MISTA: List of papers by authors
This page was developed to give a summary of the papers that have been presented at MISTA, sorted by the authors. It is provided to give you a quick way to check all the papers that you have published at MISTA (or in the post conference publication).
The papers are NOT complete references. To see the complete reference, click on the link to paper link.
You can view the papers in various ways.
- All papers (full papers, abstracts and selected papers)
- Only full papers from the conference proceedings
- Only abstracts from the conference proceedings
- Only selected papers published in the post conference volumes
There is also a menu under each author, so that you can just display the data for just one author.
Abdullah
- Abdullah, S (2005) An Investigation Of Variable Neighbourhood Search For University Course Timetabling, 413--427 (Full Paper) (link to paper)
- Abdullah, S (2009) An Investigation of a Genetic Algorithm and Sequential Local Search Approach for Curriculum-based Course Timetabling Problems, 727--731 (Abstract) (link to paper)
- Abdullah, S (2009) An Extended Great Deluge Approach to the Examination Timetabling Problem, 424--434 (Full Paper) (link to paper)
- Abdullah, S (2015) Bacteria Swarm Optimisation Approach for Enrolment-Based Course Timetabling Problems, 515--525 (Full Paper) (link to paper)
- Abdullah, S (2013) An Evolutionary Hill Climbing Algorithm for Dynamic Optimisation Problems, 795--799 (Abstract) (link to paper)
(Menu for Abdullah) All papers - Full papers - Abstracts - Selected papers Ackermann
- Ackermann, H (2015) How to Unload Bulk Carriers Quickly? Mathematical Models to Identify Efficient Loading Patterns, 772--775 (Abstract) (link to paper)
- Ackermann, H. (2016) Time-hierarchical scheduling A worst case analysis of a hierarchical approach integrating planning and scheduling in an online problem, 215--225 (Selected Paper) (link to paper)
- Ackermann, H (2013) Time-Hierarchical Scheduling A worst-case analysis of a rolling hierarchical approach for integrated production planning and scheduling i nmake-to-order environments, 617--619 (Abstract) (link to paper)
(Menu for Ackermann) All papers - Full papers - Abstracts - Selected papers Adasme
- Adasme, P (2015) A Probabilistic Constrained Approach for Unrelated Parallel Machine Scheduling, 16--24 (Full Paper) (link to paper)
- Adasme, P. (2016) Uplink scheduling for joint wireless orthogonal frequency and time division multiple access networks, 349--366 (Selected Paper) (link to paper)
- Adasme, P (2014) Stochastic and semidefinite optimization for scheduling in orthogonal frequency division multiple access networks, 445--469 (Selected Paper) (link to paper)
- Adasme, P (2011) SDP Relaxations for Two Stage OFDMA Networks with and without Probabilistic Constraints, 445--458 (Full Paper) (link to paper)
- Adasme, P (2013) Scheduling in Wireless OFDMA-TDMA Networks using Variable Neighborhood Search Metaheuristic, 55--64 (Full Paper) (link to paper)
(Menu for Adasme) All papers - Full papers - Abstracts - Selected papers Adelson-Velsky
- Adelson-Velsky, G (2005) On Project Scheduling With And/or Precedence Constraints, 597--606 (Full Paper) (link to paper)
(Menu for Adelson-Velsky) All papers - Full papers - Abstracts - Selected papers Adenso-Díaz
- Adenso-Díaz, B (2003) Rule-Based System for Platform Assignment in Bus Stations, 696--699 (Abstract) (link to paper)
- Adenso-Díaz, B (2005) Rule-Based System for Platform Assignment in Bus Stations, 369--379 (Selected Paper) (link to paper)
- Adenso-Díaz, B (2005) Approximate Solutions For A New Version Of The Car Sequencing Problem (abstract), 93--96 (Abstract) (link to paper)
- Adenso-Díaz, B (2008) A Beam Search approach for the optimization version of the Car Sequencing Problem, 233--244 (Selected Paper) (link to paper)
(Menu for Adenso-Díaz) All papers - Full papers - Abstracts - Selected papers Adriaen
- Adriaen, M (2005) Course Timetabling Extended Tiles For University Timetabling, 669--670 (Abstract) (link to paper)
- Adriaen, M (2003) Decentralised Course Timetabling in a Large Hierarchical Organisation, 60--66 (Abstract) (link to paper)
(Menu for Adriaen) All papers - Full papers - Abstracts - Selected papers Adriaensen
- Adriaensen, S (2015) On Task Scheduling Policies for Work-Stealing Schedulers, 821--824 (Abstract) (link to paper)
(Menu for Adriaensen) All papers - Full papers - Abstracts - Selected papers Afifi
- Afifi, S (2015) Primal Heuristics for the Vehicle Routing Problem with Synchronized Visits, 859--861 (Abstract) (link to paper)
(Menu for Afifi) All papers - Full papers - Abstracts - Selected papers Aggoune
- Aggoune, R (2009) Recent Adavances in Solving Two-job Shop Scheduling Problems: Extensions and Improvements of the Geometric Approach, 469--478 (Full Paper) (link to paper)
(Menu for Aggoune) All papers - Full papers - Abstracts - Selected papers Aggoune-Mtalaa
- Aggoune-Mtalaa, W (2013) Guiding wiki crowds through resource scheduling, 753--756 (Abstract) (link to paper)
(Menu for Aggoune-Mtalaa) All papers - Full papers - Abstracts - Selected papers Aghezzaf
- Aghezzaf, E-H. (2007) Aligning Frequencies in Cyclic Delivery Scheduling, 426--430 (Full Paper) (link to paper)
- Aghezzaf, E.-H (2013) A fast solution method for the Time-Dependent Orienteering Problem with time windows, 676--679 (Abstract) (link to paper)
- Aghezzaf, E- (2013) Balancing and Sequencing Mixed-Model Assembly Lines to Minimize Work Overload in Real World Workstations, 230--239 (Full Paper) (link to paper)
(Menu for Aghezzaf) All papers - Full papers - Abstracts - Selected papers Agnetis
- Agnetis, A (2013) Production and Interplant Batch Delivery Scheduling: Dominance and Cooperation, 133--150 (Full Paper) (link to paper)
(Menu for Agnetis) All papers - Full papers - Abstracts - Selected papers Aharon
- Aharon, G (2013) Hierarchical Control Model for Several Stochastic Network Projects, 800--800 (Abstract) (link to paper)
(Menu for Aharon) All papers - Full papers - Abstracts - Selected papers Ahmadi
- Ahmadi, S (2003) Perturbation Based Variable Neighbourhood Search in Heuristic Space for Examination Timetabling Problem, 155--173 (Full Paper) (link to paper)
- Ahmadi, S (2015) Optimisation of a Stagger Chart for Aviation Fleet Planning, 579--589 (Full Paper) (link to paper)
- Ahmadi, S (2015) Optimisation of a Stagger Chart for Aviation Fleet Planning, 952--962 (Abstract) (link to paper)
(Menu for Ahmadi) All papers - Full papers - Abstracts - Selected papers Aickelin
- Aickelin, U (2003) Explicit Learning: an Effort towards Human Scheduling Algorithms, 240--243 (Abstract) (link to paper)
(Menu for Aickelin) All papers - Full papers - Abstracts - Selected papers Aizam
- Aizam, N.A.H (2017) Variation of Demands for a New Improvised University Course Timetabling Problem Mathematical Model, 320--320 (Abstract) (link to paper)
- Aizam, N.A. (2017) Mathematical model for a high quality examination timetabling problem: case study of a university in Malaysia, 319--319 (Abstract) (link to paper)
(Menu for Aizam) All papers - Full papers - Abstracts - Selected papers Akartunah
- Akartunah, K (2015) Modeling Uncertainty in Vessel Crew Scheduling, 805--808 (Abstract) (link to paper)
(Menu for Akartunah) All papers - Full papers - Abstracts - Selected papers Akartunali
- Akartunali, K (2015) A Hybrid Constraint Integer Programming Approach to Solve Nurse Scheduling Problems, 429--442 (Full Paper) (link to paper)
(Menu for Akartunali) All papers - Full papers - Abstracts - Selected papers Akhavizadegan
- Akhavizadegan, F (2015) Cross-training performance of nurse scheduling with the learning effect, 296--312 (Full Paper) (link to paper)
(Menu for Akhavizadegan) All papers - Full papers - Abstracts - Selected papers Akhlaghi
- Akhlaghi, V. E. (2015) Shortest k-unit Cycle in a Multiple Part-Type Robotic Cell, 876--878 (Abstract) (link to paper)
- Akhlaghi, V.E (2017) Robotic Cell Scheduling Considering Energy Consumption of Robot Moves, 329--329 (Abstract) (link to paper)
(Menu for Akhlaghi) All papers - Full papers - Abstracts - Selected papers Akkan
- Akkan, C (2011) Improving Schedule Stability in Single-Machine Rescheduling due to New Operation Insertion, 506--518 (Abstract) (link to paper)
(Menu for Akkan) All papers - Full papers - Abstracts - Selected papers Akrotirianakis
- Akrotirianakis, I (2015) An optimization-based approach for delivering radio-pharmaceuticals to medical imaging centers, 203--217 (Full Paper) (link to paper)
(Menu for Akrotirianakis) All papers - Full papers - Abstracts - Selected papers Al-Betar
- Al-Betar, M. A (2009) A hybrid harmony search for university course timetabling, 157--179 (Full Paper) (link to paper)
(Menu for Al-Betar) All papers - Full papers - Abstracts - Selected papers Al-Khair
- Al-Khair, W.S.A (2003) Simulation-Based Days-Off Scheduling of a Pipelines Maintenance Workforce, 524--525 (Abstract) (link to paper)
(Menu for Al-Khair) All papers - Full papers - Abstracts - Selected papers Alefragis
- Alefragis, P (2017) Exploration of Logic-Based Benders Decomposition Approach for Mapping Applications on Heterogeneous Multi-Core Platforms, 030--042 (Full Paper) (link to paper)
- Alefragis, P (2013) DAG Scheduling using Integer Programming in heterogenous parallel execution environments, 392--401 (Full Paper) (link to paper)
(Menu for Alefragis) All papers - Full papers - Abstracts - Selected papers Alexandridis
- Alexandridis, A (2005) Optimal Production Scheduling For Dairy Industries, 324--325 (Abstract) (link to paper)
(Menu for Alexandridis) All papers - Full papers - Abstracts - Selected papers Alfares
- Alfares, H.K (2003) Simulation-Based Days-Off Scheduling of a Pipelines Maintenance Workforce, 524--525 (Abstract) (link to paper)
(Menu for Alfares) All papers - Full papers - Abstracts - Selected papers Ali
- Ali, O (2015) Scheduling the operation of a phosphate pipeline for OCP: A Case Study, 622--625 (Abstract) (link to paper)
(Menu for Ali) All papers - Full papers - Abstracts - Selected papers Alidaee
- Alidaee, B (2009) An Empirical Study of Impacts of Production Mix Efficiency, Product Route Efficiency on Operations Performance and Profitability: A Reverse Logistics Approach, 765--767 (Abstract) (link to paper)
(Menu for Alidaee) All papers - Full papers - Abstracts - Selected papers Alkan
- Alkan, A (2007) A Memetic Algorithm for Solving a Timetabling Problem:An Incremental Strategy, 394--401 (Full Paper) (link to paper)
(Menu for Alkan) All papers - Full papers - Abstracts - Selected papers Allaoui
- Allaoui, H (2003) Two-machine Flowshop Scheduling with the Availability Constraint on the Second Machine, 279--290 (Full Paper) (link to paper)
- Allaoui, H (2013) Minimizing the weighted sum of maximum earlinesstardiness cost on a single machine under maintenance constraints, 240--247 (Full Paper) (link to paper)
- Allaoui, H (2015) Modeling the single-processor scheduling problem with time restrictions as a parallel machine scheduling problem, 325--330 (Full Paper) (link to paper)
(Menu for Allaoui) All papers - Full papers - Abstracts - Selected papers Almakhla?
- Almakhla?, A (2015) Iterated Local Search for the Generator Maintenance Scheduling Problem, 708--742 (Abstract) (link to paper)
(Menu for Almakhla?) All papers - Full papers - Abstracts - Selected papers Almeder
- Almeder, C (2011) A GRASP Approach for Scheduling Jobs with Incompatible Families on Parallel Batch Machines, 557--560 (Abstract) (link to paper)
- Almeder, C (2009) Ant Colony Optimization Approaches for Scheduling Jobs with Incompatible Families on Parallel Batch Machines, 105--114 (Full Paper) (link to paper)
(Menu for Almeder) All papers - Full papers - Abstracts - Selected papers Almeida
- Almeida, A (2003) Reducing Job Throughput Time : Using Horizontal Scheduling and Simultaneous Manufacturing, 386--387 (Abstract) (link to paper)
(Menu for Almeida) All papers - Full papers - Abstracts - Selected papers Almgren
- Almgren, T (2015) Scheduling optimization of a real flexible job shop including side constraints regarding maintenance, ?xtures, and night shifts, 78--101 (Full Paper) (link to paper)
(Menu for Almgren) All papers - Full papers - Abstracts - Selected papers Alonso-Pecina
- Alonso-Pecina, F (2013) A Three-Phases Based Algorithm for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem The MISTA 2013 Challenge, 812--814 (Full Paper) (link to paper)
(Menu for Alonso-Pecina) All papers - Full papers - Abstracts - Selected papers Aloulou
- Aloulou, M. Al (2013) Production and Interplant Batch Delivery Scheduling: Dominance and Cooperation, 133--150 (Full Paper) (link to paper)
- Aloulou, M. Al (2005) An Efficient Proactive-Reactive Scheduling Approach to Hedge Against Shop Floor Disturbances, 223--246 (Selected Paper) (link to paper)
- Aloulou, M.A (2003) An Efficient Proactive Reactive Scheduling Approach to Hedge Against Shop Floor Disturbances, 337--362 (Full Paper) (link to paper)
- Aloulou, M.A (2015) Integrated production and outbound distribution scheduling problem with setup times and delivery time windows, 174--188 (Full Paper) (link to paper)
(Menu for Aloulou) All papers - Full papers - Abstracts - Selected papers Alqudsi
- Alqudsi, A (2015) Bacteria Swarm Optimisation Approach for Enrolment-Based Course Timetabling Problems, 515--525 (Full Paper) (link to paper)
(Menu for Alqudsi) All papers - Full papers - Abstracts - Selected papers Alsheddy
- Alsheddy, A (2009) Empowerment-based Workforce Scheduling Problem, 130--144 (Full Paper) (link to paper)
- Alsheddy, A (2011) Empowerment scheduling for a field workforce, 639--654 (Selected Paper) (link to paper)
(Menu for Alsheddy) All papers - Full papers - Abstracts - Selected papers Althaus
- Althaus, E (2015) University Course Timetabling with Con?ict Minimization and Elective Courses, 412--428 (Full Paper) (link to paper)
(Menu for Althaus) All papers - Full papers - Abstracts - Selected papers Andres
- Andres, C (2007) Unrelated Parallel Machines Scheduling with Resource-Assignable Sequence Dependent Setup Times, 439--446 (Full Paper) (link to paper)
(Menu for Andres) All papers - Full papers - Abstracts - Selected papers Angel
- Angel, E (2005) How good Are SPT Schedules For Fair Optimality Criteria, 244--257 (Full Paper) (link to paper)
- Angel, E (2008) How good are SPT schedules for fair optimality criteria, 53--64 (Selected Paper) (link to paper)
(Menu for Angel) All papers - Full papers - Abstracts - Selected papers Angelelli
- Angelelli, E (2007) Semi On-Line Scheduling on Two Uniform Processors, 51--58 (Full Paper) (link to paper)
(Menu for Angelelli) All papers - Full papers - Abstracts - Selected papers Ansarifar
- Ansarifar, J (2015) Cross-training performance of nurse scheduling with the learning effect, 296--312 (Full Paper) (link to paper)
(Menu for Ansarifar) All papers - Full papers - Abstracts - Selected papers Aparicio
- Aparicio, J (2005) A Scheduling Web Service, 187--201 (Selected Paper) (link to paper)
(Menu for Aparicio) All papers - Full papers - Abstracts - Selected papers Aparício
- Aparício, J (2003) A Scheduling Web Service, 540--553 (Full Paper) (link to paper)
(Menu for Aparício) All papers - Full papers - Abstracts - Selected papers Araki
- Araki, M (2009) An exact algorithm for single-machine scheduling without machine idle time, 575--593 (Selected Paper) (link to paper)
(Menu for Araki) All papers - Full papers - Abstracts - Selected papers Arbaoui
- Arbaoui, T (2015) Student Scheduling Problem At Universite de Technologie de Compiegne, 871--875 (Abstract) (link to paper)
(Menu for Arbaoui) All papers - Full papers - Abstracts - Selected papers Arkhipov
- Arkhipov, D (2015) Single machine scheduling: finding the Pareto Set for jobs with equal processing times with respect to criteria Lmax and Cmax., 797--800 (Abstract) (link to paper)
(Menu for Arkhipov) All papers - Full papers - Abstracts - Selected papers Armellini
- Armellini, D (2017) Modeling and Solving the Steelmaking and Casting Planning and Scheduling Problem, 380--383 (Abstract) (link to paper)
(Menu for Armellini) All papers - Full papers - Abstracts - Selected papers Armstrong
- Armstrong, R (2008) A zero-inventory production and distribution problem with a fixed customer sequence, 395--414 (Selected Paper) (link to paper)
- Armstrong, R (2005) A Zero-Inventory Production-Distribution Problem with Time-Window Constraints, 428--444 (Full Paper) (link to paper)
(Menu for Armstrong) All papers - Full papers - Abstracts - Selected papers Arroyo
- Arroyo, J. E. C. (2008) A GRASP algorithm for the multi-criteria minimum spanning tree problem, 125--133 (Selected Paper) (link to paper)
(Menu for Arroyo) All papers - Full papers - Abstracts - Selected papers Artiba
- Artiba, A (2003) Two-machine Flowshop Scheduling with the Availability Constraint on the Second Machine, 279--290 (Full Paper) (link to paper)
- Artiba, A (2013) Minimizing the weighted sum of maximum earlinesstardiness cost on a single machine under maintenance constraints, 240--247 (Full Paper) (link to paper)
- Artiba, A (2015) Scheduling preventive railway maintenance activities with resource constraints, 782--784 (Abstract) (link to paper)
(Menu for Artiba) All papers - Full papers - Abstracts - Selected papers Artigues
- Artigues, C (2005) Lower And Upper Bounds For The Job-shop Scheduling Problem With Sequence-dependent Setup Times, 316--321 (Full Paper) (link to paper)
- Artigues, C (2008) A branch and bound method for the job-shop problem with sequence-dependent setup times, 135--159 (Selected Paper) (link to paper)
- Artigues, C (2013) MIP Relaxation and Large Neighborhood Search for a Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 815--819 (Full Paper) (link to paper)
- Artigues, C (2007) Dynamic Cooperative Search for Constraint Satisfaction and Combinatorial Optimization: Application to a Rostering Problem, 557--560 (Abstract) (link to paper)
- Artigues, C (2013) Line search method for solving a non-preemptive strictly periodic scheduling problem, 356--371 (Full Paper) (link to paper)
- Artigues, C. (2016) Line search method for solving a non-preemptive strictly periodic scheduling problem, 227--243 (Selected Paper) (link to paper)
- Artigues, C (2015) Multimode Time-Constrained Scheduling Problems with Generalized Temporal Constraints and Labor Skills, 809--813 (Abstract) (link to paper)
(Menu for Artigues) All papers - Full papers - Abstracts - Selected papers Asco
- Asco, A (2014) An analysis of constructive algorithms for the airport baggage sorting station assignment problem, 601--619 (Selected Paper) (link to paper)
(Menu for Asco) All papers - Full papers - Abstracts - Selected papers Ascó
- Ascó, A. (2011) The Airport Baggage Sorting Station Allocation Problem, 419--444 (Full Paper) (link to paper)
(Menu for Ascó) All papers - Full papers - Abstracts - Selected papers Asmuni
- Asmuni, H (2007) Determining Rules in Fuzzy Multiple Heuristic Orderings for Constructing Examination Timetables, 59--66 (Full Paper) (link to paper)
- Asmuni, H (2015) A Hybrid Swarm Algorithm for Post Enrollment Course Timetabling, 931--942 (Abstract) (link to paper)
- Asmuni, H. bi (2013) Tackling University Timetabling Problems Using Hybridization of Swarm Based Approach, 543--548 (Full Paper) (link to paper)
(Menu for Asmuni) All papers - Full papers - Abstracts - Selected papers Asta
- Asta, S (2013) Combining Monte-Carlo and Hyper-heuristic methods for the Multi-mode Resource-constrained Multi-project Scheduling Problem, 836--839 (Full Paper) (link to paper)
(Menu for Asta) All papers - Full papers - Abstracts - Selected papers Atakan
- Atakan, S (2011) Minimizing Value-at-Risk in the Single-Machine Total Weighted Tardiness Problem, 215--229 (Full Paper) (link to paper)
(Menu for Atakan) All papers - Full papers - Abstracts - Selected papers Atkin
- Atkin, J. A. D (2014) An analysis of constructive algorithms for the airport baggage sorting station assignment problem, 601--619 (Selected Paper) (link to paper)
- Atkin, J. A. D (2011) The Airport Baggage Sorting Station Allocation Problem, 419--444 (Full Paper) (link to paper)
- Atkin, J. A (2009) A comparison of two methods for reducing take-off delay at London Heathrow airport, 12--27 (Full Paper) (link to paper)
- Atkin, J. A. D (2011) A more realistic approach for airport ground movement optimisation with stand holding, 146--160 (Full Paper) (link to paper)
- Atkin, J.A.D (2011) A comparison of two methods for reducing take-off delay at London Heathrow airport, 409--421 (Selected Paper) (link to paper)
- Atkin, J. A (2011) A Game Theoretic Approach for the Taxi Scheduling Problem with Street Hailing, 161--172 (Full Paper) (link to paper)
- Atkin, J. A. D (2014) A more realistic approach for airport ground movement optimisation with stand holding, 507--520 (Selected Paper) (link to paper)
(Menu for Atkin) All papers - Full papers - Abstracts - Selected papers Audenaert
- Audenaert, P (2013) Modeling Real-World Vehicle Routing Problems with Dependencies, 711--713 (Abstract) (link to paper)
(Menu for Audenaert) All papers - Full papers - Abstracts - Selected papers Aykin
- Aykin, T (2005) Skills-Based Agent Scheduling at Call Centers, 515--515 (Abstract) (link to paper)
(Menu for Aykin) All papers - Full papers - Abstracts - Selected papers Ayob
- Ayob, M (2003) An Investigation of an Adaptive Scheduling Approach for Multi Head Placement Machines, 363--381 (Full Paper) (link to paper)
- Ayob, M (2013) A Hybrid of Differential Evolution and Simulated Annealing Algorithms for the Capacitated Arc Routing Problems, 549--554 (Full Paper) (link to paper)
- Ayob, M (2009) Solving Examination Timetabling Problems using Honey-bee Mating Optimization (ETP-HBMO), 399--408 (Full Paper) (link to paper)
- Ayob, M (2017) Modeling a Practical University Course Timetabling Problem with Reward and Penalty Objective Function: Case Study FTSM-UKM, 348--357 (Abstract) (link to paper)
(Menu for Ayob) All papers - Full papers - Abstracts - Selected papers Aziz
- Aziz, N.L. (2017) Variation of Demands for a New Improvised University Course Timetabling Problem Mathematical Model, 320--320 (Abstract) (link to paper)
- Aziz, Z. Ab (2009) An Investigation of an Ant-based Hyperheuristic for the Capacitated Vehicle Routing Problem, 823--826 (Abstract) (link to paper)
- Aziz, N.L. (2017) Mathematical model for a high quality examination timetabling problem: case study of a university in Malaysia, 319--319 (Abstract) (link to paper)
(Menu for Aziz) All papers - Full papers - Abstracts - Selected papers Azouni
- Azouni, A (2015) Student Scheduling Problem At Universite de Technologie de Compiegne, 871--875 (Abstract) (link to paper)
(Menu for Azouni) All papers - Full papers - Abstracts - Selected papers Baarsma
- Baarsma, H (2007) Statistical Quality Analysis of Schedulers under Soft-Real-Time Constraints, 547--549 (Abstract) (link to paper)
(Menu for Baarsma) All papers - Full papers - Abstracts - Selected papers Baatar
- Baatar, D (2017) Symmetry breaking in a special case of the RCPSP/max, 315--318 (Abstract) (link to paper)
(Menu for Baatar) All papers - Full papers - Abstracts - Selected papers Baber
- Baber, F (2003) A Constraint Ordering Heuristic for Scheduling Problems, 476--491 (Full Paper) (link to paper)
(Menu for Baber) All papers - Full papers - Abstracts - Selected papers Babic
- Babic, O (2009) Heuristic approach to the airline schedule disturbances problem: multifleet case, 311--320 (Full Paper) (link to paper)
(Menu for Babic) All papers - Full papers - Abstracts - Selected papers Bach
- Bach, L (2017) Railway Rolling Stock Maintenance, 373--376 (Abstract) (link to paper)
- Bach, L (2017) The "Orchestrator" approach to multimodal continental trip planning., 362--366 (Abstract) (link to paper)
(Menu for Bach) All papers - Full papers - Abstracts - Selected papers Bagger
- Bagger, N-C. F. (2015) Flow Formulation-based Model for the Curriculum-based Course Timetabling Problem, 825--848 (Abstract) (link to paper)
(Menu for Bagger) All papers - Full papers - Abstracts - Selected papers Bai
- Bai, R (2007) A Simulated Annealing Hyper-heuristic: Adaptive Heuristic Selection for Different Vehicle Routing Problems, 67--70 (Full Paper) (link to paper)
- Bai, R (2011) A Game Theoretic Approach for the Taxi Scheduling Problem with Street Hailing, 161--172 (Full Paper) (link to paper)
- Bai, R (2017) Responsive Single Bus Corridor Scheduling Based on Machine Learning and Optimisation, 288--294 (Full Paper) (link to paper)
(Menu for Bai) All papers - Full papers - Abstracts - Selected papers Baille
- Baille, F (2005) Bicriteria Parallel Task Scheduling, 585--596 (Full Paper) (link to paper)
- Baille, F (2008) Bicriteria scheduling for contiguous and non contiguous parallel tasks, 97--106 (Selected Paper) (link to paper)
(Menu for Baille) All papers - Full papers - Abstracts - Selected papers Baker
- Baker, K. R (2009) Three Heuristic Procedures for the Stochastic Flow Shop Problem, 330--340 (Full Paper) (link to paper)
- Baker, K. R (2011) Three heuristic procedures for the stochastic, two-machine flow shop problem, 445--454 (Selected Paper) (link to paper)
(Menu for Baker) All papers - Full papers - Abstracts - Selected papers Balas
- Balas, E (2005) Good Neighborhoods And Well-matched Neighborhoods, 2--2 (Abstract) (link to paper)
- Balas, E (2005) Job Shop Scheduling with Setup Times, Deadlines and Precedence Constrainsts, 520--532 (Abstract) (link to paper)
(Menu for Balas) All papers - Full papers - Abstracts - Selected papers Balasubramanian
- Balasubramanian, H (2015) The polynomial solvability of a bicriteria linear combination on parallel identical machines with release dates, 902--904 (Abstract) (link to paper)
- Balasubramanian, H (2005) Bicriteria Scheduling Of Equal Length Jobs With Release Dates On Identical Parallel Machines, 112--122 (Full Paper) (link to paper)
- Balasubramanian, H (2009) Single Machine Scheduling with Interfering Job Sets, 357--365 (Full Paper) (link to paper)
- Balasubramanian, H (2011) Single Machine Scheduling with Interfering Job Sets to Minimize Total Weighted Completion Time and Maximum Lateness, 568--572 (Abstract) (link to paper)
- Balasubramanian, H (2005) A Bi-criteria Approach To Scheduling Wafer Fabrication Facilities, 276--287 (Full Paper) (link to paper)
(Menu for Balasubramanian) All papers - Full papers - Abstracts - Selected papers Baltar
- Baltar, D.D (2015) LAHC applied to The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 905--908 (Abstract) (link to paper)
(Menu for Baltar) All papers - Full papers - Abstracts - Selected papers Bampis
- Bampis, E (2005) How good Are SPT Schedules For Fair Optimality Criteria, 244--257 (Full Paper) (link to paper)
- Bampis, E (2008) How good are SPT schedules for fair optimality criteria, 53--64 (Selected Paper) (link to paper)
- Bampis, E (2005) Bicriteria Parallel Task Scheduling, 585--596 (Full Paper) (link to paper)
- Bampis, E (2008) Bicriteria scheduling for contiguous and non contiguous parallel tasks, 97--106 (Selected Paper) (link to paper)
(Menu for Bampis) All papers - Full papers - Abstracts - Selected papers Bansal
- Bansal, N (2005) Improved Approximation Algorithms For Broadcast Scheduling, 655--656 (Abstract) (link to paper)
- Bansal, N (2005) Algorithms for online buffer management, 518--518 (Abstract) (link to paper)
(Menu for Bansal) All papers - Full papers - Abstracts - Selected papers Baptiste
- Baptiste, P (2007) Sequencing a Single Machine with Due Dates and Deadlines: an ILP-based Approach to Solve Very Large Instances, 71--79 (Full Paper) (link to paper)
- Baptiste, P (2009) Preface, 563--564 (Selected Paper) (link to paper)
- Baptiste, P (2005) Scheduling A Single Machine To Minimize A Regular Objective Function Under Setup Constraints, 193--195 (Abstract) (link to paper)
- Baptiste, P (2003) The One Machine Total Cost Scheduling Problem with Release Dates, 406--408 (Abstract) (link to paper)
- Baptiste, P (2003) Dominance Based Heuristics to Minimize a Total Cost on One Machine, 403--405 (Abstract) (link to paper)
- Baptiste, P (2005) Lower Bounds For Parallel Machine Scheduling, 215--216 (Abstract) (link to paper)
(Menu for Baptiste) All papers - Full papers - Abstracts - Selected papers Barbosa
- Barbosa, A (2015) Solving the staff scheduling problem in a retail company, 611--613 (Abstract) (link to paper)
- Barbosa, A (2013) Automatic Timetabling in Higher Education Institutions: a real scenario and solution, 151--170 (Full Paper) (link to paper)
- Barbosa, A. (2016) A decision support approach to automatic timetabling in higher education institutions, 335--348 (Selected Paper) (link to paper)
- Barbosa, J. J. G. (2013) An Iterative Local Search Algorithm for Scheduling Precedence-Constrained Applications on Heterogeneous Machines, 472--485 (Full Paper) (link to paper)
(Menu for Barbosa) All papers - Full papers - Abstracts - Selected papers Barbosa-Póvoa
- Barbosa-Póvoa, A (2009) Scheduling of job shop, make-to-order industries with recirculation and assembly: discrete versus continuous time models, 802--807 (Abstract) (link to paper)
- Barbosa-Póvoa, A (2005) Optimal Reactive Scheduling For Job Shop, Make-toorder Industries: A Mould Making Industry Case Study, 46--46 (Abstract) (link to paper)
(Menu for Barbosa-Póvoa) All papers - Full papers - Abstracts - Selected papers Barbulescu
- Barbulescu, L. V (2007) Analyzing Basic Representation Choices in Oversubscribed Scheduling Problems, 259--266 (Full Paper) (link to paper)
- Barbulescu, L (2005) Random Walks And Neighborhood Bias In Oversubscribed Scheduling, 98--105 (Full Paper) (link to paper)
(Menu for Barbulescu) All papers - Full papers - Abstracts - Selected papers Bard
- Bard, J. F (2005) Scheduling Product Families In A High Volume, Flexible, Assemble-to-order Factory, 394--395 (Abstract) (link to paper)
(Menu for Bard) All papers - Full papers - Abstracts - Selected papers Bargiela
- Bargiela, A (2013) An Investigation of Multistage Approaches to Examination Timetabling, 528--542 (Full Paper) (link to paper)
(Menu for Bargiela) All papers - Full papers - Abstracts - Selected papers Barnhart
- Barnhart, C (2011) A Decomposition Approach for Shipment Pickup and Delivery with Time-Windows Under Uncertainty, 352--365 (Full Paper) (link to paper)
- Barnhart, C (2014) A decomposition approach for commodity pickup and delivery with time-windows under uncertainty, 489--506 (Selected Paper) (link to paper)
(Menu for Barnhart) All papers - Full papers - Abstracts - Selected papers Baron
- Baron, O (2015) Strategic Idling and Dynamic Scheduling in Open-Shop Service Network: Case Study and Analysis, 604--605 (Abstract) (link to paper)
(Menu for Baron) All papers - Full papers - Abstracts - Selected papers Barone
- Barone, R (2003) Perturbation Based Variable Neighbourhood Search in Heuristic Space for Examination Timetabling Problem, 155--173 (Full Paper) (link to paper)
(Menu for Barone) All papers - Full papers - Abstracts - Selected papers Bartels
- Bartels, J-H. (2011) Exact methods for the resource levelling problem, 557--569 (Selected Paper) (link to paper)
(Menu for Bartels) All papers - Full papers - Abstracts - Selected papers Barth
- Barth, T.C (2013) Baggage Scheduling at Airports A framework for e?ciently allocating resources to flight events, 599--602 (Abstract) (link to paper)
(Menu for Barth) All papers - Full papers - Abstracts - Selected papers Barták
- Barták, R (2017) Scheduling Models for Multi-Agent Path Finding, 189--200 (Full Paper) (link to paper)
- Barták, R (2005) Incremental Propagation Rules For A Precedence Graph With Optional Activities And Time Windows, 552--560 (Abstract) (link to paper)
- Barták, R (2003) Integrating Planning into Production Scheduling: Visopt Shopfloor System, 259--278 (Full Paper) (link to paper)
- Barták, R (2009) A local approach to automated correction of violated precedence and resource constraints in manually altered schedules, 507--517 (Full Paper) (link to paper)
- Barták, R (2015) Resource Failure Recovery in Production Scheduling, 852--858 (Abstract) (link to paper)
