- Adasme, P; Lisser, A and Soto, I SDP Relaxations for Two Stage OFDMA Networks with and without Probabilistic Constraints. In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA, pages 445-458, 2011.
More details for this paper (incl. download information, abstract, bibtex is available here
- Ascó, A.; Atkin, J. A. D and Burke, E. K The Airport Baggage Sorting Station Allocation Problem. In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA, pages 419-444, 2011.
More details for this paper (incl. download information, abstract, bibtex is available here
- Ásgeirsson, E. I; Kyngäs, J; Nurmi, K and Stølevik, M A Framework for Implementation-Oriented Staff Scheduling. In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA, pages 308-321, 2011.
More details for this paper (incl. download information, abstract, bibtex is available here
- Atakan, S; Tezel, B; Bülbül, K and Noyan, N Minimizing Value-at-Risk in the Single-Machine Total Weighted Tardiness Problem. In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA, pages 215-229, 2011.
More details for this paper (incl. download information, abstract, bibtex is available here
- Atkin, J. A. D; Burke, E. K and Ravizza, S A more realistic approach for airport ground movement optimisation with stand holding. In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA, pages 146-160, 2011.
More details for this paper (incl. download information, abstract, bibtex is available here
- Bai, R; Li, J; Atkin, J. A and Kendall, G A Game Theoretic Approach for the Taxi Scheduling Problem with Street Hailing. In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA, pages 161-172, 2011.
More details for this paper (incl. download information, abstract, bibtex is available here
- Bispo, C. F Single server scheduling problem: Optimal policy for convex costs depends on arrival rates. In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA, pages 275-296, 2011.
More details for this paper (incl. download information, abstract, bibtex is available here
- Borgulya, I An Evolutionary Algorithm for the large Size One-Commodity Pickup and Delivery Travelling Salesman Problems. In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA, pages 127-136, 2011.
More details for this paper (incl. download information, abstract, bibtex is available here
- Borodin, D; Vreckem, B. Va and Bruyn, W. D Case study: an effective genetic algorithm for the chemical batch production scheduling. In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA, pages 469-482, 2011.
More details for this paper (incl. download information, abstract, bibtex is available here
- Brandinu, G and Trautmann, N An MILP-approach to the optimization of event-bus schedules: a scheduling application in the tourism sector. In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA, pages 137-145, 2011.
More details for this paper (incl. download information, abstract, bibtex is available here
- Burke, E. K and Pais, T. C Using Differential Evolution to Identify Fuzzy Measures for the Exam Timetabling Problem. In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA, pages 335-351, 2011.
More details for this paper (incl. download information, abstract, bibtex is available here
- Cheng, J; Fowler, J. W; Hertzler, E. F; Huff, J. D and Kempf, K. G Multi-mode Resource-Constrained Project Scheduling of Semiconductor Equipment Install/Qual Process. In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA, pages 408-418, 2011.
More details for this paper (incl. download information, abstract, bibtex is available here
- Croce, F. D and Koulamas, C Minimizing the sum of quadratic completion times on two identical parallel machines. In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA, pages 240-244, 2011.
More details for this paper (incl. download information, abstract, bibtex is available here
- Dobson, R and Steinhöfel, K Low Energy Scheduling with Power Heterogeneous Multiprocessor Systems. In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA, pages 297-307, 2011.
More details for this paper (incl. download information, abstract, bibtex is available here
- Fordyce, K The Ongoing Challenge – A Responsive Enterprise-Wide Demand Supply Network for Semiconductor Based Package Goods – Something for Everyone. In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA, pages 10-93, 2011.
More details for this paper (incl. download information, abstract, bibtex is available here
- Glazebrook, K.D; Hodge, D.J; Kirkbride, C and Minty, R.J Stochastic scheduling: A short history of index policies and some key recent developments. In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA, pages 94-112, 2011.
More details for this paper (incl. download information, abstract, bibtex is available here
- Hanzalek, Z and Hanen, C Impact of core precedences in a Cyclic RCPSP with temporal constraints. In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA, pages 245-260, 2011.
More details for this paper (incl. download information, abstract, bibtex is available here
- Herrmann, J. W Generating Better Cyclic Fair Sequences Faster with Aggregation. In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA, pages 200-214, 2011.
More details for this paper (incl. download information, abstract, bibtex is available here
- Lin, Y.K; Hsieh, F. Y and Lin, G. J Scheduling identical jobs on uniform parallel machines to minimize maximum lateness. In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA, pages 195-199, 2011.
More details for this paper (incl. download information, abstract, bibtex is available here
- Marecek, J; Parkes, A. J; Burke, E. K; Elliot, R.; Francis, H and Lokhmotov, A Dynamic Data Structures for Taskgraph Scheduling Policies with Applications in OpenCL Accelerators. In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA, pages 322-334, 2011.
More details for this paper (incl. download information, abstract, bibtex is available here
- Marla, L and Barnhart, C A Decomposition Approach for Shipment Pickup and Delivery with Time-Windows Under Uncertainty. In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA, pages 352-365, 2011.
More details for this paper (incl. download information, abstract, bibtex is available here
- Misir, M; Verbeeck, K; Causmaecker, P. D and Berghe, G. V. A new hyper-heuristic implementation in HyFlex: a study on generality. In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA, pages 374-393, 2011.
More details for this paper (incl. download information, abstract, bibtex is available here
- Ng, T. S. A and Sy, C. L Robust Target Achievement for Decision-Making with Application to Workforce-Inventory Planning. In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA, pages 394-407, 2011.
More details for this paper (incl. download information, abstract, bibtex is available here
- Ramacher, R and Mönch, L Hybridized Genetic Algorithms to Schedule Interfering Job Sets on a Single Machine. In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA, pages 185-194, 2011.
More details for this paper (incl. download information, abstract, bibtex is available here
- Rizzo, L. M and Urrutia, S A GRASP Heuristic to the Extended Car Sequencing Problem. In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA, pages 366-373, 2011.
More details for this paper (incl. download information, abstract, bibtex is available here
- Seddik, Y; Gonzales, C and Kedad-Sidhoum, S Single machine scheduling with delivery dates and cumulative payoffs. In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA, pages 261-274, 2011.
More details for this paper (incl. download information, abstract, bibtex is available here
- Shufan, E; Ilani, H and Grinshpoun, T A Two-Campus Transport Problem. In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA, pages 173-184, 2011.
More details for this paper (incl. download information, abstract, bibtex is available here
- Uhlig, T and Rose, O A Multi Species Evolutionary Algorithm for Tool Group Scheduling in Semiconductor Manufacturing. In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA, pages 459-468, 2011.
More details for this paper (incl. download information, abstract, bibtex is available here
- Vakhania, N Minimizing the maximal lateness on a single-machine: a new polynomially solvable case. In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA, pages 230-239, 2011.
More details for this paper (incl. download information, abstract, bibtex is available here
- Whitley, D Quasi-Elementary Landscapes. In proceedings of the 5th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2011), 9-11 August 2011, Phoenix, Arizona, USA, pages 113-125, 2011.
More details for this paper (incl. download information, abstract, bibtex is available here