MISTA: List of papers by authors

This page was developed to give a summary of the papers that have been presented at MISTA, sorted by the authors. It is provided to give you a quick way to check all the papers that you have published at MISTA (or in the post conference publication).

The papers are NOT complete references. To see the complete reference, click on the link to paper link.

You can view the papers in various ways.

  • All papers (full papers, abstracts and selected papers)
  • Only full papers from the conference proceedings
  • Only abstracts from the conference proceedings
  • Only selected papers published in the post conference volumes

There is also a menu under each author, so that you can just display the data for just one author.

    Ackermann

  1. Ackermann, H. (2016) Time-hierarchical scheduling A worst case analysis of a hierarchical approach integrating planning and scheduling in an online problem, 215--225 (Selected Paper) (link to paper)

  2. (Menu for Ackermann) All papers - Full papers - Abstracts - Selected papers

    Adasme

  3. Adasme, P. (2016) Uplink scheduling for joint wireless orthogonal frequency and time division multiple access networks, 349--366 (Selected Paper) (link to paper)
  4. Adasme, P (2014) Stochastic and semidefinite optimization for scheduling in orthogonal frequency division multiple access networks, 445--469 (Selected Paper) (link to paper)

  5. (Menu for Adasme) All papers - Full papers - Abstracts - Selected papers

    Adenso-Díaz

  6. Adenso-Díaz, B (2005) Rule-Based System for Platform Assignment in Bus Stations, 369--379 (Selected Paper) (link to paper)
  7. Adenso-Díaz, B (2008) A Beam Search approach for the optimization version of the Car Sequencing Problem, 233--244 (Selected Paper) (link to paper)

  8. (Menu for Adenso-Díaz) All papers - Full papers - Abstracts - Selected papers

    Aloulou

  9. Aloulou, M. Al (2005) An Efficient Proactive-Reactive Scheduling Approach to Hedge Against Shop Floor Disturbances, 223--246 (Selected Paper) (link to paper)

  10. (Menu for Aloulou) All papers - Full papers - Abstracts - Selected papers

    Alsheddy

  11. Alsheddy, A (2011) Empowerment scheduling for a field workforce, 639--654 (Selected Paper) (link to paper)

  12. (Menu for Alsheddy) All papers - Full papers - Abstracts - Selected papers

    Angel

  13. Angel, E (2008) How good are SPT schedules for fair optimality criteria, 53--64 (Selected Paper) (link to paper)

  14. (Menu for Angel) All papers - Full papers - Abstracts - Selected papers

    Aparicio

  15. Aparicio, J (2005) A Scheduling Web Service, 187--201 (Selected Paper) (link to paper)

  16. (Menu for Aparicio) All papers - Full papers - Abstracts - Selected papers

    Araki

  17. Araki, M (2009) An exact algorithm for single-machine scheduling without machine idle time, 575--593 (Selected Paper) (link to paper)

  18. (Menu for Araki) All papers - Full papers - Abstracts - Selected papers

    Armstrong

  19. Armstrong, R (2008) A zero-inventory production and distribution problem with a fixed customer sequence, 395--414 (Selected Paper) (link to paper)

  20. (Menu for Armstrong) All papers - Full papers - Abstracts - Selected papers

    Arroyo

  21. Arroyo, J. E. C. (2008) A GRASP algorithm for the multi-criteria minimum spanning tree problem, 125--133 (Selected Paper) (link to paper)

  22. (Menu for Arroyo) All papers - Full papers - Abstracts - Selected papers

    Artigues

  23. Artigues, C (2008) A branch and bound method for the job-shop problem with sequence-dependent setup times, 135--159 (Selected Paper) (link to paper)
  24. Artigues, C. (2016) Line search method for solving a non-preemptive strictly periodic scheduling problem, 227--243 (Selected Paper) (link to paper)

  25. (Menu for Artigues) All papers - Full papers - Abstracts - Selected papers

    Asco

  26. Asco, A (2014) An analysis of constructive algorithms for the airport baggage sorting station assignment problem, 601--619 (Selected Paper) (link to paper)

  27. (Menu for Asco) All papers - Full papers - Abstracts - Selected papers

    Atkin

  28. Atkin, J. A. D (2014) An analysis of constructive algorithms for the airport baggage sorting station assignment problem, 601--619 (Selected Paper) (link to paper)
  29. Atkin, J.A.D (2011) A comparison of two methods for reducing take-off delay at London Heathrow airport, 409--421 (Selected Paper) (link to paper)
  30. Atkin, J. A. D (2014) A more realistic approach for airport ground movement optimisation with stand holding, 507--520 (Selected Paper) (link to paper)

  31. (Menu for Atkin) All papers - Full papers - Abstracts - Selected papers

    Baille

  32. Baille, F (2008) Bicriteria scheduling for contiguous and non contiguous parallel tasks, 97--106 (Selected Paper) (link to paper)

  33. (Menu for Baille) All papers - Full papers - Abstracts - Selected papers

    Baker

  34. Baker, K. R (2011) Three heuristic procedures for the stochastic, two-machine flow shop problem, 445--454 (Selected Paper) (link to paper)

  35. (Menu for Baker) All papers - Full papers - Abstracts - Selected papers

    Bampis

  36. Bampis, E (2008) How good are SPT schedules for fair optimality criteria, 53--64 (Selected Paper) (link to paper)
  37. Bampis, E (2008) Bicriteria scheduling for contiguous and non contiguous parallel tasks, 97--106 (Selected Paper) (link to paper)

  38. (Menu for Bampis) All papers - Full papers - Abstracts - Selected papers

    Baptiste

  39. Baptiste, P (2009) Preface, 563--564 (Selected Paper) (link to paper)

  40. (Menu for Baptiste) All papers - Full papers - Abstracts - Selected papers

    Barbosa

  41. Barbosa, A. (2016) A decision support approach to automatic timetabling in higher education institutions, 335--348 (Selected Paper) (link to paper)

  42. (Menu for Barbosa) All papers - Full papers - Abstracts - Selected papers

    Barnhart

  43. Barnhart, C (2014) A decomposition approach for commodity pickup and delivery with time-windows under uncertainty, 489--506 (Selected Paper) (link to paper)

  44. (Menu for Barnhart) All papers - Full papers - Abstracts - Selected papers

    Bartels

  45. Bartels, J-H. (2011) Exact methods for the resource levelling problem, 557--569 (Selected Paper) (link to paper)

  46. (Menu for Bartels) All papers - Full papers - Abstracts - Selected papers

    Bautista

  47. Bautista, J (2008) A Beam Search approach for the optimization version of the Car Sequencing Problem, 233--244 (Selected Paper) (link to paper)

  48. (Menu for Bautista) All papers - Full papers - Abstracts - Selected papers

    Belulu

  49. Belulu, A (2014) A reduction approach to the two-campus transport problem, 587--599 (Selected Paper) (link to paper)

  50. (Menu for Belulu) All papers - Full papers - Abstracts - Selected papers

    Benabid

  51. Benabid, A (2011) Worst case analysis of decomposed software pipelining for cyclic unitary RCPSP with precedence delays, 511--522 (Selected Paper) (link to paper)

  52. (Menu for Benabid) All papers - Full papers - Abstracts - Selected papers

    Bhattacharya

  53. Bhattacharya, S (2008) A two pass heuristic algorithm for scheduling ‘blocked out’ units in continuous process industry, 293--313 (Selected Paper) (link to paper)

  54. (Menu for Bhattacharya) All papers - Full papers - Abstracts - Selected papers

    Bian

  55. Bian, F (2005) Measuring the Robustness of Airline Fleet Schedules, 381--392 (Selected Paper) (link to paper)

  56. (Menu for Bian) All papers - Full papers - Abstracts - Selected papers

    Bitar

  57. Bitar, A. (2016) A memetic algorithm to solve an unrelated parallel machine scheduling problem with auxiliary resources in semiconductor manufacturing, 367--376 (Selected Paper) (link to paper)

  58. (Menu for Bitar) All papers - Full papers - Abstracts - Selected papers

    Biyani

  59. Biyani, V (2014) A decomposition approach for commodity pickup and delivery with time-windows under uncertainty, 489--506 (Selected Paper) (link to paper)