- Barták, R (2009) Preemptive scheduling with precedences and alternative resources, 518--530 (Full Paper) (link to paper)
- Barták, R (2017) Benders Decomposition in SMT for Rescheduling of Hierarchical Workflow, 295--310 (Full Paper) (link to paper)
- Barták, R (2009) Planning Heuristics for Efficient Data Movement on the Grid, 768--771 (Abstract) (link to paper)
(Menu for Barták) All papers - Full papers - Abstracts - Selected papers Battistutta
- Battistutta, M (2015) Thesis Defense Timetabling, 507--514 (Full Paper) (link to paper)
(Menu for Battistutta) All papers - Full papers - Abstracts - Selected papers Baumann
- Baumann, P (2011) Minimizing changeover times of a make-and-pack production process: model and case study, 539--541 (Abstract) (link to paper)
- Baumann, M (2011) Scheduling of large dynamic job shop problems by concurrent non-blocking threads, 542--545 (Abstract) (link to paper)
- Baumann, P (2015) A lexicographic goal programming approach for staff assignment with acceptance levels, 526--540 (Full Paper) (link to paper)
- Baumann, P (2011) Decomposition approaches for multi-stage multi-product batch-production scheduling: a re ned batching model, 596--598 (Abstract) (link to paper)
(Menu for Baumann) All papers - Full papers - Abstracts - Selected papers Baumelt
- Baumelt, Z (2011) A Parallel Approach for a Nurse Rerostering Problem on the GPU, 576--578 (Abstract) (link to paper)
(Menu for Baumelt) All papers - Full papers - Abstracts - Selected papers Baumgartner
- Baumgartner, A (2009) Speeding up the optimal off-line algorithm for solving the k-server problem, 852--854 (Abstract) (link to paper)
(Menu for Baumgartner) All papers - Full papers - Abstracts - Selected papers Bautista
- Bautista, J (2005) Approximate Solutions For A New Version Of The Car Sequencing Problem (abstract), 93--96 (Abstract) (link to paper)
- Bautista, J (2008) A Beam Search approach for the optimization version of the Car Sequencing Problem, 233--244 (Selected Paper) (link to paper)
(Menu for Bautista) All papers - Full papers - Abstracts - Selected papers Baykasoglu
- Baykasoglu, A (2015) A GRASP based approach to dynamic scheduling of parallel heat treatment furnaces in a manufacturing company, 656--658 (Abstract) (link to paper)
(Menu for Baykasoglu) All papers - Full papers - Abstracts - Selected papers Beck
- Beck, J.C (2015) Resource-Aware Scheduling for Data Centers with Heterogenous Servers, 240--259 (Full Paper) (link to paper)
(Menu for Beck) All papers - Full papers - Abstracts - Selected papers Bedoya-Valencia
- Bedoya-Valencia, L (2005) A Genetic Algorithm with Random Keys Approach for the Job Shop Scheduling Problem with Earliness and Tardiness, 745--745 (Abstract) (link to paper)
(Menu for Bedoya-Valencia) All papers - Full papers - Abstracts - Selected papers Belien
- Belien, J (2013) Building university course timetables with minimized resulting student flows, 737--740 (Abstract) (link to paper)
- Belien, J (2013) A resource loading problem in the aircraft line maintenance industry, 580--583 (Abstract) (link to paper)
- Belien, J (2013) Algorithms for building optimal aircraft maintenance personnel rosters, 633--635 (Abstract) (link to paper)
(Menu for Belien) All papers - Full papers - Abstracts - Selected papers Beliën
- Beliën, J (2009) Integrated workforce staffing and scheduling: A case study at a major aircraft maintenance company, 724--726 (Abstract) (link to paper)
- Beliën, J (2003) Scheduling Trainees at a Hospital Department, 224--225 (Abstract) (link to paper)
- Beliën, J (2005) Integrating nurse and surgery scheduling, 408--409 (Abstract) (link to paper)
(Menu for Beliën) All papers - Full papers - Abstracts - Selected papers Bellenguez-Morineau
- Bellenguez-Morineau, O (2013) A large neighborhood search for the Shift Design Personnel Task Scheduling Problem with Equity, 590--592 (Abstract) (link to paper)
- Bellenguez-Morineau, O (2007) Multi-skill Project Scheduling Problem and Total Productive Maintenance, 608--610 (Abstract) (link to paper)
(Menu for Bellenguez-Morineau) All papers - Full papers - Abstracts - Selected papers Bellio
- Bellio, R (2013) A simulated annealing approach to the curriculum-based course timetabling problem, 314--317 (Full Paper) (link to paper)
(Menu for Bellio) All papers - Full papers - Abstracts - Selected papers Bello
- Bello, R (2013) A Robust Multi-Agent Reinforcement Learning Approach for Scheduling Problems, 410--423 (Full Paper) (link to paper)
(Menu for Bello) All papers - Full papers - Abstracts - Selected papers Belouadah
- Belouadah, H (2009) Hybrid of the weighted minimum slack and shortest processing time dispatching rules for the total weighted tardiness single machine scheduling problem with availability constraints, 202--215 (Full Paper) (link to paper)
(Menu for Belouadah) All papers - Full papers - Abstracts - Selected papers Belulu
- Belulu, A (2014) A reduction approach to the two-campus transport problem, 587--599 (Selected Paper) (link to paper)
(Menu for Belulu) All papers - Full papers - Abstracts - Selected papers Benabid
- Benabid, A (2009) Decomposed Software Pipelining for cyclic unitary RCPSP with precedence delays, 254--265 (Full Paper) (link to paper)
- Benabid, A (2011) Worst case analysis of decomposed software pipelining for cyclic unitary RCPSP with precedence delays, 511--522 (Selected Paper) (link to paper)
(Menu for Benabid) All papers - Full papers - Abstracts - Selected papers Benavides
- Benavides, A.J (2013) A simple stochastic local search for multi-mode resource-constrained multi-project scheduling, 826--830 (Full Paper) (link to paper)
(Menu for Benavides) All papers - Full papers - Abstracts - Selected papers Benmansour
- Benmansour, R (2013) Minimizing the weighted sum of maximum earlinesstardiness cost on a single machine under maintenance constraints, 240--247 (Full Paper) (link to paper)
- Benmansour, R (2015) Modeling the single-processor scheduling problem with time restrictions as a parallel machine scheduling problem, 325--330 (Full Paper) (link to paper)
- Benmansour, R (2015) Scheduling preventive railway maintenance activities with resource constraints, 782--784 (Abstract) (link to paper)
(Menu for Benmansour) All papers - Full papers - Abstracts - Selected papers Bennell
- Bennell, J. A (2011) Train Scheduling in the UK using a Job Shop Scheduling Approach, 486--488 (Abstract) (link to paper)
(Menu for Bennell) All papers - Full papers - Abstracts - Selected papers Bergh
- Bergh, J. V. (2013) A resource loading problem in the aircraft line maintenance industry, 580--583 (Abstract) (link to paper)
- Bergh, J. V. (2013) Algorithms for building optimal aircraft maintenance personnel rosters, 633--635 (Abstract) (link to paper)
(Menu for Bergh) All papers - Full papers - Abstracts - Selected papers Berghe
- Berghe, G.Van de (2013) Algorithm preformance prediction for nurse rostering, 21--38 (Full Paper) (link to paper)
(Menu for Berghe) All papers - Full papers - Abstracts - Selected papers Berghman
- Berghman, L (2009) Solving a dock assignment problem as a three-stage flexible flow-shop problem, 752--755 (Abstract) (link to paper)
- Berghman, L (2013) Solving a time-indexed formulation by preprocessing and cutting planes, 603--605 (Abstract) (link to paper)
(Menu for Berghman) All papers - Full papers - Abstracts - Selected papers Berlinska
- Berlinska, J (2013) Mitigating Partitioning Skew in MapReduce Computations, 80--90 (Full Paper) (link to paper)
- Berlinska, J (2009) Heuristics for Divisible Loads Scheduling in Systems with Limited Memory, 321--329 (Full Paper) (link to paper)
(Menu for Berlinska) All papers - Full papers - Abstracts - Selected papers Berman
- Berman, O (2015) Strategic Idling and Dynamic Scheduling in Open-Shop Service Network: Case Study and Analysis, 604--605 (Abstract) (link to paper)
- Berman, O (2015) Strategic Idling and Dynamic Scheduling in Open-Shop Service Network: Case Study and Analysis, 604--605 (Abstract) (link to paper)
(Menu for Berman) All papers - Full papers - Abstracts - Selected papers Berretta
- Berretta, R (2017) Optimizing Production Schedule with Energy Consumption and Demand Charges in Parallel Machine Setting, 133--143 (Full Paper) (link to paper)
(Menu for Berretta) All papers - Full papers - Abstracts - Selected papers Bertocchi
- Bertocchi, M (2011) Deterministic and stochastic models for investment in different technologies for electricity production in the long period, 607--623 (Abstract) (link to paper)
(Menu for Bertocchi) All papers - Full papers - Abstracts - Selected papers Bessler
- Bessler, S (2013) Scheduling of electric vehicle charging operations, 486--498 (Full Paper) (link to paper)
(Menu for Bessler) All papers - Full papers - Abstracts - Selected papers Beyrouthy
- Beyrouthy, C (2007) Clustering Within Timetabling Conflict Graphs, 553--556 (Abstract) (link to paper)
(Menu for Beyrouthy) All papers - Full papers - Abstracts - Selected papers Bhattacharya
- Bhattacharya, S (2015) Continuous Time Model for Scheduling Operations in Cascaded Continuous Processing Units with Multiple Due Dates, 63--77 (Full Paper) (link to paper)
- Bhattacharya, S (2005) A Heuristic Algorithm For Scheduling ‘blocked Out’ Units In Continuous Processing Industry : Preliminary Results, 258--274 (Full Paper) (link to paper)
- Bhattacharya, S (2008) A two pass heuristic algorithm for scheduling ‘blocked out’ units in continuous process industry, 293--313 (Selected Paper) (link to paper)
(Menu for Bhattacharya) All papers - Full papers - Abstracts - Selected papers Bian
- Bian, F (2003) Making Airline Schedules More Robust, 678--695 (Full Paper) (link to paper)
- Bian, F (2005) Measuring the Robustness of Airline Fleet Schedules, 381--392 (Selected Paper) (link to paper)
(Menu for Bian) All papers - Full papers - Abstracts - Selected papers Bierwirth
- Bierwirth, C (2011) Computational Comparison of Neighbourhoods for the Job Shop Scheduling Problem with Total Weighted Tardiness Objective, 536--538 (Abstract) (link to paper)
- Bierwirth, C (2013) A GRASP approach for the Job Shop Scheduling Problem with minimizing the Total Weighted Tardiness, 613--616 (Abstract) (link to paper)
(Menu for Bierwirth) All papers - Full papers - Abstracts - Selected papers Bilgin
- Bilgin, B (2009) A Hyperheuristic Approach to Belgian Nurse Rostering Problems, 683--689 (Abstract) (link to paper)
(Menu for Bilgin) All papers - Full papers - Abstracts - Selected papers Bilginturk
- Bilginturk, Z (2007) Order Acceptance and Scheduling Decisions in Make-to-Order Systems, 80--87 (Full Paper) (link to paper)
(Menu for Bilginturk) All papers - Full papers - Abstracts - Selected papers Billaut
- Billaut, JC (2005) A Predictive-reactive Approach For Rcpsp With Labour Constraints And Time-dependent Activities Requirements, 671--672 (Abstract) (link to paper)
- Billaut, J-C. (2003) A Genetic Algorithm for Job Shop Scheduling with Flexibility, 417--418 (Abstract) (link to paper)
- Billaut, J-C. (2009) Home health care problem: An extended multiple Traveling Salesman Problem, 85--92 (Full Paper) (link to paper)
- Billaut, J-C. (2007) Single Machine and Parallel Machine Scheduling Problems with a Common Due Date to Minimize Total Weighted Tardiness, 498--505 (Full Paper) (link to paper)
(Menu for Billaut) All papers - Full papers - Abstracts - Selected papers Bini
- Bini, E (2009) Modeling Preemptive EDF and FP by Integer Variables, 77--84 (Full Paper) (link to paper)
(Menu for Bini) All papers - Full papers - Abstracts - Selected papers Bispo
- Bispo, C. F (2011) Single server scheduling problem: Optimal policy for convex costs depends on arrival rates, 275--296 (Full Paper) (link to paper)
(Menu for Bispo) All papers - Full papers - Abstracts - Selected papers Bist
- Bist, V (2007) Assigning Part-time Teachers to Courses via a Stable Marriage Algorithm, 625--627 (Abstract) (link to paper)
(Menu for Bist) All papers - Full papers - Abstracts - Selected papers Bitar
- Bitar, A (2013) An unrelated parallel machine scheduling problem with auxiliary resources and sequence dependent setup times, 718--720 (Abstract) (link to paper)
- Bitar, A. (2016) A memetic algorithm to solve an unrelated parallel machine scheduling problem with auxiliary resources in semiconductor manufacturing, 367--376 (Selected Paper) (link to paper)
(Menu for Bitar) All papers - Full papers - Abstracts - Selected papers Biyani
- Biyani, V (2014) A decomposition approach for commodity pickup and delivery with time-windows under uncertainty, 489--506 (Selected Paper) (link to paper)
(Menu for Biyani) All papers - Full papers - Abstracts - Selected papers Blazewicz
- Blazewicz, J (2017) Multi-agent based approach for the origins of life hypothesis, 009--009 (Abstract) (link to paper)
- Blazewicz, J (2013) Dual Discounting Functions for Internet Shopping Optimization Problem, 667--669 (Abstract) (link to paper)
- Blazewicz, J. (2016) Novel dual discounting functions for the Internet shopping optimization problem: new algorithms, 245--255 (Selected Paper) (link to paper)
- Blazewicz, J (2011) Preface, 407--407 (Selected Paper) (link to paper)
- Blazewicz, J (2005) On a certain berth scheduling problem, 694--697 (Abstract) (link to paper)
- Blazewicz, J (2009) Approximation algorithm for berth and quay crane allocation problem with bounds., 748--751 (Abstract) (link to paper)
- Blazewicz, J (2007) Genetic Algorithm for Late Work Minimization in a Flow Shop System, 455--462 (Full Paper) (link to paper)
(Menu for Blazewicz) All papers - Full papers - Abstracts - Selected papers Bockman
- Bockman, F (2013) Baggage Scheduling at Airports A framework for e?ciently allocating resources to flight events, 599--602 (Abstract) (link to paper)
(Menu for Bockman) All papers - Full papers - Abstracts - Selected papers Bocquillon
- Bocquillon, R (2013) Minimizing the dissemination length in the one-datum-unit data transfer problem, 587--589 (Abstract) (link to paper)
(Menu for Bocquillon) All papers - Full papers - Abstracts - Selected papers Bontoux
- Bontoux, B (2007) Dynamic Cooperative Search for Constraint Satisfaction and Combinatorial Optimization: Application to a Rostering Problem, 557--560 (Abstract) (link to paper)
(Menu for Bontoux) All papers - Full papers - Abstracts - Selected papers Boone
- Boone, A (2007) A Methodology for Integrated Risk Management and Proactive Scheduling of Construction Projects, 611--613 (Abstract) (link to paper)
(Menu for Boone) All papers - Full papers - Abstracts - Selected papers Bora
- Bora, S (2007) Scheduling the Operations of an Integrated Production-Distribution Process, 316--327 (Full Paper) (link to paper)
(Menu for Bora) All papers - Full papers - Abstracts - Selected papers Borba
- Borba, L.M (2013) A simple stochastic local search for multi-mode resource-constrained multi-project scheduling, 826--830 (Full Paper) (link to paper)
(Menu for Borba) All papers - Full papers - Abstracts - Selected papers Borenstein
- Borenstein, D (2014) Review of real-time vehicle schedule recovery methods in transportation services, 541--567 (Selected Paper) (link to paper)
(Menu for Borenstein) All papers - Full papers - Abstracts - Selected papers Borgulya
- Borgulya, I (2009) Solving the Undirected Capacitated Arc Routing Problem with a memory based Method, 827--830 (Abstract) (link to paper)
- Borgulya, I (2011) An Evolutionary Algorithm for the large Size One-Commodity Pickup and Delivery Travelling Salesman Problems, 127--136 (Full Paper) (link to paper)
(Menu for Borgulya) All papers - Full papers - Abstracts - Selected papers Borne
- Borne, P (2005) Job Shop Scheduling Problem With Multi-purpose Machines And Availability Constraints, 217--231 (Abstract) (link to paper)
(Menu for Borne) All papers - Full papers - Abstracts - Selected papers Borodin
- Borodin, D (2011) Case study: an effective genetic algorithm for the chemical batch production scheduling, 469--482 (Full Paper) (link to paper)
- Borodin, D (2013) A Reinforcement Learning Approach to Solving Hybrid Flexible Flowline Scheduling Problems, 402--409 (Full Paper) (link to paper)
(Menu for Borodin) All papers - Full papers - Abstracts - Selected papers Borzone
- Borzone, P (2017) Modeling and Solving the Steelmaking and Casting Planning and Scheduling Problem, 380--383 (Abstract) (link to paper)
(Menu for Borzone) All papers - Full papers - Abstracts - Selected papers Bose
- Bose, S.K (2015) Continuous Time Model for Scheduling Operations in Cascaded Continuous Processing Units with Multiple Due Dates, 63--77 (Full Paper) (link to paper)
- Bose, S. K. (2005) A Heuristic Algorithm For Scheduling ‘blocked Out’ Units In Continuous Processing Industry : Preliminary Results, 258--274 (Full Paper) (link to paper)
- Bose, S. K. (2008) A two pass heuristic algorithm for scheduling ‘blocked out’ units in continuous process industry, 293--313 (Selected Paper) (link to paper)
(Menu for Bose) All papers - Full papers - Abstracts - Selected papers Bou?et
- Bou?et, J-P. (2015) Student Scheduling Problem At Universite de Technologie de Compiegne, 871--875 (Abstract) (link to paper)
(Menu for Bou?et) All papers - Full papers - Abstracts - Selected papers Boudhar
- Boudhar, M (2007) Scheduling with Special Case of Multipurpose Machines, 88--95 (Full Paper) (link to paper)
(Menu for Boudhar) All papers - Full papers - Abstracts - Selected papers Boudier
- Boudier, I.S (2015) Ant Colony Optimisation for a Job Shop with Flexible Maintenance, 614--616 (Abstract) (link to paper)
(Menu for Boudier) All papers - Full papers - Abstracts - Selected papers Bouibede-Hocine
- Bouibede-Hocine, K (2005) Enumeration Of Pareto Optima For Uniform Parallel Machine Scheduling With Two Criteria, 123--131 (Full Paper) (link to paper)
(Menu for Bouibede-Hocine) All papers - Full papers - Abstracts - Selected papers Bouly
- Bouly, H (2013) Evolutionary algorithm and post-processing to minimize the total delay in multi-project scheduling, 831--835 (Full Paper) (link to paper)
(Menu for Bouly) All papers - Full papers - Abstracts - Selected papers Bouquard
- Bouquard, J-L. (2013) Evacuation Scheduling of a Town after a Natural Disaster: Time-indexed Formulations, 680--683 (Abstract) (link to paper)
- Bouquard, J-L. (2016) Scheduling evacuation operations, 467--478 (Selected Paper) (link to paper)
(Menu for Bouquard) All papers - Full papers - Abstracts - Selected papers Bourreau
- Bourreau, E (2007) Dynamic Cooperative Search for Constraint Satisfaction and Combinatorial Optimization: Application to a Rostering Problem, 557--560 (Abstract) (link to paper)
(Menu for Bourreau) All papers - Full papers - Abstracts - Selected papers Bouvry
- Bouvry, P (2013) Dual Discounting Functions for Internet Shopping Optimization Problem, 667--669 (Abstract) (link to paper)
- Bouvry, P (2013) An Iterative Local Search Algorithm for Scheduling Precedence-Constrained Applications on Heterogeneous Machines, 472--485 (Full Paper) (link to paper)
- Bouvry, P (2017) The Application of Nondominated Sorting Genetic Algorithm (NSGA-III) for Scientific-workflow Scheduling on Cloud, 269--287 (Full Paper) (link to paper)
(Menu for Bouvry) All papers - Full papers - Abstracts - Selected papers Bouyahia
- Bouyahia, Z (2015) Stability of probabilistic scheduling problems with precedence constraints and weighted completion time objective, 189--202 (Full Paper) (link to paper)
(Menu for Bouyahia) All papers - Full papers - Abstracts - Selected papers Bouzouia
- Bouzouia, B (2009) Minimizing the number of tardy jobs in single machine scheduling using MIP, 227--238 (Full Paper) (link to paper)
(Menu for Bouzouia) All papers - Full papers - Abstracts - Selected papers Bowly
- Bowly, S (2017) Symmetry breaking in a special case of the RCPSP/max, 315--318 (Abstract) (link to paper)
(Menu for Bowly) All papers - Full papers - Abstracts - Selected papers Bozejko
- Bozejko, W (2009) Scatter search for a weighted tardiness flow shop problem, 702--705 (Abstract) (link to paper)
- Bozejko, W (2007) A Parallel Metaheuristics for the Single Machine Total Weighted Tardiness Problem with Sequence-Dependent Setup Times, 96--103 (Full Paper) (link to paper)
(Menu for Bozejko) All papers - Full papers - Abstracts - Selected papers Braeckmans
- Braeckmans, K (2005) Proactive Resource Allocation Heuristics For Robust Project Scheduling, 322--323 (Abstract) (link to paper)
(Menu for Braeckmans) All papers - Full papers - Abstracts - Selected papers Brandao
- Brandao, J.S (2015) A biased random-key genetic algorithm for scheduling divisible loads, 570--578 (Full Paper) (link to paper)
(Menu for Brandao) All papers - Full papers - Abstracts - Selected papers Brandinu
- Brandinu, G (2011) An MILP-approach to the optimization of event-bus schedules: a scheduling application in the tourism sector, 137--145 (Full Paper) (link to paper)
(Menu for Brandinu) All papers - Full papers - Abstracts - Selected papers Branke
- Branke, J (2003) Task Scheduling under Gang Constraints, 506--523 (Full Paper) (link to paper)
- Branke, J (2005) Task Scheduling under Gang Constraints, 113--130 (Selected Paper) (link to paper)
(Menu for Branke) All papers - Full papers - Abstracts - Selected papers Bransinu
- Bransinu, G (2014) A mixed-integer linear programming approach to the optimization of event-bus schedules: a scheduling application in the tourism sector, 621--629 (Selected Paper) (link to paper)
(Menu for Bransinu) All papers - Full papers - Abstracts - Selected papers Braun
- Braun, O (2015) Modeling the single-processor scheduling problem with time restrictions as a parallel machine scheduling problem, 325--330 (Full Paper) (link to paper)
(Menu for Braun) All papers - Full papers - Abstracts - Selected papers Braune
- Braune, R (2015) Packing-based approaches for a discrete malleable task schedulingproblem, 888--891 (Abstract) (link to paper)
(Menu for Braune) All papers - Full papers - Abstracts - Selected papers Brauner
- Brauner, N (2013) Two extensions of Lawler’s min-max cost algorithm, 790--794 (Abstract) (link to paper)
- Brauner, N. (2016) Lawler's minmax cost algorithm: optimality conditions and uncertainty, 401--408 (Selected Paper) (link to paper)
- Brauner, N (2009) Polynomial complexity of the cyclic identical coupled task problem, 679--682 (Abstract) (link to paper)
- Brauner, N (2007) Scheduling Problems of Chemical Experiments, 581--583 (Abstract) (link to paper)
- Brauner, N (2003) Multibin Packing with the Best-Fit Rule, 74--89 (Full Paper) (link to paper)
- Brauner, N (2005) The Best-Fit Rule for Multibin Packing: An Extension of Graham's List Algorithms, 269--286 (Selected Paper) (link to paper)
(Menu for Brauner) All papers - Full papers - Abstracts - Selected papers Briand
- Briand, C (2013) Solving a cooperative project scheduling with controllable processing times, self-interested agents and equal profit sharing, 125--132 (Full Paper) (link to paper)
- Briand, C (2015) A mass-flow MILP formulation for energy-efficient supplying in assembly lines, 236--239 (Full Paper) (link to paper)
- Briand, C (2009) Minimizing the number of tardy jobs in single machine scheduling using MIP, 227--238 (Full Paper) (link to paper)
(Menu for Briand) All papers - Full papers - Abstracts - Selected papers Bril
- Bril, R. J (2009) Response time analysis in distributed real-time systems: An improvement based on best-case finalization time analysis, 839--842 (Abstract) (link to paper)
(Menu for Bril) All papers - Full papers - Abstracts - Selected papers Bronnikov
- Bronnikov, S (2015) Three approaches to solving the problem of cosmonauts’ training planning, 750--754 (Abstract) (link to paper)
(Menu for Bronnikov) All papers - Full papers - Abstracts - Selected papers Brucker
- Brucker, P (2007) The Job-Shop Problem: Old and New Challenges, 15--22 (Full Paper) (link to paper)
- Brucker, P (2005) Tabu Search Algorithms For Cyclic Machine Scheduling Problems with blocking, 107--108 (Abstract) (link to paper)
- Brucker, P (2008) Cyclic job shop scheduling problems with blocking, 161--181 (Selected Paper) (link to paper)
- Brucker, P (2005) A Decomposition, Construction And Post-processing Approach For Nurse Rostering, 397--406 (Full Paper) (link to paper)
(Menu for Brucker) All papers - Full papers - Abstracts - Selected papers Bruno
- Bruno, G (2007) Optimization of the Departure Schedule at a Public Transit Terminal with Multiple Destinations, 104--111 (Full Paper) (link to paper)
(Menu for Bruno) All papers - Full papers - Abstracts - Selected papers Bräysy
- Bräysy, O (2007) The Cost of Scheduling Customers in Routing Problems, 136--143 (Full Paper) (link to paper)
(Menu for Bräysy) All papers - Full papers - Abstracts - Selected papers Bucar
- Bucar, D (2013) Scheduling of electric vehicle charging operations, 486--498 (Full Paper) (link to paper)
(Menu for Bucar) All papers - Full papers - Abstracts - Selected papers Bukata
- Bukata, L (2015) A new lower bound for optimisation of energy consumption of robotic cells, 662--665 (Abstract) (link to paper)
(Menu for Bukata) All papers - Full papers - Abstracts - Selected papers Bulbul
- Bulbul, K (2005) Job Shop Scheduling With Earliness, Tardiness And Intermediate Inventory Holding Costs, 188--192 (Abstract) (link to paper)
(Menu for Bulbul) All papers - Full papers - Abstracts - Selected papers Bulh~oes
- Bulh~oes, T (2017) On the exact solution of a large class of parallel machine scheduling problems, 325--328 (Abstract) (link to paper)
(Menu for Bulh~oes) All papers - Full papers - Abstracts - Selected papers Bunde
- Bunde, D. P (2005) Scheduling On A Single Machine To Minimize Total Flow Time With Job Rejections, 562--572 (Full Paper) (link to paper)
(Menu for Bunde) All papers - Full papers - Abstracts - Selected papers Burda
- Burda, R (2005) Challenges in Matching Assets with Demand across All Supply Chain Management Decision Tiers in the IBM Microelectronics Division from Automated Fabs to Central Planning Engines to Collaborative Behavior (Work Arounds), 391--391 (Abstract) (link to paper)
(Menu for Burda) All papers - Full papers - Abstracts - Selected papers Burgelman
- Burgelman, J (2015) A heuristic procedure for the personnel task re-scheduling problem, 666--668 (Abstract) (link to paper)
(Menu for Burgelman) All papers - Full papers - Abstracts - Selected papers Burke
- Burke, E. K (2005) An Investigation Of Variable Neighbourhood Search For University Course Timetabling, 413--427 (Full Paper) (link to paper)
- Burke, E. K (2009) An Investigation of a Genetic Algorithm and Sequential Local Search Approach for Curriculum-based Course Timetabling Problems, 727--731 (Abstract) (link to paper)
- Burke, E. K (2014) An analysis of constructive algorithms for the airport baggage sorting station assignment problem, 601--619 (Selected Paper) (link to paper)
- Burke, E. K (2011) The Airport Baggage Sorting Station Allocation Problem, 419--444 (Full Paper) (link to paper)
- Burke, E. K (2007) Determining Rules in Fuzzy Multiple Heuristic Orderings for Constructing Examination Timetables, 59--66 (Full Paper) (link to paper)
- Burke, E. K (2009) A comparison of two methods for reducing take-off delay at London Heathrow airport, 12--27 (Full Paper) (link to paper)
- Burke, E. K (2011) A more realistic approach for airport ground movement optimisation with stand holding, 146--160 (Full Paper) (link to paper)
- Burke, E. K (2011) A comparison of two methods for reducing take-off delay at London Heathrow airport, 409--421 (Selected Paper) (link to paper)
- Burke, E. K (2007) A Simulated Annealing Hyper-heuristic: Adaptive Heuristic Selection for Different Vehicle Routing Problems, 67--70 (Full Paper) (link to paper)
- Burke, E. K (2007) Clustering Within Timetabling Conflict Graphs, 553--556 (Abstract) (link to paper)
- Burke, E. (2003) Making Airline Schedules More Robust, 678--695 (Full Paper) (link to paper)
- Burke, E. K (2005) Measuring the Robustness of Airline Fleet Schedules, 381--392 (Selected Paper) (link to paper)
- Burke, E (2005) A Decomposition, Construction And Post-processing Approach For Nurse Rostering, 397--406 (Full Paper) (link to paper)
- Burke, E (2005) Forecasting Flight Schedule Robustness, 698--700 (Abstract) (link to paper)
- Burke, E (2003) A Pheromone-based Look-ahead Hyper-heuristic for Time-tabling Problems, 174--179 (Abstract) (link to paper)
- Burke, E (2003) Scheduling Nurses Using a Tabu-Search Hyperheuristic, 197--219 (Full Paper) (link to paper)
- Burke, E. K (2009) HyFlex: A Flexible Framework for the Design and Analysis of Hyper-heuristics, 790--797 (Abstract) (link to paper)
- Burke, E. K (2003) Similarity Measures for Exam Timetabling Problems, 120--136 (Full Paper) (link to paper)
- Burke, E. K (2007) Constructive versus Improvement Heuristics:An Investigation of Examination Timetabling, 595--597 (Abstract) (link to paper)
- Burke, E. K (2011) Using Differential Evolution to Identify Fuzzy Measures for the Exam Timetabling Problem, 335--351 (Full Paper) (link to paper)
- Burke, E. K (2009) Adaptive Selection of Heuristics within a GRASP for Exam Timetabling Problems, 409--423 (Full Paper) (link to paper)
- Burke, E. K (2009) Multilevel Search for Evolving the Acceptance Criteria of a Hyper-Heuristic, 798--801 (Abstract) (link to paper)
- Burke, E. K (2011) Dynamic Data Structures for Taskgraph Scheduling Policies with Applications in OpenCL Accelerators, 322--334 (Full Paper) (link to paper)
- Burke, E. K (2009) An Extended Great Deluge Approach to the Examination Timetabling Problem, 424--434 (Full Paper) (link to paper)
- Burke, E. K (2009) Multilevel search for choosing hyper-heuristics, 788--789 (Abstract) (link to paper)
- Burke, E. K (2009) A self-organising hyper-heuristic framework, 784--787 (Abstract) (link to paper)
- Burke, E. K (2009) Recent Work on Planning and Management of University Teaching Space, 737--740 (Abstract) (link to paper)
- Burke, E (2008) Fuzzy job shop scheduling with lot-sizing, 275--292 (Selected Paper) (link to paper)
- Burke, E. K (2007) Adaptive Decomposition and Construction for Examination Timetabling Problems, 418--425 (Full Paper) (link to paper)
- Burke, E. K (2009) Hybridizing Integer Programming Models with an Adaptive Decomposition Approach for Exam Timetabling Problems, 435--446 (Full Paper) (link to paper)
- Burke, E (2013) An Investigation of Multistage Approaches to Examination Timetabling, 528--542 (Full Paper) (link to paper)
- Burke, E. K (2014) A more realistic approach for airport ground movement optimisation with stand holding, 507--520 (Selected Paper) (link to paper)
(Menu for Burke) All papers - Full papers - Abstracts - Selected papers Buscaylet
- Buscaylet, F (2005) Lower And Upper Bounds For The Job-shop Scheduling Problem With Sequence-dependent Setup Times, 316--321 (Full Paper) (link to paper)
(Menu for Buscaylet) All papers - Full papers - Abstracts - Selected papers Buscher
- Buscher, U (2014) A simultaneous and iterative approach for parallel machine scheduling with sequence-dependent family setups, 471--487 (Selected Paper) (link to paper)
- Buscher, U (2011) An Iterative Scheme for Parallel Machine Scheduling with Sequence Dependent Family Setups, 519--522 (Abstract) (link to paper)
(Menu for Buscher) All papers - Full papers - Abstracts - Selected papers Buzon
- Buzon, I (2003) A Tabu Search Heuristic to Generate Shift Schedules, 526--527 (Abstract) (link to paper)
(Menu for Buzon) All papers - Full papers - Abstracts - Selected papers Byde
- Byde, A (2009) Workforce Planning and Scheduling for the HP IT Services Business, 720--723 (Abstract) (link to paper)
(Menu for Byde) All papers - Full papers - Abstracts - Selected papers Bykov
- Bykov, Y (2013) An initial study of a novel Step Counting Hill Climbing heuristic applied to timetabling problems, 691--693 (Abstract) (link to paper)
- Bykov, Y. (2016) A Step Counting Hill Climbing Algorithm applied to University Examination Timetabling, 479--492 (Selected Paper) (link to paper)
(Menu for Bykov) All papers - Full papers - Abstracts - Selected papers Bülbül
