Full Papers and Abstracts from MISTA 2013

ALL the MISTA proceedings are available here in pdf format.

In Proceedings

2013

  1. Sahin, G. and Saridarq, F. D. The Balanced Path Problem in Crew Scheduling Applications. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 729-732, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  2. Adasme, P; Lisser, A; Wang, C and Soto, I Scheduling in Wireless OFDMA-TDMA Networks using Variable Neighborhood Search Metaheuristic. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 55-64, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  3. Agnetis, A; Aloulou, M. Al and Fu, L- Production and Interplant Batch Delivery Scheduling: Dominance and Cooperation. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 133-150, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  4. Aharon, G Hierarchical Control Model for Several Stochastic Network Projects. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 800-800, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  5. Alonso-Pecina, F; Pecero, J. E and Romero, D A Three-Phases Based Algorithm for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem The MISTA 2013 Challenge. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 812-814, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  6. Artigues, C and Hebrard, E MIP Relaxation and Large Neighborhood Search for a Multi-Mode Resource-Constrained Multi-Project Scheduling Problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 815-819, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  7. Asta, S; Karapetyan, D; Kheiri, A; Özcan, E and Parkes, A. J Combining Monte-Carlo and Hyper-heuristic methods for the Multi-mode Resource-constrained Multi-project Scheduling Problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 836-839, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  8. Barth, T.C; Bockman, F and Schafer, A Baggage Scheduling at Airports A framework for e?ciently allocating resources to flight events. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 599-602, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  9. Belien, J and Mercy, A Building university course timetables with minimized resulting student flows. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 737-740, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  10. Bellio, R; Ceschia, S; Gaspero, L. D; Schaerf, A and Urli, T. A simulated annealing approach to the curriculum-based course timetabling problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 314-317, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  11. Benmansour, R; Allaoui, H; Artiba, A and Hana?, S Minimizing the weighted sum of maximum earlinesstardiness cost on a single machine under maintenance constraints. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 240-247, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  12. Bergh, J. V. de; Belien, J; Leus, R and Nobibon, F. T. A resource loading problem in the aircraft line maintenance industry. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 580-583, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  13. Berghman, L; Spieksma, F.C.R and T’Kindt, V Solving a time-indexed formulation by preprocessing and cutting planes. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 603-605, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  14. Berlinska, J and Drozdowsk, M Mitigating Partitioning Skew in MapReduce Computations. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 80-90, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  15. Bitar, A; Dauzere-Peres, S and Yugma, C An unrelated parallel machine scheduling problem with auxiliary resources and sequence dependent setup times. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 718-720, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  16. Blazewicz, J; Bouvry, P; Musial, J; Pecero, J. E and Trystram, D. Dual Discounting Functions for Internet Shopping Optimization Problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 667-669, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  17. Bocquillon, R and Jouglet, A Minimizing the dissemination length in the one-datum-unit data transfer problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 587-589, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  18. Borba, L.M; Benavides, A.J; Zubaran, T; Carniel, G.M and Ritt, M A simple stochastic local search for multi-mode resource-constrained multi-project scheduling. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 826-830, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  19. Bouly, H; Dang, D-C.; Moukrim, A and Xu, H Evolutionary algorithm and post-processing to minimize the total delay in multi-project scheduling. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 831-835, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  20. Brauner, N; Finke, G; Shafransky, Y and Sledneu, D Two extensions of Lawler’s min-max cost algorithm. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 790-794, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  21. Briand, C; Ngueveu, S. U. and Sucha, P Solving a cooperative project scheduling with controllable processing times, self-interested agents and equal profit sharing. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 125-132, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  22. Bruecker, P. D; Demeulemeester, E; Belien, J and Bergh, J. V. d. Algorithms for building optimal aircraft maintenance personnel rosters. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 633-635, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  23. Bucar, D; Bessler, S; Musliu, N and Groenbaek, J Scheduling of electric vehicle charging operations. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 486-498, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  24. Bykov, Y and Petrovic, S An initial study of a novel Step Counting Hill Climbing heuristic applied to timetabling problems. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 691-693, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  25. Cerdeira, J. O; Lopes, I.C and Silva, E. C. Optimal scheduling of aircrafts engines repair process. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 620-623, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  26. Ceschia, S and Schaerf, A The Dynamic Patient Admission Scheduling with Operating Room Constraints, Flexible Horizon, and Patient Delays. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 646-648, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  27. Chen, C; Yao, R. He. F and Yang, Z Order acceptance and scheduling problem with time-dependent revenues. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 593-595, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  28. Chretienne, V. J. P Minimizing the number of late jobs on parallel machines with alpha time windows. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 206-217, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  29. Christiaens, J; Wauters, T; Wispelaere, A. D and Berghe, G. V. A heuristic approach to the prisoner transportation problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 786-789, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  30. Clark, M.D and Parkes, A.J Heuristic Pruning Methods For The Robust Shortest Path Problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 767-769, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  31. Coolen, K; Leus, R and Nobibon, F.T Complexity analysis of the discrete sequential search problem with group activities. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 670-672, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  32. Cortes, R; Molina, P and Garcia-Sabater, J.P On the effect of complexity and uncertainty in ELSP. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 748-752, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  33. Creemers, S; Colen, P and Lambrecht, M Evaluation of appointment scheduling rules. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 509-514, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  34. Curran, D; Krogt, R. v. de; Little, J and Wilson, N Compilation of Maintenance Schedules based on their Key Performance Indicators for Fast Iterative Interaction. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 606-609, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  35. Dauzere-Peres, S and Monch, L New MILP Formulations for Minimizing the Number of Tardy Jobs on a Single Batch Machine. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 687-690, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  36. Dauzere-Peres, S; Shen, L and Neufeld, J.Sebastia Solving the Hybrid Job Shop Problem with Sequence Dependent Setups. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 741-743, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  37. Davari, M; Demeulemeester, E; Leus, R and Nobibon, F. T Exact algorithms for single-machine scheduling with time windows and precedence constraints. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 656-658, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  38. Deghdak, K; T'kindt, V and Bouquard, J-L. Evacuation Scheduling of a Town after a Natural Disaster: Time-indexed Formulations. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 680-683, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  39. Deleplanque, S and Quilliot, A Transfers in the on-demand transportation: the DARPT Dial-a-Ride Problem with transfers allowed. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 185-205, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  40. Demir, O and Ozdamar, L A GIS-Based Emergency Response System for Disaster Relief Operations. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 372-378, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  41. Dostert, M; Politz, A and Schmitz, H Algorithms and Complexity of Student Sectioning for Existing Timetables. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 218-229, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  42. Earl, M Innovative teaching and the death of the utilisation survey. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 781-785, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  43. Elhag, A and Özcan, E A Grouping Hyper-heuristic for Graph Colouring. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 770-773, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  44. Ermis, G and Oguz, C Scheduling chains with constant time lags and variable release times on asingle machine. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 584-586, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  45. Fernandes, P; Pereira, C.S and Barbosa, A Automatic Timetabling in Higher Education Institutions: a real scenario and solution. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 151-170, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  46. Fonseca, G. H.G and Santos, H. G A New Integer Linear Programming Formulation to the Examination Timetabling Problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 345-355, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  47. Fonseca, G. H.G; Santos, H. G and To?olo, T. A.M Late Acceptance Hill-Climbing Applied to the High School Timetabling Problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 331-344, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  48. G., J. J. H.; G., M. J. G. and R., J. G. H. Use Matrixes Of Weighing for the scheduling in a sports Fantasy. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 694-702, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  49. Gafarov, E.R; Dolgui, A; Lazarev, A. A and Werner, F A Graphical Algorithm for Solving an Investment Optimization Problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 290-299, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  50. Gafarov, E.R; Dolgui, A and Lazarov, A.A Solution algorithms for the two-station single track railway scheduling problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 636-640, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  51. Garra?a, M; Salassa, F; Vancroonenburg, W; Berghe, G. V. and Wauters, T A computational study of a stock cutting problem with sequence dependent cut losses. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 703-706, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  52. Geiger, M.J Iterated Variable Neighborhood Search for the resource constrained multi-mode multi-project scheduling problem Some comments on our contribution to the MISTA 2013 Challenge. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 807-811, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  53. Geirsson, E and Runarsson, T.P Bandit Algorithms using Monte Carlo Rollouts for Job Shop Scheduling. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 318-330, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  54. Goossens, D. R and Spieksma, F. C. R Scheduling round robin tournaments for amateur sport leagues. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 596-598, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  55. Guedes, A.F. M. and Tereso, A. P. Scheduling with MS Project: an add-in. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 707-710, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  56. Hamilton-Bryce, R; McMullan, P and McCollum, B Directing selection within an extended great deluge optimization algorithm. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 499-508, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  57. Han, J; Sadykov, R and Vanderbeck, F Parallel Machine Scheduling with Generalized Precedence Relations. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 733-736, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  58. Hanzalek, Z and Hanen, C Grouping tasks to save energy in a cyclic wireless sensor network scheduling problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 721-724, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  59. Haz?r, O and Kedad-Sidhoum, S Batch Sizing and Just-In-Time Scheduling: Analysis of Some Special Cases. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 757-761, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  60. Ingels, J and Maenhout, B The Impact of Problem Characteristics on the Robustness of a Personnel Schedule: An Empirical Investigation. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 684-686, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  61. Karim, A and Mourad, B Reentrance and exact time lag on flow shop scheduling problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 610-612, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  62. Kellerer, H and Strusevich, V Fast Approximation Schemes for Boolean Programming and Scheduling Problems Related to Positive Convex Half-Product. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 577-579, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  63. Klos, T; Wilson, M and Witteveen, C Flexibility Metrics for Time and Resource Constrained Scheduling Problems. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 555-572, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  64. Kochaniková, B and Rudová, H Student Scheduling for Bachelor State Examinations. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 762-766, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  65. omarudin, K.; Feyter, T. D; Guerry, M-A. and Berghe, G. V. Extended Roster Quality Staffng Problem A medium term roster quality to support staffing decisions. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 424-436, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  66. Kristiansen, S; Mason, A and Stidsen, T.R Student Sectioning at High Schools in Denmark. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 628-632, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  67. Kuhpfahl, J and Bierwirth, C A GRASP approach for the Job Shop Scheduling Problem with minimizing the Total Weighted Tardiness. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 613-616, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  68. Laborie, P and Rogerie, J Temporal Linear Relaxation in IBM ILOG CP Optimizer. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 379-391, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  69. Lamas, P and Demeulemeester, E The stochastic resource-constrained project scheduling problem under different confidence levels. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 774-776, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  70. Lancia, G and Serafini, P Scheduling teams for aircraft ground maintenance. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 649-651, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  71. Lapègue, T; Bellenguez-Morineau, O and Prot, D A large neighborhood search for the Shift Design Personnel Task Scheduling Problem with Equity. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 590-592, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  72. Leoff, J; Ackermann, H and Kufer, K-H. Time-Hierarchical Scheduling A worst-case analysis of a rolling hierarchical approach for integrated production planning and scheduling i nmake-to-order environments. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 617-619, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  73. Lopez-Ibanez, M; Mascia, F; Marmion, M-E. and Stutzle, T Automatic Design of a Hybrid Iterated Local Search for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 820-825, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  74. Lykourentzou, I; Aggoune-Mtalaa, W; Vergados, D. J and Naudet, Y. Guiding wiki crowds through resource scheduling. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 753-756, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  75. Maenhout, B and Vanhoucke, M An exact procedure for an integrated project staffing problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 673-675, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  76. Martinez, Y; Nowe, A and Bello, R A Robust Multi-Agent Reinforcement Learning Approach for Scheduling Problems. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 410-423, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  77. Messelis, T; Causmaecker, P. D and Berghe, G.Van de Algorithm preformance prediction for nurse rostering. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 21-38, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  78. Mihaylov, M; Wauters, T and Berghe, G. V. A 3-phase approach to geographically distributed exam timetabling. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 725-728, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  79. Moura, A and Oliveira, J Container Stowage and Short Sea Ship Routing Problem Optimization. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 111-124, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  80. Muhlenthaler, M and Wanka, R A Decomposition of the Max-min Fair Curriculum-based Course Timetabling Problem: The Impact of Solving Subproblems to Optimality. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 300-313, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  81. Muklason, A; Parkes, A. J; McCollum, B and Özcan, E Initial Results on Fairness in Examination Timetabling. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 777-780, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  82. Muller, T Real-life Examination Timetabling. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 248-267, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  83. Nakamura, S; Chen, M and Nakayama, K Optimal Parallel Systems for Random Scheduling Times. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 573-576, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  84. Nishi, T and Sugiyama, T Bilevel Decomposition Approach for Cyclic Staff Scheduling Problems. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 65-79, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  85. Pineda, A. A. S.; Pecero, J. E; Huacuja, H. J. F.; Barbosa, J. J. G. and Bouvry, P An Iterative Local Search Algorithm for Scheduling Precedence-Constrained Applications on Heterogeneous Machines. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 472-485, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  86. Pira, C and Artigues, C Line search method for solving a non-preemptive strictly periodic scheduling problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 356-371, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  87. Quilliot, A and Chretienne, P Homogeneously non-idling schedules of unit-time jobs on identical parallel machines. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 39-54, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  88. Quilliot, A and Toussaint, H RCPSP with Resource Transfers and Money Management. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 91-110, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  89. Rahman, S. A; Bargiela, A; Burke, E and Özcan, B. M. E An Investigation of Multistage Approaches to Examination Timetabling. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 528-542, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  90. Rodrigues, L. U; Santos, H. G; To?olo, T. A.M and Silva, C. L.T.F. Local search techniques applied to the Unrelated Parallel Machine Scheduling Problem with Sequence Dependent Setup Time. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 458-471, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  91. Roman, V; Premysl, S and Zdenek, H Roster Evaluation Based on the Classifiers for the Nurse Rostering Problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 744-747, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  92. Sabar, N.R; Ayob, M and Kendall, G A Hybrid of Differential Evolution and Simulated Annealing Algorithms for the Capacitated Arc Routing Problems. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 549-554, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  93. Sabar, N.R and Nazri, M.Z. A. An Iterated Local Search Algorithm for the Technician Routing and Scheduling Problems. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 641-645, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  94. Schnell, A A hybrid local search algorithm integrating an exact CP-SAT approach to solve the multi-mode resource-constrained multi-project scheduling problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 802-806, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  95. Scholz-Reiter, B; Tan, Y and Hildebrandt, T A computational study of shifting bottleneck procedures for job shop total weighted tardiness scheduling problems. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 437-457, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  96. Seddik, Y; Gonzales, C and Kedad-Sidhoum, S A polynomial time OPT-1 algorithm for a scheduling problem with two delivery dates and cumulative payoffs. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 268-289, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  97. Sioud, A; Gravel, M and Gagn, C A new ant colony optimization for minimizing tardiness in the single machine scheduling problem with sequence-dependent setups times. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 17-20, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  98. Smet, P and Berghe, G. V. A heuristic approach to an integrated personnel rostering and task assignment problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 664-666, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  99. Tanaka, S The single-machine scheduling problem with a finite capacity input buffer. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 171-184, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  100. To?olo, T. A.M; Santos, H. G; Carvalho, M. A.M and Soares, J.A An Integer Programming Approach for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 840-847, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  101. Turky, A. M; Abdullah, S; McCollum, B and Sabar, N. R An Evolutionary Hill Climbing Algorithm for Dynamic Optimisation Problems. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 795-799, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  102. Valero-Herrero, M; Garcia-Sabater, J.P and Vidal-Carreras, P.I In-depth analysis of the quality sequence to resolve CRSP. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 515-527, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  103. Valouxis, C; Gogos, C; Alefragis, P; Goulas, G; Voros, N and Housos, E DAG Scheduling using Integer Programming in heterogenous parallel execution environments. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 392-401, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  104. Vancroonenburg, W and Wauters, T Extending the late acceptance metaheuristic for multi-objective optimization. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 652-655, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  105. Vansteenwegen, P and Mateo, M An efficient metaheuristic for the inventory orienteering problem and the single-vehicle cyclic inventory routing problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 659-663, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  106. Verbeeck, C; Aghezzaf, E.-H and Vansteenwegen, P A fast solution method for the Time-Dependent Orienteering Problem with time windows. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 676-679, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  107. Vreckem, B. Va; Borodin, D; Bruyn, W. D and Nowe, A A Reinforcement Learning Approach to Solving Hybrid Flexible Flowline Scheduling Problems. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 402-409, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  108. Walcarius, P; Houbraken, M; Audenaert, P; Pickavet, M and Demeester, P Modeling Real-World Vehicle Routing Problems with Dependencies. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 711-713, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  109. Walker, S and Zinder, Y New Solvable Cases of the Maximum Lateness Problem with Preemptions. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 714-717, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  110. Wei, W; Nobibon, F.T and Leus, R Optimal scheduling policies for diagnosing k-out-of-n systems with imperfect tests. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 624-627, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  111. Weng, F.C; Asmuni, H. bi and McCollum, B Tackling University Timetabling Problems Using Hybridization of Swarm Based Approach. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 543-548, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  112. Zeltzer, L; Limère, V and Aghezzaf, E- Balancing and Sequencing Mixed-Model Assembly Lines to Minimize Work Overload in Real World Workstations. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 230-239, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here