  60. (Menu for Biyani) All papers - Full papers - Abstracts - Selected papers

    Blazewicz

  61. Blazewicz, J. (2016) Novel dual discounting functions for the Internet shopping optimization problem: new algorithms, 245--255 (Selected Paper) (link to paper)
  62. Blazewicz, J (2011) Preface, 407--407 (Selected Paper) (link to paper)

  63. (Menu for Blazewicz) All papers - Full papers - Abstracts - Selected papers

    Borenstein

  64. Borenstein, D (2014) Review of real-time vehicle schedule recovery methods in transportation services, 541--567 (Selected Paper) (link to paper)

  65. (Menu for Borenstein) All papers - Full papers - Abstracts - Selected papers

    Bose

  66. Bose, S. K. (2008) A two pass heuristic algorithm for scheduling ‘blocked out’ units in continuous process industry, 293--313 (Selected Paper) (link to paper)

  67. (Menu for Bose) All papers - Full papers - Abstracts - Selected papers

    Bouquard

  68. Bouquard, J-L. (2016) Scheduling evacuation operations, 467--478 (Selected Paper) (link to paper)

  69. (Menu for Bouquard) All papers - Full papers - Abstracts - Selected papers

    Branke

  70. Branke, J (2005) Task Scheduling under Gang Constraints, 113--130 (Selected Paper) (link to paper)

  71. (Menu for Branke) All papers - Full papers - Abstracts - Selected papers

    Bransinu

  72. Bransinu, G (2014) A mixed-integer linear programming approach to the optimization of event-bus schedules: a scheduling application in the tourism sector, 621--629 (Selected Paper) (link to paper)

  73. (Menu for Bransinu) All papers - Full papers - Abstracts - Selected papers

    Brauner

  74. Brauner, N. (2016) Lawler's minmax cost algorithm: optimality conditions and uncertainty, 401--408 (Selected Paper) (link to paper)
  75. Brauner, N (2005) The Best-Fit Rule for Multibin Packing: An Extension of Graham's List Algorithms, 269--286 (Selected Paper) (link to paper)

  76. (Menu for Brauner) All papers - Full papers - Abstracts - Selected papers

    Brucker

  77. Brucker, P (2008) Cyclic job shop scheduling problems with blocking, 161--181 (Selected Paper) (link to paper)

  78. (Menu for Brucker) All papers - Full papers - Abstracts - Selected papers

    Burke

  79. Burke, E. K (2014) An analysis of constructive algorithms for the airport baggage sorting station assignment problem, 601--619 (Selected Paper) (link to paper)
  80. Burke, E. K (2011) A comparison of two methods for reducing take-off delay at London Heathrow airport, 409--421 (Selected Paper) (link to paper)
  81. Burke, E. K (2005) Measuring the Robustness of Airline Fleet Schedules, 381--392 (Selected Paper) (link to paper)
  82. Burke, E (2008) Fuzzy job shop scheduling with lot-sizing, 275--292 (Selected Paper) (link to paper)
  83. Burke, E. K (2014) A more realistic approach for airport ground movement optimisation with stand holding, 507--520 (Selected Paper) (link to paper)

  84. (Menu for Burke) All papers - Full papers - Abstracts - Selected papers

    Buscher

  85. Buscher, U (2014) A simultaneous and iterative approach for parallel machine scheduling with sequence-dependent family setups, 471--487 (Selected Paper) (link to paper)

  86. (Menu for Buscher) All papers - Full papers - Abstracts - Selected papers

    Bykov

  87. Bykov, Y. (2016) A Step Counting Hill Climbing Algorithm applied to University Examination Timetabling, 479--492 (Selected Paper) (link to paper)

  88. (Menu for Bykov) All papers - Full papers - Abstracts - Selected papers

    Carrano

  89. Carrano, E. G (2016) Late acceptance hill-climbing for high school timetabling, 453--465 (Selected Paper) (link to paper)

  90. (Menu for Carrano) All papers - Full papers - Abstracts - Selected papers

    Carvalho

  91. Carvalho, M. A. M (2016) An integer programming approach to the multimode resource-constrained multiproject scheduling problem, 295--307 (Selected Paper) (link to paper)

  92. (Menu for Carvalho) All papers - Full papers - Abstracts - Selected papers

    Ceschia

  93. Ceschia, S (2011) Tabu search techniques for the heterogeneous vehicle routing problem with time windows and carrier-dependent costs, 601--615 (Selected Paper) (link to paper)
  94. Ceschia, S. (2016) Dynamic patient admission scheduling with operating room constraints, flexible horizons, and patient delays, 377--389 (Selected Paper) (link to paper)

  95. (Menu for Ceschia) All papers - Full papers - Abstracts - Selected papers

    Cesta

  96. Cesta, A (2005) Constraint-Based Random Search for Solving Spacecraft Downlink Scheduling Problems, 133--160 (Selected Paper) (link to paper)

  97. (Menu for Cesta) All papers - Full papers - Abstracts - Selected papers

    Cheriere

  98. Cheriere, N. (2016) Novel dual discounting functions for the Internet shopping optimization problem: new algorithms, 245--255 (Selected Paper) (link to paper)

  99. (Menu for Cheriere) All papers - Full papers - Abstracts - Selected papers

    Chrétienne

  100. Chrétienne, P (2011) Integrated batch sizing and scheduling on a single machine, 541--555 (Selected Paper) (link to paper)

  101. (Menu for Chrétienne) All papers - Full papers - Abstracts - Selected papers

    Cortellessa

  102. Cortellessa, G (2005) Constraint-Based Random Search for Solving Spacecraft Downlink Scheduling Problems, 133--160 (Selected Paper) (link to paper)

  103. (Menu for Cortellessa) All papers - Full papers - Abstracts - Selected papers

    Cucu

  104. Cucu, L (2008) Periodic real-time scheduling: from deadline-based model to latency-based model, 41--51 (Selected Paper) (link to paper)

  105. (Menu for Cucu) All papers - Full papers - Abstracts - Selected papers

    Darties

  106. Darties, B (2011) Isomorphic coupled-task scheduling problem with compatibility constraints on a single processor, 501--509 (Selected Paper) (link to paper)

  107. (Menu for Darties) All papers - Full papers - Abstracts - Selected papers

    Dauzere-Peres

  108. Dauzere-Peres, S. (2016) A memetic algorithm to solve an unrelated parallel machine scheduling problem with auxiliary resources in semiconductor manufacturing, 367--376 (Selected Paper) (link to paper)

  109. (Menu for Dauzere-Peres) All papers - Full papers - Abstracts - Selected papers

    Dauzère-Pérès

  110. Dauzère-Pérès, S (2011) Scheduling jobs on parallel machines to minimize a regular step total cost function, 523--538 (Selected Paper) (link to paper)
  111. Dauzère-Pérès, S (2011) Erratum to: Scheduling jobs on parallel machines to minimize a regular step total cost function, 539--540 (Selected Paper) (link to paper)
  112. Dauzère-Pérès, S (2011) A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations, 583--599 (Selected Paper) (link to paper)

  113. (Menu for Dauzère-Pérès) All papers - Full papers - Abstracts - Selected papers

    Davari

  114. Davari, M. (2016) Exact algorithms for single-machine scheduling with time windows and precedence constraints, 309--334 (Selected Paper) (link to paper)

  115. (Menu for Davari) All papers - Full papers - Abstracts - Selected papers

    Deghdak

  116. Deghdak, K. (2016) Scheduling evacuation operations, 467--478 (Selected Paper) (link to paper)

  117. (Menu for Deghdak) All papers - Full papers - Abstracts - Selected papers

    Demeulemeester

  118. Demeulemeester, E. (2016) Exact algorithms for single-machine scheduling with time windows and precedence constraints, 309--334 (Selected Paper) (link to paper)
  119. Demeulemeester, E. (2016) A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations, 409--428 (Selected Paper) (link to paper)

  120. (Menu for Demeulemeester) All papers - Full papers - Abstracts - Selected papers

    Detienne

  121. Detienne, B (2011) Scheduling jobs on parallel machines to minimize a regular step total cost function, 523--538 (Selected Paper) (link to paper)
  122. Detienne, B (2011) Erratum to: Scheduling jobs on parallel machines to minimize a regular step total cost function, 539--540 (Selected Paper) (link to paper)