- Bülbül, K (2011) Minimizing Value-at-Risk in the Single-Machine Total Weighted Tardiness Problem, 215--229 (Full Paper) (link to paper)
(Menu for Bülbül) All papers - Full papers - Abstracts - Selected papers Bürgy
- Bürgy, R (2011) Optimal Job Insertion in the No-Wait Job Shop, 553--556 (Abstract) (link to paper)
(Menu for Bürgy) All papers - Full papers - Abstracts - Selected papers Cai
- Cai, X (2005) Single-machine Scheduling With General Costs Under Compound-type Distributions, 630--642 (Full Paper) (link to paper)
(Menu for Cai) All papers - Full papers - Abstracts - Selected papers Cangalovic
- Cangalovic, M (2009) Heuristic approach to the airline schedule disturbances problem: multifleet case, 311--320 (Full Paper) (link to paper)
(Menu for Cangalovic) All papers - Full papers - Abstracts - Selected papers Cantais
- Cantais, B (2017) Three upper bounds for the speed meeting problem, 344--347 (Abstract) (link to paper)
(Menu for Cantais) All papers - Full papers - Abstracts - Selected papers Cao
- Cao, B (2017) Improving Ant Colony Optimization algorithm with Levy Flight, 093--102 (Full Paper) (link to paper)
(Menu for Cao) All papers - Full papers - Abstracts - Selected papers Capek
- Capek, R (2011) Minimizing Total Weighted Tardiness and Total Processing Costs for the Scheduling with Alternative Process Plans, 561--563 (Abstract) (link to paper)
(Menu for Capek) All papers - Full papers - Abstracts - Selected papers Carlier
- Carlier, J (2003) The One Machine Total Cost Scheduling Problem with Release Dates, 406--408 (Abstract) (link to paper)
- Carlier, J (2003) Dominance Based Heuristics to Minimize a Total Cost on One Machine, 403--405 (Abstract) (link to paper)
- Carlier, J (2015) Lower bounds for Scheduling Problems with production and consumption of resources, 680--682 (Abstract) (link to paper)
(Menu for Carlier) All papers - Full papers - Abstracts - Selected papers Carniel
- Carniel, G.M (2013) A simple stochastic local search for multi-mode resource-constrained multi-project scheduling, 826--830 (Full Paper) (link to paper)
(Menu for Carniel) All papers - Full papers - Abstracts - Selected papers Carrano
- Carrano, E.G (2015) Improving Upper Bounds in High School Timetabling by Matheuristics, 267--275 (Full Paper) (link to paper)
- Carrano, E. G (2016) Late acceptance hill-climbing for high school timetabling, 453--465 (Selected Paper) (link to paper)
(Menu for Carrano) All papers - Full papers - Abstracts - Selected papers Carvalho
- Carvalho, M. A.M (2013) An Integer Programming Approach for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 840--847 (Full Paper) (link to paper)
- Carvalho, M. A. M (2016) An integer programming approach to the multimode resource-constrained multiproject scheduling problem, 295--307 (Selected Paper) (link to paper)
(Menu for Carvalho) All papers - Full papers - Abstracts - Selected papers Cegarra
- Cegarra, J (2003) From Human Heuristics to the Design of Scheduling Interfaces, 236--239 (Abstract) (link to paper)
(Menu for Cegarra) All papers - Full papers - Abstracts - Selected papers Cepek
- Cepek, O (2005) Incremental Propagation Rules For A Precedence Graph With Optional Activities And Time Windows, 552--560 (Abstract) (link to paper)
(Menu for Cepek) All papers - Full papers - Abstracts - Selected papers Cerdeira
- Cerdeira, J. O (2013) Optimal scheduling of aircrafts engines repair process, 620--623 (Abstract) (link to paper)
(Menu for Cerdeira) All papers - Full papers - Abstracts - Selected papers Ceschia
- Ceschia, S (2017) Modeling and Solving the Steelmaking and Casting Planning and Scheduling Problem, 380--383 (Abstract) (link to paper)
- Ceschia, S (2015) Thesis Defense Timetabling, 507--514 (Full Paper) (link to paper)
- Ceschia, S (2013) A simulated annealing approach to the curriculum-based course timetabling problem, 314--317 (Full Paper) (link to paper)
- Ceschia, S (2011) Tabu search techniques for the heterogeneous vehicle routing problem with time windows and carrier-dependent costs, 601--615 (Selected Paper) (link to paper)
- Ceschia, S (2009) Tabu Search Techniques for the Heterogeneous Vehicle Routing Problem with Time Windows and Carrier-Dependent Costs, 594--605 (Full Paper) (link to paper)
- Ceschia, S (2013) The Dynamic Patient Admission Scheduling with Operating Room Constraints, Flexible Horizon, and Patient Delays, 646--648 (Abstract) (link to paper)
- Ceschia, S. (2016) Dynamic patient admission scheduling with operating room constraints, flexible horizons, and patient delays, 377--389 (Selected Paper) (link to paper)
(Menu for Ceschia) All papers - Full papers - Abstracts - Selected papers Cesta
- Cesta, A (2007) Walk the (Time-)Line: Scheduling and Execution, 23--23 (Full Paper) (link to paper)
- Cesta, A (2003) Constraint-Based Random Search for Solving Spacecraft Downlink Scheduling Problems, 574--597 (Full Paper) (link to paper)
- Cesta, A (2005) Constraint-Based Random Search for Solving Spacecraft Downlink Scheduling Problems, 133--160 (Selected Paper) (link to paper)
(Menu for Cesta) All papers - Full papers - Abstracts - Selected papers Chaabane
- Chaabane, S (2003) Operating Theatre Management, 220--223 (Abstract) (link to paper)
(Menu for Chaabane) All papers - Full papers - Abstracts - Selected papers Chakhlevitch
- Chakhlevitch, K (2009) Scheduling in a micro-biological laboratory: heuristics for sequencing food sample tests, to co-ordinate with production of perishable media materials, 782--783 (Abstract) (link to paper)
(Menu for Chakhlevitch) All papers - Full papers - Abstracts - Selected papers Chakraborty
- Chakraborty, A (2015) An optimization-based approach for delivering radio-pharmaceuticals to medical imaging centers, 203--217 (Full Paper) (link to paper)
(Menu for Chakraborty) All papers - Full papers - Abstracts - Selected papers Chan
- Chan, P (2007) Staff Rostering Problem: Choice of a Mathematical Model, 601--604 (Abstract) (link to paper)
(Menu for Chan) All papers - Full papers - Abstracts - Selected papers Chang
- Chang, P-C. (2009) Development of E ective Estimation of Distribution Algorithms for Scheduling Problems, 531--556 (Full Paper) (link to paper)
(Menu for Chang) All papers - Full papers - Abstracts - Selected papers Chaovalitwongse
- Chaovalitwongse, W. Ar (2007) Scheduling the Operations of an Integrated Production-Distribution Process, 316--327 (Full Paper) (link to paper)
(Menu for Chaovalitwongse) All papers - Full papers - Abstracts - Selected papers Charalambous
- Charalambous, C (2011) Hybridizing local search with MIP for unrelated parallel machine scheduling problems with makespan minimization, 529--531 (Abstract) (link to paper)
(Menu for Charalambous) All papers - Full papers - Abstracts - Selected papers Chase
- Chase, D (2009) Optimal Pump Scheduling For Water Distribution Systems, 341--356 (Full Paper) (link to paper)
(Menu for Chase) All papers - Full papers - Abstracts - Selected papers Chen
- Chen, B (2015) Structural properties of an open problem in preemptive scheduling, 673--676 (Abstract) (link to paper)
- Chen, C (2013) Order acceptance and scheduling problem with time-dependent revenues, 593--595 (Abstract) (link to paper)
- Chen, S-H. (2009) Development of E ective Estimation of Distribution Algorithms for Scheduling Problems, 531--556 (Full Paper) (link to paper)
- Chen, M-C. (2009) Development of E ective Estimation of Distribution Algorithms for Scheduling Problems, 531--556 (Full Paper) (link to paper)
- Chen, Y-M. (2009) Development of E ective Estimation of Distribution Algorithms for Scheduling Problems, 531--556 (Full Paper) (link to paper)
- Chen, H-C. (2017) Solving Tourist Trip Design Problems Using a Virus Optimization Algorithm, 384--388 (Abstract) (link to paper)
- Chen, M (2013) Optimal Parallel Systems for Random Scheduling Times, 573--576 (Abstract) (link to paper)
- Chen, Z-L. (2005) Integrated Production-Distribution Scheduling to Optimize the Tradeoff between Order Delivery Performance and Total Cost, 549--550 (Abstract) (link to paper)
(Menu for Chen) All papers - Full papers - Abstracts - Selected papers Cheng
- Cheng, P (2003) Perturbation Based Variable Neighbourhood Search in Heuristic Space for Examination Timetabling Problem, 155--173 (Full Paper) (link to paper)
- Cheng, T.C E (2005) On a certain berth scheduling problem, 694--697 (Abstract) (link to paper)
- Cheng, E (2007) A Case Study of an Integer Programming Model for Instructor Assignments and Scheduling Problem, 267--275 (Full Paper) (link to paper)
- Cheng, J (2011) Multi-mode Resource-Constrained Project Scheduling of Semiconductor Equipment Install/Qual Process, 408--418 (Full Paper) (link to paper)
- Cheng, P. C- (2005) Graphical Tools for Heuristic Visualization, 658--667 (Full Paper) (link to paper)
- Cheng, T.C.E (2003) Customer Order Scheduling to Minimize Total Weighted Completion Time, 409--416 (Abstract) (link to paper)
(Menu for Cheng) All papers - Full papers - Abstracts - Selected papers Cheriere
- Cheriere, N. (2016) Novel dual discounting functions for the Internet shopping optimization problem: new algorithms, 245--255 (Selected Paper) (link to paper)
(Menu for Cheriere) All papers - Full papers - Abstracts - Selected papers Choi
- Choi, J.Y (2015) An Efficient simulated annealing for two-agent scheduling with exponential job-dependent position-based learning consideration, 601--603 (Abstract) (link to paper)
(Menu for Choi) All papers - Full papers - Abstracts - Selected papers Chopin
- Chopin, A (2003) Just-in-time Scheduling of a 2-Machine Flowshop Problem with Lot-streaming, 473--475 (Abstract) (link to paper)
(Menu for Chopin) All papers - Full papers - Abstracts - Selected papers Chou
- Chou, S-Y. (2005) A Sequential Pair Exchange Approach for Solving Single-Machine Scheduling Problems with General Earliness-Tardiness Penalties, 299--314 (Full Paper) (link to paper)
(Menu for Chou) All papers - Full papers - Abstracts - Selected papers Chretienne
- Chretienne, P (2007) Selecting and Scheduling Tasks with Agreeable Time Windows and Setup Costs, 561--563 (Abstract) (link to paper)
- Chretienne, V. J. P (2013) Minimizing the number of late jobs on parallel machines with alpha time windows, 206--217 (Full Paper) (link to paper)
- Chretienne, P (2009) Batching and Scheduling with Tardiness, 291--300 (Full Paper) (link to paper)
- Chretienne, P (2013) Homogeneously non-idling schedules of unit-time jobs on identical parallel machines, 39--54 (Full Paper) (link to paper)
(Menu for Chretienne) All papers - Full papers - Abstracts - Selected papers Christiaens
- Christiaens, J (2013) A heuristic approach to the prisoner transportation problem, 786--789 (Abstract) (link to paper)
(Menu for Christiaens) All papers - Full papers - Abstracts - Selected papers Chrétienne
- Chrétienne, P (2011) Integrated batch sizing and scheduling on a single machine, 541--555 (Selected Paper) (link to paper)
(Menu for Chrétienne) All papers - Full papers - Abstracts - Selected papers Chung
- Chung, C (2015) Fairness in employee scheduling, 687--698 (Abstract) (link to paper)
(Menu for Chung) All papers - Full papers - Abstracts - Selected papers Ciavotta
- Ciavotta, M (2009) New results for the multi-objective sequence dependent setup times °owshop problem, 808--810 (Abstract) (link to paper)
(Menu for Ciavotta) All papers - Full papers - Abstracts - Selected papers Clark
- Clark, M.D (2013) Heuristic Pruning Methods For The Robust Shortest Path Problem, 767--769 (Abstract) (link to paper)
(Menu for Clark) All papers - Full papers - Abstracts - Selected papers Clement
- Clement, M (2017) Balanced clustering based decomposition applied to Master thesis defense timetabling problem, 214--228 (Full Paper) (link to paper)
(Menu for Clement) All papers - Full papers - Abstracts - Selected papers Co?man
- Co?man, E (2015) Structural properties of an open problem in preemptive scheduling, 673--676 (Abstract) (link to paper)
(Menu for Co?man) All papers - Full papers - Abstracts - Selected papers Coban
- Coban, B (2015) Shortest k-unit Cycle in a Multiple Part-Type Robotic Cell, 876--878 (Abstract) (link to paper)
(Menu for Coban) All papers - Full papers - Abstracts - Selected papers Coffman
- Coffman, E (2005) Seamless Download Scheduling in Computer Networks, 3--3 (Abstract) (link to paper)
(Menu for Coffman) All papers - Full papers - Abstracts - Selected papers Colen
- Colen, P (2013) Evaluation of appointment scheduling rules, 509--514 (Full Paper) (link to paper)
(Menu for Colen) All papers - Full papers - Abstracts - Selected papers Coolen
- Coolen, K (2013) Complexity analysis of the discrete sequential search problem with group activities, 670--672 (Abstract) (link to paper)
(Menu for Coolen) All papers - Full papers - Abstracts - Selected papers Copado-Mendez
- Copado-Mendez, P.J (2017) Multi-commodity flow and station logistics resolution for train unit scheduling, 321--324 (Abstract) (link to paper)
(Menu for Copado-Mendez) All papers - Full papers - Abstracts - Selected papers Coppersmith
- Coppersmith, D (2005) Improved Approximation Algorithms For Broadcast Scheduling, 655--656 (Abstract) (link to paper)
(Menu for Coppersmith) All papers - Full papers - Abstracts - Selected papers Cortellessa
- Cortellessa, G (2003) Constraint-Based Random Search for Solving Spacecraft Downlink Scheduling Problems, 574--597 (Full Paper) (link to paper)
- Cortellessa, G (2005) Constraint-Based Random Search for Solving Spacecraft Downlink Scheduling Problems, 133--160 (Selected Paper) (link to paper)
(Menu for Cortellessa) All papers - Full papers - Abstracts - Selected papers Cortes
- Cortes, R (2013) On the effect of complexity and uncertainty in ELSP, 748--752 (Abstract) (link to paper)
(Menu for Cortes) All papers - Full papers - Abstracts - Selected papers Cowling
- Cowling, P (2003) Perturbation Based Variable Neighbourhood Search in Heuristic Space for Examination Timetabling Problem, 155--173 (Full Paper) (link to paper)
(Menu for Cowling) All papers - Full papers - Abstracts - Selected papers Creemers
- Creemers, S (2013) Evaluation of appointment scheduling rules, 509--514 (Full Paper) (link to paper)
- Creemers, S (2009) Project scheduling with alternative technologies and stochastic activity durations, 756--760 (Abstract) (link to paper)
- Creemers, S (2017) Optimal solutions for minimum-cost sequential system testing, 312--314 (Abstract) (link to paper)
(Menu for Creemers) All papers - Full papers - Abstracts - Selected papers Critchley
- Critchley, M (2015) Optimisation of a Stagger Chart for Aviation Fleet Planning, 579--589 (Full Paper) (link to paper)
- Critchley, M (2015) Optimisation of a Stagger Chart for Aviation Fleet Planning, 952--962 (Abstract) (link to paper)
(Menu for Critchley) All papers - Full papers - Abstracts - Selected papers Croce
- Croce, F. D. (2007) Sequencing a Single Machine with Due Dates and Deadlines: an ILP-based Approach to Solve Very Large Instances, 71--79 (Full Paper) (link to paper)
- Croce, F. D. (2015) A branch-and-reduce exact algorithm for the single machine total tardiness problem, 879--881 (Abstract) (link to paper)
- Croce, F. D (2011) Minimizing the sum of quadratic completion times on two identical parallel machines, 240--244 (Full Paper) (link to paper)
(Menu for Croce) All papers - Full papers - Abstracts - Selected papers Créput
- Créput, J. C (2011) Two Phases Parallel Hyperheuristic Approach to the Bus Driver Scheduling Problem, 633--636 (Abstract) (link to paper)
(Menu for Créput) All papers - Full papers - Abstracts - Selected papers Cucu
- Cucu, L (2008) Periodic real-time scheduling: from deadline-based model to latency-based model, 41--51 (Selected Paper) (link to paper)
- Cucu, L (2005) Periodic real-time scheduling:from latency-based model to deadline-based model, 344--352 (Full Paper) (link to paper)
(Menu for Cucu) All papers - Full papers - Abstracts - Selected papers Cucu-Grosjean
- Cucu-Grosjean, L (2009) Response time analysis in distributed real-time systems: An improvement based on best-case finalization time analysis, 839--842 (Abstract) (link to paper)
(Menu for Cucu-Grosjean) All papers - Full papers - Abstracts - Selected papers Cuervo
- Cuervo, D.P (2017) Railway Rolling Stock Maintenance, 373--376 (Abstract) (link to paper)
(Menu for Cuervo) All papers - Full papers - Abstracts - Selected papers Cui
- Cui, T (2017) Responsive Single Bus Corridor Scheduling Based on Machine Learning and Optimisation, 288--294 (Full Paper) (link to paper)
(Menu for Cui) All papers - Full papers - Abstracts - Selected papers Curran
- Curran, D (2013) Compilation of Maintenance Schedules based on their Key Performance Indicators for Fast Iterative Interaction, 606--609 (Abstract) (link to paper)
(Menu for Curran) All papers - Full papers - Abstracts - Selected papers Curtois
- Curtois, T (2009) HyFlex: A Flexible Framework for the Design and Analysis of Hyper-heuristics, 790--797 (Abstract) (link to paper)
(Menu for Curtois) All papers - Full papers - Abstracts - Selected papers Côté
- Côté, M. G. · J-F. (2009) An Effective Heuristic for the Pickup and Delivery Traveling Salesman Problem with LIFO Loading and Multiple Stacks, 831--833 (Abstract) (link to paper)
(Menu for Côté) All papers - Full papers - Abstracts - Selected papers Daffalla
- Daffalla, A (2017) Selection Hyper-heuristics for Solving the Wind Farm Layout Optimisation Problem, 393--395 (Abstract) (link to paper)
(Menu for Daffalla) All papers - Full papers - Abstracts - Selected papers Damay
- Damay, J (2003) Interval Graphs, Antichain Sets and Scheduling with Temporal and Resource Constraints, 620--637 (Full Paper) (link to paper)
(Menu for Damay) All papers - Full papers - Abstracts - Selected papers Dang
- Dang, D-C. (2013) Evolutionary algorithm and post-processing to minimize the total delay in multi-project scheduling, 831--835 (Full Paper) (link to paper)
(Menu for Dang) All papers - Full papers - Abstracts - Selected papers Darties
- Darties, B (2009) Isomorphic coupled-task scheduling problem with compatibility constraints on a single processor, 378--388 (Full Paper) (link to paper)
- Darties, B (2011) Isomorphic coupled-task scheduling problem with compatibility constraints on a single processor, 501--509 (Selected Paper) (link to paper)
(Menu for Darties) All papers - Full papers - Abstracts - Selected papers Dasaklis
- Dasaklis, T (2009) A deterministic resource scheduling model in epidemic logistics, 570--580 (Full Paper) (link to paper)
(Menu for Dasaklis) All papers - Full papers - Abstracts - Selected papers Dauz`ere-P'er`es
- Dauz`ere-P'er`es, S (2017) A Batch-oblivious Approach For Scheduling Complex Job-Shops with Batching Machines: From Non-delay to Active Scheduling, 340--343 (Abstract) (link to paper)
(Menu for Dauz`ere-P'er`es) All papers - Full papers - Abstracts - Selected papers Dauzere-Peres
- Dauzere-Peres, S (2013) An unrelated parallel machine scheduling problem with auxiliary resources and sequence dependent setup times, 718--720 (Abstract) (link to paper)
- Dauzere-Peres, S. (2016) A memetic algorithm to solve an unrelated parallel machine scheduling problem with auxiliary resources in semiconductor manufacturing, 367--376 (Selected Paper) (link to paper)
- Dauzere-Peres, S (2013) New MILP Formulations for Minimizing the Number of Tardy Jobs on a Single Batch Machine, 687--690 (Abstract) (link to paper)
- Dauzere-Peres, S (2013) Solving the Hybrid Job Shop Problem with Sequence Dependent Setups, 741--743 (Abstract) (link to paper)
- Dauzere-Peres, S (2015) Minimizing regular criteria in the flexible job-shop scheduling problem, 443--456 (Full Paper) (link to paper)
- Dauzere-Peres, S (2015) Scheduling Complex Job-Shops using Batch Oblivious Disjunctive Graphs, 788--793 (Abstract) (link to paper)
(Menu for Dauzere-Peres) All papers - Full papers - Abstracts - Selected papers Dauzère-Pérès
- Dauzère-Pérès, S (2009) Scheduling Inspection Operations subject to a Fixed Production Schedule, 581--593 (Full Paper) (link to paper)
- Dauzère-Pérès, S (2011) Scheduling jobs on parallel machines to minimize a regular step total cost function, 523--538 (Selected Paper) (link to paper)
- Dauzère-Pérès, S (2011) Erratum to: Scheduling jobs on parallel machines to minimize a regular step total cost function, 539--540 (Selected Paper) (link to paper)
- Dauzère-Pérès, S (2009) Scheduling Semiconductor Manufacturing Operations: Problems, Solution Techniques, and Future Challenges, 192--201 (Full Paper) (link to paper)
- Dauzère-Pérès, S (2011) A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations, 583--599 (Selected Paper) (link to paper)
- Dauzère-Pérès, S (2011) Scheduling job families on parallel machines with a bi-criteria objective function under time constraints, 645--648 (Abstract) (link to paper)
(Menu for Dauzère-Pérès) All papers - Full papers - Abstracts - Selected papers Davari
- Davari, M (2013) Exact algorithms for single-machine scheduling with time windows and precedence constraints, 656--658 (Abstract) (link to paper)
- Davari, M. (2016) Exact algorithms for single-machine scheduling with time windows and precedence constraints, 309--334 (Selected Paper) (link to paper)
(Menu for Davari) All papers - Full papers - Abstracts - Selected papers Davenport
- Davenport, A (2007) Scheduling Steel Production using Mixed-Integer Programming and Constraint Programming, 120--127 (Full Paper) (link to paper)
(Menu for Davenport) All papers - Full papers - Abstracts - Selected papers Davidovi
- Davidovi, T (2007) Towards the Optimal Solution of the Multiprocessor Scheduling Problem with Communication Delays, 128--135 (Full Paper) (link to paper)
(Menu for Davidovi) All papers - Full papers - Abstracts - Selected papers Dawande
- Dawande, M (2005) Approximations to Optimal k-unit Cycles for Dual Gripper Robot Cells, 326--326 (Abstract) (link to paper)
(Menu for Dawande) All papers - Full papers - Abstracts - Selected papers De Bruecker
- De Bruecker, P (2013) Algorithms for building optimal aircraft maintenance personnel rosters, 633--635 (Abstract) (link to paper)
(Menu for De Bruecker) All papers - Full papers - Abstracts - Selected papers De Bruyn
- De Bruyn, W (2011) Case study: an effective genetic algorithm for the chemical batch production scheduling, 469--482 (Full Paper) (link to paper)
- De Bruyn, W (2013) A Reinforcement Learning Approach to Solving Hybrid Flexible Flowline Scheduling Problems, 402--409 (Full Paper) (link to paper)
(Menu for De Bruyn) All papers - Full papers - Abstracts - Selected papers De Causmaecker
- De Causmaecker, P (2005) Course Timetabling Extended Tiles For University Timetabling, 669--670 (Abstract) (link to paper)
- De Causmaecker, P (2003) Decentralised Course Timetabling in a Large Hierarchical Organisation, 60--66 (Abstract) (link to paper)
- De Causmaecker, P (2009) A Hyperheuristic Approach to Belgian Nurse Rostering Problems, 683--689 (Abstract) (link to paper)
- De Causmaecker, P (2005) Forecasting Flight Schedule Robustness, 698--700 (Abstract) (link to paper)
- De Causmaecker, P (2005) Systems Design For Scheduling Open Tools, 40--41 (Abstract) (link to paper)
- De Causmaecker, P (2003) Agents in Timetabling Problems, 67--73 (Abstract) (link to paper)
- De Causmaecker, P (2011) Pareto Optimal Negotiation for Nurse Rostering Problems, 579--583 (Abstract) (link to paper)
- De Causmaecker, P (2007) Distributed Decision Making in Hospital Wide Nurse Rostering Problems, 192--199 (Full Paper) (link to paper)
- De Causmaecker, P (2009) A multi-agent system handling personnel shortages in hospitals, 693--695 (Abstract) (link to paper)
- De Causmaecker, P (2013) Algorithm preformance prediction for nurse rostering, 21--38 (Full Paper) (link to paper)
- De Causmaecker, P (2011) A new hyper-heuristic implementation in HyFlex: a study on generality, 374--393 (Full Paper) (link to paper)
- De Causmaecker, P (2015) The Intermittent Traveling Salesman Problem, 794--796 (Abstract) (link to paper)
- De Causmaecker, P (2017) Evolving Adaptive Evolutionary Algorithms, 070--083 (Full Paper) (link to paper)
(Menu for De Causmaecker) All papers - Full papers - Abstracts - Selected papers De Cesco
- De Cesco, F (2015) Thesis Defense Timetabling, 507--514 (Full Paper) (link to paper)
(Menu for De Cesco) All papers - Full papers - Abstracts - Selected papers De Dinechin
- De Dinechin, B. D (2007) Time-Indexed Formulations and a Large Neighborhood Search for the Resource-Constrained Modulo Scheduling Problem, 144--151 (Full Paper) (link to paper)
(Menu for De Dinechin) All papers - Full papers - Abstracts - Selected papers De Feyter
- De Feyter, T (2013) Extended Roster Quality Staffng Problem A medium term roster quality to support staffing decisions, 424--436 (Full Paper) (link to paper)
(Menu for De Feyter) All papers - Full papers - Abstracts - Selected papers De Maere
- De Maere, G (2005) Forecasting Flight Schedule Robustness, 698--700 (Abstract) (link to paper)
(Menu for De Maere) All papers - Full papers - Abstracts - Selected papers De Reyck
- De Reyck, B (2009) Project scheduling with alternative technologies and stochastic activity durations, 756--760 (Abstract) (link to paper)
- De Reyck, B (2007) Project Scheduling with Success or Failure in Individual Activities, 584--587 (Abstract) (link to paper)
(Menu for De Reyck) All papers - Full papers - Abstracts - Selected papers De Werra
- De Werra, D (2007) Robotics and Chromatic Scheduling, 42--49 (Full Paper) (link to paper)
(Menu for De Werra) All papers - Full papers - Abstracts - Selected papers De Wispelaere
- De Wispelaere, A (2013) A heuristic approach to the prisoner transportation problem, 786--789 (Abstract) (link to paper)
(Menu for De Wispelaere) All papers - Full papers - Abstracts - Selected papers Deblaere
- Deblaere, F (2007) An Educational Tool for the Resource-Constrained Project Scheduling Problem, 564--566 (Abstract) (link to paper)
(Menu for Deblaere) All papers - Full papers - Abstracts - Selected papers Degbotse
- Degbotse, A (2005) Challenges in Matching Assets with Demand across All Supply Chain Management Decision Tiers in the IBM Microelectronics Division from Automated Fabs to Central Planning Engines to Collaborative Behavior (Work Arounds), 391--391 (Abstract) (link to paper)
(Menu for Degbotse) All papers - Full papers - Abstracts - Selected papers Deghdak
- Deghdak, K (2013) Evacuation Scheduling of a Town after a Natural Disaster: Time-indexed Formulations, 680--683 (Abstract) (link to paper)
- Deghdak, K. (2016) Scheduling evacuation operations, 467--478 (Selected Paper) (link to paper)
- Deghdak, K (2015) A Decomposition Heuristic for a Bicriteria Evacuation Scheduling Problem, 704--707 (Abstract) (link to paper)
- Deghdak, K (2015) The Discrete Parallel Machine Makespan Scheduling-Location Problem, 659--661 (Abstract) (link to paper)
(Menu for Deghdak) All papers - Full papers - Abstracts - Selected papers Deleplanque
- Deleplanque, S (2013) Transfers in the on-demand transportation: the DARPT Dial-a-Ride Problem with transfers allowed, 185--205 (Full Paper) (link to paper)
(Menu for Deleplanque) All papers - Full papers - Abstracts - Selected papers Demange
- Demange, M (2007) Robotics and Chromatic Scheduling, 42--49 (Full Paper) (link to paper)
(Menu for Demange) All papers - Full papers - Abstracts - Selected papers Demeester
- Demeester, P (2005) Systems Design For Scheduling Open Tools, 40--41 (Abstract) (link to paper)
- Demeester, P (2013) Modeling Real-World Vehicle Routing Problems with Dependencies, 711--713 (Abstract) (link to paper)
(Menu for Demeester) All papers - Full papers - Abstracts - Selected papers Demeulemeester
- Demeulemeester, E (2009) Integrated workforce staffing and scheduling: A case study at a major aircraft maintenance company, 724--726 (Abstract) (link to paper)
- Demeulemeester, E (2003) Scheduling Trainees at a Hospital Department, 224--225 (Abstract) (link to paper)
- Demeulemeester, E (2005) Integrating nurse and surgery scheduling, 408--409 (Abstract) (link to paper)
- Demeulemeester, E (2005) Proactive Resource Allocation Heuristics For Robust Project Scheduling, 322--323 (Abstract) (link to paper)
- Demeulemeester, E (2013) Algorithms for building optimal aircraft maintenance personnel rosters, 633--635 (Abstract) (link to paper)
- Demeulemeester, E (2013) Exact algorithms for single-machine scheduling with time windows and precedence constraints, 656--658 (Abstract) (link to paper)
- Demeulemeester, E. (2016) Exact algorithms for single-machine scheduling with time windows and precedence constraints, 309--334 (Selected Paper) (link to paper)
- Demeulemeester, E (2007) An Educational Tool for the Resource-Constrained Project Scheduling Problem, 564--566 (Abstract) (link to paper)
- Demeulemeester, E. L (2007) Dynamic Algorithms for Order Acceptance and Capacity Planning within a Multi-Project Environment, 572--574 (Abstract) (link to paper)
- Demeulemeester, E (2013) The stochastic resource-constrained project scheduling problem under different confidence levels, 774--776 (Abstract) (link to paper)
- Demeulemeester, E. (2016) A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations, 409--428 (Selected Paper) (link to paper)
- Demeulemeester, E (2005) A Tabu-search Based Reactive Procedure For The Rcpsp With Stochastic Resource Availabilities, 335--336 (Abstract) (link to paper)
- Demeulemeester, E. L (2007) Exact and Suboptimal Reactive Strategies for Resource-Constrained Project Scheduling with Uncertain Resource Availabilities, 575--577 (Abstract) (link to paper)
- Demeulemeester, E (2005) An Evaluation Of Exact And Suboptimal Procedures For Constructing Stable Project Schedules, 341--342 (Abstract) (link to paper)
(Menu for Demeulemeester) All papers - Full papers - Abstracts - Selected papers Demir
- Demir, O (2013) A GIS-Based Emergency Response System for Disaster Relief Operations, 372--378 (Full Paper) (link to paper)
(Menu for Demir) All papers - Full papers - Abstracts - Selected papers Demirovic
- Demirovic, E (2017) Balanced clustering based decomposition applied to Master thesis defense timetabling problem, 214--228 (Full Paper) (link to paper)
(Menu for Demirovic) All papers - Full papers - Abstracts - Selected papers Denton
- Denton, B. T (2009) Bi-Criteria Scheduling of an Outpatient Procedure Center, 696--698 (Abstract) (link to paper)
(Menu for Denton) All papers - Full papers - Abstracts - Selected papers Dereniowski
- Dereniowski, D (2015) Structural properties of an open problem in preemptive scheduling, 673--676 (Abstract) (link to paper)
(Menu for Dereniowski) All papers - Full papers - Abstracts - Selected papers Desrosiers
- Desrosiers, J (2015) Vector space decomposition for linear programming, 652--655 (Abstract) (link to paper)
(Menu for Desrosiers) All papers - Full papers - Abstracts - Selected papers Detienne
- Detienne, B (2009) Scheduling Inspection Operations subject to a Fixed Production Schedule, 581--593 (Full Paper) (link to paper)
- Detienne, B (2011) Scheduling jobs on parallel machines to minimize a regular step total cost function, 523--538 (Selected Paper) (link to paper)
- Detienne, B (2011) Erratum to: Scheduling jobs on parallel machines to minimize a regular step total cost function, 539--540 (Selected Paper) (link to paper)
- Detienne, B (2015) The two-machine flowshop total completion time problem: A branch-and-bound based on Network-flow formulation, 635--637 (Abstract) (link to paper)
(Menu for Detienne) All papers - Full papers - Abstracts - Selected papers Dimitrov
- Dimitrov, T (2011) Scheduling of large dynamic job shop problems by concurrent non-blocking threads, 542--545 (Abstract) (link to paper)
(Menu for Dimitrov) All papers - Full papers - Abstracts - Selected papers Dios
- Dios, M (2015) Manufacturing Scheduling Systems: What are they made of?, 768--771 (Abstract) (link to paper)
- Dios, M (2015) A framework of constructive heuristics for permutation-type scheduling problems, 764--767 (Abstract) (link to paper)
