Full Papers and Abstracts from MISTA 2007

ALL the MISTA proceedings are available here in pdf format.

In Proceedings

2007

  1. Angelelli, E; Speranza, M. G. and Tuza, Z Semi On-Line Scheduling on Two Uniform Processors. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 51-58, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  2. Asmuni, H; Burke, E. K; Garibaldi, J. M and McCollum, B Determining Rules in Fuzzy Multiple Heuristic Orderings for Constructing Examination Timetables. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 59-66, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  3. Baarsma, H; Hurink, J and Jansen, P Statistical Quality Analysis of Schedulers under Soft-Real-Time Constraints. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 547-549, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  4. Bai, R; Burke, E. K; Gendreau, M and Kendall, G A Simulated Annealing Hyper-heuristic: Adaptive Heuristic Selection for Different Vehicle Routing Problems. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 67-70, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  5. Baptiste, P; Croce, F. D.; Grosso, A and T’kindt, V Sequencing a Single Machine with Due Dates and Deadlines: an ILP-based Approach to Solve Very Large Instances. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 71-79, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  6. Beyrouthy, C; Burke, E. K; Landa-Silva, D; McCollum, B; McMullan, P and Parkes, A. J Clustering Within Timetabling Conflict Graphs. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 553-556, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  7. Bilginturk, Z; Oguz, C and Salman, S Order Acceptance and Scheduling Decisions in Make-to-Order Systems. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 80-87, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  8. Bist, V; Do, H; Sharma, N and White, G. M Assigning Part-time Teachers to Courses via a Stable Marriage Algorithm. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 625-627, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  9. Bontoux, B; Feillet, D; Artigues, C and Bourreau, E Dynamic Cooperative Search for Constraint Satisfaction and Combinatorial Optimization: Application to a Rostering Problem. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 557-560, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  10. Boudhar, M and Tchikou, H Scheduling with Special Case of Multipurpose Machines. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 88-95, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  11. Bozejko, W and Wodecki, M A Parallel Metaheuristics for the Single Machine Total Weighted Tardiness Problem with Sequence-Dependent Setup Times. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 96-103, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  12. Brucker, P The Job-Shop Problem: Old and New Challenges. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 15-22, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  13. Bruno, G; Improta, G and Sgalambro, A Optimization of the Departure Schedule at a Public Transit Terminal with Multiple Destinations. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 104-111, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  14. Burke, E. K; Kendall, G; McCollum, B and McMullan, P Constructive versus Improvement Heuristics:An Investigation of Examination Timetabling. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 595-597, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  15. Cesta, A Walk the (Time-)Line: Scheduling and Execution. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 23-23, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  16. Cheng, E and Kruk, S A Case Study of an Integer Programming Model for Instructor Assignments and Scheduling Problem. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 267-275, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  17. Chretienne, P and Sourd, F Selecting and Scheduling Tasks with Agreeable Time Windows and Setup Costs. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 561-563, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  18. Davenport, A and Kalagnanam, J Scheduling Steel Production using Mixed-Integer Programming and Constraint Programming. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 120-127, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  19. Davidovi, T; Liberti, L; Liberti, L and Mladenovi, N Towards the Optimal Solution of the Multiprocessor Scheduling Problem with Communication Delays. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 128-135, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  20. Deblaere, F; Demeulemeester, E and Herroelen, W. S An Educational Tool for the Resource-Constrained Project Scheduling Problem. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 564-566, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  21. Dinechin, B. D. D Time-Indexed Formulations and a Large Neighborhood Search for the Resource-Constrained Modulo Scheduling Problem. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 144-151, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  22. Dullaert, W; Bräysy, O and Salehipour, A The Cost of Scheduling Customers in Routing Problems. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 136-143, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  23. Ecker, K. H and Hasenfuss, A Non-preemptive Scheduling of Distance Constrained Tasks Subject to Minimizing Processor Load. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 200-208, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  24. Elvikis, D; Hamacher, H. W and Kalsch, M. T Scheduling and Location (ScheLoc):Makespan Problem with Variable Release Dates. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 152-158, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  25. Ersoy, E; Özcan, E and Uyar, A. S. Memetic Algorithms and Hyperhill-climbers. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 159-166, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  26. Fagundez, F. D. and Facó, J. L. D. Applying Optimal Control to Jetty Scheduling Problems. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 167-174, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  27. Finke, G Scheduling with Batch Compatible Tasks. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 24-26, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  28. García-Sabater, J. P.; Romano, C. A.; García-Sabater, J. J. and Miralles, C A Decision Support System for Scheduling a Painting Facility in an Automotive Supplier. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 175-183, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  29. Gawiejnowicz, S. la and Kononov, A Scheduling Resumable Deteriorating Jobs. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 567-569, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  30. Habla, C; Mönch, L; Habla, C and Mönch, L A Decomposition Heuristic for Planning and Scheduling of Jobs on Unrelated Parallel Machines. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 112-119, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  31. Hadda, H; Dridi, N and Hajri-Gabouj, S The Two-Stage Assembly Flow Shop Scheduling with an Availability Constraint. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 184-191, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  32. Haspeslagh, S; Causmaecker, P. D and Berghe, G. V. Distributed Decision Making in Hospital Wide Nurse Rostering Problems. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 192-199, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  33. Hemig, C and Zimmermann, J Medium-Term Production and Staff Planning in the Automotive Industry. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 209-216, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  34. Hendel, Y and Kubiak, W The Parallel Machine Scheduling Problem with Path-like Constraints. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 570-571, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  35. Hentenryck, P. Va Online Stochastic Routing and Scheduling. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 41-41, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  36. Herbots, J; Herroelen, W. S; Leus, R and Demeulemeester, E. L Dynamic Algorithms for Order Acceptance and Capacity Planning within a Multi-Project Environment. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 572-574, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  37. Hmida, A. Be; Huguet, M-J.; Lopez, P and Haouari, M Climbing Depth-bounded Discrepancy Search for Solving Flexible Job Shop Scheduling Problems. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 217-224, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  38. Jampani, J and Mason, S. J Complex Job Shop Multiple Orders per Job Scheduling. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 225-233, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  39. Jarboui, B New Lower Bound for the Bin Packing Problem. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 234-241, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  40. Karaesmen, I. Z; Yang, W and Keskinocak, P Optimization vs. Persistence in Scheduling: Heuristics to Manage Uncertainty in On-Demand Air Travel. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 242-250, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  41. Kramer, L. A; Barbulescu, L. V and Smith, S. F Analyzing Basic Representation Choices in Oversubscribed Scheduling Problems. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 259-266, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  42. Laborie, P and Godard, D Self-Adapting Large Neighborhood Search:Application to Single-Mode Scheduling Problems. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 276-284, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  43. Lacomme, P; Larabi, M and Tchernev, N A Disjunctive Graph for the Job-Shop with Several Robots. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 285-292, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  44. Lambrechts, O; Demeulemeester, E. L and Herroelen, W. S Exact and Suboptimal Reactive Strategies for Resource-Constrained Project Scheduling with Uncertain Resource Availabilities. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 575-577, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  45. Lancia, G; Rinaldi, F and Serafini, P A Compact Optimization Approach for Job-Shop Problems. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 293-300, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  46. Laub, J. D; Fowler, J. W and Keha, A. B Minimizing Makespan with Multiple Orders per Job in Mixed Flowshops. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 301-308, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  47. Laurent, B and Hao, J-K. Integrated Vehicle and Crew Scheduling for Extra-Urban Transport. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 578-580, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  48. Lazarev, A. A Estimation of Absolute Error for Minimization Maximum Lateness. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 309-315, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  49. Lehoux-Lebacque, V; Brauner, N; Finke, G and Rapine, C Scheduling Problems of Chemical Experiments. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 581-583, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  50. Lei, L; Chaovalitwongse, W. Ar and Bora, S Scheduling the Operations of an Integrated Production-Distribution Process. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 316-327, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  51. Leong, T and Lau, H. C. Generating Job Schedules for Vessel Operations in a Container Terminal. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 328-335, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  52. Leus, R and Reyck, B. D Project Scheduling with Success or Failure in Individual Activities. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 584-587, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  53. Limtanyakul, K and Schwiegelshohn, U Scheduling Tests on Vehicle Prototypes using Constraint Programming. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 336-343, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  54. Liret, A; Lesaint, D; Dorne, R and Voudouris, C iSchedule, an Optimisation Toolkit for Complex Scheduling. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 344-352, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  55. Lucarelli, G; Milis, I and Paschos, V. Th On a Generalized Graph Coloring/Batch Scheduling Problem. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 353-360, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  56. Maenhout, B and Vanhoucke, M A Branch-and-Price Procedure for Nurse Staffing Incorporating Roster Preferences. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 588-590, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  57. Marquis, J; Fowler, J. W; Gel, E; Koksalan, M; Korhonen, P and Wallenius, J Interactive Evolutionary Multicriteria Scheduling. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 591-594, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  58. Melo, R. A; Urrutia, S and Ribeiro, C. C Scheduling Single Round Robin Tournaments with Fixed Venues. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 431-438, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  59. Michel, S and Vanderbeck, F Inventory Routing Problem Solved by Heuristic Based on Column Generation. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 361-367, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  60. Morton, A and Loucks, W. M EDF Feasibility and Hardware Accelerators. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 368-376, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  61. Munier-Kordon, A and Rebaine, D An Approximation Algorithm for the UET Two-Machine Open-Shop Problem with Time Delays. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 377-385, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  62. Murray, K and Müller, T Real-time Student Sectioning. