; Keskinocak, P; Tayur, S and Yang, We Scheduling Multiple Types of Time-Shared Aircraft: Models and Methods for Practice. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 19-38, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  58. Keha, A and Fowler, J A Divide-and-merge Heuristic For Single Machine Weighted Tardiness Problem. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 186-187, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  59. Kelly, J. D. The Unit-Operation-Stock Superstructure (UOSS) and the Quantity-Logic-Quality Paradigm (QLQP) for Production Scheduling in the Process Industries. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 327-333, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  60. Khowala, K; Keha, A and Fowler, J A Comparison Of Different Formulations For The Non-preemptive Single Machine Total Weighted Tardiness Scheduling Problem. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 643-651, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  61. Kimbrel, T A survey on minimizing makespan for the preemptive job with two machine. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 337-339, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  62. Krasik, V; Leung, J; Pinedo, M and Zhang, J Inventory Control And Scheduling With Facilities In Parallel. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 740-742, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  63. Kwan, A. S. K; Laplagne, I and Kwan, R. S. K Building Robustness Into Train Driver Schedules. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 702-703, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  64. Lambrechts, O; Demeulemeester, E and Herroelen, W A Tabu-search Based Reactive Procedure For The Rcpsp With Stochastic Resource Availabilities. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 335-336, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  65. Laplagne, I; Kwan, R. S. K and Kwan, A. S. K Repair-cost-guided Local Search For Scheduling. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 109-110, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  66. Lau, H. Y. K; Zhaoa, Y and Pan, C Integrated Scheduling of Different Types of Handling Equipment at Automated Container Terminals. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 536-537, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  67. Laub, J. D; Fowler, J. W and Keha, A. B Minimizing Makespan With Multiple Orders Per Job In A Two Machine Flowshop With Item Processing. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 288-298, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  68. Lei, L; Park, S and Liu, S On the Capacitated Packing-Delivering Problem with a Fixed Route. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 70-70, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  69. Lenstra, J. K. Scheduling, a Critical Biography. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 4-4, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  70. Leung, J. M.Y and Wong, R. C.W Timetable Synchronization for Mass Transit. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 516-517, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  71. Leung, J. Y-T.; Li, H and Pinedo, M Scheduling Orders In Dedicated And Flexible Machine Environments. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 471-484, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  72. Leung, J. Y-T. and Zhao, H Scheduling Algorithms for Master-Slave System. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 501-513, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  73. Leus, R and Herroelen, W Stable Single-machine Schedules. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 213-214, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  74. Lin, S-W. and Chou, S-Y. A Sequential Pair Exchange Approach for Solving Single-Machine Scheduling Problems with General Earliness-Tardiness Penalties. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 299-314, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  75. Maenhout, B and Vanhoucke, M An Electromagnetic Meta-heuristic For The Nurse Scheduling Problem. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 410-411, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  76. Maravelias, C. T A Decomposition Approach For Batch Scheduling In The Process Industry. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 66-67, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  77. Mason, S. J; Pfund, M and Fowler, J A Deterministic Scheduling Approach For Wafer Fabrication Facilities. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 42-43, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  78. Miller, T A Practitioner’s Approach To Distribution And Supply Chain Planning And Management. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 519-519, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  79. Miori, V. M A Dynamic Programming Approach To The Truckload Routing Problem Using A Triplet Formulation. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 725-738, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  80. Monkman, S. K; Morrice, D. J and Bard, J. F Scheduling Product Families In A High Volume, Flexible, Assemble-to-order Factory. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 394-395, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  81. Montana, D A Comparison of Combinatorial Optimization and Dispatch Rules for Online Scheduling. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 353-361, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  82. Nikolakopoulos, A and Sarimveis, H A TSP Formulation Of The DNA Sequencing Problem. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 8-10, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  83. Oguz, C and Yucel., E A Branch-and-bound Algorithm For Single Machine Total Tardiness Problem With Release Dates. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 162-168, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  84. Ouelhadj, D; Garibaldi, J. M and Sakellariou, R A Service Level Agreement Protocol And Tabu Search For Scheduling On Computational Grids. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 238-243, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  85. Petrovic, S; Fayad, C and Petrovic, D Job Shop Scheduling With Lot-sizing And Batching In An Uncertain Real-world Environment. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 363-379, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  86. Pfund, M; Balasubramanian, H; Fowler, J and Mason, a. S A Bi-criteria Approach To Scheduling Wafer Fabrication Facilities. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 276-287, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  87. Pundoor, G and Chen, Z-L. Integrated Production-Distribution Scheduling to Optimize the Tradeoff between Order Delivery Performance and Total Cost. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 549-550, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  88. Ranson, D and Cheng, P. C- Graphical Tools for Heuristic Visualization. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 658-667, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  89. Rashidi, H and Tsang, E. P. K Applying The Extended Network Simplex Algorithm To Dynamic Automated Guided Vehicle Scheduling. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 677-692, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  90. Roberts, M; Whitley, L. D; Howe, A. E and Barbulescu, L Random Walks And Neighborhood Bias In Oversubscribed Scheduling. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 98-105, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  91. Rudová, H and Vlk, M Multi-Criteria Soft Constraints in Timetabling. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 11-15, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  92. Sarin, S. C and Nagarajan, B Analytic Evaluation of the Expectation and Variance of Different Performance Measures for Scheduling Jobs on a Single Machine under Processing Time Variability. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 744-744, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  93. Sarin, S. C; Wang, Y and Varadarajan, A Solving a Timetabling Problem using Benders’ Decomposition. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 673-675, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  94. Savourey, D; Jouglet, A and Baptiste, P Lower Bounds For Parallel Machine Scheduling. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 215-216, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  95. Shchepin, E and Vakhania, N New Tight Np-hardness Of Preemptive Multiprocessor And Open Shop Scheduling. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 606-629, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  96. Solis, Y. A. R. and Sourd, F Large Neighborhood For A Parallel Scheduling Problem With Earlinesstardiness Penalties And A Common Due Date. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 169-184, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  97. Steiner, G and Shabtay, D The Single-machine Earliness-tardiness Scheduling Problem With Due Date Assignment And Resource-dependent Processing Times. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 149-161, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  98. Sung, C.S; Lee, I. S; Yoon, S.H and Juhn, J. H Single Machine Product Scheduling With Outsourcing Allowed. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 340-340, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  99. Tanrisever, F and Kutanoglu, E Forming And Scheduling Jobs With Order Weights In Semiconductor Manufacturing. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 334-334, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  100. Tsang, E.P.K; Gosling, T; Virginas, B; Voudouris, C and Owusu, G Retractable Contract Network for Distributed Scheduling. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 485-500, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  101. Vonder, S. V. d; Demeulemeester, E and Herroelen, W An Evaluation Of Exact And Suboptimal Procedures For Constructing Stable Project Schedules. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 341-342, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  102. Wang, Z and Xing, W Worst-case Analysis for Queueing Service Policies. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 533-535, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  103. Westphal, S and Krumke, S. O Improved Pruningin Columngeneration Of A Vehicle Routing Problem. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 705-722, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here

  104. Zribi, N; Kamel, A. E and Borne, P Job Shop Scheduling Problem With Multi-purpose Machines And Availability Constraints. In proceedings of the 2nd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2005), 18 -21 July 2005, New York, USA, pages 217-231, 2005.

    More details for this paper (incl. download information, abstract, bibtex is available here