  123. (Menu for Detienne) All papers - Full papers - Abstracts - Selected papers

    Do

  124. Do, V. H (2005) Scheduling UET Tasks on Two Parallel Machines with the Criteria of Makespan and Total Completion Time, 83--109 (Selected Paper) (link to paper)

  125. (Menu for Do) All papers - Full papers - Abstracts - Selected papers

    Doganis

  126. Doganis, P (2008) Optimal production scheduling for the dairy industry, 315--331 (Selected Paper) (link to paper)

  127. (Menu for Doganis) All papers - Full papers - Abstracts - Selected papers

    Dostert

  128. Dostert, M (2016) A complexity analysis and an algorithmic approach to student sectioning in existing timetables, 285--293 (Selected Paper) (link to paper)

  129. (Menu for Dostert) All papers - Full papers - Abstracts - Selected papers

    Dror

  130. Dror, M (2005) Case-Based Initialisation of Metaheuristics for Examination, 289--308 (Selected Paper) (link to paper)

  131. (Menu for Dror) All papers - Full papers - Abstracts - Selected papers

    Drozdowski

  132. Drozdowski, M (2011) Preface, 407--407 (Selected Paper) (link to paper)

  133. (Menu for Drozdowski) All papers - Full papers - Abstracts - Selected papers

    Duenas

  134. Duenas, A (2008) An approach to predictive-reactive scheduling of parallel machines subject to disruptions, 65--82 (Selected Paper) (link to paper)

  135. (Menu for Duenas) All papers - Full papers - Abstracts - Selected papers

    Dutot

  136. Dutot, P-F. (2016) Novel dual discounting functions for the Internet shopping optimization problem: new algorithms, 245--255 (Selected Paper) (link to paper)

  137. (Menu for Dutot) All papers - Full papers - Abstracts - Selected papers

    Elvikis

  138. Elvikis, D (2011) Scheduling two agents on uniform parallel machines with makespan and cost functions, 471--481 (Selected Paper) (link to paper)

  139. (Menu for Elvikis) All papers - Full papers - Abstracts - Selected papers

    Erramilli

  140. Erramilli, V (2008) Multiple orders per job batch scheduling with incompatible jobs, 245--260 (Selected Paper) (link to paper)

  141. (Menu for Erramilli) All papers - Full papers - Abstracts - Selected papers

    Fainberg

  142. Fainberg, A (2014) A reduction approach to the two-campus transport problem, 587--599 (Selected Paper) (link to paper)

  143. (Menu for Fainberg) All papers - Full papers - Abstracts - Selected papers

    Fayad

  144. Fayad, C (2008) Fuzzy job shop scheduling with lot-sizing, 275--292 (Selected Paper) (link to paper)

  145. (Menu for Fayad) All papers - Full papers - Abstracts - Selected papers

    Feillet

  146. Feillet, D (2008) A branch and bound method for the job-shop problem with sequence-dependent setup times, 135--159 (Selected Paper) (link to paper)

  147. (Menu for Feillet) All papers - Full papers - Abstracts - Selected papers

    Feng

  148. Feng, G (2008) Efficient algorithms for machine scheduling problems with earliness and tardiness penalties, 83--95 (Selected Paper) (link to paper)

  149. (Menu for Feng) All papers - Full papers - Abstracts - Selected papers

    Fernandes

  150. Fernandes, P. (2016) A decision support approach to automatic timetabling in higher education institutions, 335--348 (Selected Paper) (link to paper)

  151. (Menu for Fernandes) All papers - Full papers - Abstracts - Selected papers

    Finke

  152. Finke, G. (2016) Lawler's minmax cost algorithm: optimality conditions and uncertainty, 401--408 (Selected Paper) (link to paper)
  153. Finke, G (2005) The Best-Fit Rule for Multibin Packing: An Extension of Graham's List Algorithms, 269--286 (Selected Paper) (link to paper)

  154. (Menu for Finke) All papers - Full papers - Abstracts - Selected papers

    Fonseca

  155. Fonseca, G. H. G (2016) Late acceptance hill-climbing for high school timetabling, 453--465 (Selected Paper) (link to paper)

  156. (Menu for Fonseca) All papers - Full papers - Abstracts - Selected papers

    Foong

  157. Foong, W. K. (2008) Ant colony optimization for power plant maintenance scheduling optimization—a five-station hydropower system, 433--450 (Selected Paper) (link to paper)

  158. (Menu for Foong) All papers - Full papers - Abstracts - Selected papers

    Fowler

  159. Fowler, J. W (2014) Processing time generation schemes for parallel machine scheduling problems with various correlation structures, 569--586 (Selected Paper) (link to paper)
  160. Fowler, J. W (2011) A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations, 583--599 (Selected Paper) (link to paper)

  161. (Menu for Fowler) All papers - Full papers - Abstracts - Selected papers

    Froncek

  162. Froncek, D (2005) Round Robin Tournaments with One Bye and No Breaks in Home-Away Patterns are Unique, 331--340 (Selected Paper) (link to paper)

  163. (Menu for Froncek) All papers - Full papers - Abstracts - Selected papers

    Fujikuma

  164. Fujikuma, S (2009) An exact algorithm for single-machine scheduling without machine idle time, 575--593 (Selected Paper) (link to paper)

  165. (Menu for Fujikuma) All papers - Full papers - Abstracts - Selected papers

    Gao

  166. Gao, S (2008) A zero-inventory production and distribution problem with a fixed customer sequence, 395--414 (Selected Paper) (link to paper)

  167. (Menu for Gao) All papers - Full papers - Abstracts - Selected papers

    Gaspero

  168. Gaspero, L. D (2011) Tabu search techniques for the heterogeneous vehicle routing problem with time windows and carrier-dependent costs, 601--615 (Selected Paper) (link to paper)

  169. (Menu for Gaspero) All papers - Full papers - Abstracts - Selected papers

    Gather

  170. Gather, T (2011) Exact methods for the resource levelling problem, 557--569 (Selected Paper) (link to paper)

  171. (Menu for Gather) All papers - Full papers - Abstracts - Selected papers

    Giroudeau

  172. Giroudeau, R (2011) Isomorphic coupled-task scheduling problem with compatibility constraints on a single processor, 501--509 (Selected Paper) (link to paper)

  173. (Menu for Giroudeau) All papers - Full papers - Abstracts - Selected papers

    Glazebrook

  174. Glazebrook, K. D (2014) Stochastic scheduling: A short history of index policies and new approaches to index generation for dynamic resource allocation, 407--425 (Selected Paper) (link to paper)

  175. (Menu for Glazebrook) All papers - Full papers - Abstracts - Selected papers

    Greenwood

  176. Greenwood, J. S (2011) A comparison of two methods for reducing take-off delay at London Heathrow airport, 409--421 (Selected Paper) (link to paper)

  177. (Menu for Greenwood) All papers - Full papers - Abstracts - Selected papers

    Grinshpoun

  178. Grinshpoun, T (2014) A reduction approach to the two-campus transport problem, 587--599 (Selected Paper) (link to paper)

  179. (Menu for Grinshpoun) All papers - Full papers - Abstracts - Selected papers

    Guedes

  180. Guedes, A. C.B (2011) A heuristic for minimizing weighted carry-over effects in round robin tournaments, 655--667 (Selected Paper) (link to paper)

  181. (Menu for Guedes) All papers - Full papers - Abstracts - Selected papers

    Hamacher

  182. Hamacher, H. W (2011) Scheduling two agents on uniform parallel machines with makespan and cost functions, 471--481 (Selected Paper) (link to paper)

  183. (Menu for Hamacher) All papers - Full papers - Abstracts - Selected papers

    Hanen

  184. Hanen, C (2011) Worst case analysis of decomposed software pipelining for cyclic unitary RCPSP with precedence delays, 511--522 (Selected Paper) (link to paper)

  185. (Menu for Hanen) All papers - Full papers - Abstracts - Selected papers

    Hanne

  186. Hanne, T (2005) Scheduling in Software Development Using Multiobjective Evolutionary Algorithms, 57--81 (Selected Paper) (link to paper)