- Dios, M (2015) Heuristic Methods for Single Machine Scheduling with Periodic Maintenance, 473--483 (Full Paper) (link to paper)
(Menu for Dios) All papers - Full papers - Abstracts - Selected papers Do
- Do, H (2007) Assigning Part-time Teachers to Courses via a Stable Marriage Algorithm, 625--627 (Abstract) (link to paper)
- Do, V.H (2003) Scheduling with Two Criteria, 468--472 (Abstract) (link to paper)
- Do, V. H (2005) Scheduling UET Tasks on Two Parallel Machines with the Criteria of Makespan and Total Completion Time, 83--109 (Selected Paper) (link to paper)
(Menu for Do) All papers - Full papers - Abstracts - Selected papers Dobson
- Dobson, R (2011) Low Energy Scheduling with Power Heterogeneous Multiprocessor Systems, 297--307 (Full Paper) (link to paper)
(Menu for Dobson) All papers - Full papers - Abstracts - Selected papers Doerner
- Doerner, K.E (2017) Scheduling of maintenance tasks of a large-scale tram network, 367--369 (Abstract) (link to paper)
- Doerner, K.F (2015) Variable Neighborhood Search for a Rich Production Planning Problem, 896--898 (Abstract) (link to paper)
(Menu for Doerner) All papers - Full papers - Abstracts - Selected papers Doganis
- Doganis, P (2008) Optimal production scheduling for the dairy industry, 315--331 (Selected Paper) (link to paper)
- Doganis, P (2005) Optimal Production Scheduling For Dairy Industries, 324--325 (Abstract) (link to paper)
(Menu for Doganis) All papers - Full papers - Abstracts - Selected papers Dolgui
- Dolgui, A (2013) A Graphical Algorithm for Solving an Investment Optimization Problem, 290--299 (Full Paper) (link to paper)
- Dolgui, A (2013) Solution algorithms for the two-station single track railway scheduling problem, 636--640 (Abstract) (link to paper)
(Menu for Dolgui) All papers - Full papers - Abstracts - Selected papers Donaldson
- Donaldson, J (2011) Ring Out the Bells, 624--627 (Abstract) (link to paper)
(Menu for Donaldson) All papers - Full papers - Abstracts - Selected papers Dooren
- Dooren, D. V. (2015) Multi-objective energy-aware scheduling, 946--948 (Abstract) (link to paper)
(Menu for Dooren) All papers - Full papers - Abstracts - Selected papers Dorne
- Dorne, R (2007) iSchedule, an Optimisation Toolkit for Complex Scheduling, 344--352 (Full Paper) (link to paper)
(Menu for Dorne) All papers - Full papers - Abstracts - Selected papers Dostert
- Dostert, M (2013) Algorithms and Complexity of Student Sectioning for Existing Timetables, 218--229 (Full Paper) (link to paper)
- Dostert, M (2016) A complexity analysis and an algorithmic approach to student sectioning in existing timetables, 285--293 (Selected Paper) (link to paper)
(Menu for Dostert) All papers - Full papers - Abstracts - Selected papers Down
- Down, D. G (2015) Resource-Aware Scheduling for Data Centers with Heterogenous Servers, 240--259 (Full Paper) (link to paper)
(Menu for Down) All papers - Full papers - Abstracts - Selected papers Dowsland
- Dowsland, K (2011) An Exact and Heuristic Hybrid for Solving a Medical Student Scheduling Problem, 584--586 (Abstract) (link to paper)
(Menu for Dowsland) All papers - Full papers - Abstracts - Selected papers Dozic
- Dozic, S (2009) Heuristic approach to the airline schedule disturbances problem: multifleet case, 311--320 (Full Paper) (link to paper)
(Menu for Dozic) All papers - Full papers - Abstracts - Selected papers Drezet
- Drezet, LE (2005) A Predictive-reactive Approach For Rcpsp With Labour Constraints And Time-dependent Activities Requirements, 671--672 (Abstract) (link to paper)
(Menu for Drezet) All papers - Full papers - Abstracts - Selected papers Dridi
- Dridi, N (2007) The Two-Stage Assembly Flow Shop Scheduling with an Availability Constraint, 184--191 (Full Paper) (link to paper)
(Menu for Dridi) All papers - Full papers - Abstracts - Selected papers Dror
- Dror, M (2003) A Pheromone-based Look-ahead Hyper-heuristic for Time-tabling Problems, 174--179 (Abstract) (link to paper)
- Dror, M (2009) Strong-Weak Precedence in Scheduling: Extended Order Implications, 28--42 (Full Paper) (link to paper)
- Dror, M (2005) Case-Based Initialisation of Metaheuristics for Examination, 289--308 (Selected Paper) (link to paper)
- Dror, M (2003) Case-Based Initialisation of Metaheuristics for Examination Timetabling, 137--154 (Full Paper) (link to paper)
(Menu for Dror) All papers - Full papers - Abstracts - Selected papers Drozdowsk
- Drozdowsk, M (2013) Mitigating Partitioning Skew in MapReduce Computations, 80--90 (Full Paper) (link to paper)
(Menu for Drozdowsk) All papers - Full papers - Abstracts - Selected papers Drozdowski
- Drozdowski, M (2009) Heuristics for Divisible Loads Scheduling in Systems with Limited Memory, 321--329 (Full Paper) (link to paper)
- Drozdowski, M (2011) Preface, 407--407 (Selected Paper) (link to paper)
- Drozdowski, M (2015) Energy Consumption in Single- and Multi-installment Divisible Loads Processing in Systems with Hierarchical Memory, 146--153 (Full Paper) (link to paper)
(Menu for Drozdowski) All papers - Full papers - Abstracts - Selected papers Drwal
- Drwal, M (2015) Complexity of minimizing the total flow time on parallel machines with interval data and minmax regret criterion, 617--621 (Abstract) (link to paper)
(Menu for Drwal) All papers - Full papers - Abstracts - Selected papers Duarte
- Duarte, A (2003) A Software Pipelining Method Based on a Hierarchical Social Algorithm, 382--385 (Abstract) (link to paper)
(Menu for Duarte) All papers - Full papers - Abstracts - Selected papers Ducatelle
- Ducatelle, F (2003) Ants Can Solve Difficult Bin Packing Problems, 90--91 (Abstract) (link to paper)
(Menu for Ducatelle) All papers - Full papers - Abstracts - Selected papers Duenas
- Duenas, A (2003) Handling Preferences using Genetic Algorithms for the Nurse Scheduling Problem, 180--196 (Full Paper) (link to paper)
- Duenas, A (2005) An Approach To Predictive-reactive Scheduling Of Parallel Machines Subject To Disruptions, 74--91 (Full Paper) (link to paper)
- Duenas, A (2008) An approach to predictive-reactive scheduling of parallel machines subject to disruptions, 65--82 (Selected Paper) (link to paper)
(Menu for Duenas) All papers - Full papers - Abstracts - Selected papers Duin
- Duin, C.W (2005) Models For Adjacent Resource Scheduling, 16--17 (Abstract) (link to paper)
- Duin, C.W (2005) On The Complexity Of Adjacent Resource Scheduling, 653--654 (Abstract) (link to paper)
(Menu for Duin) All papers - Full papers - Abstracts - Selected papers Dullaert
- Dullaert, W (2007) The Cost of Scheduling Customers in Routing Problems, 136--143 (Full Paper) (link to paper)
(Menu for Dullaert) All papers - Full papers - Abstracts - Selected papers Dung
- Dung, P.Q (2017) Balanced clustering based decomposition applied to Master thesis defense timetabling problem, 214--228 (Full Paper) (link to paper)
(Menu for Dung) All papers - Full papers - Abstracts - Selected papers Dusa
- Dusa, V (2009) Preemptive scheduling with precedences and alternative resources, 518--530 (Full Paper) (link to paper)
(Menu for Dusa) All papers - Full papers - Abstracts - Selected papers Dutot
- Dutot, P-F. (2016) Novel dual discounting functions for the Internet shopping optimization problem: new algorithms, 245--255 (Selected Paper) (link to paper)
(Menu for Dutot) All papers - Full papers - Abstracts - Selected papers Earl
- Earl, M (2013) Innovative teaching and the death of the utilisation survey, 781--785 (Abstract) (link to paper)
(Menu for Earl) All papers - Full papers - Abstracts - Selected papers Ecker
- Ecker, K. H (2007) Non-preemptive Scheduling of Distance Constrained Tasks Subject to Minimizing Processor Load, 200--208 (Full Paper) (link to paper)
(Menu for Ecker) All papers - Full papers - Abstracts - Selected papers Eckersley
- Eckersley, A. J (2003) Similarity Measures for Exam Timetabling Problems, 120--136 (Full Paper) (link to paper)
(Menu for Eckersley) All papers - Full papers - Abstracts - Selected papers Edwards
- Edwards, S (2017) Symmetry breaking in a special case of the RCPSP/max, 315--318 (Abstract) (link to paper)
(Menu for Edwards) All papers - Full papers - Abstracts - Selected papers Eglese
- Eglese, R (2003) Vehicle Routing and Scheduling with a Road Timetable, 700--700 (Abstract) (link to paper)
- Eglese, R (2005) Vehicle Routing And Scheduling With Time Varying Travel Times, 724--724 (Abstract) (link to paper)
(Menu for Eglese) All papers - Full papers - Abstracts - Selected papers Ekim
- Ekim, T (2007) Robotics and Chromatic Scheduling, 42--49 (Full Paper) (link to paper)
(Menu for Ekim) All papers - Full papers - Abstracts - Selected papers Elalouf
- Elalouf, A (2015) A general technique for improving the complexity of FPTAS for scheduling problems, 743--745 (Abstract) (link to paper)
- Elalouf, A (2015) Floating Patients method based on scheduling algorithm for emergency department's service improvement, 683--686 (Abstract) (link to paper)
(Menu for Elalouf) All papers - Full papers - Abstracts - Selected papers Elhag
- Elhag, A (2013) A Grouping Hyper-heuristic for Graph Colouring, 770--773 (Abstract) (link to paper)
(Menu for Elhag) All papers - Full papers - Abstracts - Selected papers Elliot
- Elliot, R. (2011) Dynamic Data Structures for Taskgraph Scheduling Policies with Applications in OpenCL Accelerators, 322--334 (Full Paper) (link to paper)
(Menu for Elliot) All papers - Full papers - Abstracts - Selected papers Elmaghraby
- Elmaghraby, S.E (2003) Two-machine Flowshop Scheduling with the Availability Constraint on the Second Machine, 279--290 (Full Paper) (link to paper)
(Menu for Elmaghraby) All papers - Full papers - Abstracts - Selected papers Elvikis
- Elvikis, D (2007) Scheduling and Location (ScheLoc):Makespan Problem with Variable Release Dates, 152--158 (Full Paper) (link to paper)
- Elvikis, D (2009) Scheduling two interfering job sets on uniform parallel machines with makespan and cost functions, 645--654 (Full Paper) (link to paper)
- Elvikis, D (2011) Scheduling two agents on uniform parallel machines with makespan and cost functions, 471--481 (Selected Paper) (link to paper)
(Menu for Elvikis) All papers - Full papers - Abstracts - Selected papers Emeretlis
- Emeretlis, A (2017) Exploration of Logic-Based Benders Decomposition Approach for Mapping Applications on Heterogeneous Multi-Core Platforms, 030--042 (Full Paper) (link to paper)
(Menu for Emeretlis) All papers - Full papers - Abstracts - Selected papers Ermis
- Ermis, G (2013) Scheduling chains with constant time lags and variable release times on asingle machine, 584--586 (Abstract) (link to paper)
(Menu for Ermis) All papers - Full papers - Abstracts - Selected papers Erramilli
- Erramilli, V (2005) Multiple Orders Per Job Batch Scheduling With Incompatible Jobs, 48--64 (Full Paper) (link to paper)
- Erramilli, V (2008) Multiple orders per job batch scheduling with incompatible jobs, 245--260 (Selected Paper) (link to paper)
- Erramilli, V (2005) Single Machine Multiple Orders Per Job Scheduling Using Column Generation, 539--547 (Full Paper) (link to paper)
(Menu for Erramilli) All papers - Full papers - Abstracts - Selected papers Ersoy
- Ersoy, E (2007) Memetic Algorithms and Hyperhill-climbers, 159--166 (Full Paper) (link to paper)
(Menu for Ersoy) All papers - Full papers - Abstracts - Selected papers Esswein
- Esswein, C (2003) A Genetic Algorithm for Job Shop Scheduling with Flexibility, 417--418 (Abstract) (link to paper)
(Menu for Esswein) All papers - Full papers - Abstracts - Selected papers Esteve
- Esteve, B (2003) Just-in-time Scheduling of a 2-Machine Flowshop Problem with Lot-streaming, 473--475 (Abstract) (link to paper)
(Menu for Esteve) All papers - Full papers - Abstracts - Selected papers Facó
- Facó, J. L. D. (2007) Applying Optimal Control to Jetty Scheduling Problems, 167--174 (Full Paper) (link to paper)
(Menu for Facó) All papers - Full papers - Abstracts - Selected papers Fagundez
- Fagundez, F. D. (2007) Applying Optimal Control to Jetty Scheduling Problems, 167--174 (Full Paper) (link to paper)
(Menu for Fagundez) All papers - Full papers - Abstracts - Selected papers Fainberg
- Fainberg, A (2014) A reduction approach to the two-campus transport problem, 587--599 (Selected Paper) (link to paper)
(Menu for Fainberg) All papers - Full papers - Abstracts - Selected papers Fan
- Fan, C (2005) Scheduling The Production And Transportation Operations Subject To Dynamic Arrivals, 701--701 (Abstract) (link to paper)
(Menu for Fan) All papers - Full papers - Abstracts - Selected papers Fathy
- Fathy, Y (2015) On Task Scheduling Policies for Work-Stealing Schedulers, 821--824 (Abstract) (link to paper)
(Menu for Fathy) All papers - Full papers - Abstracts - Selected papers Fayad
- Fayad, C (2005) Job Shop Scheduling With Lot-sizing And Batching In An Uncertain Real-world Environment, 363--379 (Full Paper) (link to paper)
- Fayad, C (2008) Fuzzy job shop scheduling with lot-sizing, 275--292 (Selected Paper) (link to paper)
(Menu for Fayad) All papers - Full papers - Abstracts - Selected papers Feillet
- Feillet, D (2005) Lower And Upper Bounds For The Job-shop Scheduling Problem With Sequence-dependent Setup Times, 316--321 (Full Paper) (link to paper)
- Feillet, D (2008) A branch and bound method for the job-shop problem with sequence-dependent setup times, 135--159 (Selected Paper) (link to paper)
- Feillet, D (2007) Dynamic Cooperative Search for Constraint Satisfaction and Combinatorial Optimization: Application to a Rostering Problem, 557--560 (Abstract) (link to paper)
(Menu for Feillet) All papers - Full papers - Abstracts - Selected papers Feitelson
- Feitelson, D.G (2003) Bicriteria Scheduling for Parallel Jobs, 606--619 (Full Paper) (link to paper)
(Menu for Feitelson) All papers - Full papers - Abstracts - Selected papers Feng
- Feng, G (2005) Efficient Algorithms For Machine Scheduling Problems With Earliness And Tardiness Penalties, 196--212 (Abstract) (link to paper)
- Feng, G (2008) Efficient algorithms for machine scheduling problems with earliness and tardiness penalties, 83--95 (Selected Paper) (link to paper)
(Menu for Feng) All papers - Full papers - Abstracts - Selected papers Fernandes
- Fernandes, F (2015) Solving the staff scheduling problem in a retail company, 611--613 (Abstract) (link to paper)
- Fernandes, P (2013) Automatic Timetabling in Higher Education Institutions: a real scenario and solution, 151--170 (Full Paper) (link to paper)
- Fernandes, P. (2016) A decision support approach to automatic timetabling in higher education institutions, 335--348 (Selected Paper) (link to paper)
(Menu for Fernandes) All papers - Full papers - Abstracts - Selected papers Fernandez-Viagas
- Fernandez-Viagas, V (2015) Manufacturing Scheduling Systems: What are they made of?, 768--771 (Abstract) (link to paper)
- Fernandez-Viagas, V (2015) A framework of constructive heuristics for permutation-type scheduling problems, 764--767 (Abstract) (link to paper)
- Fernandez-Viagas, V (2015) Heuristic Methods for Single Machine Scheduling with Periodic Maintenance, 473--483 (Full Paper) (link to paper)
(Menu for Fernandez-Viagas) All papers - Full papers - Abstracts - Selected papers Fernández
- Fernández, F (2003) A Software Pipelining Method Based on a Hierarchical Social Algorithm, 382--385 (Abstract) (link to paper)
(Menu for Fernández) All papers - Full papers - Abstracts - Selected papers Finke
- Finke, G (2013) Two extensions of Lawler’s min-max cost algorithm, 790--794 (Abstract) (link to paper)
- Finke, G. (2016) Lawler's minmax cost algorithm: optimality conditions and uncertainty, 401--408 (Selected Paper) (link to paper)
- Finke, G (2007) Scheduling with Batch Compatible Tasks, 24--26 (Full Paper) (link to paper)
- Finke, G (2009) Polynomial complexity of the cyclic identical coupled task problem, 679--682 (Abstract) (link to paper)
- Finke, G (2007) Scheduling Problems of Chemical Experiments, 581--583 (Abstract) (link to paper)
- Finke, G (2003) Multibin Packing with the Best-Fit Rule, 74--89 (Full Paper) (link to paper)
- Finke, G (2005) The Best-Fit Rule for Multibin Packing: An Extension of Graham's List Algorithms, 269--286 (Selected Paper) (link to paper)
(Menu for Finke) All papers - Full papers - Abstracts - Selected papers Fleischer
- Fleischer, L. (2005) Algorithms for online buffer management, 518--518 (Abstract) (link to paper)
(Menu for Fleischer) All papers - Full papers - Abstracts - Selected papers Fleszar
- Fleszar, K (2011) Hybridizing local search with MIP for unrelated parallel machine scheduling problems with makespan minimization, 529--531 (Abstract) (link to paper)
- Fleszar, K (2009) Hybrid of the weighted minimum slack and shortest processing time dispatching rules for the total weighted tardiness single machine scheduling problem with availability constraints, 202--215 (Full Paper) (link to paper)
(Menu for Fleszar) All papers - Full papers - Abstracts - Selected papers Fong
- Fong, C-W. (2015) A Hybrid Swarm Algorithm for Post Enrollment Course Timetabling, 931--942 (Abstract) (link to paper)
- Fong, P. Y. (2005) Combined Production and Distribution Scheduling of Ready-Mix Concrete, 551--551 (Abstract) (link to paper)
(Menu for Fong) All papers - Full papers - Abstracts - Selected papers Fonseca
- Fonseca, G.H.G (2015) Improving Upper Bounds in High School Timetabling by Matheuristics, 267--275 (Full Paper) (link to paper)
- Fonseca, G. H.G (2013) A New Integer Linear Programming Formulation to the Examination Timetabling Problem, 345--355 (Full Paper) (link to paper)
- Fonseca, G. H.G (2013) Late Acceptance Hill-Climbing Applied to the High School Timetabling Problem, 331--344 (Full Paper) (link to paper)
- Fonseca, G. H. G (2016) Late acceptance hill-climbing for high school timetabling, 453--465 (Selected Paper) (link to paper)
(Menu for Fonseca) All papers - Full papers - Abstracts - Selected papers Fontes
- Fontes, B.B.M.M (2017) Integrated Scheduling of Machines and Vehicles and and Storage Tasks in Flexible Manufacturing Systems, 388--392 (Abstract) (link to paper)
(Menu for Fontes) All papers - Full papers - Abstracts - Selected papers Foong
- Foong, W. K. (2005) Ant Colony Optimization for Power Plant Maintenance Scheduling Optimization:A Simplified Hydro Tasmania System, 72--72 (Abstract) (link to paper)
- Foong, W. K. (2008) Ant colony optimization for power plant maintenance scheduling optimization—a five-station hydropower system, 433--450 (Selected Paper) (link to paper)
(Menu for Foong) All papers - Full papers - Abstracts - Selected papers Fordyce
- Fordyce, K (2011) The Ongoing Challenge – A Responsive Enterprise-Wide Demand Supply Network for Semiconductor Based Package Goods – Something for Everyone, 10--93 (Full Paper) (link to paper)
- Fordyce, K (2005) Challenges in Matching Assets with Demand across All Supply Chain Management Decision Tiers in the IBM Microelectronics Division from Automated Fabs to Central Planning Engines to Collaborative Behavior (Work Arounds), 391--391 (Abstract) (link to paper)
(Menu for Fordyce) All papers - Full papers - Abstracts - Selected papers Fores
- Fores, S (2003) Recent Advancement in an Established Driver Scheduling System, 704--706 (Abstract) (link to paper)
(Menu for Fores) All papers - Full papers - Abstracts - Selected papers Fowler
- Fowler, J (2015) The polynomial solvability of a bicriteria linear combination on parallel identical machines with release dates, 902--904 (Abstract) (link to paper)
- Fowler, J (2005) Bicriteria Scheduling Of Equal Length Jobs With Release Dates On Identical Parallel Machines, 112--122 (Full Paper) (link to paper)
- Fowler, J. W (2011) Multi-mode Resource-Constrained Project Scheduling of Semiconductor Equipment Install/Qual Process, 408--418 (Full Paper) (link to paper)
- Fowler, J (2005) Multiple Orders Per Job Scheduling Problems, 44--45 (Abstract) (link to paper)
- Fowler, J (2005) Scheduling Wafer Fabrication Operations: State-of-the-practice And Future Needs, 392--393 (Abstract) (link to paper)
- Fowler, J. W (2009) Bi-Criteria Scheduling of an Outpatient Procedure Center, 696--698 (Abstract) (link to paper)
- Fowler, J (2005) A Divide-and-merge Heuristic For Single Machine Weighted Tardiness Problem, 186--187 (Abstract) (link to paper)
- Fowler, J (2009) Single Machine Scheduling with Interfering Job Sets, 357--365 (Full Paper) (link to paper)
- Fowler, J (2011) Single Machine Scheduling with Interfering Job Sets to Minimize Total Weighted Completion Time and Maximum Lateness, 568--572 (Abstract) (link to paper)
- Fowler, J (2005) A Comparison Of Different Formulations For The Non-preemptive Single Machine Total Weighted Tardiness Scheduling Problem, 643--651 (Full Paper) (link to paper)
- Fowler, J. W (2007) Minimizing Makespan with Multiple Orders per Job in Mixed Flowshops, 301--308 (Full Paper) (link to paper)
- Fowler, J. W (2005) Minimizing Makespan With Multiple Orders Per Job In A Two Machine Flowshop With Item Processing, 288--298 (Full Paper) (link to paper)
- Fowler, J. W (2014) Processing time generation schemes for parallel machine scheduling problems with various correlation structures, 569--586 (Selected Paper) (link to paper)
- Fowler, J. W (2007) Interactive Evolutionary Multicriteria Scheduling, 591--594 (Abstract) (link to paper)
- Fowler, J (2005) A Deterministic Scheduling Approach For Wafer Fabrication Facilities, 42--43 (Abstract) (link to paper)
- Fowler, J. W (2009) Scheduling Semiconductor Manufacturing Operations: Problems, Solution Techniques, and Future Challenges, 192--201 (Full Paper) (link to paper)
- Fowler, J. W (2011) A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations, 583--599 (Selected Paper) (link to paper)
- Fowler, J. W (2011) Flexible Constraint Optimization of Product Profits: A responsive approach to determine profit-optimal product start rates subject to mean cycle time and product volume constraints in support of production planning for semiconductor fabrication facilities, 599--601 (Abstract) (link to paper)
- Fowler, J (2005) A Bi-criteria Approach To Scheduling Wafer Fabrication Facilities, 276--287 (Full Paper) (link to paper)
- Fowler, J. W (2011) Investigating the boundary between scheduling and dispatching, 573--575 (Abstract) (link to paper)
- Fowler, J. W (2011) Algorithmic Parallelization in Multi-Criteria Semiconductor Scheduling, 642--644 (Abstract) (link to paper)
- Fowler, J. W (2011) Job Scheduling to Minimize Weighted Completion Time Variance on Identical Parallel Machines, 546--548 (Abstract) (link to paper)
- Fowler, J (2015) Scheduling Jobs in a Two-Stage Flexible Flow Shop with Batch Processing Machines, 801--804 (Abstract) (link to paper)
(Menu for Fowler) All papers - Full papers - Abstracts - Selected papers Framinan
- Framinan, J. M (2015) Manufacturing Scheduling Systems: What are they made of?, 768--771 (Abstract) (link to paper)
- Framinan, J.M (2015) A framework of constructive heuristics for permutation-type scheduling problems, 764--767 (Abstract) (link to paper)
- Framinan, J. M (2015) Heuristic Methods for Single Machine Scheduling with Periodic Maintenance, 473--483 (Full Paper) (link to paper)
(Menu for Framinan) All papers - Full papers - Abstracts - Selected papers Francis
- Francis, H (2011) Dynamic Data Structures for Taskgraph Scheduling Policies with Applications in OpenCL Accelerators, 322--334 (Full Paper) (link to paper)
(Menu for Francis) All papers - Full papers - Abstracts - Selected papers Froncek
- Froncek, D (2003) Round Robin Tournaments with No Breaks in Home-Away Patterns, 602--603 (Abstract) (link to paper)
- Froncek, D (2005) Round Robin Tournaments with One Bye and No Breaks in Home-Away Patterns are Unique, 331--340 (Selected Paper) (link to paper)
(Menu for Froncek) All papers - Full papers - Abstracts - Selected papers Fu
- Fu, L- (2013) Production and Interplant Batch Delivery Scheduling: Dominance and Cooperation, 133--150 (Full Paper) (link to paper)
- Fu, L- (2015) Integrated production and outbound distribution scheduling problem with setup times and delivery time windows, 174--188 (Full Paper) (link to paper)
(Menu for Fu) All papers - Full papers - Abstracts - Selected papers Fuchigami
- Fuchigami, H.Y (2017) A parametric priority rule for just-in-time scheduling problem with sequence-dependent setup times, 370--372 (Abstract) (link to paper)
(Menu for Fuchigami) All papers - Full papers - Abstracts - Selected papers Fugenschuh
- Fugenschuh, A (2015) Home Health Care Scheduling: A Case Study, 555--569 (Full Paper) (link to paper)
(Menu for Fugenschuh) All papers - Full papers - Abstracts - Selected papers Fujikuma
- Fujikuma, S (2009) An exact algorithm for single-machine scheduling without machine idle time, 575--593 (Selected Paper) (link to paper)
(Menu for Fujikuma) All papers - Full papers - Abstracts - Selected papers G
- G, J. J. H. (2013) Use Matrixes Of Weighing for the scheduling in a sports Fantasy., 694--702 (Abstract) (link to paper)
- G, M. J. G. (2013) Use Matrixes Of Weighing for the scheduling in a sports Fantasy., 694--702 (Abstract) (link to paper)
(Menu for G) All papers - Full papers - Abstracts - Selected papers G"unther
- G"unther, M (2017) Evolutionary Bilevel Approach for Integrated Long-Term Staffing and Scheduling, 144--157 (Full Paper) (link to paper)
(Menu for G"unther) All papers - Full papers - Abstracts - Selected papers Gafarov
- Gafarov, E.R (2013) A Graphical Algorithm for Solving an Investment Optimization Problem, 290--299 (Full Paper) (link to paper)
- Gafarov, E.R (2013) Solution algorithms for the two-station single track railway scheduling problem, 636--640 (Abstract) (link to paper)
- Gafarov, E. R (2009) Estimation of absolute error for the resources-constrained project scheduling problem, 671--678 (Abstract) (link to paper)
(Menu for Gafarov) All papers - Full papers - Abstracts - Selected papers Gagn
- Gagn, C (2013) A new ant colony optimization for minimizing tardiness in the single machine scheduling problem with sequence-dependent setups times, 17--20 (Full Paper) (link to paper)
(Menu for Gagn) All papers - Full papers - Abstracts - Selected papers Gao
- Gao, S (2008) A zero-inventory production and distribution problem with a fixed customer sequence, 395--414 (Selected Paper) (link to paper)
- Gao, S (2005) A Zero-Inventory Production-Distribution Problem with Time-Window Constraints, 428--444 (Full Paper) (link to paper)
- Gao, J (2011) Two-Stage Shipment Planning with Uncertainties: A Stochastic Programming Approach, 602--604 (Abstract) (link to paper)
- Gao, H (2009) An Empirical Study of Impacts of Production Mix Efficiency, Product Route Efficiency on Operations Performance and Profitability: A Reverse Logistics Approach, 765--767 (Abstract) (link to paper)
(Menu for Gao) All papers - Full papers - Abstracts - Selected papers Garc?a-Leon
- Garc?a-Leon, A (2015) Minimizing regular criteria in the flexible job-shop scheduling problem, 443--456 (Full Paper) (link to paper)
(Menu for Garc?a-Leon) All papers - Full papers - Abstracts - Selected papers Garcia-Sabater
- Garcia-Sabater, J.P (2013) On the effect of complexity and uncertainty in ELSP, 748--752 (Abstract) (link to paper)
- Garcia-Sabater, J.P (2013) In-depth analysis of the quality sequence to resolve CRSP, 515--527 (Full Paper) (link to paper)
(Menu for Garcia-Sabater) All papers - Full papers - Abstracts - Selected papers García-Sabater
- García-Sabater, J. P. (2007) A Decision Support System for Scheduling a Painting Facility in an Automotive Supplier, 175--183 (Full Paper) (link to paper)
- García-Sabater, J. J. (2007) A Decision Support System for Scheduling a Painting Facility in an Automotive Supplier, 175--183 (Full Paper) (link to paper)
(Menu for García-Sabater) All papers - Full papers - Abstracts - Selected papers Garibaldi
- Garibaldi, J. M (2007) Determining Rules in Fuzzy Multiple Heuristic Orderings for Constructing Examination Timetables, 59--66 (Full Paper) (link to paper)
- Garibaldi, J. M (2005) A Service Level Agreement Protocol And Tabu Search For Scheduling On Computational Grids, 238--243 (Full Paper) (link to paper)
(Menu for Garibaldi) All papers - Full papers - Abstracts - Selected papers Garra?a
- Garra?a, M (2015) A branch-and-reduce exact algorithm for the single machine total tardiness problem, 879--881 (Abstract) (link to paper)
- Garra?a, M (2013) A computational study of a stock cutting problem with sequence dependent cut losses, 703--706 (Abstract) (link to paper)
(Menu for Garra?a) All papers - Full papers - Abstracts - Selected papers Gaspero
- Gaspero, L. D (2017) Modeling and Solving the Steelmaking and Casting Planning and Scheduling Problem, 380--383 (Abstract) (link to paper)
- Gaspero, L. D (2013) A simulated annealing approach to the curriculum-based course timetabling problem, 314--317 (Full Paper) (link to paper)
- Gaspero, L. D (2011) Tabu search techniques for the heterogeneous vehicle routing problem with time windows and carrier-dependent costs, 601--615 (Selected Paper) (link to paper)
(Menu for Gaspero) All papers - Full papers - Abstracts - Selected papers Gather
- Gather, T (2009) Exact methods for the resource levelling problem, 811--820 (Abstract) (link to paper)
- Gather, T (2011) Exact methods for the resource levelling problem, 557--569 (Selected Paper) (link to paper)
(Menu for Gather) All papers - Full papers - Abstracts - Selected papers Gauthier
- Gauthier, J.B (2015) Vector space decomposition for linear programming, 652--655 (Abstract) (link to paper)
(Menu for Gauthier) All papers - Full papers - Abstracts - Selected papers Gawiejnowicz
- Gawiejnowicz, S. la (2007) Scheduling Resumable Deteriorating Jobs, 567--569 (Abstract) (link to paper)
(Menu for Gawiejnowicz) All papers - Full papers - Abstracts - Selected papers Gazdar
- Gazdar, A (2015) Bounding schemes for the parallel processors scheduling problem with release date, delivery time and with no-idle time constraint, 393--402 (Full Paper) (link to paper)
- Gazdar, A (2015) Lower bounds for the parallel processing scheduling problem with multiprocessor tasks, release date and delivery time, 403--411 (Full Paper) (link to paper)
(Menu for Gazdar) All papers - Full papers - Abstracts - Selected papers Geiger
- Geiger, M.J (2013) Iterated Variable Neighborhood Search for the resource constrained multi-mode multi-project scheduling problem Some comments on our contribution to the MISTA 2013 Challenge, 807--811 (Full Paper) (link to paper)
(Menu for Geiger) All papers - Full papers - Abstracts - Selected papers Geirsson
- Geirsson, E (2013) Bandit Algorithms using Monte Carlo Rollouts for Job Shop Scheduling, 318--330 (Full Paper) (link to paper)
(Menu for Geirsson) All papers - Full papers - Abstracts - Selected papers Geismar
- Geismar, H. N (2005) Approximations to Optimal k-unit Cycles for Dual Gripper Robot Cells, 326--326 (Abstract) (link to paper)
(Menu for Geismar) All papers - Full papers - Abstracts - Selected papers Gel
- Gel, E (2007) Interactive Evolutionary Multicriteria Scheduling, 591--594 (Abstract) (link to paper)
(Menu for Gel) All papers - Full papers - Abstracts - Selected papers Gelbukh
- Gelbukh, A (2005) On Project Scheduling With And/or Precedence Constraints, 597--606 (Full Paper) (link to paper)
(Menu for Gelbukh) All papers - Full papers - Abstracts - Selected papers Gendreau
- Gendreau, M (2007) A Simulated Annealing Hyper-heuristic: Adaptive Heuristic Selection for Different Vehicle Routing Problems, 67--70 (Full Paper) (link to paper)
- Gendreau, M (2003) A Tabu Search Heuristic to Generate Shift Schedules, 526--527 (Abstract) (link to paper)
(Menu for Gendreau) All papers - Full papers - Abstracts - Selected papers Giroudeau
- Giroudeau, R (2009) Isomorphic coupled-task scheduling problem with compatibility constraints on a single processor, 378--388 (Full Paper) (link to paper)
- Giroudeau, R (2011) Isomorphic coupled-task scheduling problem with compatibility constraints on a single processor, 501--509 (Selected Paper) (link to paper)
(Menu for Giroudeau) All papers - Full papers - Abstracts - Selected papers Glass
