Full Papers from MISTA 2007

ALL the MISTA proceedings are available here in pdf format.

In Proceedings

2007

  1. Angelelli, E; Speranza, M. G. and Tuza, Z Semi On-Line Scheduling on Two Uniform Processors. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 51-58, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  2. Asmuni, H; Burke, E. K; Garibaldi, J. M and McCollum, B Determining Rules in Fuzzy Multiple Heuristic Orderings for Constructing Examination Timetables. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 59-66, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  3. Bai, R; Burke, E. K; Gendreau, M and Kendall, G A Simulated Annealing Hyper-heuristic: Adaptive Heuristic Selection for Different Vehicle Routing Problems. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 67-70, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  4. Baptiste, P; Croce, F. D.; Grosso, A and T’kindt, V Sequencing a Single Machine with Due Dates and Deadlines: an ILP-based Approach to Solve Very Large Instances. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 71-79, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  5. Bilginturk, Z; Oguz, C and Salman, S Order Acceptance and Scheduling Decisions in Make-to-Order Systems. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 80-87, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  6. Boudhar, M and Tchikou, H Scheduling with Special Case of Multipurpose Machines. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 88-95, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  7. Bozejko, W and Wodecki, M A Parallel Metaheuristics for the Single Machine Total Weighted Tardiness Problem with Sequence-Dependent Setup Times. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 96-103, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  8. Brucker, P The Job-Shop Problem: Old and New Challenges. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 15-22, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  9. Bruno, G; Improta, G and Sgalambro, A Optimization of the Departure Schedule at a Public Transit Terminal with Multiple Destinations. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 104-111, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  10. Cesta, A Walk the (Time-)Line: Scheduling and Execution. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 23-23, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  11. Cheng, E and Kruk, S A Case Study of an Integer Programming Model for Instructor Assignments and Scheduling Problem. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 267-275, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  12. Davenport, A and Kalagnanam, J Scheduling Steel Production using Mixed-Integer Programming and Constraint Programming. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 120-127, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  13. Davidovi, T; Liberti, L; Liberti, L and Mladenovi, N Towards the Optimal Solution of the Multiprocessor Scheduling Problem with Communication Delays. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 128-135, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  14. Dinechin, B. D. D Time-Indexed Formulations and a Large Neighborhood Search for the Resource-Constrained Modulo Scheduling Problem. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 144-151, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  15. Dullaert, W; Bräysy, O and Salehipour, A The Cost of Scheduling Customers in Routing Problems. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 136-143, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  16. Ecker, K. H and Hasenfuss, A Non-preemptive Scheduling of Distance Constrained Tasks Subject to Minimizing Processor Load. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 200-208, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  17. Elvikis, D; Hamacher, H. W and Kalsch, M. T Scheduling and Location (ScheLoc):Makespan Problem with Variable Release Dates. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 152-158, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  18. Ersoy, E; Özcan, E and Uyar, A. S. Memetic Algorithms and Hyperhill-climbers. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 159-166, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  19. Fagundez, F. D. and Facó, J. L. D. Applying Optimal Control to Jetty Scheduling Problems. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 167-174, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  20. Finke, G Scheduling with Batch Compatible Tasks. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 24-26, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  21. García-Sabater, J. P.; Romano, C. A.; García-Sabater, J. J. and Miralles, C A Decision Support System for Scheduling a Painting Facility in an Automotive Supplier. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 175-183, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  22. Habla, C; Mönch, L; Habla, C and Mönch, L A Decomposition Heuristic for Planning and Scheduling of Jobs on Unrelated Parallel Machines. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 112-119, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  23. Hadda, H; Dridi, N and Hajri-Gabouj, S The Two-Stage Assembly Flow Shop Scheduling with an Availability Constraint. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 184-191, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  24. Haspeslagh, S; Causmaecker, P. D and Berghe, G. V. Distributed Decision Making in Hospital Wide Nurse Rostering Problems. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 192-199, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  25. Hemig, C and Zimmermann, J Medium-Term Production and Staff Planning in the Automotive Industry. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 209-216, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  26. Hmida, A. Be; Huguet, M-J.; Lopez, P and Haouari, M Climbing Depth-bounded Discrepancy Search for Solving Flexible Job Shop Scheduling Problems. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 217-224, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  27. Jampani, J and Mason, S. J Complex Job Shop Multiple Orders per Job Scheduling. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 225-233, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  28. Jarboui, B New Lower Bound for the Bin Packing Problem. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 234-241, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  29. Karaesmen, I. Z; Yang, W and Keskinocak, P Optimization vs. Persistence in Scheduling: Heuristics to Manage Uncertainty in On-Demand Air Travel. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 242-250, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  30. Kramer, L. A; Barbulescu, L. V and Smith, S. F Analyzing Basic Representation Choices in Oversubscribed Scheduling Problems. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 259-266, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  31. Laborie, P and Godard, D Self-Adapting Large Neighborhood Search:Application to Single-Mode Scheduling Problems. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 276-284, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  32. Lacomme, P; Larabi, M and Tchernev, N A Disjunctive Graph for the Job-Shop with Several Robots. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 285-292, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  33. Lancia, G; Rinaldi, F and Serafini, P A Compact Optimization Approach for Job-Shop Problems. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 293-300, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  34. Laub, J. D; Fowler, J. W and Keha, A. B Minimizing Makespan with Multiple Orders per Job in Mixed Flowshops. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 301-308, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  35. Lazarev, A. A Estimation of Absolute Error for Minimization Maximum Lateness. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 309-315, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  36. Lei, L; Chaovalitwongse, W. Ar and Bora, S Scheduling the Operations of an Integrated Production-Distribution Process. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 316-327, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  37. Leong, T and Lau, H. C. Generating Job Schedules for Vessel Operations in a Container Terminal. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 328-335, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  38. Limtanyakul, K and Schwiegelshohn, U Scheduling Tests on Vehicle Prototypes using Constraint Programming. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 336-343, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  39. Liret, A; Lesaint, D; Dorne, R and Voudouris, C iSchedule, an Optimisation Toolkit for Complex Scheduling. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 344-352, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  40. Lucarelli, G; Milis, I and Paschos, V. Th On a Generalized Graph Coloring/Batch Scheduling Problem. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 353-360, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  41. Melo, R. A; Urrutia, S and Ribeiro, C. C Scheduling Single Round Robin Tournaments with Fixed Venues. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 431-438, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  42. Michel, S and Vanderbeck, F Inventory Routing Problem Solved by Heuristic Based on Column Generation. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 361-367, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  43. Morton, A and Loucks, W. M EDF Feasibility and Hardware Accelerators. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 368-376, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  44. Munier-Kordon, A and Rebaine, D An Approximation Algorithm for the UET Two-Machine Open-Shop Problem with Time Delays. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 377-385, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  45. Nurmi, K and Kyngäs, J A Framework for School Timetabling Problem. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 386-393, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  46. Özcan, E and Alkan, A A Memetic Algorithm for Solving a Timetabling Problem:An Incremental Strategy. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 394-401, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  47. Pappis, C. P and Rachaniotis, N. P Scheduling in a Multi-Processor Environment with Deteriorating Job Processing Times and Decreasing Values: the Case of Forest Fires. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 402-409, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  48. Portmann, M-C. and Mouloua, Z A Window Time Negotiation Approach at the Scheduling Level inside Supply Chains. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 410-417, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  49. Qu, R and Burke, E. K Adaptive Decomposition and Construction for Examination Timetabling Problems. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 418-425, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  50. Raa, B and Aghezzaf, E-H. Aligning Frequencies in Cyclic Delivery Scheduling. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 426-430, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  51. Righter, R Scheduling in Highly Uncertain Environments. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 27-32, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  52. Rodriguez, J. A. V.; Petrovic, S and Salhi, A A Combined Meta-Heuristic with Hyper-Heuristic Approach to the Scheduling of the Hybrid Flow Shop with Sequence Dependent Setup Times and Uniform Machines. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 506-513, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  53. Ruiz, R and Andres, C Unrelated Parallel Machines Scheduling with Resource-Assignable Sequence Dependent Setup Times. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 439-446, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  54. Spieksma, F. C.R Interval Scheduling. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 33-40, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  55. Steiner, G and Zhang, R Minimizing the Total Weighted Number of Late Jobs with Late Deliveries in Two-Level Supply Chains. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 447-454, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  56. Sterna, M; Blazewicz, J and Pesch, E Genetic Algorithm for Late Work Minimization in a Flow Shop System. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 455-462, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  57. Sucha, P and Hanzalek, Z Cyclic Scheduling of Tasks with Unit Processing Time on Dedicated Sets of Parallel Identical Processors. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 463-470, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  58. Tchomt´e, S. K.; Gourgand, M and Quilliot, A Solving Resource-Constrained Project Scheduling Problem with Particle Swarm Optimization. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 251-258, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  59. Thomas, M and Szczerbicka, H Evaluating Online Scheduling Techniques in Uncertain Environments. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 471-479, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  60. Touati, S-A. Optimal and Approximate Periodic Task Scheduling with Storage Requirement Minimization. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 480-489, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  61. Trautmann, N and Schwindt, C Large-Scale Short-Term Planning in Chemical Batch Production. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 490-497, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  62. Tuong, N. H.; Soukhal, A and Billaut, J-C. Single Machine and Parallel Machine Scheduling Problems with a Common Due Date to Minimize Total Weighted Tardiness. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 498-505, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  63. Wan, G; Leung, J. Y.-T and Pinedo, M Competitive Agent Scheduling with Controllable Processing Times. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 514-522, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  64. Werra, D. D; Demange, M and Ekim, T Robotics and Chromatic Scheduling. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 42-49, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  65. Winter, E and Sadykov, R Computing Lower Bounds for the Schedule of a Multifunction Radar. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 523-530, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  66. Zhang, X and Gupta, J. N.D Two-machine Shop Floor Scheduling Problem with Multi-Predecessor Constraints*. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 538-545, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here

  67. Zinder, Y The Strength of Priority Algorithms. In proceedings of the 3rd Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2007), 28 -31 August 2007, Paris, France, pages 531-537, 2007.

    More details for this paper (incl. download information, abstract, bibtex is available here