  187. (Menu for Hanne) All papers - Full papers - Abstracts - Selected papers

    Haz?r

  188. Haz?r, Ö (2011) Integrated batch sizing and scheduling on a single machine, 541--555 (Selected Paper) (link to paper)

  189. (Menu for Haz?r) All papers - Full papers - Abstracts - Selected papers

    Hildebrandt

  190. Hildebrandt, T. (2016) Configuration and the advantages of the shifting bottleneck procedure for optimizing the job shop total weighted tardiness scheduling problem, 429--452 (Selected Paper) (link to paper)

  191. (Menu for Hildebrandt) All papers - Full papers - Abstracts - Selected papers

    Hodge

  192. Hodge, D. J (2014) Stochastic scheduling: A short history of index policies and new approaches to index generation for dynamic resource allocation, 407--425 (Selected Paper) (link to paper)

  193. (Menu for Hodge) All papers - Full papers - Abstracts - Selected papers

    Howe

  194. Howe, A. E (2005) A Dynamic Model of Tabu Search for the Job-Shop Scheduling Problem, 247--266 (Selected Paper) (link to paper)

  195. (Menu for Howe) All papers - Full papers - Abstracts - Selected papers

    Hussin

  196. Hussin, N. M. (2005) An Investigation of a Tabu-Search-Based Hyper-heuristic for Examination Timetabling, 309--328 (Selected Paper) (link to paper)

  197. (Menu for Hussin) All papers - Full papers - Abstracts - Selected papers

    Ilani

  198. Ilani, H (2014) A reduction approach to the two-campus transport problem, 587--599 (Selected Paper) (link to paper)

  199. (Menu for Ilani) All papers - Full papers - Abstracts - Selected papers

    Indra-Payoong

  200. Indra-Payoong, N (2005) Rail Container Service Planning: A Constraint-Based Approach, 343--368 (Selected Paper) (link to paper)

  201. (Menu for Indra-Payoong) All papers - Full papers - Abstracts - Selected papers

    Jain

  202. Jain, S (2005) Measuring the Robustness of Airline Fleet Schedules, 381--392 (Selected Paper) (link to paper)

  203. (Menu for Jain) All papers - Full papers - Abstracts - Selected papers

    Jampani

  204. Jampani, J (2008) Column generation heuristics for multiple machine, multiple orders per job scheduling problems, 261--273 (Selected Paper) (link to paper)

  205. (Menu for Jampani) All papers - Full papers - Abstracts - Selected papers

    Jat

  206. Jat, S. N. (2011) A hybrid genetic algorithm and tabu search approach for post enrolment course timetabling, 617--637 (Selected Paper) (link to paper)

  207. (Menu for Jat) All papers - Full papers - Abstracts - Selected papers

    Kampmeyer

  208. Kampmeyer, T (2008) Cyclic job shop scheduling problems with blocking, 161--181 (Selected Paper) (link to paper)

  209. (Menu for Kampmeyer) All papers - Full papers - Abstracts - Selected papers

    Karaesmen

  210. Karaesmen, I. Z (2008) Aircraft and crew scheduling for fractional ownership programs, 415--431 (Selected Paper) (link to paper)

  211. (Menu for Karaesmen) All papers - Full papers - Abstracts - Selected papers

    Kedad-Sidhoum

  212. Kedad-Sidhoum, S (2011) Integrated batch sizing and scheduling on a single machine, 541--555 (Selected Paper) (link to paper)

  213. (Menu for Kedad-Sidhoum) All papers - Full papers - Abstracts - Selected papers

    Kendall

  214. Kendall, G (2009) Preface, 563--564 (Selected Paper) (link to paper)
  215. Kendall, G (2005) Measuring the Robustness of Airline Fleet Schedules, 381--392 (Selected Paper) (link to paper)
  216. Kendall, G (2011) Preface, 407--407 (Selected Paper) (link to paper)
  217. Kendall, G (2005) An Investigation of a Tabu-Search-Based Hyper-heuristic for Examination Timetabling, 309--328 (Selected Paper) (link to paper)
  218. Kendall, G (2008) Preface, 1--3 (Selected Paper) (link to paper)
  219. Kendall, G (2008) Fuzzy job shop scheduling with lot-sizing, 275--292 (Selected Paper) (link to paper)

  220. (Menu for Kendall) All papers - Full papers - Abstracts - Selected papers

    Keskinocak

  221. Keskinocak, P (2008) Aircraft and crew scheduling for fractional ownership programs, 415--431 (Selected Paper) (link to paper)

  222. (Menu for Keskinocak) All papers - Full papers - Abstracts - Selected papers

    Kinable

  223. Kinable, J. (2016) The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 271--283 (Selected Paper) (link to paper)

  224. (Menu for Kinable) All papers - Full papers - Abstracts - Selected papers

    Kirkbride

  225. Kirkbride, C (2014) Stochastic scheduling: A short history of index policies and new approaches to index generation for dynamic resource allocation, 407--425 (Selected Paper) (link to paper)

  226. (Menu for Kirkbride) All papers - Full papers - Abstracts - Selected papers

    Koole

  227. Koole, G. M (2005) Measuring the Robustness of Airline Fleet Schedules, 381--392 (Selected Paper) (link to paper)

  228. (Menu for Koole) All papers - Full papers - Abstracts - Selected papers

    Kravchenko

  229. Kravchenko, S. A (2011) Parallel machine problems with equal processing times: a survey, 435--444 (Selected Paper) (link to paper)

  230. (Menu for Kravchenko) All papers - Full papers - Abstracts - Selected papers

    Krumke

  231. Krumke, S. O (2008) Pruning in column generation for service vehicle dispatching, 355--371 (Selected Paper) (link to paper)

  232. (Menu for Krumke) All papers - Full papers - Abstracts - Selected papers

    Kuefer

  233. Kuefer, K-H. (2016) Time-hierarchical scheduling A worst case analysis of a hierarchical approach integrating planning and scheduling in an online problem, 215--225 (Selected Paper) (link to paper)

  234. (Menu for Kuefer) All papers - Full papers - Abstracts - Selected papers

    Kutanoglu

  235. Kutanoglu, E (2008) Forming and scheduling jobs with capacitated containers in semiconductor manufacturing: Single machine problem, 5--24 (Selected Paper) (link to paper)

  236. (Menu for Kutanoglu) All papers - Full papers - Abstracts - Selected papers

    Kwan

  237. Kwan, R. S (2005) Rail Container Service Planning: A Constraint-Based Approach, 343--368 (Selected Paper) (link to paper)
  238. Kwan, R. S.K (2011) Case studies of successful train crew scheduling optimisation, 423--434 (Selected Paper) (link to paper)

  239. (Menu for Kwan) All papers - Full papers - Abstracts - Selected papers

    König

  240. König, J.-C (2011) Isomorphic coupled-task scheduling problem with compatibility constraints on a single processor, 501--509 (Selected Paper) (link to paper)

  241. (Menu for König) All papers - Full papers - Abstracts - Selected papers

    Laborie

  242. Laborie, P. (2016) Temporal linear relaxation in IBM ILOG CP Optimizer, 391--400 (Selected Paper) (link to paper)

  243. (Menu for Laborie) All papers - Full papers - Abstracts - Selected papers

    Laforest

  244. Laforest, C (2008) Bicriteria scheduling for contiguous and non contiguous parallel tasks, 97--106 (Selected Paper) (link to paper)

  245. (Menu for Laforest) All papers - Full papers - Abstracts - Selected papers

    Lamas

  246. Lamas, P. (2016) A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations, 409--428 (Selected Paper) (link to paper)

  247. (Menu for Lamas) All papers - Full papers - Abstracts - Selected papers

    Landa-Silva

  248. Landa-Silva, J. D (2005) Measuring the Robustness of Airline Fleet Schedules, 381--392 (Selected Paper) (link to paper)

  249. (Menu for Landa-Silva) All papers - Full papers - Abstracts - Selected papers

    Lau

  250. Lau, H. C. (2008) Efficient algorithms for machine scheduling problems with earliness and tardiness penalties, 83--95 (Selected Paper) (link to paper)
  251. Lau, H. Y.K (2008) Integrated scheduling of handling equipment at automated container terminals, 373--394 (Selected Paper) (link to paper)