- Glass, C. A (2005) How to maximize rewards in an incentived made-to-order scheduling environment:, 69--69 (Abstract) (link to paper)
- Glass, C (2009) Scheduling in a micro-biological laboratory: heuristics for sequencing food sample tests, to co-ordinate with production of perishable media materials, 782--783 (Abstract) (link to paper)
(Menu for Glass) All papers - Full papers - Abstracts - Selected papers Glazebrook
- Glazebrook, K (2015) Ant Colony Optimisation for a Job Shop with Flexible Maintenance, 614--616 (Abstract) (link to paper)
- Glazebrook, K.D (2011) Stochastic scheduling: A short history of index policies and some key recent developments, 94--112 (Full Paper) (link to paper)
- Glazebrook, K. D (2014) Stochastic scheduling: A short history of index policies and new approaches to index generation for dynamic resource allocation, 407--425 (Selected Paper) (link to paper)
(Menu for Glazebrook) All papers - Full papers - Abstracts - Selected papers Glizer
- Glizer, V.Y (2015) Optimal schedule of a statistical process control with a nonlinear expected loss, 42--54 (Full Paper) (link to paper)
(Menu for Glizer) All papers - Full papers - Abstracts - Selected papers Godard
- Godard, D (2007) Self-Adapting Large Neighborhood Search:Application to Single-Mode Scheduling Problems, 276--284 (Full Paper) (link to paper)
(Menu for Godard) All papers - Full papers - Abstracts - Selected papers Goel
- Goel, A (2015) Scheduling of jobs in the continuous casting stage of steel production, 899--901 (Abstract) (link to paper)
(Menu for Goel) All papers - Full papers - Abstracts - Selected papers Gogos
- Gogos, C (2013) DAG Scheduling using Integer Programming in heterogenous parallel execution environments, 392--401 (Full Paper) (link to paper)
(Menu for Gogos) All papers - Full papers - Abstracts - Selected papers Goldrick
- Goldrick, J. M (2009) Decision Support Systems for Tankering within the Airline Industry, 837--838 (Abstract) (link to paper)
(Menu for Goldrick) All papers - Full papers - Abstracts - Selected papers Gomes
- Gomes, F.R.A (2017) Mathematical Formulation for Minimizing Total Tardiness in a Scheduling Problem with Parallel Machines, 201--213 (Full Paper) (link to paper)
- Gomes, M. C (2009) Scheduling of job shop, make-to-order industries with recirculation and assembly: discrete versus continuous time models, 802--807 (Abstract) (link to paper)
- Gomes, M. C (2005) Optimal Reactive Scheduling For Job Shop, Make-toorder Industries: A Mould Making Industry Case Study, 46--46 (Abstract) (link to paper)
(Menu for Gomes) All papers - Full papers - Abstracts - Selected papers Gonzales
- Gonzales, C (2011) Single machine scheduling with delivery dates and cumulative payoffs, 261--274 (Full Paper) (link to paper)
- Gonzales, C (2013) A polynomial time OPT-1 algorithm for a scheduling problem with two delivery dates and cumulative payoffs, 268--289 (Full Paper) (link to paper)
(Menu for Gonzales) All papers - Full papers - Abstracts - Selected papers Gonzalez
- Gonzalez, M.A (2017) A constraint programming approach for the energy-efficient job shop scheduling problem, 158--172 (Full Paper) (link to paper)
- Gonzalez, M. T (2009) Workforce Planning and Scheduling for the HP IT Services Business, 720--723 (Abstract) (link to paper)
(Menu for Gonzalez) All papers - Full papers - Abstracts - Selected papers González
- González, E. J (2003) Masplan: A Multi-Agent System for Automated Planning and Scheduling in a University Research Group Scenario, 42--55 (Full Paper) (link to paper)
(Menu for González) All papers - Full papers - Abstracts - Selected papers Goossens
- Goossens, J (2009) Response time analysis in distributed real-time systems: An improvement based on best-case finalization time analysis, 839--842 (Abstract) (link to paper)
- Goossens, D. R (2009) Soccer schedules in Europe: an overview, 715--717 (Abstract) (link to paper)
- Goossens, D. R (2013) Scheduling round robin tournaments for amateur sport leagues, 596--598 (Abstract) (link to paper)
(Menu for Goossens) All papers - Full papers - Abstracts - Selected papers Gorczyca
- Gorczyca, M (2015) A dynamic model of task processing for scheduling problems without additional resources, 649--651 (Abstract) (link to paper)
(Menu for Gorczyca) All papers - Full papers - Abstracts - Selected papers Gordon
- Gordon, V. S (2005) Heuristic Approaches To A Common Due Date Earliness-tardiness Scheduling Problem, 132--139 (Full Paper) (link to paper)
(Menu for Gordon) All papers - Full papers - Abstracts - Selected papers Gort
- Gort, E (2017) Towards improving tenders for Higher Education timetabling software: Uncovering the selection criteria of HEIs when choosing timetabling applications and using ERP as a reference, 173--188 (Full Paper) (link to paper)
(Menu for Gort) All papers - Full papers - Abstracts - Selected papers Gosling
- Gosling, T (2005) Retractable Contract Network for Distributed Scheduling, 485--500 (Full Paper) (link to paper)
(Menu for Gosling) All papers - Full papers - Abstracts - Selected papers Goulas
- Goulas, G (2013) DAG Scheduling using Integer Programming in heterogenous parallel execution environments, 392--401 (Full Paper) (link to paper)
(Menu for Goulas) All papers - Full papers - Abstracts - Selected papers Gourgand
- Gourgand, M (2007) Solving Resource-Constrained Project Scheduling Problem with Particle Swarm Optimization, 251--258 (Full Paper) (link to paper)
(Menu for Gourgand) All papers - Full papers - Abstracts - Selected papers Gravel
- Gravel, M (2013) A new ant colony optimization for minimizing tardiness in the single machine scheduling problem with sequence-dependent setups times, 17--20 (Full Paper) (link to paper)
(Menu for Gravel) All papers - Full papers - Abstracts - Selected papers Greenwood
- Greenwood, J. S (2009) A comparison of two methods for reducing take-off delay at London Heathrow airport, 12--27 (Full Paper) (link to paper)
- Greenwood, J. S (2011) A comparison of two methods for reducing take-off delay at London Heathrow airport, 409--421 (Selected Paper) (link to paper)
(Menu for Greenwood) All papers - Full papers - Abstracts - Selected papers Grigoreva
- Grigoreva, N.S (2015) Multiprocessor Scheduling with Inserted Idle Time to Minimize the Maximum Lateness, 814--816 (Abstract) (link to paper)
(Menu for Grigoreva) All papers - Full papers - Abstracts - Selected papers Grinshpoun
- Grinshpoun, T (2015) A Fixed Route Dial-a-Ride Problem, 313--324 (Full Paper) (link to paper)
- Grinshpoun, T (2014) A reduction approach to the two-campus transport problem, 587--599 (Selected Paper) (link to paper)
- Grinshpoun, T (2011) A Two-Campus Transport Problem, 173--184 (Full Paper) (link to paper)
(Menu for Grinshpoun) All papers - Full papers - Abstracts - Selected papers Groenbaek
- Groenbaek, J (2013) Scheduling of electric vehicle charging operations, 486--498 (Full Paper) (link to paper)
(Menu for Groenbaek) All papers - Full papers - Abstracts - Selected papers Grosso
- Grosso, A (2007) Sequencing a Single Machine with Due Dates and Deadlines: an ILP-based Approach to Solve Very Large Instances, 71--79 (Full Paper) (link to paper)
(Menu for Grosso) All papers - Full papers - Abstracts - Selected papers Gröflin
- Gröflin, H (2011) Optimal Job Insertion in the No-Wait Job Shop, 553--556 (Abstract) (link to paper)
(Menu for Gröflin) All papers - Full papers - Abstracts - Selected papers Gude
- Gude, J. P. (2007) Sequencing JIT Mixed Model Assembly Lines Under Station-Load and Part-Usage Constraints using Lagrangean Relaxations, 550--552 (Abstract) (link to paper)
(Menu for Gude) All papers - Full papers - Abstracts - Selected papers Guedes
- Guedes, A. C.B (2011) A heuristic for minimizing weighted carry-over effects in round robin tournaments, 655--667 (Selected Paper) (link to paper)
- Guedes, A. C. B (2009) A heuristic for minimizing weighted carry-over effects in round robin tournaments, 115--129 (Full Paper) (link to paper)
- Guedes, A.F. M. (2013) Scheduling with MS Project: an add-in, 707--710 (Abstract) (link to paper)
(Menu for Guedes) All papers - Full papers - Abstracts - Selected papers Guerry
- Guerry, M-A. (2013) Extended Roster Quality Staffng Problem A medium term roster quality to support staffing decisions, 424--436 (Full Paper) (link to paper)
(Menu for Guerry) All papers - Full papers - Abstracts - Selected papers Gui
- Gui, H (2011) Supply Logistics Synchronization: Scale Development and Empirical Study of Chinese Manufacturing, 497--501 (Abstract) (link to paper)
(Menu for Gui) All papers - Full papers - Abstracts - Selected papers Guinet
- Guinet, A (2003) Operating Theatre Management, 220--223 (Abstract) (link to paper)
(Menu for Guinet) All papers - Full papers - Abstracts - Selected papers Guirchoun
- Guirchoun, S (2005) Complexity Results For Parallel Machine Scheduling Problems With A Server In Computer Systems, 232--236 (Abstract) (link to paper)
(Menu for Guirchoun) All papers - Full papers - Abstracts - Selected papers Guitouni
- Guitouni, A (2009) A Nonlinear Mixed Integer Program for Search Path Planning Problem (SPPP), 277--290 (Full Paper) (link to paper)
(Menu for Guitouni) All papers - Full papers - Abstracts - Selected papers Gul
- Gul, S (2009) Bi-Criteria Scheduling of an Outpatient Procedure Center, 696--698 (Abstract) (link to paper)
(Menu for Gul) All papers - Full papers - Abstracts - Selected papers Gultekin
- Gultekin, H (2015) Shortest k-unit Cycle in a Multiple Part-Type Robotic Cell, 876--878 (Abstract) (link to paper)
- Gultekin, H (2017) Robotic Cell Scheduling Considering Energy Consumption of Robot Moves, 329--329 (Abstract) (link to paper)
(Menu for Gultekin) All papers - Full papers - Abstracts - Selected papers Gunawan
- Gunawan, A (2017) Home Health Care Delivery Problem, 244--255 (Full Paper) (link to paper)
- Gunawan, A (2015) SAILS: Hybrid Algorithm for the Team Orienteering ProblemwithTimeWindows, 276--295 (Full Paper) (link to paper)
- Gunawan, A (2009) Master Physician Scheduling Problem, 145--156 (Full Paper) (link to paper)
- Gunawan, A (2017) A Selective-Discrete Particle Swarm Optimization Algorithm for Solving a Class of Orienteering Problem, 229--243 (Full Paper) (link to paper)
- Gunawan, A (2017) Solving Tourist Trip Design Problems Using a Virus Optimization Algorithm, 384--388 (Abstract) (link to paper)
(Menu for Gunawan) All papers - Full papers - Abstracts - Selected papers Gupta
- Gupta, J.N.D (2015) Family Scheduling in Flow Shop Manufacturing Systems with Batch Availability, 746--749 (Abstract) (link to paper)
- Gupta, J. N.D (2007) Two-machine Shop Floor Scheduling Problem with Multi-Predecessor Constraints*, 538--545 (Full Paper) (link to paper)
(Menu for Gupta) All papers - Full papers - Abstracts - Selected papers Gurel
- Gurel, S (2017) Robotic Cell Scheduling Considering Energy Consumption of Robot Moves, 329--329 (Abstract) (link to paper)
(Menu for Gurel) All papers - Full papers - Abstracts - Selected papers Gushchina
- Gushchina, V (2015) Three approaches to solving the problem of cosmonauts’ training planning, 750--754 (Abstract) (link to paper)
(Menu for Gushchina) All papers - Full papers - Abstracts - Selected papers Günther
- Günther, H-O. (2009) An MILP-based approach to short-term production scheduling and lot sizing with major and minor setups: A case study from the beverage industry, 741--743 (Abstract) (link to paper)
(Menu for Günther) All papers - Full papers - Abstracts - Selected papers Habla
- Habla, C (2007) A Decomposition Heuristic for Planning and Scheduling of Jobs on Unrelated Parallel Machines, 112--119 (Full Paper) (link to paper)
- Habla, C (2007) A Decomposition Heuristic for Planning and Scheduling of Jobs on Unrelated Parallel Machines, 112--119 (Full Paper) (link to paper)
(Menu for Habla) All papers - Full papers - Abstracts - Selected papers Hadda
- Hadda, H (2007) The Two-Stage Assembly Flow Shop Scheduling with an Availability Constraint, 184--191 (Full Paper) (link to paper)
(Menu for Hadda) All papers - Full papers - Abstracts - Selected papers Hajjam
- Hajjam, A (2011) Two Phases Parallel Hyperheuristic Approach to the Bus Driver Scheduling Problem, 633--636 (Abstract) (link to paper)
(Menu for Hajjam) All papers - Full papers - Abstracts - Selected papers Hajri-Gabouj
- Hajri-Gabouj, S (2007) The Two-Stage Assembly Flow Shop Scheduling with an Availability Constraint, 184--191 (Full Paper) (link to paper)
(Menu for Hajri-Gabouj) All papers - Full papers - Abstracts - Selected papers Hall
- Hall, N.G (2003) The Coordination of Scheduling and Batch Deliveries, 656--659 (Abstract) (link to paper)
(Menu for Hall) All papers - Full papers - Abstracts - Selected papers Hamacher
- Hamacher, H. W (2007) Scheduling and Location (ScheLoc):Makespan Problem with Variable Release Dates, 152--158 (Full Paper) (link to paper)
- Hamacher, H. W (2009) Scheduling two interfering job sets on uniform parallel machines with makespan and cost functions, 645--654 (Full Paper) (link to paper)
- Hamacher, H. W (2011) Scheduling two agents on uniform parallel machines with makespan and cost functions, 471--481 (Selected Paper) (link to paper)
(Menu for Hamacher) All papers - Full papers - Abstracts - Selected papers Hamid
- Hamid, N. H. A (2009) Mathematical Modeling for Maximising Gate Receipt Problem, 709--714 (Abstract) (link to paper)
(Menu for Hamid) All papers - Full papers - Abstracts - Selected papers Hamilton
- Hamilton, A. F (2003) Masplan: A Multi-Agent System for Automated Planning and Scheduling in a University Research Group Scenario, 42--55 (Full Paper) (link to paper)
(Menu for Hamilton) All papers - Full papers - Abstracts - Selected papers Hamilton-Bryce
- Hamilton-Bryce, R (2013) Directing selection within an extended great deluge optimization algorithm, 499--508 (Full Paper) (link to paper)
(Menu for Hamilton-Bryce) All papers - Full papers - Abstracts - Selected papers Han
- Han, J (2013) Parallel Machine Scheduling with Generalized Precedence Relations, 733--736 (Abstract) (link to paper)
- Han, K (2017) Hyper-heuristics using Reinforcement Learning for the Examination Timetabling Problem, 256--268 (Full Paper) (link to paper)
- Han, L (2003) Application of Genetic Algorithm Based Hyper-heuristics to Personnel Scheduling Problems, 528--539 (Abstract) (link to paper)
(Menu for Han) All papers - Full papers - Abstracts - Selected papers Hana?
- Hana?, S (2013) Minimizing the weighted sum of maximum earlinesstardiness cost on a single machine under maintenance constraints, 240--247 (Full Paper) (link to paper)
(Menu for Hana?) All papers - Full papers - Abstracts - Selected papers Hanayama
- Hanayama, N (2015) Routing Strategy for Prioritized Limited Multi-server Processor-Sharing System that includes Servers with Various Capacities, 596--600 (Abstract) (link to paper)
(Menu for Hanayama) All papers - Full papers - Abstracts - Selected papers Hanen
- Hanen, C (2009) Decomposed Software Pipelining for cyclic unitary RCPSP with precedence delays, 254--265 (Full Paper) (link to paper)
- Hanen, C (2011) Worst case analysis of decomposed software pipelining for cyclic unitary RCPSP with precedence delays, 511--522 (Selected Paper) (link to paper)
- Hanen, C (2005) Scheduling UET-UCT task systems under the out-forest precedence constraints, 445--452 (Full Paper) (link to paper)
- Hanen, C (2005) The Worst-case Analysis of the Carey-Johnson Algorithm for preemptive tasks on m processors, 453--470 (Full Paper) (link to paper)
- Hanen, C (2011) Impact of core precedences in a Cyclic RCPSP with temporal constraints, 245--260 (Full Paper) (link to paper)
- Hanen, C (2013) Grouping tasks to save energy in a cyclic wireless sensor network scheduling problem, 721--724 (Abstract) (link to paper)
(Menu for Hanen) All papers - Full papers - Abstracts - Selected papers Hanne
- Hanne, T (2003) Scheduling In Software Development Using MultiObjective Evolutionary Algorithms, 438--465 (Full Paper) (link to paper)
- Hanne, T (2005) Scheduling in Software Development Using Multiobjective Evolutionary Algorithms, 57--81 (Selected Paper) (link to paper)
(Menu for Hanne) All papers - Full papers - Abstracts - Selected papers Hans
- Hans, E (2017) Towards improving tenders for Higher Education timetabling software: Uncovering the selection criteria of HEIs when choosing timetabling applications and using ERP as a reference, 173--188 (Full Paper) (link to paper)
(Menu for Hans) All papers - Full papers - Abstracts - Selected papers Hanzalek
- Hanzalek, Z (2011) A Parallel Approach for a Nurse Rerostering Problem on the GPU, 576--578 (Abstract) (link to paper)
- Hanzalek, Z (2015) A new lower bound for optimisation of energy consumption of robotic cells, 662--665 (Abstract) (link to paper)
- Hanzalek, Z (2011) Minimizing Total Weighted Tardiness and Total Processing Costs for the Scheduling with Alternative Process Plans, 561--563 (Abstract) (link to paper)
- Hanzalek, Z (2011) Impact of core precedences in a Cyclic RCPSP with temporal constraints, 245--260 (Full Paper) (link to paper)
- Hanzalek, Z (2013) Grouping tasks to save energy in a cyclic wireless sensor network scheduling problem, 721--724 (Abstract) (link to paper)
- Hanzalek, Z (2009) Time Symmetry of Project Scheduling with Time Windows and Take-give Resources, 239--253 (Full Paper) (link to paper)
- Hanzalek, Z (2017) Efficient algorithms for non-preemptive mixed-criticality match-up scheduling problem, 377--379 (Abstract) (link to paper)
- Hanzalek, Z (2015) Nurse Rostering Problem: Tighter Upper Bound for Pricing Problem in Branch and Price Approach, 759--763 (Abstract) (link to paper)
- Hanzalek, Z (2015) Mixed-criticality scheduling with known probabilities, 867--870 (Abstract) (link to paper)
- Hanzalek, Z (2007) Cyclic Scheduling of Tasks with Unit Processing Time on Dedicated Sets of Parallel Identical Processors, 463--470 (Full Paper) (link to paper)
(Menu for Hanzalek) All papers - Full papers - Abstracts - Selected papers Hao
- Hao, J-K. (2007) Integrated Vehicle and Crew Scheduling for Extra-Urban Transport, 578--580 (Abstract) (link to paper)
(Menu for Hao) All papers - Full papers - Abstracts - Selected papers Haouari
- Haouari, M (2007) Climbing Depth-bounded Discrepancy Search for Solving Flexible Job Shop Scheduling Problems, 217--224 (Full Paper) (link to paper)
(Menu for Haouari) All papers - Full papers - Abstracts - Selected papers Harbering
- Harbering, J (2015) Single Track Train Scheduling, 102--117 (Full Paper) (link to paper)
(Menu for Harbering) All papers - Full papers - Abstracts - Selected papers Hartl
- Hartl, R. F (2009) A VNS-based solution approach for a flexible flow shop problem with limited buffer, 706--708 (Abstract) (link to paper)
(Menu for Hartl) All papers - Full papers - Abstracts - Selected papers Hartmann
- Hartmann, S (2015) An Efficient Simulated Annealing for the Integrated Problem of Berth Allocation and Quay Crane Assignment in Seaside Container Terminals, 154--164 (Full Paper) (link to paper)
(Menu for Hartmann) All papers - Full papers - Abstracts - Selected papers Hasenfuss
- Hasenfuss, A (2007) Non-preemptive Scheduling of Distance Constrained Tasks Subject to Minimizing Processor Load, 200--208 (Full Paper) (link to paper)
(Menu for Hasenfuss) All papers - Full papers - Abstracts - Selected papers Haspeslagh
- Haspeslagh, S (2011) Pareto Optimal Negotiation for Nurse Rostering Problems, 579--583 (Abstract) (link to paper)
- Haspeslagh, S (2007) Distributed Decision Making in Hospital Wide Nurse Rostering Problems, 192--199 (Full Paper) (link to paper)
- Haspeslagh, S (2009) A multi-agent system handling personnel shortages in hospitals, 693--695 (Abstract) (link to paper)
(Menu for Haspeslagh) All papers - Full papers - Abstracts - Selected papers Haugen
- Haugen, K (2009) Using a set of fixed prices when solving Profit Maximization Capacitated Lot-Size Problems (PCLSP), 821--822 (Abstract) (link to paper)
(Menu for Haugen) All papers - Full papers - Abstracts - Selected papers Haz?r
- Haz?r, Ö (2011) Integrated batch sizing and scheduling on a single machine, 541--555 (Selected Paper) (link to paper)
- Haz?r, O (2013) Batch Sizing and Just-In-Time Scheduling: Analysis of Some Special Cases, 757--761 (Abstract) (link to paper)
(Menu for Haz?r) All papers - Full papers - Abstracts - Selected papers Hazir
- Hazir, O (2009) Batching and Scheduling with Tardiness, 291--300 (Full Paper) (link to paper)
(Menu for Hazir) All papers - Full papers - Abstracts - Selected papers He
- He, F (2009) Hybridizing Integer Programming Models with an Adaptive Decomposition Approach for Exam Timetabling Problems, 435--446 (Full Paper) (link to paper)
(Menu for He) All papers - Full papers - Abstracts - Selected papers Hebrard
- Hebrard, E (2013) MIP Relaxation and Large Neighborhood Search for a Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 815--819 (Full Paper) (link to paper)
- Hebrard, E (2017) Benders Decomposition in SMT for Rescheduling of Hierarchical Workflow, 295--310 (Full Paper) (link to paper)
(Menu for Hebrard) All papers - Full papers - Abstracts - Selected papers Hemig
- Hemig, C (2007) Medium-Term Production and Staff Planning in the Automotive Industry, 209--216 (Full Paper) (link to paper)
(Menu for Hemig) All papers - Full papers - Abstracts - Selected papers Hendel
- Hendel, Y (2007) The Parallel Machine Scheduling Problem with Path-like Constraints, 570--571 (Abstract) (link to paper)
- Hendel, Y (2005) The Single Machine Just-in-time Scheduling Problem With Preemptions, 140--148 (Full Paper) (link to paper)
(Menu for Hendel) All papers - Full papers - Abstracts - Selected papers Hendriks
- Hendriks, M (2003) Recognizing Finite Repetitive Scheduling Patterns in Manufacturing Systems, 291--319 (Full Paper) (link to paper)
(Menu for Hendriks) All papers - Full papers - Abstracts - Selected papers Herbots
- Herbots, J (2007) Dynamic Algorithms for Order Acceptance and Capacity Planning within a Multi-Project Environment, 572--574 (Abstract) (link to paper)
- Herbots, J (2009) Order acceptance and scheduling in a single-machine environment: exact and heuristic algorithms, 772--774 (Abstract) (link to paper)
(Menu for Herbots) All papers - Full papers - Abstracts - Selected papers Herding
- Herding, R (2015) Using Adaptive Large Neighborhood Search to Solve Parallel Machine Scheduling Problems with Dedications and Unequal Ready Times of the Jobs, 817--820 (Abstract) (link to paper)
(Menu for Herding) All papers - Full papers - Abstracts - Selected papers Herr
- Herr, O (2015) Scheduling of jobs in the continuous casting stage of steel production, 899--901 (Abstract) (link to paper)
(Menu for Herr) All papers - Full papers - Abstracts - Selected papers Herring
- Herring, W. L (2011) Scheduling Impatient Jobs with Diminishing Rewards: The Impact of Deteriorating Survival Probabilities on Mass Casualty Incident Triage, 587--591 (Abstract) (link to paper)
(Menu for Herring) All papers - Full papers - Abstracts - Selected papers Herrmann
- Herrmann, J. W (2011) Scheduling Impatient Jobs with Diminishing Rewards: The Impact of Deteriorating Survival Probabilities on Mass Casualty Incident Triage, 587--591 (Abstract) (link to paper)
- Herrmann, J. W (2009) Generating Cyclic Fair Sequences for Multiple Servers, 628--644 (Full Paper) (link to paper)
- Herrmann, J. W (2011) Generating Better Cyclic Fair Sequences Faster with Aggregation, 200--214 (Full Paper) (link to paper)
- Herrmann, J. W (2005) A History Of Decision-making Tools For Production Scheduling, 380--389 (Full Paper) (link to paper)
(Menu for Herrmann) All papers - Full papers - Abstracts - Selected papers Herroelen
- Herroelen, W (2005) Proactive Resource Allocation Heuristics For Robust Project Scheduling, 322--323 (Abstract) (link to paper)
- Herroelen, W. S (2007) An Educational Tool for the Resource-Constrained Project Scheduling Problem, 564--566 (Abstract) (link to paper)
- Herroelen, W. S (2007) Dynamic Algorithms for Order Acceptance and Capacity Planning within a Multi-Project Environment, 572--574 (Abstract) (link to paper)
- Herroelen, W (2005) A Tabu-search Based Reactive Procedure For The Rcpsp With Stochastic Resource Availabilities, 335--336 (Abstract) (link to paper)
- Herroelen, W. S (2007) Exact and Suboptimal Reactive Strategies for Resource-Constrained Project Scheduling with Uncertain Resource Availabilities, 575--577 (Abstract) (link to paper)
- Herroelen, W (2003) Resource Allocation for Stability in Reactive Project Scheduling, 116--119 (Abstract) (link to paper)
- Herroelen, W (2005) Stable Single-machine Schedules, 213--214 (Abstract) (link to paper)
- Herroelen, W. S (2007) A Methodology for Integrated Risk Management and Proactive Scheduling of Construction Projects, 611--613 (Abstract) (link to paper)
- Herroelen, W (2005) An Evaluation Of Exact And Suboptimal Procedures For Constructing Stable Project Schedules, 341--342 (Abstract) (link to paper)
(Menu for Herroelen) All papers - Full papers - Abstracts - Selected papers Hertzler
- Hertzler, E. F (2011) Multi-mode Resource-Constrained Project Scheduling of Semiconductor Equipment Install/Qual Process, 408--418 (Full Paper) (link to paper)
(Menu for Hertzler) All papers - Full papers - Abstracts - Selected papers Heydar
- Heydar, M (2017) Optimizing Production Schedule with Energy Consumption and Demand Charges in Parallel Machine Setting, 133--143 (Full Paper) (link to paper)
(Menu for Heydar) All papers - Full papers - Abstracts - Selected papers Heßler
- Heßler, C (2015) The Discrete Parallel Machine Makespan Scheduling-Location Problem, 659--661 (Abstract) (link to paper)
(Menu for Heßler) All papers - Full papers - Abstracts - Selected papers Hidri
- Hidri, L (2015) Bounding schemes for the parallel processors scheduling problem with release date, delivery time and with no-idle time constraint, 393--402 (Full Paper) (link to paper)
- Hidri, L (2015) Lower bounds for the parallel processing scheduling problem with multiprocessor tasks, release date and delivery time, 403--411 (Full Paper) (link to paper)
(Menu for Hidri) All papers - Full papers - Abstracts - Selected papers Hieu
- Hieu, T. T (2009) A Water Flow Algorithm for Flexible Flow Shop Scheduling with Limited Intermediate Buffers, 606--615 (Full Paper) (link to paper)
- Hieu, T. T (2011) Two-level water-flow algorithm for vehicle routing problems, 493--496 (Abstract) (link to paper)
(Menu for Hieu) All papers - Full papers - Abstracts - Selected papers Hildebrandt
- Hildebrandt, T (2013) A computational study of shifting bottleneck procedures for job shop total weighted tardiness scheduling problems, 437--457 (Full Paper) (link to paper)
- Hildebrandt, T. (2016) Configuration and the advantages of the shifting bottleneck procedure for optimizing the job shop total weighted tardiness scheduling problem, 429--452 (Selected Paper) (link to paper)
(Menu for Hildebrandt) All papers - Full papers - Abstracts - Selected papers Hiranaka
- Hiranaka, Y (2009) Lagrangian Relaxation and Cut Generation for Sequence Dependent Setup Time Flowshop Scheduling Problems, 655--659 (Full Paper) (link to paper)
(Menu for Hiranaka) All papers - Full papers - Abstracts - Selected papers Hiroux
- Hiroux, M (2007) Staff Rostering Problem: Choice of a Mathematical Model, 601--604 (Abstract) (link to paper)
(Menu for Hiroux) All papers - Full papers - Abstracts - Selected papers Hmida
- Hmida, A. Be (2007) Climbing Depth-bounded Discrepancy Search for Solving Flexible Job Shop Scheduling Problems, 217--224 (Full Paper) (link to paper)
(Menu for Hmida) All papers - Full papers - Abstracts - Selected papers Hoc
- Hoc, J-M. (2003) From Human Heuristics to the Design of Scheduling Interfaces, 236--239 (Abstract) (link to paper)
(Menu for Hoc) All papers - Full papers - Abstracts - Selected papers Hodge
- Hodge, D.J (2011) Stochastic scheduling: A short history of index policies and some key recent developments, 94--112 (Full Paper) (link to paper)
- Hodge, D. J (2014) Stochastic scheduling: A short history of index policies and new approaches to index generation for dynamic resource allocation, 407--425 (Selected Paper) (link to paper)
(Menu for Hodge) All papers - Full papers - Abstracts - Selected papers Hojati
- Hojati, M (2015) A Greedy-based Heuristic for Shift Minimization Personnel Task Scheduling Problem, 949--951 (Abstract) (link to paper)
(Menu for Hojati) All papers - Full papers - Abstracts - Selected papers Homayouni
- Homayouni, S.M (2017) Integrated Scheduling of Machines and Vehicles and and Storage Tasks in Flexible Manufacturing Systems, 388--392 (Abstract) (link to paper)
(Menu for Homayouni) All papers - Full papers - Abstracts - Selected papers Honer
- Honer, J (2015) An IP-based Model for the Post-Enrollment-based Course Timetabling Problem at TU Berlin, 331--344 (Full Paper) (link to paper)
(Menu for Honer) All papers - Full papers - Abstracts - Selected papers Horn
- Horn, G (2015) Scheduling Time Variant Jobs on a Time Variant Resource, 914--917 (Abstract) (link to paper)
(Menu for Horn) All papers - Full papers - Abstracts - Selected papers Horvath
- Horvath, M (2015) Solving resource constrained shortest path problems with branch-and-cut, 677--679 (Abstract) (link to paper)
(Menu for Horvath) All papers - Full papers - Abstracts - Selected papers Houbraken
- Houbraken, M (2013) Modeling Real-World Vehicle Routing Problems with Dependencies, 711--713 (Abstract) (link to paper)
(Menu for Houbraken) All papers - Full papers - Abstracts - Selected papers Housos
- Housos, E (2013) DAG Scheduling using Integer Programming in heterogenous parallel execution environments, 392--401 (Full Paper) (link to paper)
(Menu for Housos) All papers - Full papers - Abstracts - Selected papers Howe
- Howe, A. E (2005) Random Walks And Neighborhood Bias In Oversubscribed Scheduling, 98--105 (Full Paper) (link to paper)
- Howe, A.E (2003) A Dynamic Model of Tabu Search for the Job-Shop Scheduling Problem, 320--336 (Full Paper) (link to paper)
- Howe, A. E (2005) A Dynamic Model of Tabu Search for the Job-Shop Scheduling Problem, 247--266 (Selected Paper) (link to paper)
(Menu for Howe) All papers - Full papers - Abstracts - Selected papers Hsieh
- Hsieh, F. Y (2011) Scheduling identical jobs on uniform parallel machines to minimize maximum lateness, 195--199 (Full Paper) (link to paper)
(Menu for Hsieh) All papers - Full papers - Abstracts - Selected papers Huacuja
- Huacuja, H. J. F. (2013) An Iterative Local Search Algorithm for Scheduling Precedence-Constrained Applications on Heterogeneous Machines, 472--485 (Full Paper) (link to paper)
(Menu for Huacuja) All papers - Full papers - Abstracts - Selected papers Huang
- Huang, P (2011) Supply Logistics Synchronization: Scale Development and Empirical Study of Chinese Manufacturing, 497--501 (Abstract) (link to paper)
(Menu for Huang) All papers - Full papers - Abstracts - Selected papers Huff
- Huff, J. D (2011) Multi-mode Resource-Constrained Project Scheduling of Semiconductor Equipment Install/Qual Process, 408--418 (Full Paper) (link to paper)
(Menu for Huff) All papers - Full papers - Abstracts - Selected papers Huguet
- Huguet, M-J. (2007) Climbing Depth-bounded Discrepancy Search for Solving Flexible Job Shop Scheduling Problems, 217--224 (Full Paper) (link to paper)
(Menu for Huguet) All papers - Full papers - Abstracts - Selected papers Huisman
- Huisman, B (2015) Exact and heuristic methods for trading-off makespan and stability in stochastic project scheduling, 25--41 (Full Paper) (link to paper)
(Menu for Huisman) All papers - Full papers - Abstracts - Selected papers Huo
- Huo, Y (2005) Online Scheduling Of Precedence Constrained Tasks, 573--584 (Full Paper) (link to paper)
(Menu for Huo) All papers - Full papers - Abstracts - Selected papers Hurink
- Hurink, J (2007) Statistical Quality Analysis of Schedulers under Soft-Real-Time Constraints, 547--549 (Abstract) (link to paper)
- Hurink, J. L (2009) Time-constrained project scheduling with adjacent resources, 761--763 (Abstract) (link to paper)
- Hurink, J. L (2007) Online Scheduling of Parallel Jobs on Two Machines is 2-Competitive, 605--607 (Abstract) (link to paper)
