MISTA: List of papers by authors

This page was developed to give a summary of the papers that have been presented at MISTA, sorted by the authors. It is provided to give you a quick way to check all the papers that you have published at MISTA (or in the post conference publication).

The papers are NOT complete references. To see the complete reference, click on the link to paper link.

You can view the papers in various ways.

  • All papers (full papers, abstracts and selected papers)
  • Only full papers from the conference proceedings
  • Only abstracts from the conference proceedings
  • Only selected papers published in the post conference volumes

There is also a menu under each author, so that you can just display the data for just one author.

    Fowler

  1. Fowler, J (2015) The polynomial solvability of a bicriteria linear combination on parallel identical machines with release dates, 902--904 (Abstract) (link to paper)
  2. Fowler, J (2005) Bicriteria Scheduling Of Equal Length Jobs With Release Dates On Identical Parallel Machines, 112--122 (Full Paper) (link to paper)
  3. Fowler, J. W (2011) Multi-mode Resource-Constrained Project Scheduling of Semiconductor Equipment Install/Qual Process, 408--418 (Full Paper) (link to paper)
  4. Fowler, J (2005) Multiple Orders Per Job Scheduling Problems, 44--45 (Abstract) (link to paper)
  5. Fowler, J (2005) Scheduling Wafer Fabrication Operations: State-of-the-practice And Future Needs, 392--393 (Abstract) (link to paper)
  6. Fowler, J. W (2009) Bi-Criteria Scheduling of an Outpatient Procedure Center, 696--698 (Abstract) (link to paper)
  7. Fowler, J (2005) A Divide-and-merge Heuristic For Single Machine Weighted Tardiness Problem, 186--187 (Abstract) (link to paper)
  8. Fowler, J (2009) Single Machine Scheduling with Interfering Job Sets, 357--365 (Full Paper) (link to paper)
  9. Fowler, J (2011) Single Machine Scheduling with Interfering Job Sets to Minimize Total Weighted Completion Time and Maximum Lateness, 568--572 (Abstract) (link to paper)
  10. Fowler, J (2005) A Comparison Of Different Formulations For The Non-preemptive Single Machine Total Weighted Tardiness Scheduling Problem, 643--651 (Full Paper) (link to paper)
  11. Fowler, J. W (2007) Minimizing Makespan with Multiple Orders per Job in Mixed Flowshops, 301--308 (Full Paper) (link to paper)
  12. Fowler, J. W (2005) Minimizing Makespan With Multiple Orders Per Job In A Two Machine Flowshop With Item Processing, 288--298 (Full Paper) (link to paper)
  13. Fowler, J. W (2014) Processing time generation schemes for parallel machine scheduling problems with various correlation structures, 569--586 (Selected Paper) (link to paper)
  14. Fowler, J. W (2007) Interactive Evolutionary Multicriteria Scheduling, 591--594 (Abstract) (link to paper)
  15. Fowler, J (2005) A Deterministic Scheduling Approach For Wafer Fabrication Facilities, 42--43 (Abstract) (link to paper)
  16. Fowler, J. W (2009) Scheduling Semiconductor Manufacturing Operations: Problems, Solution Techniques, and Future Challenges, 192--201 (Full Paper) (link to paper)
  17. Fowler, J. W (2011) A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations, 583--599 (Selected Paper) (link to paper)
  18. Fowler, J. W (2011) Flexible Constraint Optimization of Product Profits: A responsive approach to determine profit-optimal product start rates subject to mean cycle time and product volume constraints in support of production planning for semiconductor fabrication facilities, 599--601 (Abstract) (link to paper)
  19. Fowler, J (2005) A Bi-criteria Approach To Scheduling Wafer Fabrication Facilities, 276--287 (Full Paper) (link to paper)
  20. Fowler, J. W (2011) Investigating the boundary between scheduling and dispatching, 573--575 (Abstract) (link to paper)
  21. Fowler, J. W (2011) Algorithmic Parallelization in Multi-Criteria Semiconductor Scheduling, 642--644 (Abstract) (link to paper)
  22. Fowler, J. W (2011) Job Scheduling to Minimize Weighted Completion Time Variance on Identical Parallel Machines, 546--548 (Abstract) (link to paper)
  23. Fowler, J (2015) Scheduling Jobs in a Two-Stage Flexible Flow Shop with Batch Processing Machines, 801--804 (Abstract) (link to paper)

  24. (Menu for Fowler) All papers - Full papers - Abstracts - Selected papers