  252. (Menu for Lau) All papers - Full papers - Abstracts - Selected papers

    Lei

  253. Lei, L (2008) A zero-inventory production and distribution problem with a fixed customer sequence, 395--414 (Selected Paper) (link to paper)
  254. Lei, L (2008) Preface, 1--3 (Selected Paper) (link to paper)

  255. (Menu for Lei) All papers - Full papers - Abstracts - Selected papers

    Lemaire

  256. Lemaire, P (2005) The Best-Fit Rule for Multibin Packing: An Extension of Graham's List Algorithms, 269--286 (Selected Paper) (link to paper)

  257. (Menu for Lemaire) All papers - Full papers - Abstracts - Selected papers

    Leoff

  258. Leoff, J. (2016) Time-hierarchical scheduling A worst case analysis of a hierarchical approach integrating planning and scheduling in an online problem, 215--225 (Selected Paper) (link to paper)

  259. (Menu for Leoff) All papers - Full papers - Abstracts - Selected papers

    Leung

  260. Leung, J. Y.-T (2005) Order Scheduling Models: An Overview, 37--53 (Selected Paper) (link to paper)
  261. Leung, J. Y.-T (2008) Scheduling orders on either dedicated or flexible machines in parallel to minimize total weighted completion time, 107--123 (Selected Paper) (link to paper)
  262. Leung, J. Y.-T (2008) Scheduling problems in master-slave model, 215--231 (Selected Paper) (link to paper)

  263. (Menu for Leung) All papers - Full papers - Abstracts - Selected papers

    Leus

  264. Leus, R. (2016) Exact algorithms for single-machine scheduling with time windows and precedence constraints, 309--334 (Selected Paper) (link to paper)

  265. (Menu for Leus) All papers - Full papers - Abstracts - Selected papers

    Li

  266. Li, H (2005) Order Scheduling Models: An Overview, 37--53 (Selected Paper) (link to paper)
  267. Li, H (2008) Scheduling orders on either dedicated or flexible machines in parallel to minimize total weighted completion time, 107--123 (Selected Paper) (link to paper)
  268. Li, J-Q. (2014) Review of real-time vehicle schedule recovery methods in transportation services, 541--567 (Selected Paper) (link to paper)

  269. (Menu for Li) All papers - Full papers - Abstracts - Selected papers

    Lin

  270. Lin, Y-K. (2014) Processing time generation schemes for parallel machine scheduling problems with various correlation structures, 569--586 (Selected Paper) (link to paper)

  271. (Menu for Lin) All papers - Full papers - Abstracts - Selected papers

    Lisser

  272. Lisser, A. (2016) Uplink scheduling for joint wireless orthogonal frequency and time division multiple access networks, 349--366 (Selected Paper) (link to paper)
  273. Lisser, A (2014) Stochastic and semidefinite optimization for scheduling in orthogonal frequency division multiple access networks, 445--469 (Selected Paper) (link to paper)

  274. (Menu for Lisser) All papers - Full papers - Abstracts - Selected papers

    Lozarno

  275. Lozarno, A. J (2014) Scheduling of parallel machines with sequence-dependent batches and product incompatibilities in an automotive glass facility, 521--540 (Selected Paper) (link to paper)

  276. (Menu for Lozarno) All papers - Full papers - Abstracts - Selected papers

    Maenhout

  277. Maenhout, B (2008) Comparison and hybridization of crossover operators for the nurse scheduling problem, 333--353 (Selected Paper) (link to paper)

  278. (Menu for Maenhout) All papers - Full papers - Abstracts - Selected papers

    Maier

  279. Maier, H. R (2008) Ant colony optimization for power plant maintenance scheduling optimization—a five-station hydropower system, 433--450 (Selected Paper) (link to paper)

  280. (Menu for Maier) All papers - Full papers - Abstracts - Selected papers

    Marla

  281. Marla, L (2014) A decomposition approach for commodity pickup and delivery with time-windows under uncertainty, 489--506 (Selected Paper) (link to paper)

  282. (Menu for Marla) All papers - Full papers - Abstracts - Selected papers

    Mason

  283. Mason, S. J (2008) Multiple orders per job batch scheduling with incompatible jobs, 245--260 (Selected Paper) (link to paper)
  284. Mason, S. J (2008) Column generation heuristics for multiple machine, multiple orders per job scheduling problems, 261--273 (Selected Paper) (link to paper)
  285. Mason, S. J (2011) A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations, 583--599 (Selected Paper) (link to paper)

  286. (Menu for Mason) All papers - Full papers - Abstracts - Selected papers

    Mattfield

  287. Mattfield, D. C. (2005) Task Scheduling under Gang Constraints, 113--130 (Selected Paper) (link to paper)

  288. (Menu for Mattfield) All papers - Full papers - Abstracts - Selected papers

    McCollum

  289. McCollum, B (2011) Preface, 407--407 (Selected Paper) (link to paper)

  290. (Menu for McCollum) All papers - Full papers - Abstracts - Selected papers

    Medaglia

  291. Medaglia, A. L (2014) Scheduling of parallel machines with sequence-dependent batches and product incompatibilities in an automotive glass facility, 521--540 (Selected Paper) (link to paper)

  292. (Menu for Medaglia) All papers - Full papers - Abstracts - Selected papers

    Melo

  293. Melo, R. A (2009) The traveling tournament problem with predefined venues, 607--622 (Selected Paper) (link to paper)

  294. (Menu for Melo) All papers - Full papers - Abstracts - Selected papers

    Meszka

  295. Meszka, M (2005) Round Robin Tournaments with One Bye and No Breaks in Home-Away Patterns are Unique, 331--340 (Selected Paper) (link to paper)

  296. (Menu for Meszka) All papers - Full papers - Abstracts - Selected papers

    Minty

  297. Minty, R. J (2014) Stochastic scheduling: A short history of index policies and new approaches to index generation for dynamic resource allocation, 407--425 (Selected Paper) (link to paper)

  298. (Menu for Minty) All papers - Full papers - Abstracts - Selected papers

    Mirchandani

  299. Mirchandani, P. B (2014) Review of real-time vehicle schedule recovery methods in transportation services, 541--567 (Selected Paper) (link to paper)

  300. (Menu for Mirchandani) All papers - Full papers - Abstracts - Selected papers

    Monch

  301. Monch, L (2014) A simultaneous and iterative approach for parallel machine scheduling with sequence-dependent family setups, 471--487 (Selected Paper) (link to paper)

  302. (Menu for Monch) All papers - Full papers - Abstracts - Selected papers

    Mueller

  303. Mueller, T. (2016) Real-life examination timetabling, 257--270 (Selected Paper) (link to paper)

  304. (Menu for Mueller) All papers - Full papers - Abstracts - Selected papers

    Mulder

  305. Mulder, J (2005) Measuring the Robustness of Airline Fleet Schedules, 381--392 (Selected Paper) (link to paper)

  306. (Menu for Mulder) All papers - Full papers - Abstracts - Selected papers

    Munier

  307. Munier, A (2009) Preface, 563--564 (Selected Paper) (link to paper)

  308. (Menu for Munier) All papers - Full papers - Abstracts - Selected papers

    Musial

  309. Musial, J. (2016) Novel dual discounting functions for the Internet shopping optimization problem: new algorithms, 245--255 (Selected Paper) (link to paper)

  310. (Menu for Musial) All papers - Full papers - Abstracts - Selected papers

    Mönch

  311. Mönch, L (2011) A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations, 583--599 (Selected Paper) (link to paper)

  312. (Menu for Mönch) All papers - Full papers - Abstracts - Selected papers

    Ng

  313. Ng, T. S (2014) A resilience optimization approach for workforce-inventory control dynamics under uncertainty, 427--444 (Selected Paper) (link to paper)
  314. Ng, K. M. (2011) A water-flow algorithm for flexible flow shop scheduling with intermediate buffers, 483--500 (Selected Paper) (link to paper)

  315. (Menu for Ng) All papers - Full papers - Abstracts - Selected papers

    Nickel

  316. Nickel, S (2005) Scheduling in Software Development Using Multiobjective Evolutionary Algorithms, 57--81 (Selected Paper) (link to paper)