(Menu for Hurink) All papers - Full papers - Abstracts - Selected papers Huschka
- Huschka, T. R (2009) Bi-Criteria Scheduling of an Outpatient Procedure Center, 696--698 (Abstract) (link to paper)
(Menu for Huschka) All papers - Full papers - Abstracts - Selected papers Hussin
- Hussin, N. M. (2003) An Investigation of a Tabu Search Based Hyper-heuristic for Examination Timetabling, 226--235 (Abstract) (link to paper)
- Hussin, N. M. (2005) An Investigation of a Tabu-Search-Based Hyper-heuristic for Examination Timetabling, 309--328 (Selected Paper) (link to paper)
(Menu for Hussin) All papers - Full papers - Abstracts - Selected papers Hutabarat
- Hutabarat, W (2015) Investigating Scheduling models for Power Plant Preventive Maintenance using Genetic Algorithm, 591--595 (Abstract) (link to paper)
(Menu for Hutabarat) All papers - Full papers - Abstracts - Selected papers Hyde
- Hyde, M (2009) HyFlex: A Flexible Framework for the Design and Analysis of Hyper-heuristics, 790--797 (Abstract) (link to paper)
- Hyde, M (2009) Multilevel Search for Evolving the Acceptance Criteria of a Hyper-Heuristic, 798--801 (Abstract) (link to paper)
(Menu for Hyde) All papers - Full papers - Abstracts - Selected papers Hübner
- Hübner, F (2015) Robust multi-mode resource constrained project scheduling of building deconstruction under uncertainty, 638--644 (Abstract) (link to paper)
(Menu for Hübner) All papers - Full papers - Abstracts - Selected papers Iima
- Iima, H (2003) Genetic Algorithm Approach to a Multiobjective Rescheduling Problem in a Job Shop, 422--437 (Full Paper) (link to paper)
(Menu for Iima) All papers - Full papers - Abstracts - Selected papers Ilagan
- Ilagan, I.F.A (2017) A Robust Crew Pairing Model for Airline Operations using Crew Swaps and Slack Times, 103--120 (Full Paper) (link to paper)
(Menu for Ilagan) All papers - Full papers - Abstracts - Selected papers Ilani
- Ilani, H (2015) A Fixed Route Dial-a-Ride Problem, 313--324 (Full Paper) (link to paper)
- Ilani, H (2014) A reduction approach to the two-campus transport problem, 587--599 (Selected Paper) (link to paper)
- Ilani, H (2011) A Two-Campus Transport Problem, 173--184 (Full Paper) (link to paper)
(Menu for Ilani) All papers - Full papers - Abstracts - Selected papers Improta
- Improta, G (2007) Optimization of the Departure Schedule at a Public Transit Terminal with Multiple Destinations, 104--111 (Full Paper) (link to paper)
(Menu for Improta) All papers - Full papers - Abstracts - Selected papers Indra-Payoong
- Indra-Payoong, N (2003) Constraint-Based Local Search for Rail Container Service Planning, 660--677 (Full Paper) (link to paper)
- Indra-Payoong, N (2005) Rail Container Service Planning: A Constraint-Based Approach, 343--368 (Selected Paper) (link to paper)
(Menu for Indra-Payoong) All papers - Full papers - Abstracts - Selected papers Ingels
- Ingels, J (2015) A heuristic procedure to proactively increase employee substitutability and personnel roster robustness, 669--672 (Abstract) (link to paper)
- Ingels, J (2013) The Impact of Problem Characteristics on the Robustness of a Personnel Schedule: An Empirical Investigation, 684--686 (Abstract) (link to paper)
(Menu for Ingels) All papers - Full papers - Abstracts - Selected papers Innorta
- Innorta, M (2011) Deterministic and stochastic models for investment in different technologies for electricity production in the long period, 607--623 (Abstract) (link to paper)
(Menu for Innorta) All papers - Full papers - Abstracts - Selected papers Inoue
- Inoue, K (2017) Balanced clustering based decomposition applied to Master thesis defense timetabling problem, 214--228 (Full Paper) (link to paper)
(Menu for Inoue) All papers - Full papers - Abstracts - Selected papers Ionescu
- Ionescu, L (2015) Stability and Flexibility of Crew and Aircraft Schedules, 785--787 (Abstract) (link to paper)
(Menu for Ionescu) All papers - Full papers - Abstracts - Selected papers Ishii
- Ishii, R (2015) Scheduling competition in the airline industry and the issue of duplicate bookings, 55--62 (Full Paper) (link to paper)
(Menu for Ishii) All papers - Full papers - Abstracts - Selected papers Jain
- Jain, S (2003) Making Airline Schedules More Robust, 678--695 (Full Paper) (link to paper)
- Jain, S (2005) Measuring the Robustness of Airline Fleet Schedules, 381--392 (Selected Paper) (link to paper)
- Jain, S (2009) Workforce Planning and Scheduling for the HP IT Services Business, 720--723 (Abstract) (link to paper)
(Menu for Jain) All papers - Full papers - Abstracts - Selected papers Jamaluddin
- Jamaluddin, N.F (2017) Variation of Demands for a New Improvised University Course Timetabling Problem Mathematical Model, 320--320 (Abstract) (link to paper)
- Jamaluddin, N.F (2017) Mathematical model for a high quality examination timetabling problem: case study of a university in Malaysia, 319--319 (Abstract) (link to paper)
(Menu for Jamaluddin) All papers - Full papers - Abstracts - Selected papers Jampani
- Jampani, J (2007) Complex Job Shop Multiple Orders per Job Scheduling, 225--233 (Full Paper) (link to paper)
- Jampani, J (2008) Column generation heuristics for multiple machine, multiple orders per job scheduling problems, 261--273 (Selected Paper) (link to paper)
- Jampani, J (2005) Single Machine Multiple Orders Per Job Scheduling Using Column Generation, 539--547 (Full Paper) (link to paper)
(Menu for Jampani) All papers - Full papers - Abstracts - Selected papers Janiak
- Janiak, A (2015) A dynamic model of task processing for scheduling problems without additional resources, 649--651 (Abstract) (link to paper)
(Menu for Janiak) All papers - Full papers - Abstracts - Selected papers Jansen
- Jansen, P (2007) Statistical Quality Analysis of Schedulers under Soft-Real-Time Constraints, 547--549 (Abstract) (link to paper)
- Jansen, E (2017) Towards improving tenders for Higher Education timetabling software: Uncovering the selection criteria of HEIs when choosing timetabling applications and using ERP as a reference, 173--188 (Full Paper) (link to paper)
(Menu for Jansen) All papers - Full papers - Abstracts - Selected papers Jarboui
- Jarboui, B (2007) New Lower Bound for the Bin Packing Problem, 234--241 (Full Paper) (link to paper)
(Menu for Jarboui) All papers - Full papers - Abstracts - Selected papers Jat
- Jat, S. N (2009) A Guided Search Genetic Algorithm for the University Course Timetabling Problem, 180--191 (Full Paper) (link to paper)
- Jat, S. N. (2011) A hybrid genetic algorithm and tabu search approach for post enrolment course timetabling, 617--637 (Selected Paper) (link to paper)
(Menu for Jat) All papers - Full papers - Abstracts - Selected papers Jennings
- Jennings, P (2015) Ant Colony Optimisation for a Job Shop with Flexible Maintenance, 614--616 (Abstract) (link to paper)
(Menu for Jennings) All papers - Full papers - Abstracts - Selected papers Jewpanya
- Jewpanya, P (2017) A Selective-Discrete Particle Swarm Optimization Algorithm for Solving a Class of Orienteering Problem, 229--243 (Full Paper) (link to paper)
(Menu for Jewpanya) All papers - Full papers - Abstracts - Selected papers Jolai
- Jolai, F (2015) Cross-training performance of nurse scheduling with the learning effect, 296--312 (Full Paper) (link to paper)
(Menu for Jolai) All papers - Full papers - Abstracts - Selected papers Jougle
- Jougle, A (2017) Three upper bounds for the speed meeting problem, 344--347 (Abstract) (link to paper)
(Menu for Jougle) All papers - Full papers - Abstracts - Selected papers Jouglet
- Jouglet, A (2013) Minimizing the dissemination length in the one-datum-unit data transfer problem, 587--589 (Abstract) (link to paper)
- Jouglet, A (2003) The One Machine Total Cost Scheduling Problem with Release Dates, 406--408 (Abstract) (link to paper)
- Jouglet, A (2003) Dominance Based Heuristics to Minimize a Total Cost on One Machine, 403--405 (Abstract) (link to paper)
- Jouglet, A (2005) Lower Bounds For Parallel Machine Scheduling, 215--216 (Abstract) (link to paper)
(Menu for Jouglet) All papers - Full papers - Abstracts - Selected papers Jozefowiez
- Jozefowiez, N (2015) A mass-flow MILP formulation for energy-efficient supplying in assembly lines, 236--239 (Full Paper) (link to paper)
(Menu for Jozefowiez) All papers - Full papers - Abstracts - Selected papers Juarez
- Juarez, J.R.C (2017) Solving Tourist Trip Design Problems Using a Virus Optimization Algorithm, 384--388 (Abstract) (link to paper)
(Menu for Juarez) All papers - Full papers - Abstracts - Selected papers Juhn
- Juhn, J. H (2005) Single Machine Product Scheduling With Outsourcing Allowed., 340--340 (Abstract) (link to paper)
(Menu for Juhn) All papers - Full papers - Abstracts - Selected papers Juraszek
- Juraszek, J (2009) Simulated Annealing Method for Maximizing Revenue on Parallel Machines, 699--701 (Abstract) (link to paper)
- Juraszek, J (2009) Scheduling policy for on-line translation service, 266--276 (Full Paper) (link to paper)
(Menu for Juraszek) All papers - Full papers - Abstracts - Selected papers Kaihara
- Kaihara, T (2017) An Integrated Optimization of Dynamic Product Family Configuration and Supply Chain Configuration, 336--339 (Abstract) (link to paper)
(Menu for Kaihara) All papers - Full papers - Abstracts - Selected papers Kalagnanam
- Kalagnanam, J (2007) Scheduling Steel Production using Mixed-Integer Programming and Constraint Programming, 120--127 (Full Paper) (link to paper)
(Menu for Kalagnanam) All papers - Full papers - Abstracts - Selected papers Kalic
- Kalic, M (2009) Heuristic approach to the airline schedule disturbances problem: multifleet case, 311--320 (Full Paper) (link to paper)
(Menu for Kalic) All papers - Full papers - Abstracts - Selected papers Kalsch
- Kalsch, M. T (2007) Scheduling and Location (ScheLoc):Makespan Problem with Variable Release Dates, 152--158 (Full Paper) (link to paper)
(Menu for Kalsch) All papers - Full papers - Abstracts - Selected papers Kamel
- Kamel, A. E (2005) Job Shop Scheduling Problem With Multi-purpose Machines And Availability Constraints, 217--231 (Abstract) (link to paper)
(Menu for Kamel) All papers - Full papers - Abstracts - Selected papers Kampmeyer
- Kampmeyer, T (2005) Tabu Search Algorithms For Cyclic Machine Scheduling Problems with blocking, 107--108 (Abstract) (link to paper)
- Kampmeyer, T (2008) Cyclic job shop scheduling problems with blocking, 161--181 (Selected Paper) (link to paper)
(Menu for Kampmeyer) All papers - Full papers - Abstracts - Selected papers Kaplansky
- Kaplansky, E (2003) University Timetabling – A Case Study for Scheduling Agents, 56--59 (Abstract) (link to paper)
(Menu for Kaplansky) All papers - Full papers - Abstracts - Selected papers Karaesmen
- Karaesmen, I (2005) Scheduling Multiple Types of Time-Shared Aircraft: Models and Methods for Practice, 19--38 (Full Paper) (link to paper)
- Karaesmen, I. Z (2007) Optimization vs. Persistence in Scheduling: Heuristics to Manage Uncertainty in On-Demand Air Travel, 242--250 (Full Paper) (link to paper)
- Karaesmen, I. Z (2008) Aircraft and crew scheduling for fractional ownership programs, 415--431 (Selected Paper) (link to paper)
(Menu for Karaesmen) All papers - Full papers - Abstracts - Selected papers Karapetyan
- Karapetyan, D (2013) Combining Monte-Carlo and Hyper-heuristic methods for the Multi-mode Resource-constrained Multi-project Scheduling Problem, 836--839 (Full Paper) (link to paper)
(Menu for Karapetyan) All papers - Full papers - Abstracts - Selected papers Karhi
- Karhi, S (2015) Online and semi-online scheduling of two job types on a set of multipurpose machines, 626--628 (Abstract) (link to paper)
(Menu for Karhi) All papers - Full papers - Abstracts - Selected papers Karim
- Karim, A (2013) Reentrance and exact time lag on flow shop scheduling problem, 610--612 (Abstract) (link to paper)
(Menu for Karim) All papers - Full papers - Abstracts - Selected papers Kasirzadeh
- Kasirzadeh, A (2015) An integrated simultaneous approach for pilots and copilots re-scheduling problem, 943--945 (Abstract) (link to paper)
(Menu for Kasirzadeh) All papers - Full papers - Abstracts - Selected papers Katzensteiner
- Katzensteiner, C. A. · S (2009) A VNS-based solution approach for a flexible flow shop problem with limited buffer, 706--708 (Abstract) (link to paper)
(Menu for Katzensteiner) All papers - Full papers - Abstracts - Selected papers Kedad-Sidhoum
- Kedad-Sidhoum, S (2011) Integrated batch sizing and scheduling on a single machine, 541--555 (Selected Paper) (link to paper)
- Kedad-Sidhoum, S (2013) Batch Sizing and Just-In-Time Scheduling: Analysis of Some Special Cases, 757--761 (Abstract) (link to paper)
- Kedad-Sidhoum, S (2009) Batching and Scheduling with Tardiness, 291--300 (Full Paper) (link to paper)
- Kedad-Sidhoum, S (2011) Single machine scheduling with delivery dates and cumulative payoffs, 261--274 (Full Paper) (link to paper)
- Kedad-Sidhoum, S (2013) A polynomial time OPT-1 algorithm for a scheduling problem with two delivery dates and cumulative payoffs, 268--289 (Full Paper) (link to paper)
(Menu for Kedad-Sidhoum) All papers - Full papers - Abstracts - Selected papers Keha
- Keha, A (2015) The polynomial solvability of a bicriteria linear combination on parallel identical machines with release dates, 902--904 (Abstract) (link to paper)
- Keha, A (2005) Bicriteria Scheduling Of Equal Length Jobs With Release Dates On Identical Parallel Machines, 112--122 (Full Paper) (link to paper)
- Keha, A (2005) A Divide-and-merge Heuristic For Single Machine Weighted Tardiness Problem, 186--187 (Abstract) (link to paper)
- Keha, A (2009) Single Machine Scheduling with Interfering Job Sets, 357--365 (Full Paper) (link to paper)
- Keha, A (2011) Single Machine Scheduling with Interfering Job Sets to Minimize Total Weighted Completion Time and Maximum Lateness, 568--572 (Abstract) (link to paper)
- Keha, A (2005) A Comparison Of Different Formulations For The Non-preemptive Single Machine Total Weighted Tardiness Scheduling Problem, 643--651 (Full Paper) (link to paper)
- Keha, A. B (2007) Minimizing Makespan with Multiple Orders per Job in Mixed Flowshops, 301--308 (Full Paper) (link to paper)
- Keha, A. B (2005) Minimizing Makespan With Multiple Orders Per Job In A Two Machine Flowshop With Item Processing, 288--298 (Full Paper) (link to paper)
(Menu for Keha) All papers - Full papers - Abstracts - Selected papers Kellerer
- Kellerer, H (2013) Fast Approximation Schemes for Boolean Programming and Scheduling Problems Related to Positive Convex Half-Product, 577--579 (Abstract) (link to paper)
(Menu for Kellerer) All papers - Full papers - Abstracts - Selected papers Kelly
- Kelly, J. D. (2005) The Unit-Operation-Stock Superstructure (UOSS) and the Quantity-Logic-Quality Paradigm (QLQP) for Production Scheduling in the Process Industries, 327--333 (Abstract) (link to paper)
(Menu for Kelly) All papers - Full papers - Abstracts - Selected papers Kemmoe-Tchomte
- Kemmoe-Tchomte, S (2015) An Optimization Framework for Job-shop with Energy Threshold Issue With consideration of machining operations with consumption peaks, 118--133 (Full Paper) (link to paper)
(Menu for Kemmoe-Tchomte) All papers - Full papers - Abstracts - Selected papers Kempf
- Kempf, K. G (2011) Multi-mode Resource-Constrained Project Scheduling of Semiconductor Equipment Install/Qual Process, 408--418 (Full Paper) (link to paper)
(Menu for Kempf) All papers - Full papers - Abstracts - Selected papers Kendall
- Kendall, G (2003) An Investigation of an Adaptive Scheduling Approach for Multi Head Placement Machines, 363--381 (Full Paper) (link to paper)
- Kendall, G (2009) An Investigation of an Ant-based Hyperheuristic for the Capacitated Vehicle Routing Problem, 823--826 (Abstract) (link to paper)
- Kendall, G (2007) A Simulated Annealing Hyper-heuristic: Adaptive Heuristic Selection for Different Vehicle Routing Problems, 67--70 (Full Paper) (link to paper)
- Kendall, G (2011) A Game Theoretic Approach for the Taxi Scheduling Problem with Street Hailing, 161--172 (Full Paper) (link to paper)
- Kendall, G (2009) Preface, 563--564 (Selected Paper) (link to paper)
- Kendall, G (2003) Making Airline Schedules More Robust, 678--695 (Full Paper) (link to paper)
- Kendall, G (2005) Measuring the Robustness of Airline Fleet Schedules, 381--392 (Selected Paper) (link to paper)
- Kendall, G (2011) Preface, 407--407 (Selected Paper) (link to paper)
- Kendall, G (2003) A Pheromone-based Look-ahead Hyper-heuristic for Time-tabling Problems, 174--179 (Abstract) (link to paper)
- Kendall, G (2009) HyFlex: A Flexible Framework for the Design and Analysis of Hyper-heuristics, 790--797 (Abstract) (link to paper)
- Kendall, G (2007) Constructive versus Improvement Heuristics:An Investigation of Examination Timetabling, 595--597 (Abstract) (link to paper)
- Kendall, G (2015) A Hybrid Swarm Algorithm for Post Enrollment Course Timetabling, 931--942 (Abstract) (link to paper)
- Kendall, G (2009) Mathematical Modeling for Maximising Gate Receipt Problem, 709--714 (Abstract) (link to paper)
- Kendall, G (2003) Application of Genetic Algorithm Based Hyper-heuristics to Personnel Scheduling Problems, 528--539 (Abstract) (link to paper)
- Kendall, G (2003) An Investigation of a Tabu Search Based Hyper-heuristic for Examination Timetabling, 226--235 (Abstract) (link to paper)
- Kendall, G (2005) An Investigation of a Tabu-Search-Based Hyper-heuristic for Examination Timetabling, 309--328 (Selected Paper) (link to paper)
- Kendall, G (2008) Preface, 1--3 (Selected Paper) (link to paper)
- Kendall, G (2003) Channel Assignment Optimisation Using an Adaptive Heuristic, 492--505 (Abstract) (link to paper)
- Kendall, G (2009) Decision Support Systems for Tankering within the Airline Industry, 837--838 (Abstract) (link to paper)
- Kendall, G (2008) Fuzzy job shop scheduling with lot-sizing, 275--292 (Selected Paper) (link to paper)
- Kendall, G (2013) A Hybrid of Differential Evolution and Simulated Annealing Algorithms for the Capacitated Arc Routing Problems, 549--554 (Full Paper) (link to paper)
- Kendall, G (2009) Solving Examination Timetabling Problems using Honey-bee Mating Optimization (ETP-HBMO), 399--408 (Full Paper) (link to paper)
(Menu for Kendall) All papers - Full papers - Abstracts - Selected papers Kergosien
- Kergosien, Y (2009) Home health care problem: An extended multiple Traveling Salesman Problem, 85--92 (Full Paper) (link to paper)
(Menu for Kergosien) All papers - Full papers - Abstracts - Selected papers Keskinocak
- Keskinocak, P (2005) Scheduling Multiple Types of Time-Shared Aircraft: Models and Methods for Practice, 19--38 (Full Paper) (link to paper)
- Keskinocak, P (2007) Optimization vs. Persistence in Scheduling: Heuristics to Manage Uncertainty in On-Demand Air Travel, 242--250 (Full Paper) (link to paper)
- Keskinocak, P (2008) Aircraft and crew scheduling for fractional ownership programs, 415--431 (Selected Paper) (link to paper)
(Menu for Keskinocak) All papers - Full papers - Abstracts - Selected papers Khader
- Khader, A. T (2009) A hybrid harmony search for university course timetabling, 157--179 (Full Paper) (link to paper)
(Menu for Khader) All papers - Full papers - Abstracts - Selected papers Kheiri
- Kheiri, A (2013) Combining Monte-Carlo and Hyper-heuristic methods for the Multi-mode Resource-constrained Multi-project Scheduling Problem, 836--839 (Full Paper) (link to paper)
- Kheiri, A (2017) Selection Hyper-heuristics for Solving the Wind Farm Layout Optimisation Problem, 393--395 (Abstract) (link to paper)
(Menu for Kheiri) All papers - Full papers - Abstracts - Selected papers Khosravi
- Khosravi, B (2011) Train Scheduling in the UK using a Job Shop Scheduling Approach, 486--488 (Abstract) (link to paper)
(Menu for Khosravi) All papers - Full papers - Abstracts - Selected papers Khowala
- Khowala, K (2009) Single Machine Scheduling with Interfering Job Sets, 357--365 (Full Paper) (link to paper)
- Khowala, K (2011) Single Machine Scheduling with Interfering Job Sets to Minimize Total Weighted Completion Time and Maximum Lateness, 568--572 (Abstract) (link to paper)
- Khowala, K (2005) A Comparison Of Different Formulations For The Non-preemptive Single Machine Total Weighted Tardiness Scheduling Problem, 643--651 (Full Paper) (link to paper)
(Menu for Khowala) All papers - Full papers - Abstracts - Selected papers Kiefer
- Kiefer, A (2017) Scheduling of maintenance tasks of a large-scale tram network, 367--369 (Abstract) (link to paper)
(Menu for Kiefer) All papers - Full papers - Abstracts - Selected papers Kim
- Kim, Y.K (2003) Using an Artificial Intelligence Search Technique in a Manufacturing Planning and Scheduling Environment, 388--402 (Abstract) (link to paper)
(Menu for Kim) All papers - Full papers - Abstracts - Selected papers Kimbrel
- Kimbrel, T (2005) Algorithms for online buffer management, 518--518 (Abstract) (link to paper)
- Kimbrel, T (2005) A survey on minimizing makespan for the preemptive job with two machine, 337--339 (Abstract) (link to paper)
(Menu for Kimbrel) All papers - Full papers - Abstracts - Selected papers Kinable
- Kinable, J. (2016) The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 271--283 (Selected Paper) (link to paper)
(Menu for Kinable) All papers - Full papers - Abstracts - Selected papers Kirchner
- Kirchner, S (2015) Appointment scheduling in hospitals Sequencing and scheduling using timeaggregation, 849--851 (Abstract) (link to paper)
(Menu for Kirchner) All papers - Full papers - Abstracts - Selected papers Kirkbride
- Kirkbride, C (2011) Stochastic scheduling: A short history of index policies and some key recent developments, 94--112 (Full Paper) (link to paper)
- Kirkbride, C (2014) Stochastic scheduling: A short history of index policies and new approaches to index generation for dynamic resource allocation, 407--425 (Selected Paper) (link to paper)
(Menu for Kirkbride) All papers - Full papers - Abstracts - Selected papers Kis
- Kis, T (2015) Solving resource constrained shortest path problems with branch-and-cut, 677--679 (Abstract) (link to paper)
(Menu for Kis) All papers - Full papers - Abstracts - Selected papers Kjenstad
- Kjenstad, D (2017) The "Orchestrator" approach to multimodal continental trip planning., 362--366 (Abstract) (link to paper)
(Menu for Kjenstad) All papers - Full papers - Abstracts - Selected papers Kl"ocker
- Kl"ocker, C (2015) Optimisation of Staff Absences, 360--369 (Full Paper) (link to paper)
(Menu for Kl"ocker) All papers - Full papers - Abstracts - Selected papers Kliewer
- Kliewer, N (2015) Stability and Flexibility of Crew and Aircraft Schedules, 785--787 (Abstract) (link to paper)
(Menu for Kliewer) All papers - Full papers - Abstracts - Selected papers Klos
- Klos, T (2013) Flexibility Metrics for Time and Resource Constrained Scheduling Problems, 555--572 (Full Paper) (link to paper)
- Klos, T (2015) Exact and heuristic methods for trading-off makespan and stability in stochastic project scheduling, 25--41 (Full Paper) (link to paper)
- Klos, T (2015) Robustness of Partial Order Schedules: Understanding the Chaining algorithm, 457--472 (Full Paper) (link to paper)
(Menu for Klos) All papers - Full papers - Abstracts - Selected papers Knopp
- Knopp, S (2015) Scheduling Complex Job-Shops using Batch Oblivious Disjunctive Graphs, 788--793 (Abstract) (link to paper)
(Menu for Knopp) All papers - Full papers - Abstracts - Selected papers Knowles
- Knowles, J (2015) Iterated Local Search for the Generator Maintenance Scheduling Problem, 708--742 (Abstract) (link to paper)
(Menu for Knowles) All papers - Full papers - Abstracts - Selected papers Ko
- Ko, J (2003) Using an Artificial Intelligence Search Technique in a Manufacturing Planning and Scheduling Environment, 388--402 (Abstract) (link to paper)
(Menu for Ko) All papers - Full papers - Abstracts - Selected papers Kochaniková
- Kochaniková, B (2013) Student Scheduling for Bachelor State Examinations, 762--766 (Abstract) (link to paper)
(Menu for Kochaniková) All papers - Full papers - Abstracts - Selected papers Kok
- Kok, A.L (2009) Time-constrained project scheduling with adjacent resources, 761--763 (Abstract) (link to paper)
(Menu for Kok) All papers - Full papers - Abstracts - Selected papers Koksalan
- Koksalan, M (2007) Interactive Evolutionary Multicriteria Scheduling, 591--594 (Abstract) (link to paper)
(Menu for Koksalan) All papers - Full papers - Abstracts - Selected papers Konig
- Konig, J-C. (2009) Isomorphic coupled-task scheduling problem with compatibility constraints on a single processor, 378--388 (Full Paper) (link to paper)
(Menu for Konig) All papers - Full papers - Abstracts - Selected papers Kononov
- Kononov, A (2007) Scheduling Resumable Deteriorating Jobs, 567--569 (Abstract) (link to paper)
(Menu for Kononov) All papers - Full papers - Abstracts - Selected papers Koole
- Koole, G. (2003) Making Airline Schedules More Robust, 678--695 (Full Paper) (link to paper)
- Koole, G. M (2005) Measuring the Robustness of Airline Fleet Schedules, 381--392 (Selected Paper) (link to paper)
(Menu for Koole) All papers - Full papers - Abstracts - Selected papers Korhonen
- Korhonen, P (2007) Interactive Evolutionary Multicriteria Scheduling, 591--594 (Abstract) (link to paper)
(Menu for Korhonen) All papers - Full papers - Abstracts - Selected papers Korosec
- Korosec, P (2009) Metaheuristic Approach to Loading Schedule Problem, 616--627 (Full Paper) (link to paper)
(Menu for Korosec) All papers - Full papers - Abstracts - Selected papers Koukam
- Koukam, A (2011) Two Phases Parallel Hyperheuristic Approach to the Bus Driver Scheduling Problem, 633--636 (Abstract) (link to paper)
(Menu for Koukam) All papers - Full papers - Abstracts - Selected papers Koulamas
- Koulamas, C (2011) Minimizing the sum of quadratic completion times on two identical parallel machines, 240--244 (Full Paper) (link to paper)
(Menu for Koulamas) All papers - Full papers - Abstracts - Selected papers Kozik
- Kozik, A (2015) A novel Approximate/Exact objective based search technique for precedence constrained scheduling problems, 484--491 (Full Paper) (link to paper)
(Menu for Kozik) All papers - Full papers - Abstracts - Selected papers Kozma
- Kozma, R. (2011) Optimization of Scheduling for Large-Scale Logistics Tasks, 489--492 (Abstract) (link to paper)
(Menu for Kozma) All papers - Full papers - Abstracts - Selected papers Kramer
- Kramer, L. A (2007) Analyzing Basic Representation Choices in Oversubscribed Scheduling Problems, 259--266 (Full Paper) (link to paper)
(Menu for Kramer) All papers - Full papers - Abstracts - Selected papers Krasik
- Krasik, V (2005) Inventory Control And Scheduling With Facilities In Parallel, 740--742 (Abstract) (link to paper)
(Menu for Krasik) All papers - Full papers - Abstracts - Selected papers Krass
- Krass, D (2015) Strategic Idling and Dynamic Scheduling in Open-Shop Service Network: Case Study and Analysis, 604--605 (Abstract) (link to paper)
(Menu for Krass) All papers - Full papers - Abstracts - Selected papers Kravchenko
- Kravchenko, S. A (2009) Parallel Machine Problems with Equal Processing Times, 458--468 (Full Paper) (link to paper)
- Kravchenko, S. A (2011) Parallel machine problems with equal processing times: a survey, 435--444 (Selected Paper) (link to paper)
(Menu for Kravchenko) All papers - Full papers - Abstracts - Selected papers Kristiansen
- Kristiansen, S (2015) Flow Formulation-based Model for the Curriculum-based Course Timetabling Problem, 825--848 (Abstract) (link to paper)
- Kristiansen, S (2013) Student Sectioning at High Schools in Denmark, 628--632 (Abstract) (link to paper)
(Menu for Kristiansen) All papers - Full papers - Abstracts - Selected papers Krivulin
- Krivulin, N (2015) Tropical optimization problems in project scheduling, 492--506 (Full Paper) (link to paper)
(Menu for Krivulin) All papers - Full papers - Abstracts - Selected papers Krogt
- Krogt, R. v. (2013) Compilation of Maintenance Schedules based on their Key Performance Indicators for Fast Iterative Interaction, 606--609 (Abstract) (link to paper)
(Menu for Krogt) All papers - Full papers - Abstracts - Selected papers Kruk
- Kruk, S (2007) A Case Study of an Integer Programming Model for Instructor Assignments and Scheduling Problem, 267--275 (Full Paper) (link to paper)
(Menu for Kruk) All papers - Full papers - Abstracts - Selected papers Krumke
- Krumke, S. O (2005) Improved Pruningin Columngeneration Of A Vehicle Routing Problem, 705--722 (Full Paper) (link to paper)
- Krumke, S. O (2008) Pruning in column generation for service vehicle dispatching, 355--371 (Selected Paper) (link to paper)
(Menu for Krumke) All papers - Full papers - Abstracts - Selected papers Kubiak
- Kubiak, W (2015) Structural properties of an open problem in preemptive scheduling, 673--676 (Abstract) (link to paper)
- Kubiak, W (2007) The Parallel Machine Scheduling Problem with Path-like Constraints, 570--571 (Abstract) (link to paper)
(Menu for Kubiak) All papers - Full papers - Abstracts - Selected papers Kuefer
- Kuefer, K-H. (2016) Time-hierarchical scheduling A worst case analysis of a hierarchical approach integrating planning and scheduling in an online problem, 215--225 (Selected Paper) (link to paper)
(Menu for Kuefer) All papers - Full papers - Abstracts - Selected papers Kufer
- Kufer, K-H. (2015) How to Unload Bulk Carriers Quickly? Mathematical Models to Identify Efficient Loading Patterns, 772--775 (Abstract) (link to paper)
- Kufer, K-H. (2013) Time-Hierarchical Scheduling A worst-case analysis of a rolling hierarchical approach for integrated production planning and scheduling i nmake-to-order environments, 617--619 (Abstract) (link to paper)
(Menu for Kufer) All papers - Full papers - Abstracts - Selected papers Kuhpfahl
- Kuhpfahl, J (2011) Computational Comparison of Neighbourhoods for the Job Shop Scheduling Problem with Total Weighted Tardiness Objective, 536--538 (Abstract) (link to paper)
- Kuhpfahl, J (2013) A GRASP approach for the Job Shop Scheduling Problem with minimizing the Total Weighted Tardiness, 613--616 (Abstract) (link to paper)
(Menu for Kuhpfahl) All papers - Full papers - Abstracts - Selected papers Kumar
- Kumar, M (2005) Scheduling The Production And Transportation Operations Subject To Dynamic Arrivals, 701--701 (Abstract) (link to paper)
(Menu for Kumar) All papers - Full papers - Abstracts - Selected papers Kurz
- Kurz, M. E (2011) Adapting Particle Swarm Optimization for the Flexible Flow Line, 653--656 (Abstract) (link to paper)
(Menu for Kurz) All papers - Full papers - Abstracts - Selected papers Kutanoglu
- Kutanoglu, E (2005) Multiple Orders Per Job Scheduling Problems, 44--45 (Abstract) (link to paper)
- Kutanoglu, E (2005) Forming And Scheduling Jobs With Order Weights In Semiconductor Manufacturing, 334--334 (Abstract) (link to paper)
- Kutanoglu, E (2008) Forming and scheduling jobs with capacitated containers in semiconductor manufacturing: Single machine problem, 5--24 (Selected Paper) (link to paper)
(Menu for Kutanoglu) All papers - Full papers - Abstracts - Selected papers Kvaratskhelia
- Kvaratskhelia, A (2009) Polynomial algorithm for 1 r_j , p_j = p, pmnt SUM(w_i c_j) scheduling problem, 68--76 (Full Paper) (link to paper)
(Menu for Kvaratskhelia) All papers - Full papers - Abstracts - Selected papers Kwan
- Kwan, R.S.K (2003) Constraint-Based Local Search for Rail Container Service Planning, 660--677 (Full Paper) (link to paper)
- Kwan, R. S (2005) Rail Container Service Planning: A Constraint-Based Approach, 343--368 (Selected Paper) (link to paper)
- Kwan, A.S.K (2003) Recent Advancement in an Established Driver Scheduling System, 704--706 (Abstract) (link to paper)
- Kwan, R.S.K (2003) Recent Advancement in an Established Driver Scheduling System, 704--706 (Abstract) (link to paper)
- Kwan, A. S. K (2005) Building Robustness Into Train Driver Schedules, 702--703 (Abstract) (link to paper)
- Kwan, R. S. K (2005) Building Robustness Into Train Driver Schedules, 702--703 (Abstract) (link to paper)
