Full Papers from MISTA 2013

ALL the MISTA proceedings are available here in pdf format.

In Proceedings

2013

  1. Adasme, P; Lisser, A; Wang, C and Soto, I Scheduling in Wireless OFDMA-TDMA Networks using Variable Neighborhood Search Metaheuristic. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 55-64, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  2. Agnetis, A; Aloulou, M. Al and Fu, L- Production and Interplant Batch Delivery Scheduling: Dominance and Cooperation. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 133-150, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  3. Alonso-Pecina, F; Pecero, J. E and Romero, D A Three-Phases Based Algorithm for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem The MISTA 2013 Challenge. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 812-814, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  4. Artigues, C and Hebrard, E MIP Relaxation and Large Neighborhood Search for a Multi-Mode Resource-Constrained Multi-Project Scheduling Problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 815-819, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  5. Asta, S; Karapetyan, D; Kheiri, A; Özcan, E and Parkes, A. J Combining Monte-Carlo and Hyper-heuristic methods for the Multi-mode Resource-constrained Multi-project Scheduling Problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 836-839, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  6. Bellio, R; Ceschia, S; Gaspero, L. D; Schaerf, A and Urli, T. A simulated annealing approach to the curriculum-based course timetabling problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 314-317, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  7. Benmansour, R; Allaoui, H; Artiba, A and Hana?, S Minimizing the weighted sum of maximum earlinesstardiness cost on a single machine under maintenance constraints. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 240-247, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  8. Berlinska, J and Drozdowsk, M Mitigating Partitioning Skew in MapReduce Computations. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 80-90, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  9. Borba, L.M; Benavides, A.J; Zubaran, T; Carniel, G.M and Ritt, M A simple stochastic local search for multi-mode resource-constrained multi-project scheduling. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 826-830, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  10. Bouly, H; Dang, D-C.; Moukrim, A and Xu, H Evolutionary algorithm and post-processing to minimize the total delay in multi-project scheduling. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 831-835, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  11. Briand, C; Ngueveu, S. U. and Sucha, P Solving a cooperative project scheduling with controllable processing times, self-interested agents and equal profit sharing. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 125-132, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  12. Bucar, D; Bessler, S; Musliu, N and Groenbaek, J Scheduling of electric vehicle charging operations. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 486-498, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  13. Chretienne, V. J. P Minimizing the number of late jobs on parallel machines with alpha time windows. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 206-217, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  14. Creemers, S; Colen, P and Lambrecht, M Evaluation of appointment scheduling rules. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 509-514, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  15. Deleplanque, S and Quilliot, A Transfers in the on-demand transportation: the DARPT Dial-a-Ride Problem with transfers allowed. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 185-205, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  16. Demir, O and Ozdamar, L A GIS-Based Emergency Response System for Disaster Relief Operations. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 372-378, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  17. Dostert, M; Politz, A and Schmitz, H Algorithms and Complexity of Student Sectioning for Existing Timetables. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 218-229, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  18. Fernandes, P; Pereira, C.S and Barbosa, A Automatic Timetabling in Higher Education Institutions: a real scenario and solution. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 151-170, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  19. Fonseca, G. H.G and Santos, H. G A New Integer Linear Programming Formulation to the Examination Timetabling Problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 345-355, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  20. Fonseca, G. H.G; Santos, H. G and To?olo, T. A.M Late Acceptance Hill-Climbing Applied to the High School Timetabling Problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 331-344, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  21. Gafarov, E.R; Dolgui, A; Lazarev, A. A and Werner, F A Graphical Algorithm for Solving an Investment Optimization Problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 290-299, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  22. Geiger, M.J Iterated Variable Neighborhood Search for the resource constrained multi-mode multi-project scheduling problem Some comments on our contribution to the MISTA 2013 Challenge. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 807-811, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  23. Geirsson, E and Runarsson, T.P Bandit Algorithms using Monte Carlo Rollouts for Job Shop Scheduling. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 318-330, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  24. Hamilton-Bryce, R; McMullan, P and McCollum, B Directing selection within an extended great deluge optimization algorithm. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 499-508, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  25. Klos, T; Wilson, M and Witteveen, C Flexibility Metrics for Time and Resource Constrained Scheduling Problems. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 555-572, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  26. omarudin, K.; Feyter, T. D; Guerry, M-A. and Berghe, G. V. Extended Roster Quality Staffng Problem A medium term roster quality to support staffing decisions. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 424-436, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  27. Laborie, P and Rogerie, J Temporal Linear Relaxation in IBM ILOG CP Optimizer. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 379-391, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  28. Lopez-Ibanez, M; Mascia, F; Marmion, M-E. and Stutzle, T Automatic Design of a Hybrid Iterated Local Search for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 820-825, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  29. Martinez, Y; Nowe, A and Bello, R A Robust Multi-Agent Reinforcement Learning Approach for Scheduling Problems. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 410-423, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  30. Messelis, T; Causmaecker, P. D and Berghe, G.Van de Algorithm preformance prediction for nurse rostering. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 21-38, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  31. Moura, A and Oliveira, J Container Stowage and Short Sea Ship Routing Problem Optimization. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 111-124, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  32. Muhlenthaler, M and Wanka, R A Decomposition of the Max-min Fair Curriculum-based Course Timetabling Problem: The Impact of Solving Subproblems to Optimality. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 300-313, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  33. Muller, T Real-life Examination Timetabling. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 248-267, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  34. Nishi, T and Sugiyama, T Bilevel Decomposition Approach for Cyclic Staff Scheduling Problems. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 65-79, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  35. Pineda, A. A. S.; Pecero, J. E; Huacuja, H. J. F.; Barbosa, J. J. G. and Bouvry, P An Iterative Local Search Algorithm for Scheduling Precedence-Constrained Applications on Heterogeneous Machines. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 472-485, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  36. Pira, C and Artigues, C Line search method for solving a non-preemptive strictly periodic scheduling problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 356-371, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  37. Quilliot, A and Chretienne, P Homogeneously non-idling schedules of unit-time jobs on identical parallel machines. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 39-54, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  38. Quilliot, A and Toussaint, H RCPSP with Resource Transfers and Money Management. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 91-110, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  39. Rahman, S. A; Bargiela, A; Burke, E and Özcan, B. M. E An Investigation of Multistage Approaches to Examination Timetabling. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 528-542, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  40. Rodrigues, L. U; Santos, H. G; To?olo, T. A.M and Silva, C. L.T.F. Local search techniques applied to the Unrelated Parallel Machine Scheduling Problem with Sequence Dependent Setup Time. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 458-471, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  41. Sabar, N.R; Ayob, M and Kendall, G A Hybrid of Differential Evolution and Simulated Annealing Algorithms for the Capacitated Arc Routing Problems. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 549-554, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  42. Schnell, A A hybrid local search algorithm integrating an exact CP-SAT approach to solve the multi-mode resource-constrained multi-project scheduling problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 802-806, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  43. Scholz-Reiter, B; Tan, Y and Hildebrandt, T A computational study of shifting bottleneck procedures for job shop total weighted tardiness scheduling problems. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 437-457, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  44. Seddik, Y; Gonzales, C and Kedad-Sidhoum, S A polynomial time OPT-1 algorithm for a scheduling problem with two delivery dates and cumulative payoffs. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 268-289, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  45. Sioud, A; Gravel, M and Gagn, C A new ant colony optimization for minimizing tardiness in the single machine scheduling problem with sequence-dependent setups times. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 17-20, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  46. Tanaka, S The single-machine scheduling problem with a finite capacity input buffer. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 171-184, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  47. To?olo, T. A.M; Santos, H. G; Carvalho, M. A.M and Soares, J.A An Integer Programming Approach for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 840-847, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  48. Valero-Herrero, M; Garcia-Sabater, J.P and Vidal-Carreras, P.I In-depth analysis of the quality sequence to resolve CRSP. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 515-527, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  49. Valouxis, C; Gogos, C; Alefragis, P; Goulas, G; Voros, N and Housos, E DAG Scheduling using Integer Programming in heterogenous parallel execution environments. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 392-401, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  50. Vreckem, B. Va; Borodin, D; Bruyn, W. D and Nowe, A A Reinforcement Learning Approach to Solving Hybrid Flexible Flowline Scheduling Problems. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 402-409, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  51. Weng, F.C; Asmuni, H. bi and McCollum, B Tackling University Timetabling Problems Using Hybridization of Swarm Based Approach. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 543-548, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here

  52. Zeltzer, L; Limère, V and Aghezzaf, E- Balancing and Sequencing Mixed-Model Assembly Lines to Minimize Work Overload in Real World Workstations. In proceedings of the 6th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2013), 27 - 30 Aug 2013, Ghent, Belgium, pages 230-239, 2013.

    More details for this paper (incl. download information, abstract, bibtex is available here