  317. (Menu for Nickel) All papers - Full papers - Abstracts - Selected papers

    Nobibon

  318. Nobibon, F. T. (2016) Exact algorithms for single-machine scheduling with time windows and precedence constraints, 309--334 (Selected Paper) (link to paper)

  319. (Menu for Nobibon) All papers - Full papers - Abstracts - Selected papers

    Oddi

  320. Oddi, A (2005) Constraint-Based Random Search for Solving Spacecraft Downlink Scheduling Problems, 133--160 (Selected Paper) (link to paper)

  321. (Menu for Oddi) All papers - Full papers - Abstracts - Selected papers

    Paelinck

  322. Paelinck, M. C. E (2005) Measuring the Robustness of Airline Fleet Schedules, 381--392 (Selected Paper) (link to paper)

  323. (Menu for Paelinck) All papers - Full papers - Abstracts - Selected papers

    Pascual

  324. Pascual, F (2008) How good are SPT schedules for fair optimality criteria, 53--64 (Selected Paper) (link to paper)

  325. (Menu for Pascual) All papers - Full papers - Abstracts - Selected papers

    Pereira

  326. Pereira, J (2008) A Beam Search approach for the optimization version of the Car Sequencing Problem, 233--244 (Selected Paper) (link to paper)
  327. Pereira, C. S. (2016) A decision support approach to automatic timetabling in higher education institutions, 335--348 (Selected Paper) (link to paper)

  328. (Menu for Pereira) All papers - Full papers - Abstracts - Selected papers

    Peridy

  329. Peridy, L (2005) An O (N log N) Stable Algorithm for Immediate Selections Adjustments, 205--222 (Selected Paper) (link to paper)

  330. (Menu for Peridy) All papers - Full papers - Abstracts - Selected papers

    Pernet

  331. Pernet, N (2008) Periodic real-time scheduling: from deadline-based model to latency-based model, 41--51 (Selected Paper) (link to paper)

  332. (Menu for Pernet) All papers - Full papers - Abstracts - Selected papers

    Petrovic

  333. Petrovic, S. (2016) A Step Counting Hill Climbing Algorithm applied to University Examination Timetabling, 479--492 (Selected Paper) (link to paper)
  334. Petrovic, D (2008) An approach to predictive-reactive scheduling of parallel machines subject to disruptions, 65--82 (Selected Paper) (link to paper)
  335. Petrovic, S (2008) Fuzzy job shop scheduling with lot-sizing, 275--292 (Selected Paper) (link to paper)
  336. Petrovic, D (2008) Fuzzy job shop scheduling with lot-sizing, 275--292 (Selected Paper) (link to paper)
  337. Petrovic, S (2005) Case-Based Initialisation of Metaheuristics for Examination, 289--308 (Selected Paper) (link to paper)

  338. (Menu for Petrovic) All papers - Full papers - Abstracts - Selected papers

    Pfund

  339. Pfund, M. E (2014) Processing time generation schemes for parallel machine scheduling problems with various correlation structures, 569--586 (Selected Paper) (link to paper)

  340. (Menu for Pfund) All papers - Full papers - Abstracts - Selected papers

    Pinedo

  341. Pinedo, M (2008) Preface, 1--3 (Selected Paper) (link to paper)
  342. Pinedo, M (2005) Order Scheduling Models: An Overview, 37--53 (Selected Paper) (link to paper)
  343. Pinedo, M (2008) Scheduling orders on either dedicated or flexible machines in parallel to minimize total weighted completion time, 107--123 (Selected Paper) (link to paper)

  344. (Menu for Pinedo) All papers - Full papers - Abstracts - Selected papers

    Pira

  345. Pira, C. (2016) Line search method for solving a non-preemptive strictly periodic scheduling problem, 227--243 (Selected Paper) (link to paper)

  346. (Menu for Pira) All papers - Full papers - Abstracts - Selected papers

    Policella

  347. Policella, N (2005) Constraint-Based Random Search for Solving Spacecraft Downlink Scheduling Problems, 133--160 (Selected Paper) (link to paper)

  348. (Menu for Policella) All papers - Full papers - Abstracts - Selected papers

    Politz

  349. Politz, A (2016) A complexity analysis and an algorithmic approach to student sectioning in existing timetables, 285--293 (Selected Paper) (link to paper)

  350. (Menu for Politz) All papers - Full papers - Abstracts - Selected papers

    Portmann

  351. Portmann, M-C. (2005) An Efficient Proactive-Reactive Scheduling Approach to Hedge Against Shop Floor Disturbances, 223--246 (Selected Paper) (link to paper)

  352. (Menu for Portmann) All papers - Full papers - Abstracts - Selected papers

    Proll

  353. Proll, L (2005) Rail Container Service Planning: A Constraint-Based Approach, 343--368 (Selected Paper) (link to paper)

  354. (Menu for Proll) All papers - Full papers - Abstracts - Selected papers

    Rapine

  355. Rapine, C (2008) Bicriteria scheduling for contiguous and non contiguous parallel tasks, 97--106 (Selected Paper) (link to paper)

  356. (Menu for Rapine) All papers - Full papers - Abstracts - Selected papers

    Reeves

  357. Reeves, C. (2005) Measuring the Robustness of Airline Fleet Schedules, 381--392 (Selected Paper) (link to paper)

  358. (Menu for Reeves) All papers - Full papers - Abstracts - Selected papers

    Ribeiro

  359. Ribeiro, C. C (2011) A heuristic for minimizing weighted carry-over effects in round robin tournaments, 655--667 (Selected Paper) (link to paper)
  360. Ribeiro, C. C (2009) The traveling tournament problem with predefined venues, 607--622 (Selected Paper) (link to paper)

  361. (Menu for Ribeiro) All papers - Full papers - Abstracts - Selected papers

    Rivizza

  362. Rivizza, S (2014) A more realistic approach for airport ground movement optimisation with stand holding, 507--520 (Selected Paper) (link to paper)

  363. (Menu for Rivizza) All papers - Full papers - Abstracts - Selected papers

    Rivreau

  364. Rivreau, D (2005) An O (N log N) Stable Algorithm for Immediate Selections Adjustments, 205--222 (Selected Paper) (link to paper)

  365. (Menu for Rivreau) All papers - Full papers - Abstracts - Selected papers

    Rogerie

  366. Rogerie, J. (2016) Temporal linear relaxation in IBM ILOG CP Optimizer, 391--400 (Selected Paper) (link to paper)

  367. (Menu for Rogerie) All papers - Full papers - Abstracts - Selected papers

    Rose

  368. Rose, O (2011) A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations, 583--599 (Selected Paper) (link to paper)

  369. (Menu for Rose) All papers - Full papers - Abstracts - Selected papers

    Roussel

  370. Roussel, R. (2016) A memetic algorithm to solve an unrelated parallel machine scheduling problem with auxiliary resources in semiconductor manufacturing, 367--376 (Selected Paper) (link to paper)

  371. (Menu for Roussel) All papers - Full papers - Abstracts - Selected papers

    Rusdi

  372. Rusdi, I (2005) Measuring the Robustness of Airline Fleet Schedules, 381--392 (Selected Paper) (link to paper)

  373. (Menu for Rusdi) All papers - Full papers - Abstracts - Selected papers

    Santos

  374. Santos, H. G (2016) Late acceptance hill-climbing for high school timetabling, 453--465 (Selected Paper) (link to paper)
  375. Santos, H. G (2016) An integer programming approach to the multimode resource-constrained multiproject scheduling problem, 295--307 (Selected Paper) (link to paper)

  376. (Menu for Santos) All papers - Full papers - Abstracts - Selected papers

    Sarimveis

  377. Sarimveis, H (2008) Optimal production scheduling for the dairy industry, 315--331 (Selected Paper) (link to paper)

  378. (Menu for Sarimveis) All papers - Full papers - Abstracts - Selected papers

    Schaerf

  379. Schaerf, A (2011) Tabu search techniques for the heterogeneous vehicle routing problem with time windows and carrier-dependent costs, 601--615 (Selected Paper) (link to paper)
  380. Schaerf, A. (2016) Dynamic patient admission scheduling with operating room constraints, flexible horizons, and patient delays, 377--389 (Selected Paper) (link to paper)