- Kwan, R.S. (2017) Multi-commodity flow and station logistics resolution for train unit scheduling, 321--324 (Abstract) (link to paper)
- Kwan, R.S.K (2003) A Co-Evolutionary Approach for Train Timetabling, 701--703 (Abstract) (link to paper)
- Kwan, R. S.K (2011) Case studies of successful train crew scheduling optimisation, 423--434 (Selected Paper) (link to paper)
- Kwan, R. S. K (2009) Case studies of successful train crew scheduling optimization, 43--57 (Full Paper) (link to paper)
- Kwan, R. S. K (2005) Repair-cost-guided Local Search For Scheduling, 109--110 (Abstract) (link to paper)
- Kwan, A. S. K (2005) Repair-cost-guided Local Search For Scheduling, 109--110 (Abstract) (link to paper)
- Kwan, R. S. K (2009) Real World Optimisation through Spin Out Activity, 778--781 (Abstract) (link to paper)
(Menu for Kwan) All papers - Full papers - Abstracts - Selected papers Kyngäs
- Kyngäs, J (2011) A Framework for Implementation-Oriented Staff Scheduling, 308--321 (Full Paper) (link to paper)
- Kyngäs, J (2007) A Framework for School Timetabling Problem, 386--393 (Full Paper) (link to paper)
(Menu for Kyngäs) All papers - Full papers - Abstracts - Selected papers König
- König, J.-C (2011) Isomorphic coupled-task scheduling problem with compatibility constraints on a single processor, 501--509 (Selected Paper) (link to paper)
(Menu for König) All papers - Full papers - Abstracts - Selected papers Labane
- Labane, M (2003) A Genetic Algorithm for Job Shop Scheduling with Flexibility, 417--418 (Abstract) (link to paper)
(Menu for Labane) All papers - Full papers - Abstracts - Selected papers Laborie
- Laborie, P (2007) Self-Adapting Large Neighborhood Search:Application to Single-Mode Scheduling Problems, 276--284 (Full Paper) (link to paper)
- Laborie, P (2013) Temporal Linear Relaxation in IBM ILOG CP Optimizer, 379--391 (Full Paper) (link to paper)
- Laborie, P. (2016) Temporal linear relaxation in IBM ILOG CP Optimizer, 391--400 (Selected Paper) (link to paper)
(Menu for Laborie) All papers - Full papers - Abstracts - Selected papers Lach
- Lach, G (2015) An IP-based Model for the Post-Enrollment-based Course Timetabling Problem at TU Berlin, 331--344 (Full Paper) (link to paper)
- Lach, G (2015) Solving Huge Real-World Timetabling Instances, 360--369 (Full Paper) (link to paper)
- Lach, M (2015) Solving Huge Real-World Timetabling Instances, 360--369 (Full Paper) (link to paper)
- Lach, M (2015) Examination timetabling at Technische Universit¨at Berlin, 260--266 (Full Paper) (link to paper)
- Lach, G (2015) Examination timetabling at Technische Universit¨at Berlin, 260--266 (Full Paper) (link to paper)
(Menu for Lach) All papers - Full papers - Abstracts - Selected papers Lacomme
- Lacomme, P (2007) A Disjunctive Graph for the Job-Shop with Several Robots, 285--292 (Full Paper) (link to paper)
(Menu for Lacomme) All papers - Full papers - Abstracts - Selected papers Laforest
- Laforest, C (2005) Bicriteria Parallel Task Scheduling, 585--596 (Full Paper) (link to paper)
- Laforest, C (2008) Bicriteria scheduling for contiguous and non contiguous parallel tasks, 97--106 (Selected Paper) (link to paper)
(Menu for Laforest) All papers - Full papers - Abstracts - Selected papers Lam
- Lam, W- (2015) A Hybrid Swarm Algorithm for Post Enrollment Course Timetabling, 931--942 (Abstract) (link to paper)
(Menu for Lam) All papers - Full papers - Abstracts - Selected papers Lamas
- Lamas, P (2013) The stochastic resource-constrained project scheduling problem under different confidence levels, 774--776 (Abstract) (link to paper)
- Lamas, P. (2016) A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations, 409--428 (Selected Paper) (link to paper)
(Menu for Lamas) All papers - Full papers - Abstracts - Selected papers Lambrecht
- Lambrecht, M (2013) Evaluation of appointment scheduling rules, 509--514 (Full Paper) (link to paper)
- Lambrecht, M (2009) Project scheduling with alternative technologies and stochastic activity durations, 756--760 (Abstract) (link to paper)
(Menu for Lambrecht) All papers - Full papers - Abstracts - Selected papers Lambrechts
- Lambrechts, O (2005) A Tabu-search Based Reactive Procedure For The Rcpsp With Stochastic Resource Availabilities, 335--336 (Abstract) (link to paper)
- Lambrechts, O (2007) Exact and Suboptimal Reactive Strategies for Resource-Constrained Project Scheduling with Uncertain Resource Availabilities, 575--577 (Abstract) (link to paper)
(Menu for Lambrechts) All papers - Full papers - Abstracts - Selected papers Lamorgese
- Lamorgese, L (2015) Multi-level Benders Decomposition for Multi-modal Outpatient Scheduling in Hospitals, 892--895 (Abstract) (link to paper)
(Menu for Lamorgese) All papers - Full papers - Abstracts - Selected papers Lamy
- Lamy, D (2015) An Optimization Framework for Job-shop with Energy Threshold Issue With consideration of machining operations with consumption peaks, 118--133 (Full Paper) (link to paper)
(Menu for Lamy) All papers - Full papers - Abstracts - Selected papers Lancia
- Lancia, G (2007) A Compact Optimization Approach for Job-Shop Problems, 293--300 (Full Paper) (link to paper)
- Lancia, G (2013) Scheduling teams for aircraft ground maintenance, 649--651 (Abstract) (link to paper)
(Menu for Lancia) All papers - Full papers - Abstracts - Selected papers Landa-Silva
- Landa-Silva, D (2007) Clustering Within Timetabling Conflict Graphs, 553--556 (Abstract) (link to paper)
- Landa-Silva, J. D (2005) Measuring the Robustness of Airline Fleet Schedules, 381--392 (Selected Paper) (link to paper)
(Menu for Landa-Silva) All papers - Full papers - Abstracts - Selected papers Lane
- Lane, J.P (2003) EventMAP – A Workable Solution, 570--573 (Abstract) (link to paper)
(Menu for Lane) All papers - Full papers - Abstracts - Selected papers Lange
- Lange, J (2015) Approaches to modeling job-shop problems with blocking constraints, 645--648 (Abstract) (link to paper)
(Menu for Lange) All papers - Full papers - Abstracts - Selected papers Lanquepin
- Lanquepin, G (2009) Using a set of fixed prices when solving Profit Maximization Capacitated Lot-Size Problems (PCLSP), 821--822 (Abstract) (link to paper)
(Menu for Lanquepin) All papers - Full papers - Abstracts - Selected papers Lapierre
- Lapierre, S (2003) A Tabu Search Heuristic to Generate Shift Schedules, 526--527 (Abstract) (link to paper)
(Menu for Lapierre) All papers - Full papers - Abstracts - Selected papers Laplagne
- Laplagne, I (2005) Building Robustness Into Train Driver Schedules, 702--703 (Abstract) (link to paper)
- Laplagne, I (2005) Repair-cost-guided Local Search For Scheduling, 109--110 (Abstract) (link to paper)
(Menu for Laplagne) All papers - Full papers - Abstracts - Selected papers Lapègue
- Lapègue, T (2013) A large neighborhood search for the Shift Design Personnel Task Scheduling Problem with Equity, 590--592 (Abstract) (link to paper)
(Menu for Lapègue) All papers - Full papers - Abstracts - Selected papers Larabi
- Larabi, M (2007) A Disjunctive Graph for the Job-Shop with Several Robots, 285--292 (Full Paper) (link to paper)
(Menu for Larabi) All papers - Full papers - Abstracts - Selected papers Lau
- Lau, H. C. (2005) Efficient Algorithms For Machine Scheduling Problems With Earliness And Tardiness Penalties, 196--212 (Abstract) (link to paper)
- Lau, H. C. (2008) Efficient algorithms for machine scheduling problems with earliness and tardiness penalties, 83--95 (Selected Paper) (link to paper)
- Lau, H.C (2017) Home Health Care Delivery Problem, 244--255 (Full Paper) (link to paper)
- Lau, H.C (2015) SAILS: Hybrid Algorithm for the Team Orienteering ProblemwithTimeWindows, 276--295 (Full Paper) (link to paper)
- Lau, H. C (2009) Master Physician Scheduling Problem, 145--156 (Full Paper) (link to paper)
- Lau, H.C. (2017) A Selective-Discrete Particle Swarm Optimization Algorithm for Solving a Class of Orienteering Problem, 229--243 (Full Paper) (link to paper)
- Lau, H.C (2017) Combining Machine Learning and Optimization for Real-World Scheduling Applications, 011--011 (Abstract) (link to paper)
- Lau, H. Y.K (2008) Integrated scheduling of handling equipment at automated container terminals, 373--394 (Selected Paper) (link to paper)
- Lau, H. Y. K (2005) Integrated Scheduling of Different Types of Handling Equipment at Automated Container Terminals, 536--537 (Abstract) (link to paper)
- Lau, H. C. (2007) Generating Job Schedules for Vessel Operations in a Container Terminal, 328--335 (Full Paper) (link to paper)
(Menu for Lau) All papers - Full papers - Abstracts - Selected papers Laub
- Laub, J. D (2007) Minimizing Makespan with Multiple Orders per Job in Mixed Flowshops, 301--308 (Full Paper) (link to paper)
- Laub, J. D (2005) Minimizing Makespan With Multiple Orders Per Job In A Two Machine Flowshop With Item Processing, 288--298 (Full Paper) (link to paper)
(Menu for Laub) All papers - Full papers - Abstracts - Selected papers Laurent
- Laurent, B (2007) Integrated Vehicle and Crew Scheduling for Extra-Urban Transport, 578--580 (Abstract) (link to paper)
(Menu for Laurent) All papers - Full papers - Abstracts - Selected papers Lauret
- Lauret, J (2015) Model for planning of distributed data production, 699--703 (Abstract) (link to paper)
- Lauret, J (2009) Planning Heuristics for Efficient Data Movement on the Grid, 768--771 (Abstract) (link to paper)
(Menu for Lauret) All papers - Full papers - Abstracts - Selected papers Lavangnananda
- Lavangnananda, K (2017) The Application of Nondominated Sorting Genetic Algorithm (NSGA-III) for Scientific-workflow Scheduling on Cloud, 269--287 (Full Paper) (link to paper)
(Menu for Lavangnananda) All papers - Full papers - Abstracts - Selected papers Lazarev
- Lazarev, A (2015) Three approaches to solving the problem of cosmonauts’ training planning, 750--754 (Abstract) (link to paper)
- Lazarev, A. A (2013) A Graphical Algorithm for Solving an Investment Optimization Problem, 290--299 (Full Paper) (link to paper)
- Lazarev, A (2009) Polynomial algorithm for 1 r_j , p_j = p, pmnt SUM(w_i c_j) scheduling problem, 68--76 (Full Paper) (link to paper)
- Lazarev, A. A (2007) Estimation of Absolute Error for Minimization Maximum Lateness, 309--315 (Full Paper) (link to paper)
- Lazarev, A. A (2009) Estimation of absolute error for the resources-constrained project scheduling problem, 671--678 (Abstract) (link to paper)
- Lazarev, A (2015) Single machine scheduling: finding the Pareto Set for jobs with equal processing times with respect to criteria Lmax and Cmax., 797--800 (Abstract) (link to paper)
(Menu for Lazarev) All papers - Full papers - Abstracts - Selected papers Lazarov
- Lazarov, A.A (2013) Solution algorithms for the two-station single track railway scheduling problem, 636--640 (Abstract) (link to paper)
(Menu for Lazarov) All papers - Full papers - Abstracts - Selected papers Lee
- Lee, I. S (2005) Single Machine Product Scheduling With Outsourcing Allowed., 340--340 (Abstract) (link to paper)
(Menu for Lee) All papers - Full papers - Abstracts - Selected papers Leggate
- Leggate, A (2015) Modeling Uncertainty in Vessel Crew Scheduling, 805--808 (Abstract) (link to paper)
(Menu for Leggate) All papers - Full papers - Abstracts - Selected papers Lehoux-Lebacque
- Lehoux-Lebacque, V (2009) Polynomial complexity of the cyclic identical coupled task problem, 679--682 (Abstract) (link to paper)
- Lehoux-Lebacque, V (2007) Scheduling Problems of Chemical Experiments, 581--583 (Abstract) (link to paper)
(Menu for Lehoux-Lebacque) All papers - Full papers - Abstracts - Selected papers Lei
- Lei, L (2008) A zero-inventory production and distribution problem with a fixed customer sequence, 395--414 (Selected Paper) (link to paper)
- Lei, L (2005) A Zero-Inventory Production-Distribution Problem with Time-Window Constraints, 428--444 (Full Paper) (link to paper)
- Lei, L (2005) Scheduling The Production And Transportation Operations Subject To Dynamic Arrivals, 701--701 (Abstract) (link to paper)
- Lei, L (2008) Preface, 1--3 (Selected Paper) (link to paper)
- Lei, L (2017) Multi-commodity flow and station logistics resolution for train unit scheduling, 321--324 (Abstract) (link to paper)
- Lei, L (2007) Scheduling the Operations of an Integrated Production-Distribution Process, 316--327 (Full Paper) (link to paper)
- Lei, L (2005) On the Capacitated Packing-Delivering Problem with a Fixed Route, 70--70 (Abstract) (link to paper)
(Menu for Lei) All papers - Full papers - Abstracts - Selected papers Leithauser
- Leithauser, N (2015) How to Unload Bulk Carriers Quickly? Mathematical Models to Identify Efficient Loading Patterns, 772--775 (Abstract) (link to paper)
(Menu for Leithauser) All papers - Full papers - Abstracts - Selected papers Lemaire
- Lemaire, P (2003) Multibin Packing with the Best-Fit Rule, 74--89 (Full Paper) (link to paper)
- Lemaire, P (2005) The Best-Fit Rule for Multibin Packing: An Extension of Graham's List Algorithms, 269--286 (Selected Paper) (link to paper)
(Menu for Lemaire) All papers - Full papers - Abstracts - Selected papers Lennartz
- Lennartz, P (2003) The Relation Between the No-Wait Job Shop Problem and the Traveling Salesman Problem, 419--421 (Abstract) (link to paper)
(Menu for Lennartz) All papers - Full papers - Abstracts - Selected papers Lenstra
- Lenstra, J. K. (2005) Scheduling, a Critical Biography, 4--4 (Abstract) (link to paper)
(Menu for Lenstra) All papers - Full papers - Abstracts - Selected papers Lente
- Lente, C (2009) Home health care problem: An extended multiple Traveling Salesman Problem, 85--92 (Full Paper) (link to paper)
- Lente, C (2015) An exponential dynamic programming algorithm for the 3-machine ?owshop scheduling problem to minimize the makespan, 755--758 (Abstract) (link to paper)
(Menu for Lente) All papers - Full papers - Abstracts - Selected papers Lenté
- Lenté, C (2011) Sort & Search exponential-time algorithms for scheduling problems, 523--528 (Abstract) (link to paper)
(Menu for Lenté) All papers - Full papers - Abstracts - Selected papers Leoff
- Leoff, J. (2016) Time-hierarchical scheduling A worst case analysis of a hierarchical approach integrating planning and scheduling in an online problem, 215--225 (Selected Paper) (link to paper)
- Leoff, J (2013) Time-Hierarchical Scheduling A worst-case analysis of a rolling hierarchical approach for integrated production planning and scheduling i nmake-to-order environments, 617--619 (Abstract) (link to paper)
(Menu for Leoff) All papers - Full papers - Abstracts - Selected papers Leong
- Leong, T (2007) Generating Job Schedules for Vessel Operations in a Container Terminal, 328--335 (Full Paper) (link to paper)
(Menu for Leong) All papers - Full papers - Abstracts - Selected papers Lesaint
- Lesaint, D (2007) iSchedule, an Optimisation Toolkit for Complex Scheduling, 344--352 (Full Paper) (link to paper)
(Menu for Lesaint) All papers - Full papers - Abstracts - Selected papers Leung
- Leung, J (2015) A Probabilistic Constrained Approach for Unrelated Parallel Machine Scheduling, 16--24 (Full Paper) (link to paper)
- Leung, L. C. K (2011) Two-Stage Shipment Planning with Uncertainties: A Stochastic Programming Approach, 602--604 (Abstract) (link to paper)
- Leung, J. Y-T. (2005) Online Scheduling Of Precedence Constrained Tasks, 573--584 (Full Paper) (link to paper)
- Leung, J (2005) Inventory Control And Scheduling With Facilities In Parallel, 740--742 (Abstract) (link to paper)
- Leung, J. M.Y (2005) Timetable Synchronization for Mass Transit, 516--517 (Abstract) (link to paper)
- Leung, J. Y-T. (2003) Ordering Scheduling Models with Applications in Practice, 2--10 (Full Paper) (link to paper)
- Leung, J. Y.-T (2005) Order Scheduling Models: An Overview, 37--53 (Selected Paper) (link to paper)
- Leung, J. Y-T. (2005) Scheduling Orders In Dedicated And Flexible Machine Environments, 471--484 (Full Paper) (link to paper)
- Leung, J. Y.-T (2008) Scheduling orders on either dedicated or flexible machines in parallel to minimize total weighted completion time, 107--123 (Selected Paper) (link to paper)
- Leung, J. Y-T. (2005) Scheduling Algorithms for Master-Slave System, 501--513 (Full Paper) (link to paper)
- Leung, J. Y.-T (2008) Scheduling problems in master-slave model, 215--231 (Selected Paper) (link to paper)
- Leung, J. Y.-T (2007) Competitive Agent Scheduling with Controllable Processing Times, 514--522 (Full Paper) (link to paper)
(Menu for Leung) All papers - Full papers - Abstracts - Selected papers Leus
- Leus, R (2013) A resource loading problem in the aircraft line maintenance industry, 580--583 (Abstract) (link to paper)
- Leus, R (2009) Solving a dock assignment problem as a three-stage flexible flow-shop problem, 752--755 (Abstract) (link to paper)
- Leus, R (2013) Complexity analysis of the discrete sequential search problem with group activities, 670--672 (Abstract) (link to paper)
- Leus, R (2009) Project scheduling with alternative technologies and stochastic activity durations, 756--760 (Abstract) (link to paper)
- Leus, R (2013) Exact algorithms for single-machine scheduling with time windows and precedence constraints, 656--658 (Abstract) (link to paper)
- Leus, R. (2016) Exact algorithms for single-machine scheduling with time windows and precedence constraints, 309--334 (Selected Paper) (link to paper)
- Leus, R (2007) Dynamic Algorithms for Order Acceptance and Capacity Planning within a Multi-Project Environment, 572--574 (Abstract) (link to paper)
- Leus, R (2003) Resource Allocation for Stability in Reactive Project Scheduling, 116--119 (Abstract) (link to paper)
- Leus, R (2005) Stable Single-machine Schedules, 213--214 (Abstract) (link to paper)
- Leus, R (2007) Project Scheduling with Success or Failure in Individual Activities, 584--587 (Abstract) (link to paper)
- Leus, R (2017) Optimal solutions for minimum-cost sequential system testing, 312--314 (Abstract) (link to paper)
- Leus, R (2009) Order acceptance and scheduling in a single-machine environment: exact and heuristic algorithms, 772--774 (Abstract) (link to paper)
- Leus, R (2013) Optimal scheduling policies for diagnosing k-out-of-n systems with imperfect tests, 624--627 (Abstract) (link to paper)
(Menu for Leus) All papers - Full papers - Abstracts - Selected papers Levine
- Levine, J (2003) Ants Can Solve Difficult Bin Packing Problems, 90--91 (Abstract) (link to paper)
- Levine, J (2015) A Hybrid Constraint Integer Programming Approach to Solve Nurse Scheduling Problems, 429--442 (Full Paper) (link to paper)
(Menu for Levine) All papers - Full papers - Abstracts - Selected papers Levner
- Levner, E (2005) On Project Scheduling With And/or Precedence Constraints, 597--606 (Full Paper) (link to paper)
- Levner, E (2015) A general technique for improving the complexity of FPTAS for scheduling problems, 743--745 (Abstract) (link to paper)
(Menu for Levner) All papers - Full papers - Abstracts - Selected papers Lewis
- Lewis, R (2009) Round-robin Sports Scheduling from a Graph Colouring Perspective: A Case Study in Rugby Union Scheduling, 718--719 (Abstract) (link to paper)
(Menu for Lewis) All papers - Full papers - Abstracts - Selected papers Li
- Li, J (2011) A Game Theoretic Approach for the Taxi Scheduling Problem with Street Hailing, 161--172 (Full Paper) (link to paper)
- Li, X (2017) Responsive Single Bus Corridor Scheduling Based on Machine Learning and Optimisation, 288--294 (Full Paper) (link to paper)
- Li, H (2003) Ordering Scheduling Models with Applications in Practice, 2--10 (Full Paper) (link to paper)
- Li, H (2005) Order Scheduling Models: An Overview, 37--53 (Selected Paper) (link to paper)
- Li, H (2005) Scheduling Orders In Dedicated And Flexible Machine Environments, 471--484 (Full Paper) (link to paper)
- Li, H (2008) Scheduling orders on either dedicated or flexible machines in parallel to minimize total weighted completion time, 107--123 (Selected Paper) (link to paper)
- Li, H (2017) Customer Order Scheduling on Unrelated Parallel Machines to Minimize Total Weighted Completion Time, 013--029 (Full Paper) (link to paper)
- Li, J (2003) Explicit Learning: an Effort towards Human Scheduling Algorithms, 240--243 (Abstract) (link to paper)
- Li, S (2011) Two Phases Parallel Hyperheuristic Approach to the Bus Driver Scheduling Problem, 633--636 (Abstract) (link to paper)
- Li, J-Q. (2011) Schedule Recovery Strategies in Public and Freight Transportation Systems under Disruptions, 484--485 (Abstract) (link to paper)
- Li, X (2011) Job Scheduling to Minimize Weighted Completion Time Variance on Identical Parallel Machines, 546--548 (Abstract) (link to paper)
- Li, H (2015) Resource-Aware Scheduling for Data Centers with Heterogenous Servers, 240--259 (Full Paper) (link to paper)
- Li, J-Q. (2014) Review of real-time vehicle schedule recovery methods in transportation services, 541--567 (Selected Paper) (link to paper)
(Menu for Li) All papers - Full papers - Abstracts - Selected papers Liang
- Liang, Y-C. (2017) Solving Tourist Trip Design Problems Using a Virus Optimization Algorithm, 384--388 (Abstract) (link to paper)
(Menu for Liang) All papers - Full papers - Abstracts - Selected papers Liberti
- Liberti, L (2007) Towards the Optimal Solution of the Multiprocessor Scheduling Problem with Communication Delays, 128--135 (Full Paper) (link to paper)
- Liberti, L (2007) Towards the Optimal Solution of the Multiprocessor Scheduling Problem with Communication Delays, 128--135 (Full Paper) (link to paper)
(Menu for Liberti) All papers - Full papers - Abstracts - Selected papers Lichtenstein
- Lichtenstein, M (2015) A dynamic model of task processing for scheduling problems without additional resources, 649--651 (Abstract) (link to paper)
(Menu for Lichtenstein) All papers - Full papers - Abstracts - Selected papers Liedlo?
- Liedlo?, M (2015) An exponential dynamic programming algorithm for the 3-machine ?owshop scheduling problem to minimize the makespan, 755--758 (Abstract) (link to paper)
(Menu for Liedlo?) All papers - Full papers - Abstracts - Selected papers Liedloff
- Liedloff, M (2011) Sort & Search exponential-time algorithms for scheduling problems, 523--528 (Abstract) (link to paper)
(Menu for Liedloff) All papers - Full papers - Abstracts - Selected papers Limtanyakul
- Limtanyakul, K (2007) Scheduling Tests on Vehicle Prototypes using Constraint Programming, 336--343 (Full Paper) (link to paper)
(Menu for Limtanyakul) All papers - Full papers - Abstracts - Selected papers Limère
- Limère, V (2013) Balancing and Sequencing Mixed-Model Assembly Lines to Minimize Work Overload in Real World Workstations, 230--239 (Full Paper) (link to paper)
(Menu for Limère) All papers - Full papers - Abstracts - Selected papers Lin
- Lin, Z (2017) Multi-commodity flow and station logistics resolution for train unit scheduling, 321--324 (Abstract) (link to paper)
- Lin, E. Y.H (2009) On the Effective Approach of Teaching Activity Scheduling in Project Management, 764--764 (Abstract) (link to paper)
- Lin, S-W. (2005) A Sequential Pair Exchange Approach for Solving Single-Machine Scheduling Problems with General Earliness-Tardiness Penalties, 299--314 (Full Paper) (link to paper)
- Lin, Y.K (2011) Scheduling identical jobs on uniform parallel machines to minimize maximum lateness, 195--199 (Full Paper) (link to paper)
- Lin, G. J (2011) Scheduling identical jobs on uniform parallel machines to minimize maximum lateness, 195--199 (Full Paper) (link to paper)
- Lin, Y-K. (2014) Processing time generation schemes for parallel machine scheduling problems with various correlation structures, 569--586 (Selected Paper) (link to paper)
(Menu for Lin) All papers - Full papers - Abstracts - Selected papers Lindahl
- Lindahl, M (2015) A Matheuristic for Curriculum-Based Course Timetabling, 606--610 (Abstract) (link to paper)
(Menu for Lindahl) All papers - Full papers - Abstracts - Selected papers Lingireddy
- Lingireddy, S (2009) Optimal Pump Scheduling For Water Distribution Systems, 341--356 (Full Paper) (link to paper)
(Menu for Lingireddy) All papers - Full papers - Abstracts - Selected papers Liret
- Liret, A (2007) iSchedule, an Optimisation Toolkit for Complex Scheduling, 344--352 (Full Paper) (link to paper)
(Menu for Liret) All papers - Full papers - Abstracts - Selected papers Lisovoy
- Lisovoy, A (2015) The resource dependent assignment problem with a convex assignment cost function and its relation to scheduling with controllable processing times, 629--634 (Abstract) (link to paper)
(Menu for Lisovoy) All papers - Full papers - Abstracts - Selected papers Lisser
- Lisser, A (2015) A Probabilistic Constrained Approach for Unrelated Parallel Machine Scheduling, 16--24 (Full Paper) (link to paper)
- Lisser, A. (2016) Uplink scheduling for joint wireless orthogonal frequency and time division multiple access networks, 349--366 (Selected Paper) (link to paper)
- Lisser, A (2014) Stochastic and semidefinite optimization for scheduling in orthogonal frequency division multiple access networks, 445--469 (Selected Paper) (link to paper)
- Lisser, A (2011) SDP Relaxations for Two Stage OFDMA Networks with and without Probabilistic Constraints, 445--458 (Full Paper) (link to paper)
- Lisser, A (2013) Scheduling in Wireless OFDMA-TDMA Networks using Variable Neighborhood Search Metaheuristic, 55--64 (Full Paper) (link to paper)
(Menu for Lisser) All papers - Full papers - Abstracts - Selected papers Little
- Little, J (2013) Compilation of Maintenance Schedules based on their Key Performance Indicators for Fast Iterative Interaction, 606--609 (Abstract) (link to paper)
(Menu for Little) All papers - Full papers - Abstracts - Selected papers Liu
- Liu, S (2005) On the Capacitated Packing-Delivering Problem with a Fixed Route, 70--70 (Abstract) (link to paper)
- Liu, Y (2017) Improving Ant Colony Optimization algorithm with Levy Flight, 093--102 (Full Paper) (link to paper)
(Menu for Liu) All papers - Full papers - Abstracts - Selected papers Lokhmotov
- Lokhmotov, A (2011) Dynamic Data Structures for Taskgraph Scheduling Policies with Applications in OpenCL Accelerators, 322--334 (Full Paper) (link to paper)
(Menu for Lokhmotov) All papers - Full papers - Abstracts - Selected papers Lopes
- Lopes, I.C (2013) Optimal scheduling of aircrafts engines repair process, 620--623 (Abstract) (link to paper)
(Menu for Lopes) All papers - Full papers - Abstracts - Selected papers Lopez
- Lopez, P (2007) Climbing Depth-bounded Discrepancy Search for Solving Flexible Job Shop Scheduling Problems, 217--224 (Full Paper) (link to paper)
- Lopez, P (2015) Multimode Time-Constrained Scheduling Problems with Generalized Temporal Constraints and Labor Skills, 809--813 (Abstract) (link to paper)
(Menu for Lopez) All papers - Full papers - Abstracts - Selected papers Lopez-Ibanez
- Lopez-Ibanez, M (2013) Automatic Design of a Hybrid Iterated Local Search for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 820--825 (Full Paper) (link to paper)
(Menu for Lopez-Ibanez) All papers - Full papers - Abstracts - Selected papers Loucks
- Loucks, W. M (2007) EDF Feasibility and Hardware Accelerators, 368--376 (Full Paper) (link to paper)
(Menu for Loucks) All papers - Full papers - Abstracts - Selected papers Lozano
- Lozano, A. J (2011) Scheduling of parallel machines with sequence-dependent batches and product incompatibilities in an automotive glass facility, 564--567 (Abstract) (link to paper)
(Menu for Lozano) All papers - Full papers - Abstracts - Selected papers Lozarno
- Lozarno, A. J (2014) Scheduling of parallel machines with sequence-dependent batches and product incompatibilities in an automotive glass facility, 521--540 (Selected Paper) (link to paper)
(Menu for Lozarno) All papers - Full papers - Abstracts - Selected papers Lu
- Lu, K (2017) Home Health Care Delivery Problem, 244--255 (Full Paper) (link to paper)
- Lu, K (2015) SAILS: Hybrid Algorithm for the Team Orienteering ProblemwithTimeWindows, 276--295 (Full Paper) (link to paper)
(Menu for Lu) All papers - Full papers - Abstracts - Selected papers Lubbecke
- Lubbecke, M.E (2015) Vector space decomposition for linear programming, 652--655 (Abstract) (link to paper)
- Lubbecke, M (2015) Appointment scheduling in hospitals Sequencing and scheduling using timeaggregation, 849--851 (Abstract) (link to paper)
(Menu for Lubbecke) All papers - Full papers - Abstracts - Selected papers Lucarelli
- Lucarelli, G (2007) On a Generalized Graph Coloring/Batch Scheduling Problem, 353--360 (Full Paper) (link to paper)
(Menu for Lucarelli) All papers - Full papers - Abstracts - Selected papers Lykourentzou
- Lykourentzou, I (2013) Guiding wiki crowds through resource scheduling, 753--756 (Abstract) (link to paper)
(Menu for Lykourentzou) All papers - Full papers - Abstracts - Selected papers Løkketangen
- Løkketangen, A (2009) Using a set of fixed prices when solving Profit Maximization Capacitated Lot-Size Problems (PCLSP), 821--822 (Abstract) (link to paper)
(Menu for Løkketangen) All papers - Full papers - Abstracts - Selected papers M"onch
- M"onch, L (2017) Hybrid Heuristics for Multiple Orders per Job Scheduling Problems with Parallel Machines and a Common Due Date, 358--361 (Abstract) (link to paper)
(Menu for M"onch) All papers - Full papers - Abstracts - Selected papers M. Mahdian
- M. Mahdian, (2005) Algorithms for online buffer management, 518--518 (Abstract) (link to paper)
(Menu for M. Mahdian) All papers - Full papers - Abstracts - Selected papers Ma
- Ma, S (2011) Supply Logistics Synchronization: Scale Development and Empirical Study of Chinese Manufacturing, 497--501 (Abstract) (link to paper)
(Menu for Ma) All papers - Full papers - Abstracts - Selected papers Macedo
- Macedo, R (2015) Scheduling preventive railway maintenance activities with resource constraints, 782--784 (Abstract) (link to paper)
(Menu for Macedo) All papers - Full papers - Abstracts - Selected papers Machowiak
- Machowiak, M (2005) On a certain berth scheduling problem, 694--697 (Abstract) (link to paper)
- Machowiak, M (2009) Approximation algorithm for berth and quay crane allocation problem with bounds., 748--751 (Abstract) (link to paper)
(Menu for Machowiak) All papers - Full papers - Abstracts - Selected papers Mackulak
- Mackulak, G. T (2011) Flexible Constraint Optimization of Product Profits: A responsive approach to determine profit-optimal product start rates subject to mean cycle time and product volume constraints in support of production planning for semiconductor fabrication facilities, 599--601 (Abstract) (link to paper)
(Menu for Mackulak) All papers - Full papers - Abstracts - Selected papers Maden
- Maden, W (2003) Vehicle Routing and Scheduling with a Road Timetable, 700--700 (Abstract) (link to paper)
- Maden, W (2005) Vehicle Routing And Scheduling With Time Varying Travel Times, 724--724 (Abstract) (link to paper)
(Menu for Maden) All papers - Full papers - Abstracts - Selected papers Madureira
- Madureira, A (2003) Using Tabu Search for Dynamic Scheduling: The Extended Job-Shop Scheduling Problem, 114--115 (Abstract) (link to paper)
(Menu for Madureira) All papers - Full papers - Abstracts - Selected papers Maenhout
- Maenhout, B (2015) A heuristic procedure to proactively increase employee substitutability and personnel roster robustness, 669--672 (Abstract) (link to paper)
- Maenhout, B (2013) The Impact of Problem Characteristics on the Robustness of a Personnel Schedule: An Empirical Investigation, 684--686 (Abstract) (link to paper)
- Maenhout, B (2015) A heuristic procedure for the personnel task re-scheduling problem, 666--668 (Abstract) (link to paper)
- Maenhout, B (2007) A Branch-and-Price Procedure for Nurse Staffing Incorporating Roster Preferences, 588--590 (Abstract) (link to paper)
- Maenhout, B (2009) Reactive Nurse Scheduling in Hospitals, 690--692 (Abstract) (link to paper)
- Maenhout, B (2005) An Electromagnetic Meta-heuristic For The Nurse Scheduling Problem, 410--411 (Abstract) (link to paper)
- Maenhout, B (2013) An exact procedure for an integrated project staffing problem, 673--675 (Abstract) (link to paper)