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 598-600, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  63. Naudin, E; Chan, P; Hiroux, M; Weil, G and Zemmouri, T Staff Rostering Problem: Choice of a Mathematical Model. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 601-604, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  64. Nurmi, K and Kyngäs, J A Framework for School Timetabling Problem. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 386-393, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  65. Özcan, E and Alkan, A A Memetic Algorithm for Solving a Timetabling Problem:An Incremental Strategy. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 394-401, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  66. Pappis, C. P and Rachaniotis, N. P Scheduling in a Multi-Processor Environment with Deteriorating Job Processing Times and Decreasing Values: the Case of Forest Fires. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 402-409, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  67. Paulus, J. Ja and Hurink, J. L Online Scheduling of Parallel Jobs on Two Machines is 2-Competitive. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 605-607, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  68. Pessan, C; Bellenguez-Morineau, O and Neron, E Multi-skill Project Scheduling Problem and Total Productive Maintenance. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 608-610, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  69. Peteghem, V. Va and Vanhoucke, M An Efficient Heuristic Procedure for the Resource Availability Cost Problem. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 618-620, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  70. Portmann, M-C. and Mouloua, Z A Window Time Negotiation Approach at the Scheduling Level inside Supply Chains. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 410-417, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  71. Qu, R and Burke, E. K Adaptive Decomposition and Construction for Examination Timetabling Problems. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 418-425, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  72. Raa, B and Aghezzaf, E-H. Aligning Frequencies in Cyclic Delivery Scheduling. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 426-430, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  73. Righter, R Scheduling in Highly Uncertain Environments. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 27-32, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  74. Rodriguez, J. A. V.; Petrovic, S and Salhi, A A Combined Meta-Heuristic with Hyper-Heuristic Approach to the Scheduling of the Hybrid Flow Shop with Sequence Dependent Setup Times and Uniform Machines. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 506-513, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  75. Ruiz, R and Andres, C Unrelated Parallel Machines Scheduling with Resource-Assignable Sequence Dependent Setup Times. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 439-446, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  76. Schatteman, D; Herroelen, W. S; Vonder, S. V. d and Boone, A A Methodology for Integrated Risk Management and Proactive Scheduling of Construction Projects. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 611-613, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  77. Spieksma, F. C.R Interval Scheduling. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 33-40, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  78. Steiner, G and Zhang, R Minimizing the Total Weighted Number of Late Jobs with Late Deliveries in Two-Level Supply Chains. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 447-454, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  79. Sterna, M; Blazewicz, J and Pesch, E Genetic Algorithm for Late Work Minimization in a Flow Shop System. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 455-462, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  80. Sucha, P and Hanzalek, Z Cyclic Scheduling of Tasks with Unit Processing Time on Dedicated Sets of Parallel Identical Processors. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 463-470, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  81. Tanaka, S An Exact Algorithm for Single-Machine Scheduling without Idle Time. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 614-617, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  82. Tchomt´e, S. K.; Gourgand, M and Quilliot, A Solving Resource-Constrained Project Scheduling Problem with Particle Swarm Optimization. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 251-258, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  83. Thomas, M and Szczerbicka, H Evaluating Online Scheduling Techniques in Uncertain Environments. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 471-479, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  84. Touati, S-A. Optimal and Approximate Periodic Task Scheduling with Storage Requirement Minimization. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 480-489, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  85. Trautmann, N and Schwindt, C Large-Scale Short-Term Planning in Chemical Batch Production. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 490-497, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  86. Tuong, N. H.; Soukhal, A and Billaut, J-C. Single Machine and Parallel Machine Scheduling Problems with a Common Due Date to Minimize Total Weighted Tardiness. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 498-505, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  87. Valhondo, J. B. and Gude, J. P. Sequencing JIT Mixed Model Assembly Lines Under Station-Load and Part-Usage Constraints using Lagrangean Relaxations. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 550-552, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  88. Wan, G; Leung, J. Y.-T and Pinedo, M Competitive Agent Scheduling with Controllable Processing Times. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 514-522, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  89. Warichet, F and Pochet, Y A Strengthened Continuous Time Formulation for the Cyclic Scheduling of a Plant. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 621-624, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  90. Werra, D. D; Demange, M and Ekim, T Robotics and Chromatic Scheduling. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 42-49, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  91. Winter, E and Sadykov, R Computing Lower Bounds for the Schedule of a Multifunction Radar. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 523-530, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  92. Zhang, X and Gupta, J. N.D Two-machine Shop Floor Scheduling Problem with Multi-Predecessor Constraints*. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 538-545, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  93. Zinder, Y The Strength of Priority Algorithms. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 531-537, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here