  381. (Menu for Schaerf) All papers - Full papers - Abstracts - Selected papers

    Schmitz

  382. Schmitz, H (2016) A complexity analysis and an algorithmic approach to student sectioning in existing timetables, 285--293 (Selected Paper) (link to paper)

  383. (Menu for Schmitz) All papers - Full papers - Abstracts - Selected papers

    Scholz-Reiter

  384. Scholz-Reiter, B. (2016) Configuration and the advantages of the shifting bottleneck procedure for optimizing the job shop total weighted tardiness scheduling problem, 429--452 (Selected Paper) (link to paper)

  385. (Menu for Scholz-Reiter) All papers - Full papers - Abstracts - Selected papers

    Schwiegelshohn

  386. Schwiegelshohn, U (2011) A system-centric metric for the evaluation of online job schedules, 571--581 (Selected Paper) (link to paper)

  387. (Menu for Schwiegelshohn) All papers - Full papers - Abstracts - Selected papers

    Schwindt

  388. Schwindt, C (2009) A cyclic approach to large-scale short-term planning in chemical batch production, 595--606 (Selected Paper) (link to paper)

  389. (Menu for Schwindt) All papers - Full papers - Abstracts - Selected papers

    Shabtay

  390. Shabtay, D (2011) A bicriteria approach to minimize the total weighted number of tardy jobs with convex controllable processing times and assignable due dates, 455--469 (Selected Paper) (link to paper)
  391. Shabtay, D (2008) The single-machine earliness-tardiness scheduling problem with due date assignment and resource-dependent processing times, 25--40 (Selected Paper) (link to paper)

  392. (Menu for Shabtay) All papers - Full papers - Abstracts - Selected papers

    Shafransky

  393. Shafransky, Y. (2016) Lawler's minmax cost algorithm: optimality conditions and uncertainty, 401--408 (Selected Paper) (link to paper)

  394. (Menu for Shafransky) All papers - Full papers - Abstracts - Selected papers

    Shchepin

  395. Shchepin, E. V (2008) On the geometry, preemptions and complexity of multiprocessor and shop scheduling, 183--213 (Selected Paper) (link to paper)

  396. (Menu for Shchepin) All papers - Full papers - Abstracts - Selected papers

    Shen

  397. Shen, L (2014) A simultaneous and iterative approach for parallel machine scheduling with sequence-dependent family setups, 471--487 (Selected Paper) (link to paper)

  398. (Menu for Shen) All papers - Full papers - Abstracts - Selected papers

    Shufan

  399. Shufan, E (2014) A reduction approach to the two-campus transport problem, 587--599 (Selected Paper) (link to paper)

  400. (Menu for Shufan) All papers - Full papers - Abstracts - Selected papers

    Silva

  401. Silva, S. do C. (2005) A Scheduling Web Service, 187--201 (Selected Paper) (link to paper)

  402. (Menu for Silva) All papers - Full papers - Abstracts - Selected papers

    Simonin

  403. Simonin, G (2011) Isomorphic coupled-task scheduling problem with compatibility constraints on a single processor, 501--509 (Selected Paper) (link to paper)

  404. (Menu for Simonin) All papers - Full papers - Abstracts - Selected papers

    Simpson

  405. Simpson, A. R (2008) Ant colony optimization for power plant maintenance scheduling optimization—a five-station hydropower system, 433--450 (Selected Paper) (link to paper)

  406. (Menu for Simpson) All papers - Full papers - Abstracts - Selected papers

    Sledneu

  407. Sledneu, D. (2016) Lawler's minmax cost algorithm: optimality conditions and uncertainty, 401--408 (Selected Paper) (link to paper)

  408. (Menu for Sledneu) All papers - Full papers - Abstracts - Selected papers

    Smet

  409. Smet, P. (2016) The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 271--283 (Selected Paper) (link to paper)

  410. (Menu for Smet) All papers - Full papers - Abstracts - Selected papers

    Smith

  411. Smith, S. F (2005) Is Scheduling a Solved Problem?, 3--17 (Selected Paper) (link to paper)

  412. (Menu for Smith) All papers - Full papers - Abstracts - Selected papers

    Soares

  413. Soares, J. A (2016) An integer programming approach to the multimode resource-constrained multiproject scheduling problem, 295--307 (Selected Paper) (link to paper)

  414. (Menu for Soares) All papers - Full papers - Abstracts - Selected papers

    Sorel

  415. Sorel, Y (2008) Periodic real-time scheduling: from deadline-based model to latency-based model, 41--51 (Selected Paper) (link to paper)

  416. (Menu for Sorel) All papers - Full papers - Abstracts - Selected papers

    Sourd

  417. Sourd, F (2009) Preface, 563--564 (Selected Paper) (link to paper)

  418. (Menu for Sourd) All papers - Full papers - Abstracts - Selected papers

    Steiner

  419. Steiner, G (2011) A bicriteria approach to minimize the total weighted number of tardy jobs with convex controllable processing times and assignable due dates, 455--469 (Selected Paper) (link to paper)
  420. Steiner, G (2008) The single-machine earliness-tardiness scheduling problem with due date assignment and resource-dependent processing times, 25--40 (Selected Paper) (link to paper)
  421. Steiner, G (2009) Approximation algorithms for minimizing the total weighted number of late jobs with late deliveries in two-level supply chains, 565--574 (Selected Paper) (link to paper)

  422. (Menu for Steiner) All papers - Full papers - Abstracts - Selected papers

    Stolp

  423. Stolp, S (2008) Ant colony optimization for power plant maintenance scheduling optimization—a five-station hydropower system, 433--450 (Selected Paper) (link to paper)

  424. (Menu for Stolp) All papers - Full papers - Abstracts - Selected papers

    Suleman

  425. Suleman, M. O (2005) Measuring the Robustness of Airline Fleet Schedules, 381--392 (Selected Paper) (link to paper)

  426. (Menu for Suleman) All papers - Full papers - Abstracts - Selected papers

    Sy

  427. Sy, C. (2014) A resilience optimization approach for workforce-inventory control dynamics under uncertainty, 427--444 (Selected Paper) (link to paper)

  428. (Menu for Sy) All papers - Full papers - Abstracts - Selected papers

    T'kindt

  429. T'kindt, V. (2016) Scheduling evacuation operations, 467--478 (Selected Paper) (link to paper)

  430. (Menu for T'kindt) All papers - Full papers - Abstracts - Selected papers

    Tan

  431. Tan, Yi (2016) Configuration and the advantages of the shifting bottleneck procedure for optimizing the job shop total weighted tardiness scheduling problem, 429--452 (Selected Paper) (link to paper)

  432. (Menu for Tan) All papers - Full papers - Abstracts - Selected papers

    Tanaka

  433. Tanaka, S (2009) An exact algorithm for single-machine scheduling without machine idle time, 575--593 (Selected Paper) (link to paper)

  434. (Menu for Tanaka) All papers - Full papers - Abstracts - Selected papers

    Tanrisever

  435. Tanrisever, F (2008) Forming and scheduling jobs with capacitated containers in semiconductor manufacturing: Single machine problem, 5--24 (Selected Paper) (link to paper)

  436. (Menu for Tanrisever) All papers - Full papers - Abstracts - Selected papers

    Tayur

  437. Tayur, S (2008) Aircraft and crew scheduling for fractional ownership programs, 415--431 (Selected Paper) (link to paper)

  438. (Menu for Tayur) All papers - Full papers - Abstracts - Selected papers

    Toffolo

  439. Toffolo, T. A. M (2016) An integer programming approach to the multimode resource-constrained multiproject scheduling problem, 295--307 (Selected Paper) (link to paper)

  440. (Menu for Toffolo) All papers - Full papers - Abstracts - Selected papers

    Tran

  441. Tran, T. H. (2011) A water-flow algorithm for flexible flow shop scheduling with intermediate buffers, 483--500 (Selected Paper) (link to paper)

