Full Papers and Abstracts from MISTA 2009

ALL the MISTA proceedings are available here in pdf format.

In Proceedings

2009

  1. Abdullah, S; Turabieh, H; McCollum, B and Burke, E. K An Investigation of a Genetic Algorithm and Sequential Local Search Approach for Curriculum-based Course Timetabling Problems. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 727-731, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  2. Aggoune, R and Mati, Y Recent Adavances in Solving Two-job Shop Scheduling Problems: Extensions and Improvements of the Geometric Approach. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 469-478, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  3. Al-Betar, M. A and Khader, A. T A hybrid harmony search for university course timetabling. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 157-179, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  4. Alsheddy, A and Tsang, E Empowerment-based Workforce Scheduling Problem. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 130-144, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  5. Atkin, J. A; Burke, E. K and Greenwood, J. S A comparison of two methods for reducing take-off delay at London Heathrow airport. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 12-27, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  6. Aziz, Z. Ab and Kendall, G An Investigation of an Ant-based Hyperheuristic for the Capacitated Vehicle Routing Problem. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 823-826, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  7. Baker, K. R and Trietsch, D Three Heuristic Procedures for the Stochastic Flow Shop Problem. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 330-340, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  8. Barták, R and Skalicky, T A local approach to automated correction of violated precedence and resource constraints in manually altered schedules. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 507-517, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  9. Beliën, J and Demeulemeester, E Integrated workforce staffing and scheduling: A case study at a major aircraft maintenance company. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 724-726, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  10. Benabid, A and Hanen, C Decomposed Software Pipelining for cyclic unitary RCPSP with precedence delays. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 254-265, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  11. Berghman, L and Leus, R Solving a dock assignment problem as a three-stage flexible flow-shop problem. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 752-755, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  12. Berlinska, J and Drozdowski, M Heuristics for Divisible Loads Scheduling in Systems with Limited Memory. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 321-329, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  13. Bilgin, B; Causmaecker, P. D and Berghe, G. V. A Hyperheuristic Approach to Belgian Nurse Rostering Problems. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 683-689, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  14. Bini, E Modeling Preemptive EDF and FP by Integer Variables. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 77-84, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  15. Blazewicz, J; Machowiak, M and Oguz, C Approximation algorithm for berth and quay crane allocation problem with bounds. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 748-751, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  16. Borgulya, I Solving the Undirected Capacitated Arc Routing Problem with a memory based Method. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 827-830, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  17. Bozejko, W; Uchronski, M. and Wodecki, M Scatter search for a weighted tardiness flow shop problem. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 702-705, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  18. Bril, R. J; Cucu-Grosjean, L and Goossens, J Response time analysis in distributed real-time systems: An improvement based on best-case finalization time analysis. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 839-842, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  19. Burke, E. K; Curtois, T; Hyde, M; Kendall, G; Ochoa, G; Petrovic, S and Vázquez-Rodriguez, J. A HyFlex: A Flexible Framework for the Design and Analysis of Hyper-heuristics. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 790-797, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  20. Burke, E. K; Qu, R and Soghier, A Adaptive Selection of Heuristics within a GRASP for Exam Timetabling Problems. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 409-423, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  21. Ceschia, S and Schaerf, A Tabu Search Techniques for the Heterogeneous Vehicle Routing Problem with Time Windows and Carrier-Dependent Costs. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 594-605, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  22. Chen, S-H.; Chen, M-C.; Chang, P-C.; Zhang, Q and Chen, Y-M. Development of E ective Estimation of Distribution Algorithms for Scheduling Problems. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 531-556, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  23. Ciavotta, M; Ruiz, R and Minella, G New results for the multi-objective sequence dependent setup times °owshop problem. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 808-810, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  24. Côté, M. G. ˇ J-F. and Potvin, J-Y. An Effective Heuristic for the Pickup and Delivery Traveling Salesman Problem with LIFO Loading and Multiple Stacks. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 831-833, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  25. Creemers, S; Reyck, B. D; Lambrecht, M and Leus, R Project scheduling with alternative technologies and stochastic activity durations. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 756-760, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  26. Detienne, B; Dauzčre-Pérčs, S and Yugma, C Scheduling Inspection Operations subject to a Fixed Production Schedule. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 581-593, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  27. Dozic, S; Kalic, M; Babic, O and Cangalovic, M Heuristic approach to the airline schedule disturbances problem: multifleet case. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 311-320, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  28. Dror, M and Steiner, G Strong-Weak Precedence in Scheduling: Extended Order Implications. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 28-42, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  29. Dusa, V and Barták, R Preemptive scheduling with precedences and alternative resources. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 518-530, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  30. Elvikis, D; Hamacher, H. W and T'kindt, V Scheduling two interfering job sets on uniform parallel machines with makespan and cost functions. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 645-654, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  31. Fowler, J. W; Gul, S; Denton, B. T and Huschka, T. R Bi-Criteria Scheduling of an Outpatient Procedure Center. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 696-698, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  32. Gather, T and Zimmermann, J Exact methods for the resource levelling problem. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 811-820, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  33. Glass, C and Chakhlevitch, K Scheduling in a micro-biological laboratory: heuristics for sequencing food sample tests, to co-ordinate with production of perishable media materials. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 782-783, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  34. Gomes, M. C; Barbosa-Póvoa, A and Novais, A. Q Scheduling of job shop, make-to-order industries with recirculation and assembly: discrete versus continuous time models. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 802-807, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  35. Goossens, D. R and Spieksma, F. C .R Soccer schedules in Europe: an overview. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 715-717, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  36. Guedes, A. C. B and Ribeiro, C. C A heuristic for minimizing weighted carry-over effects in round robin tournaments. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 115-129, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  37. Guitouni, A and Masri, H A Nonlinear Mixed Integer Program for Search Path Planning Problem (SPPP). Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 277-290, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  38. Gunawan, A and Lau, H. C Master Physician Scheduling Problem. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 145-156, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  39. Günther, H-O. An MILP-based approach to short-term production scheduling and lot sizing with major and minor setups: A case study from the beverage industry. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 741-743, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  40. Hamid, N. H. A; Kendall, G and Sagir, M Mathematical Modeling for Maximising Gate Receipt Problem. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 709-714, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  41. Hanzalek, Z and Sucha, P Time Symmetry of Project Scheduling with Time Windows and Take-give Resources. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 239-253, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  42. Haspeslagh, S; Causmaecker, P. D and Berghe, G. V. A multi-agent system handling personnel shortages in hospitals. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 693-695, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  43. Hazir, O; Kedad-Sidhoum, S and Chretienne, P Batching and Scheduling with Tardiness. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 291-300, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  44. Herrmann, J. W Generating Cyclic Fair Sequences for Multiple Servers. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 628-644, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  45. Hieu, T. T and Ming, N. K A Water Flow Algorithm for Flexible Flow Shop Scheduling with Limited Intermediate Buffers. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 606-615, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  46. Hurink, J. L; Kok, A.L; Paulus, J. J and Schutten, J. M. J Time-constrained project scheduling with adjacent resources. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 761-763, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  47. Hyde, M; Özcan, E and Burke, E. K Multilevel Search for Evolving the Acceptance Criteria of a Hyper-Heuristic. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 798-801, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  48. Jat, S. N and Yang, S A Guided Search Genetic Algorithm for the University Course Timetabling Problem. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 180-191, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  49. Juraszek, J; Pesch, E and Sterna, M Simulated Annealing Method for Maximizing Revenue on Parallel Machines. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 699-701, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  50. Katzensteiner, C. A. ˇ S and Hartl, R. F A VNS-based solution approach for a flexible flow shop problem with limited buffer. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 706-708, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  51. Kergosien, Y; Lente, C and Billaut, J-C. Home health care problem: An extended multiple Traveling Salesman Problem. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 85-92, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  52. Khowala, K; Fowler, J; Keha, A and Balasubramanian, H Single Machine Scheduling with Interfering Job Sets. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 357-365, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  53. Kravchenko, S. A and Werner, F Parallel Machine Problems with Equal Processing Times. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 458-468, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  54. Kvaratskhelia, A and Lazarev, A Polynomial algorithm for 1 r_j , p_j = p, pmnt SUM(w_i c_j) scheduling problem. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 68-76, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  55. Kwan, R. S. K Case studies of successful train crew scheduling optimization. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 43-57, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  56. Lazarev, A. A and Gafarov, E. R Estimation of absolute error for the resources-constrained project scheduling problem. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 671-678, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  57. Lehoux-Lebacque, V; Brauner, N and Finke, G Polynomial complexity of the cyclic identical coupled task problem. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 679-682, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  58. Lewis, R and Thompson, J Round-robin Sports Scheduling from a Graph Colouring Perspective: A Case Study in Rugby Union Scheduling. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 718-719, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  59. Lin, E. Y.H On the Effective Approach of Teaching Activity Scheduling in Project Management. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 764-764, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  60. Lřkketangen, A; Haugen, K; Lanquepin, G and Olstad, A Using a set of fixed prices when solving Profit Maximization Capacitated Lot-Size Problems (PCLSP). Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 821-822, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  61. Maenhout, B and Vanhoucke, M Reactive Nurse Scheduling in Hospitals. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 690-692, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  62. McCollum, B; Kendall, G; McMullan, P and Goldrick, J. M Decision Support Systems for Tankering within the Airline Industry. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 837-838, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  63. McCollum, B; Kwan, R. S. K and McMullan, P. J Real World Optimisation through Spin Out Activity. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 778-781, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  64. McCollum, B; McMullan, P. J; Parkes, A. J; Burke, E. K and Abdullah, S An Extended Great Deluge Approach to the Examination Timetabling Problem. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 424-434, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  65. Mokotoff, E Minimizing the Makespan and Total Flow Time on the Permutation Flow Shop Scheduling Problem. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 479-506, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  66. Monch, L and Almeder, C Ant Colony Optimization Approaches for Scheduling Jobs with Incompatible Families on Parallel Batch Machines. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 105-114, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  67. Monch, L; Fowler, J. W; Dauzčre-Pérčs, S; Mason, S. J and Rose, O Scheduling Semiconductor Manufacturing Operations: Problems, Solution Techniques, and Future Challenges. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 192-201, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  68. Müller, T; Rudová, H. and Murray, K. Interactive Course Timetabling. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 732-736, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  69. Nishi, T and Hiranaka, Y Lagrangian Relaxation and Cut Generation for Sequence Dependent Setup Time Flowshop Scheduling Problems. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 655-659, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  70. Nobibon, F. T; Herbots, J and Leus, R Order acceptance and scheduling in a single-machine environment: exact and heuristic algorithms. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 772-774, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  71. Oguz, C and Narin, O Solving Berth Allocation Problem with Column Generation. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 744-747, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  72. Ormsbee, L; Lingireddy, S and Chase, D Optimal Pump Scheduling For Water Distribution Systems. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 341-356, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  73. Osman, I. H; Belouadah, H; Fleszar, K and Saffar, M Hybrid of the weighted minimum slack and shortest processing time dispatching rules for the total weighted tardiness single machine scheduling problem with availability constraints. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 202-215, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  74. Ourari, S; Briand, C and Bouzouia, B Minimizing the number of tardy jobs in single machine scheduling using MIP. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 227-238, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  75. Özcan, E and Burke, E. K Multilevel search for choosing hyper-heuristics. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 788-789, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  76. Özcan, E; Misir, M and Burke, E. K A self-organising hyper-heuristic framework. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 784-787, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  77. Papa, G and Korosec, P Metaheuristic Approach to Loading Schedule Problem. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 616-627, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  78. Pappis, C. P; Rachaniotis, N. P and Dasaklis, T A deterministic resource scheduling model in epidemic logistics. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 570-580, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  79. Parkes, A. J; McCollum, B.; McMullan, P and Burke, E. K Recent Work on Planning and Management of University Teaching Space. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 737-740, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  80. Pawlak, G and Rucinski, M Single machine re-entrant jobs scheduling in the car factory paint shop. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 775-777, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  81. Pillay, N Evolving Hyper-Heuristics for the Uncapacitated Examination Timetabling Problem. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 447-457, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  82. Qu, R; He, F and Burke, E. K Hybridizing Integer Programming Models with an Adaptive Decomposition Approach for Exam Timetabling Problems. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 435-446, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  83. Rudec, T; Baumgartner, A and Manger, R Speeding up the optimal off-line algorithm for solving the k-server problem. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 852-854, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  84. Ruiz, R and Naderi, B Variable Neighborhood Descent methods for the Distributed Permutation Flowshop Problem. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 834-836, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  85. Sabar, N. R; Ayob, M and Kendall, G Solving Examination Timetabling Problems using Honey-bee Mating Optimization (ETP-HBMO). Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 399-408, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  86. Santos, C. A; Zhang, A; Gonzalez, M. T; Jain, S and Byde, A Workforce Planning and Scheduling for the HP IT Services Business. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 720-723, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  87. Schwiegelshohn, U An Owner-centric Metric for the Evaluation of Online Job Schedules. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 557-569, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  88. Serafini, P On some combinatorial properties of PESP. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 59-67, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  89. Shabtay, D and Steiner, G Bicriteria models to minimize the total weighted number of tardy jobs with convex controllable processing times and common due date assignment. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 301-310, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  90. Simonin, G; Darties, B; Giroudeau, R and Konig, J-C. Isomorphic coupled-task scheduling problem with compatibility constraints on a single processor. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 378-388, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  91. Sterna, M and Juraszek, J Scheduling policy for on-line translation service. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 266-276, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  92. Tanaka, S and Sato, S An exact algorithm for the precedence-constrained single-machine scheduling problem. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 216-226, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  93. Vakhania, N An effcient implicit enumeration for scheduling equal-length jobs with release times on a single processor to maximize throughput. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 366-377, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  94. Vakhania, N Scheduling jobs with release times preemptively on a single machine to minimize the number of late jobs. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 389-398, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  95. Weeks, K. O; Gao, H; Alidaee, B and Rana, D An Empirical Study of Impacts of Production Mix Efficiency, Product Route Efficiency on Operations Performance and Profitability: A Reverse Logistics Approach. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 765-767, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  96. Xu, Y and Qu, R A GRASP approach for the delay-constrained multicast routing problem. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 93-104, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  97. Yomsi, P. M and Sorel, Y Schedulability Analysis for non Necessarily Harmonic Real-Time Systems with Precedence and Strict Periodicity Constraints using the Exact Number of Preemptions and no Idle Time. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 843-851, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here

  98. Zerola, M; Barták, R; Lauret, J and Sumbera, M Planning Heuristics for Efficient Data Movement on the Grid. Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10-12 Aug 2009, Dublin, Ireland, pages 768-771, 2009.

    More details for this paper (incl. download information, abstract, bibtex is available here