  442. (Menu for Tran) All papers - Full papers - Abstracts - Selected papers

    Trautmann

  443. Trautmann, N (2014) A mixed-integer linear programming approach to the optimization of event-bus schedules: a scheduling application in the tourism sector, 621--629 (Selected Paper) (link to paper)
  444. Trautmann, N (2009) A cyclic approach to large-scale short-term planning in chemical batch production, 595--606 (Selected Paper) (link to paper)

  445. (Menu for Trautmann) All papers - Full papers - Abstracts - Selected papers

    Trietsch

  446. Trietsch, D (2011) Three heuristic procedures for the stochastic, two-machine flow shop problem, 445--454 (Selected Paper) (link to paper)

  447. (Menu for Trietsch) All papers - Full papers - Abstracts - Selected papers

    Trystram

  448. Trystram, D. (2016) Novel dual discounting functions for the Internet shopping optimization problem: new algorithms, 245--255 (Selected Paper) (link to paper)

  449. (Menu for Trystram) All papers - Full papers - Abstracts - Selected papers

    Tsang

  450. Tsang, E. P.K (2011) Empowerment scheduling for a field workforce, 639--654 (Selected Paper) (link to paper)

  451. (Menu for Tsang) All papers - Full papers - Abstracts - Selected papers

    T’kindt

  452. T’kindt, V (2011) Scheduling two agents on uniform parallel machines with makespan and cost functions, 471--481 (Selected Paper) (link to paper)

  453. (Menu for T’kindt) All papers - Full papers - Abstracts - Selected papers

    Urrutia

  454. Urrutia, S (2009) The traveling tournament problem with predefined venues, 607--622 (Selected Paper) (link to paper)

  455. (Menu for Urrutia) All papers - Full papers - Abstracts - Selected papers

    Vakhania

  456. Vakhania, N (2008) On the geometry, preemptions and complexity of multiprocessor and shop scheduling, 183--213 (Selected Paper) (link to paper)

  457. (Menu for Vakhania) All papers - Full papers - Abstracts - Selected papers

    Vancroonenburg

  458. Vancroonenburg, W. (2016) The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 271--283 (Selected Paper) (link to paper)

  459. (Menu for Vancroonenburg) All papers - Full papers - Abstracts - Selected papers

    Vanden Berghe

  460. Vanden Berghe, G. (2016) The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 271--283 (Selected Paper) (link to paper)

  461. (Menu for Vanden Berghe) All papers - Full papers - Abstracts - Selected papers

    Vanhoucke

  462. Vanhoucke, M (2008) Comparison and hybridization of crossover operators for the nurse scheduling problem, 333--353 (Selected Paper) (link to paper)

  463. (Menu for Vanhoucke) All papers - Full papers - Abstracts - Selected papers

    Varela

  464. Varela, L (2005) A Scheduling Web Service, 187--201 (Selected Paper) (link to paper)

  465. (Menu for Varela) All papers - Full papers - Abstracts - Selected papers

    Verstichel

  466. Verstichel, J. (2016) The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 271--283 (Selected Paper) (link to paper)

  467. (Menu for Verstichel) All papers - Full papers - Abstracts - Selected papers

    Vianna

  468. Vianna, D. S. (2008) A GRASP algorithm for the multi-criteria minimum spanning tree problem, 125--133 (Selected Paper) (link to paper)

  469. (Menu for Vianna) All papers - Full papers - Abstracts - Selected papers

    Vieira

  470. Vieira, P. S. (2008) A GRASP algorithm for the multi-criteria minimum spanning tree problem, 125--133 (Selected Paper) (link to paper)

  471. (Menu for Vieira) All papers - Full papers - Abstracts - Selected papers

    Visentini

  472. Visentini, M. S (2014) Review of real-time vehicle schedule recovery methods in transportation services, 541--567 (Selected Paper) (link to paper)

  473. (Menu for Visentini) All papers - Full papers - Abstracts - Selected papers

    Wang

  474. Wang, Z (2008) Performance of service policies in a specialized service system with parallel servers, 451--460 (Selected Paper) (link to paper)

  475. (Menu for Wang) All papers - Full papers - Abstracts - Selected papers

    Watson

  476. Watson, J-P. (2005) A Dynamic Model of Tabu Search for the Job-Shop Scheduling Problem, 247--266 (Selected Paper) (link to paper)

  477. (Menu for Watson) All papers - Full papers - Abstracts - Selected papers

    Wauters

  478. Wauters, T. (2016) The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 271--283 (Selected Paper) (link to paper)

  479. (Menu for Wauters) All papers - Full papers - Abstracts - Selected papers

    Werner

  480. Werner, F (2011) Parallel machine problems with equal processing times: a survey, 435--444 (Selected Paper) (link to paper)

  481. (Menu for Werner) All papers - Full papers - Abstracts - Selected papers

    Westphal

  482. Westphal, S (2008) Pruning in column generation for service vehicle dispatching, 355--371 (Selected Paper) (link to paper)

  483. (Menu for Westphal) All papers - Full papers - Abstracts - Selected papers

    Whitley

  484. Whitley, L. D (2005) A Dynamic Model of Tabu Search for the Job-Shop Scheduling Problem, 247--266 (Selected Paper) (link to paper)

  485. (Menu for Whitley) All papers - Full papers - Abstracts - Selected papers

    Woeginger

  486. Woeginger, G. J (2005) Formulations, Relaxations, Approximations and Gaps in the World of Scheduling, 19--36 (Selected Paper) (link to paper)

  487. (Menu for Woeginger) All papers - Full papers - Abstracts - Selected papers

    Xing

  488. Xing, W (2008) Performance of service policies in a specialized service system with parallel servers, 451--460 (Selected Paper) (link to paper)

  489. (Menu for Xing) All papers - Full papers - Abstracts - Selected papers

    Yang

  490. Yang, S (2011) A hybrid genetic algorithm and tabu search approach for post enrolment course timetabling, 617--637 (Selected Paper) (link to paper)
  491. Yang, Y (2005) Case-Based Initialisation of Metaheuristics for Examination, 289--308 (Selected Paper) (link to paper)
  492. Yang, W (2008) Aircraft and crew scheduling for fractional ownership programs, 415--431 (Selected Paper) (link to paper)

  493. (Menu for Yang) All papers - Full papers - Abstracts - Selected papers

    Yugma

  494. Yugma, C. (2016) A memetic algorithm to solve an unrelated parallel machine scheduling problem with auxiliary resources in semiconductor manufacturing, 367--376 (Selected Paper) (link to paper)
  495. Yugma, C (2011) Scheduling jobs on parallel machines to minimize a regular step total cost function, 523--538 (Selected Paper) (link to paper)
  496. Yugma, C (2011) Erratum to: Scheduling jobs on parallel machines to minimize a regular step total cost function, 539--540 (Selected Paper) (link to paper)

  497. (Menu for Yugma) All papers - Full papers - Abstracts - Selected papers

    Zhang

  498. Zhang, R (2009) Approximation algorithms for minimizing the total weighted number of late jobs with late deliveries in two-level supply chains, 565--574 (Selected Paper) (link to paper)

  499. (Menu for Zhang) All papers - Full papers - Abstracts - Selected papers

    Zhao

  500. Zhao, Y (2008) Integrated scheduling of handling equipment at automated container terminals, 373--394 (Selected Paper) (link to paper)
  501. Zhao, H (2008) Scheduling problems in master-slave model, 215--231 (Selected Paper) (link to paper)

  502. (Menu for Zhao) All papers - Full papers - Abstracts - Selected papers

    Zimmermann

  503. Zimmermann, J (2011) Exact methods for the resource levelling problem, 557--569 (Selected Paper) (link to paper)

  504. (Menu for Zimmermann) All papers - Full papers - Abstracts - Selected papers

    Zinder

  505. Zinder, Y (2005) Scheduling UET Tasks on Two Parallel Machines with the Criteria of Makespan and Total Completion Time, 83--109 (Selected Paper) (link to paper)

  506. (Menu for Zinder) All papers - Full papers - Abstracts - Selected papers

    Özcan

  507. Özcan, E (2005) Towards and XML based standard for Timetabling Problems:TTML, 163--185 (Selected Paper) (link to paper)

  508. (Menu for Özcan) All papers - Full papers - Abstracts - Selected papers