- Maenhout, B (2008) Comparison and hybridization of crossover operators for the nurse scheduling problem, 333--353 (Selected Paper) (link to paper)
(Menu for Maenhout) All papers - Full papers - Abstracts - Selected papers Maier
- Maier, H. R (2005) Ant Colony Optimization for Power Plant Maintenance Scheduling Optimization:A Simplified Hydro Tasmania System, 72--72 (Abstract) (link to paper)
- Maier, H. R (2008) Ant colony optimization for power plant maintenance scheduling optimization—a five-station hydropower system, 433--450 (Selected Paper) (link to paper)
(Menu for Maier) All papers - Full papers - Abstracts - Selected papers Makatun
- Makatun, D (2015) Model for planning of distributed data production, 699--703 (Abstract) (link to paper)
(Menu for Makatun) All papers - Full papers - Abstracts - Selected papers Manger
- Manger, R (2009) Speeding up the optimal off-line algorithm for solving the k-server problem, 852--854 (Abstract) (link to paper)
(Menu for Manger) All papers - Full papers - Abstracts - Selected papers Mannino
- Mannino, C (2017) The "Orchestrator" approach to multimodal continental trip planning., 362--366 (Abstract) (link to paper)
- Mannino, C (2015) Multi-level Benders Decomposition for Multi-modal Outpatient Scheduling in Hospitals, 892--895 (Abstract) (link to paper)
- Mannino, C (2011) Operational Surgery scheduling problems: Modelling and solving, 592--595 (Abstract) (link to paper)
(Menu for Mannino) All papers - Full papers - Abstracts - Selected papers Maravelias
- Maravelias, C. T (2005) A Decomposition Approach For Batch Scheduling In The Process Industry, 66--67 (Abstract) (link to paper)
(Menu for Maravelias) All papers - Full papers - Abstracts - Selected papers Marecek
- Marecek, J (2011) Dynamic Data Structures for Taskgraph Scheduling Policies with Applications in OpenCL Accelerators, 322--334 (Full Paper) (link to paper)
(Menu for Marecek) All papers - Full papers - Abstracts - Selected papers Marichal
- Marichal, R. L (2003) Masplan: A Multi-Agent System for Automated Planning and Scheduling in a University Research Group Scenario, 42--55 (Full Paper) (link to paper)
(Menu for Marichal) All papers - Full papers - Abstracts - Selected papers Marinelli
- Marinelli, F (2003) Scheduling Commands on Satellite Constellation, 598--601 (Abstract) (link to paper)
(Menu for Marinelli) All papers - Full papers - Abstracts - Selected papers Marla
- Marla, L (2011) A Decomposition Approach for Shipment Pickup and Delivery with Time-Windows Under Uncertainty, 352--365 (Full Paper) (link to paper)
- Marla, L (2014) A decomposition approach for commodity pickup and delivery with time-windows under uncertainty, 489--506 (Selected Paper) (link to paper)
(Menu for Marla) All papers - Full papers - Abstracts - Selected papers Marmion
- Marmion, M-E. (2013) Automatic Design of a Hybrid Iterated Local Search for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 820--825 (Full Paper) (link to paper)
(Menu for Marmion) All papers - Full papers - Abstracts - Selected papers Marquis
- Marquis, J (2007) Interactive Evolutionary Multicriteria Scheduling, 591--594 (Abstract) (link to paper)
(Menu for Marquis) All papers - Full papers - Abstracts - Selected papers Marszalkowski
- Marszalkowski, J (2015) Budgeted Internet Shopping Optimization Problem (B-ISOP), 885--887 (Abstract) (link to paper)
- Marszalkowski, J (2015) Energy Consumption in Single- and Multi-installment Divisible Loads Processing in Systems with Hierarchical Memory, 146--153 (Full Paper) (link to paper)
(Menu for Marszalkowski) All papers - Full papers - Abstracts - Selected papers Martineau
- Martineau, P (2005) Complexity Results For Parallel Machine Scheduling Problems With A Server In Computer Systems, 232--236 (Abstract) (link to paper)
- Martineau, P (2017) Fixed jobs scheduling on a single machine with renewable resources, 084--092 (Full Paper) (link to paper)
(Menu for Martineau) All papers - Full papers - Abstracts - Selected papers Martinez
- Martinez, Y (2013) A Robust Multi-Agent Reinforcement Learning Approach for Scheduling Problems, 410--423 (Full Paper) (link to paper)
(Menu for Martinez) All papers - Full papers - Abstracts - Selected papers Mascia
- Mascia, F (2013) Automatic Design of a Hybrid Iterated Local Search for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 820--825 (Full Paper) (link to paper)
(Menu for Mascia) All papers - Full papers - Abstracts - Selected papers Mason
- Mason, S. J (2005) Multiple Orders Per Job Batch Scheduling With Incompatible Jobs, 48--64 (Full Paper) (link to paper)
- Mason, S. J (2008) Multiple orders per job batch scheduling with incompatible jobs, 245--260 (Selected Paper) (link to paper)
- Mason, S (2005) Multiple Orders Per Job Scheduling Problems, 44--45 (Abstract) (link to paper)
- Mason, S. J (2007) Complex Job Shop Multiple Orders per Job Scheduling, 225--233 (Full Paper) (link to paper)
- Mason, S. J (2008) Column generation heuristics for multiple machine, multiple orders per job scheduling problems, 261--273 (Selected Paper) (link to paper)
- Mason, S. J (2005) Single Machine Multiple Orders Per Job Scheduling Using Column Generation, 539--547 (Full Paper) (link to paper)
- Mason, A (2013) Student Sectioning at High Schools in Denmark, 628--632 (Abstract) (link to paper)
- Mason, S. J (2005) A Deterministic Scheduling Approach For Wafer Fabrication Facilities, 42--43 (Abstract) (link to paper)
- Mason, S. J (2009) Scheduling Semiconductor Manufacturing Operations: Problems, Solution Techniques, and Future Challenges, 192--201 (Full Paper) (link to paper)
- Mason, S. J (2011) A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations, 583--599 (Selected Paper) (link to paper)
- Mason, a. S (2005) A Bi-criteria Approach To Scheduling Wafer Fabrication Facilities, 276--287 (Full Paper) (link to paper)
- Mason, S. J (2011) Algorithmic Parallelization in Multi-Criteria Semiconductor Scheduling, 642--644 (Abstract) (link to paper)
(Menu for Mason) All papers - Full papers - Abstracts - Selected papers Masri
- Masri, H (2009) A Nonlinear Mixed Integer Program for Search Path Planning Problem (SPPP), 277--290 (Full Paper) (link to paper)
(Menu for Masri) All papers - Full papers - Abstracts - Selected papers Mateo
- Mateo, M (2013) An efficient metaheuristic for the inventory orienteering problem and the single-vehicle cyclic inventory routing problem, 659--663 (Abstract) (link to paper)
(Menu for Mateo) All papers - Full papers - Abstracts - Selected papers Mateus
- Mateus, G.R (2017) Mathematical Formulation for Minimizing Total Tardiness in a Scheduling Problem with Parallel Machines, 201--213 (Full Paper) (link to paper)
- Mateus, G. R. (2015) Scheduling with incompatible jobs: model and algorithms, 776--781 (Abstract) (link to paper)
(Menu for Mateus) All papers - Full papers - Abstracts - Selected papers Mathirajan
- Mathirajan, M (2015) Simulation Based Cause and Effect analysis of Input Variables in Wafer Fabrication, 345--359 (Full Paper) (link to paper)
(Menu for Mathirajan) All papers - Full papers - Abstracts - Selected papers Mati
- Mati, Y (2009) Recent Adavances in Solving Two-job Shop Scheduling Problems: Extensions and Improvements of the Geometric Approach, 469--478 (Full Paper) (link to paper)
- Mati, Y (2015) Minimizing regular criteria in the flexible job-shop scheduling problem, 443--456 (Full Paper) (link to paper)
(Menu for Mati) All papers - Full papers - Abstracts - Selected papers Mattfield
- Mattfield, D.C (2003) Task Scheduling under Gang Constraints, 506--523 (Full Paper) (link to paper)
- Mattfield, D. C. (2005) Task Scheduling under Gang Constraints, 113--130 (Selected Paper) (link to paper)
(Menu for Mattfield) All papers - Full papers - Abstracts - Selected papers Mauergauz
- Mauergauz, Y (2015) Production Scheduling Based on Order Utility Functions, 134--145 (Full Paper) (link to paper)
(Menu for Mauergauz) All papers - Full papers - Abstracts - Selected papers McCollum
- McCollum, B (2005) An Investigation Of Variable Neighbourhood Search For University Course Timetabling, 413--427 (Full Paper) (link to paper)
- McCollum, B (2009) An Investigation of a Genetic Algorithm and Sequential Local Search Approach for Curriculum-based Course Timetabling Problems, 727--731 (Abstract) (link to paper)
- McCollum, B (2003) Perturbation Based Variable Neighbourhood Search in Heuristic Space for Examination Timetabling Problem, 155--173 (Full Paper) (link to paper)
- McCollum, B (2007) Determining Rules in Fuzzy Multiple Heuristic Orderings for Constructing Examination Timetables, 59--66 (Full Paper) (link to paper)
- McCollum, B (2007) Clustering Within Timetabling Conflict Graphs, 553--556 (Abstract) (link to paper)
- McCollum, B (2011) Preface, 407--407 (Selected Paper) (link to paper)
- McCollum, B (2003) Similarity Measures for Exam Timetabling Problems, 120--136 (Full Paper) (link to paper)
- McCollum, B (2007) Constructive versus Improvement Heuristics:An Investigation of Examination Timetabling, 595--597 (Abstract) (link to paper)
- McCollum, B (2011) Ring Out the Bells, 624--627 (Abstract) (link to paper)
- McCollum, B (2015) A Hybrid Swarm Algorithm for Post Enrollment Course Timetabling, 931--942 (Abstract) (link to paper)
- McCollum, B (2013) Directing selection within an extended great deluge optimization algorithm, 499--508 (Full Paper) (link to paper)
- McCollum, B (2009) Decision Support Systems for Tankering within the Airline Industry, 837--838 (Abstract) (link to paper)
- McCollum, B (2009) Real World Optimisation through Spin Out Activity, 778--781 (Abstract) (link to paper)
- McCollum, B (2003) EventMAP – A Workable Solution, 570--573 (Abstract) (link to paper)
- McCollum, B (2009) An Extended Great Deluge Approach to the Examination Timetabling Problem, 424--434 (Full Paper) (link to paper)
- McCollum, B (2013) Initial Results on Fairness in Examination Timetabling, 777--780 (Abstract) (link to paper)
- McCollum, B (2015) Heuristics and Algorithms for Data Center Optimization, 921--927 (Abstract) (link to paper)
- McCollum, B. (2009) Recent Work on Planning and Management of University Teaching Space, 737--740 (Abstract) (link to paper)
- McCollum, B (2013) An Evolutionary Hill Climbing Algorithm for Dynamic Optimisation Problems, 795--799 (Abstract) (link to paper)
- McCollum, B (2013) Tackling University Timetabling Problems Using Hybridization of Swarm Based Approach, 543--548 (Full Paper) (link to paper)
(Menu for McCollum) All papers - Full papers - Abstracts - Selected papers McKenna
- McKenna, J. S (2005) Skills-Based Agent Scheduling at Call Centers, 515--515 (Abstract) (link to paper)
(Menu for McKenna) All papers - Full papers - Abstracts - Selected papers McMullan
- McMullan, P (2007) Clustering Within Timetabling Conflict Graphs, 553--556 (Abstract) (link to paper)
- McMullan, P (2007) Constructive versus Improvement Heuristics:An Investigation of Examination Timetabling, 595--597 (Abstract) (link to paper)
- McMullan, P (2015) A Hybrid Swarm Algorithm for Post Enrollment Course Timetabling, 931--942 (Abstract) (link to paper)
- McMullan, P (2013) Directing selection within an extended great deluge optimization algorithm, 499--508 (Full Paper) (link to paper)
- McMullan, P (2017) Hyper-heuristics using Reinforcement Learning for the Examination Timetabling Problem, 256--268 (Full Paper) (link to paper)
- McMullan, P (2009) Decision Support Systems for Tankering within the Airline Industry, 837--838 (Abstract) (link to paper)
- McMullan, P. J (2009) Real World Optimisation through Spin Out Activity, 778--781 (Abstract) (link to paper)
- McMullan, P (2003) EventMAP – A Workable Solution, 570--573 (Abstract) (link to paper)
- McMullan, P. J (2009) An Extended Great Deluge Approach to the Examination Timetabling Problem, 424--434 (Full Paper) (link to paper)
- McMullan, P (2009) Recent Work on Planning and Management of University Teaching Space, 737--740 (Abstract) (link to paper)
(Menu for McMullan) All papers - Full papers - Abstracts - Selected papers Mecl
- Mecl, R (2003) Integrating Planning into Production Scheduling: Visopt Shopfloor System, 259--278 (Full Paper) (link to paper)
(Menu for Mecl) All papers - Full papers - Abstracts - Selected papers Medaglia
- Medaglia, A. L (2011) Scheduling of parallel machines with sequence-dependent batches and product incompatibilities in an automotive glass facility, 564--567 (Abstract) (link to paper)
- Medaglia, A. L (2014) Scheduling of parallel machines with sequence-dependent batches and product incompatibilities in an automotive glass facility, 521--540 (Selected Paper) (link to paper)
(Menu for Medaglia) All papers - Full papers - Abstracts - Selected papers Meer
- Meer, R. V. (2015) Modeling Uncertainty in Vessel Crew Scheduling, 805--808 (Abstract) (link to paper)
(Menu for Meer) All papers - Full papers - Abstracts - Selected papers Meisels
- Meisels, A (2003) University Timetabling – A Case Study for Scheduling Agents, 56--59 (Abstract) (link to paper)
(Menu for Meisels) All papers - Full papers - Abstracts - Selected papers Melo
- Melo, R. A (2007) Scheduling Single Round Robin Tournaments with Fixed Venues, 431--438 (Full Paper) (link to paper)
- Melo, R. A (2009) The traveling tournament problem with predefined venues, 607--622 (Selected Paper) (link to paper)
(Menu for Melo) All papers - Full papers - Abstracts - Selected papers Menezes
- Menezes, G. C. (2015) Scheduling with incompatible jobs: model and algorithms, 776--781 (Abstract) (link to paper)
(Menu for Menezes) All papers - Full papers - Abstracts - Selected papers Mercy
- Mercy, A (2013) Building university course timetables with minimized resulting student flows, 737--740 (Abstract) (link to paper)
(Menu for Mercy) All papers - Full papers - Abstracts - Selected papers Messelis
- Messelis, T (2013) Algorithm preformance prediction for nurse rostering, 21--38 (Full Paper) (link to paper)
(Menu for Messelis) All papers - Full papers - Abstracts - Selected papers Meszka
- Meszka, M (2003) Round Robin Tournaments with No Breaks in Home-Away Patterns, 602--603 (Abstract) (link to paper)
- Meszka, M (2005) Round Robin Tournaments with One Bye and No Breaks in Home-Away Patterns are Unique, 331--340 (Selected Paper) (link to paper)
(Menu for Meszka) All papers - Full papers - Abstracts - Selected papers Meyer
- Meyer, A (2015) How to Unload Bulk Carriers Quickly? Mathematical Models to Identify Efficient Loading Patterns, 772--775 (Abstract) (link to paper)
(Menu for Meyer) All papers - Full papers - Abstracts - Selected papers Michel
- Michel, S (2007) Inventory Routing Problem Solved by Heuristic Based on Column Generation, 361--367 (Full Paper) (link to paper)
(Menu for Michel) All papers - Full papers - Abstracts - Selected papers Mier
- Mier, M. O. (2015) Multimode Time-Constrained Scheduling Problems with Generalized Temporal Constraints and Labor Skills, 809--813 (Abstract) (link to paper)
(Menu for Mier) All papers - Full papers - Abstracts - Selected papers Mihaylov
- Mihaylov, M (2013) A 3-phase approach to geographically distributed exam timetabling, 725--728 (Abstract) (link to paper)
(Menu for Mihaylov) All papers - Full papers - Abstracts - Selected papers Milis
- Milis, I (2007) On a Generalized Graph Coloring/Batch Scheduling Problem, 353--360 (Full Paper) (link to paper)
(Menu for Milis) All papers - Full papers - Abstracts - Selected papers Miller
- Miller, T (2005) A Practitioner’s Approach To Distribution And Supply Chain Planning And Management, 519--519 (Abstract) (link to paper)
(Menu for Miller) All papers - Full papers - Abstracts - Selected papers Milne
- Milne, J (2005) Challenges in Matching Assets with Demand across All Supply Chain Management Decision Tiers in the IBM Microelectronics Division from Automated Fabs to Central Planning Engines to Collaborative Behavior (Work Arounds), 391--391 (Abstract) (link to paper)
(Menu for Milne) All papers - Full papers - Abstracts - Selected papers Minella
- Minella, G (2009) New results for the multi-objective sequence dependent setup times °owshop problem, 808--810 (Abstract) (link to paper)
(Menu for Minella) All papers - Full papers - Abstracts - Selected papers Ming
- Ming, N. K (2009) A Water Flow Algorithm for Flexible Flow Shop Scheduling with Limited Intermediate Buffers, 606--615 (Full Paper) (link to paper)
- Ming, N. K (2011) Two-level water-flow algorithm for vehicle routing problems, 493--496 (Abstract) (link to paper)
(Menu for Ming) All papers - Full papers - Abstracts - Selected papers Minty
- Minty, R.J (2011) Stochastic scheduling: A short history of index policies and some key recent developments, 94--112 (Full Paper) (link to paper)
- Minty, R. J (2014) Stochastic scheduling: A short history of index policies and new approaches to index generation for dynamic resource allocation, 407--425 (Selected Paper) (link to paper)
(Menu for Minty) All papers - Full papers - Abstracts - Selected papers Miori
- Miori, V. M (2005) A Dynamic Programming Approach To The Truckload Routing Problem Using A Triplet Formulation, 725--738 (Abstract) (link to paper)
(Menu for Miori) All papers - Full papers - Abstracts - Selected papers Miralles
- Miralles, C (2007) A Decision Support System for Scheduling a Painting Facility in an Automotive Supplier, 175--183 (Full Paper) (link to paper)
(Menu for Miralles) All papers - Full papers - Abstracts - Selected papers Mirault
- Mirault, A (2003) Just-in-time Scheduling of a 2-Machine Flowshop Problem with Lot-streaming, 473--475 (Abstract) (link to paper)
(Menu for Mirault) All papers - Full papers - Abstracts - Selected papers Mirchandani
- Mirchandani, P (2011) Schedule Recovery Strategies in Public and Freight Transportation Systems under Disruptions, 484--485 (Abstract) (link to paper)
- Mirchandani, P. B (2014) Review of real-time vehicle schedule recovery methods in transportation services, 541--567 (Selected Paper) (link to paper)
(Menu for Mirchandani) All papers - Full papers - Abstracts - Selected papers Misir
- Misir, M (2011) A new hyper-heuristic implementation in HyFlex: a study on generality, 374--393 (Full Paper) (link to paper)
- Misir, M (2009) A self-organising hyper-heuristic framework, 784--787 (Abstract) (link to paper)
(Menu for Misir) All papers - Full papers - Abstracts - Selected papers Mistry
- Mistry, P (2003) A Co-Evolutionary Approach for Train Timetabling, 701--703 (Abstract) (link to paper)
(Menu for Mistry) All papers - Full papers - Abstracts - Selected papers Mladenovi
- Mladenovi, N (2007) Towards the Optimal Solution of the Multiprocessor Scheduling Problem with Communication Delays, 128--135 (Full Paper) (link to paper)
(Menu for Mladenovi) All papers - Full papers - Abstracts - Selected papers Mladenovic
- Mladenovic, N. (2015) Scheduling preventive railway maintenance activities with resource constraints, 782--784 (Abstract) (link to paper)
(Menu for Mladenovic) All papers - Full papers - Abstracts - Selected papers Mohamad
- Mohamad, M (2003) Channel Assignment Optimisation Using an Adaptive Heuristic, 492--505 (Abstract) (link to paper)
(Menu for Mohamad) All papers - Full papers - Abstracts - Selected papers Mokotoff
- Mokotoff, E (2009) Minimizing the Makespan and Total Flow Time on the Permutation Flow Shop Scheduling Problem, 479--506 (Full Paper) (link to paper)
(Menu for Mokotoff) All papers - Full papers - Abstracts - Selected papers Molina
- Molina, P (2013) On the effect of complexity and uncertainty in ELSP, 748--752 (Abstract) (link to paper)
(Menu for Molina) All papers - Full papers - Abstracts - Selected papers Moll
- Moll, M (2017) Optimal Interdiction of Vehicle Routing on a Dynamic Network, 059--069 (Full Paper) (link to paper)
(Menu for Moll) All papers - Full papers - Abstracts - Selected papers Monch
- Monch, L (2013) New MILP Formulations for Minimizing the Number of Tardy Jobs on a Single Batch Machine, 687--690 (Abstract) (link to paper)
- Monch, L (2009) Ant Colony Optimization Approaches for Scheduling Jobs with Incompatible Families on Parallel Batch Machines, 105--114 (Full Paper) (link to paper)
- Monch, L (2009) Scheduling Semiconductor Manufacturing Operations: Problems, Solution Techniques, and Future Challenges, 192--201 (Full Paper) (link to paper)
- Monch, L (2014) A simultaneous and iterative approach for parallel machine scheduling with sequence-dependent family setups, 471--487 (Selected Paper) (link to paper)
- Monch, L (2015) Scheduling Jobs in a Two-Stage Flexible Flow Shop with Batch Processing Machines, 801--804 (Abstract) (link to paper)
(Menu for Monch) All papers - Full papers - Abstracts - Selected papers Monkman
- Monkman, S. K (2005) Scheduling Product Families In A High Volume, Flexible, Assemble-to-order Factory, 394--395 (Abstract) (link to paper)
(Menu for Monkman) All papers - Full papers - Abstracts - Selected papers Montana
- Montana, D (2003) A Comparison of Vishnu and OPL Studio, 554--565 (Abstract) (link to paper)
- Montana, D (2005) A Comparison of Combinatorial Optimization and Dispatch Rules for Online Scheduling, 353--361 (Full Paper) (link to paper)
(Menu for Montana) All papers - Full papers - Abstracts - Selected papers Moreno
- Moreno, L (2003) Masplan: A Multi-Agent System for Automated Planning and Scheduling in a University Research Group Scenario, 42--55 (Full Paper) (link to paper)
(Menu for Moreno) All papers - Full papers - Abstracts - Selected papers Moris
- Moris, M.U (2015) A mass-flow MILP formulation for energy-efficient supplying in assembly lines, 236--239 (Full Paper) (link to paper)
(Menu for Moris) All papers - Full papers - Abstracts - Selected papers Morozov
- Morozov, N (2015) Three approaches to solving the problem of cosmonauts’ training planning, 750--754 (Abstract) (link to paper)
(Menu for Morozov) All papers - Full papers - Abstracts - Selected papers Morrice
- Morrice, D. J (2005) Scheduling Product Families In A High Volume, Flexible, Assemble-to-order Factory, 394--395 (Abstract) (link to paper)
(Menu for Morrice) All papers - Full papers - Abstracts - Selected papers Morrison
- Morrison, J. R (2005) Challenges in Matching Assets with Demand across All Supply Chain Management Decision Tiers in the IBM Microelectronics Division from Automated Fabs to Central Planning Engines to Collaborative Behavior (Work Arounds), 391--391 (Abstract) (link to paper)
- Morrison, J. R (2011) Scheduling Wafer Release in Clustered Photolithography Tools, 639--641 (Abstract) (link to paper)
(Menu for Morrison) All papers - Full papers - Abstracts - Selected papers Mort
- Mort, N (2003) Handling Preferences using Genetic Algorithms for the Nurse Scheduling Problem, 180--196 (Full Paper) (link to paper)
(Menu for Mort) All papers - Full papers - Abstracts - Selected papers Morton
- Morton, A (2007) EDF Feasibility and Hardware Accelerators, 368--376 (Full Paper) (link to paper)
(Menu for Morton) All papers - Full papers - Abstracts - Selected papers Mosquera
- Mosquera, F (2017) Integer programming for home care scheduling with flexible task frequency and controllable processing times, 121--132 (Full Paper) (link to paper)
(Menu for Mosquera) All papers - Full papers - Abstracts - Selected papers Moukrim
- Moukrim, A (2015) Primal Heuristics for the Vehicle Routing Problem with Synchronized Visits, 859--861 (Abstract) (link to paper)
- Moukrim, A (2015) Student Scheduling Problem At Universite de Technologie de Compiegne, 871--875 (Abstract) (link to paper)
- Moukrim, A (2013) Evolutionary algorithm and post-processing to minimize the total delay in multi-project scheduling, 831--835 (Full Paper) (link to paper)
- Moukrim, A (2015) Lower bounds for Scheduling Problems with production and consumption of resources, 680--682 (Abstract) (link to paper)
(Menu for Moukrim) All papers - Full papers - Abstracts - Selected papers Mouloua
- Mouloua, Z (2007) A Window Time Negotiation Approach at the Scheduling Level inside Supply Chains, 410--417 (Full Paper) (link to paper)
(Menu for Mouloua) All papers - Full papers - Abstracts - Selected papers Mountakis
- Mountakis, S (2015) Exact and heuristic methods for trading-off makespan and stability in stochastic project scheduling, 25--41 (Full Paper) (link to paper)
(Menu for Mountakis) All papers - Full papers - Abstracts - Selected papers Moura
- Moura, A (2013) Container Stowage and Short Sea Ship Routing Problem Optimization, 111--124 (Full Paper) (link to paper)
(Menu for Moura) All papers - Full papers - Abstracts - Selected papers Mourad
- Mourad, B (2013) Reentrance and exact time lag on flow shop scheduling problem, 610--612 (Abstract) (link to paper)
(Menu for Mourad) All papers - Full papers - Abstracts - Selected papers Mualem
- Mualem, A (2003) Bicriteria Scheduling for Parallel Jobs, 606--619 (Full Paper) (link to paper)
(Menu for Mualem) All papers - Full papers - Abstracts - Selected papers Mueller
- Mueller, T. (2016) Real-life examination timetabling, 257--270 (Selected Paper) (link to paper)
(Menu for Mueller) All papers - Full papers - Abstracts - Selected papers Muguerza
- Muguerza, M (2015) A mass-flow MILP formulation for energy-efficient supplying in assembly lines, 236--239 (Full Paper) (link to paper)
(Menu for Muguerza) All papers - Full papers - Abstracts - Selected papers Muhlenthaler
- Muhlenthaler, M (2013) A Decomposition of the Max-min Fair Curriculum-based Course Timetabling Problem: The Impact of Solving Subproblems to Optimality, 300--313 (Full Paper) (link to paper)
(Menu for Muhlenthaler) All papers - Full papers - Abstracts - Selected papers Muklason
- Muklason, A (2013) Initial Results on Fairness in Examination Timetabling, 777--780 (Abstract) (link to paper)
(Menu for Muklason) All papers - Full papers - Abstracts - Selected papers Mulder
- Mulder, J (2003) Making Airline Schedules More Robust, 678--695 (Full Paper) (link to paper)
- Mulder, J (2005) Measuring the Robustness of Airline Fleet Schedules, 381--392 (Selected Paper) (link to paper)
- Mulder, J (2005) Forecasting Flight Schedule Robustness, 698--700 (Abstract) (link to paper)
(Menu for Mulder) All papers - Full papers - Abstracts - Selected papers Muller
- Muller, T (2013) Real-life Examination Timetabling, 248--267 (Full Paper) (link to paper)
(Menu for Muller) All papers - Full papers - Abstracts - Selected papers Munier
- Munier, A (2009) Preface, 563--564 (Selected Paper) (link to paper)
(Menu for Munier) All papers - Full papers - Abstracts - Selected papers Munier-Kordon
- Munier-Kordon, A (2007) An Approximation Algorithm for the UET Two-Machine Open-Shop Problem with Time Delays, 377--385 (Full Paper) (link to paper)
(Menu for Munier-Kordon) All papers - Full papers - Abstracts - Selected papers Murray
- Murray, K. (2009) Interactive Course Timetabling, 732--736 (Abstract) (link to paper)
- Murray, K (2007) Real-time Student Sectioning, 598--600 (Abstract) (link to paper)
(Menu for Murray) All papers - Full papers - Abstracts - Selected papers Musial
- Musial, J (2013) Dual Discounting Functions for Internet Shopping Optimization Problem, 667--669 (Abstract) (link to paper)
- Musial, J. (2016) Novel dual discounting functions for the Internet shopping optimization problem: new algorithms, 245--255 (Selected Paper) (link to paper)
(Menu for Musial) All papers - Full papers - Abstracts - Selected papers Musliu
- Musliu, N (2013) Scheduling of electric vehicle charging operations, 486--498 (Full Paper) (link to paper)
(Menu for Musliu) All papers - Full papers - Abstracts - Selected papers Muttray
- Muttray, U (2015) University Course Timetabling with Con?ict Minimization and Elective Courses, 412--428 (Full Paper) (link to paper)
(Menu for Muttray) All papers - Full papers - Abstracts - Selected papers Mönch
- Mönch, L (2011) A GRASP Approach for Scheduling Jobs with Incompatible Families on Parallel Batch Machines, 557--560 (Abstract) (link to paper)
- Mönch, L (2007) A Decomposition Heuristic for Planning and Scheduling of Jobs on Unrelated Parallel Machines, 112--119 (Full Paper) (link to paper)
- Mönch, L (2007) A Decomposition Heuristic for Planning and Scheduling of Jobs on Unrelated Parallel Machines, 112--119 (Full Paper) (link to paper)
- Mönch, L (2015) Using Adaptive Large Neighborhood Search to Solve Parallel Machine Scheduling Problems with Dedications and Unequal Ready Times of the Jobs, 817--820 (Abstract) (link to paper)
- Mönch, L (2011) A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations, 583--599 (Selected Paper) (link to paper)
- Mönch, L. (2011) Algorithmic Parallelization in Multi-Criteria Semiconductor Scheduling, 642--644 (Abstract) (link to paper)
- Mönch, L (2011) Hybridized Genetic Algorithms to Schedule Interfering Job Sets on a Single Machine, 185--194 (Full Paper) (link to paper)
- Mönch, L (2011) An Iterative Scheme for Parallel Machine Scheduling with Sequence Dependent Family Setups, 519--522 (Abstract) (link to paper)
(Menu for Mönch) All papers - Full papers - Abstracts - Selected papers Müller
- Müller, M (2015) Comparison of EATTS and XHSTT - Towards a Uni?ed Description Language for Timetabling Problems, 862--866 (Abstract) (link to paper)
- Müller, T (2009) Interactive Course Timetabling, 732--736 (Abstract) (link to paper)
- Müller, T (2007) Real-time Student Sectioning, 598--600 (Abstract) (link to paper)
- Müller, T. (2011) Rapid Development of University Course Timetables, 649--652 (Abstract) (link to paper)
(Menu for Müller) All papers - Full papers - Abstracts - Selected papers Naderi
- Naderi, B (2009) Variable Neighborhood Descent methods for the Distributed Permutation Flowshop Problem, 834--836 (Abstract) (link to paper)
(Menu for Naderi) All papers - Full papers - Abstracts - Selected papers Nagarajan
- Nagarajan, B (2005) Analytic Evaluation of the Expectation and Variance of Different Performance Measures for Scheduling Jobs on a Single Machine under Processing Time Variability, 744--744 (Abstract) (link to paper)
(Menu for Nagarajan) All papers - Full papers - Abstracts - Selected papers Nakagawa
- Nakagawa, K (2015) Scheduling competition in the airline industry and the issue of duplicate bookings, 55--62 (Full Paper) (link to paper)
(Menu for Nakagawa) All papers - Full papers - Abstracts - Selected papers Nakamura
- Nakamura, S (2013) Optimal Parallel Systems for Random Scheduling Times, 573--576 (Abstract) (link to paper)
(Menu for Nakamura) All papers - Full papers - Abstracts - Selected papers Nakase
- Nakase, R (2003) Genetic Algorithm Approach to a Multiobjective Rescheduling Problem in a Job Shop, 422--437 (Full Paper) (link to paper)
(Menu for Nakase) All papers - Full papers - Abstracts - Selected papers Nakayama
- Nakayama, K (2013) Optimal Parallel Systems for Random Scheduling Times, 573--576 (Abstract) (link to paper)
(Menu for Nakayama) All papers - Full papers - Abstracts - Selected papers Narin
- Narin, O (2009) Solving Berth Allocation Problem with Column Generation, 744--747 (Abstract) (link to paper)
(Menu for Narin) All papers - Full papers - Abstracts - Selected papers Naudet
- Naudet, Y. (2013) Guiding wiki crowds through resource scheduling, 753--756 (Abstract) (link to paper)
(Menu for Naudet) All papers - Full papers - Abstracts - Selected papers Naudin
- Naudin, E (2007) Staff Rostering Problem: Choice of a Mathematical Model, 601--604 (Abstract) (link to paper)
(Menu for Naudin) All papers - Full papers - Abstracts - Selected papers Nazri
- Nazri, M.Z. A. (2013) An Iterated Local Search Algorithm for the Technician Routing and Scheduling Problems, 641--645 (Abstract) (link to paper)
- Nazri, M.Z.A (2017) Modeling a Practical University Course Timetabling Problem with Reward and Penalty Objective Function: Case Study FTSM-UKM, 348--357 (Abstract) (link to paper)
(Menu for Nazri) All papers - Full papers - Abstracts - Selected papers Neron
- Neron, E (2007) Multi-skill Project Scheduling Problem and Total Productive Maintenance, 608--610 (Abstract) (link to paper)
(Menu for Neron) All papers - Full papers - Abstracts - Selected papers Neufeld
- Neufeld, J.Sebastia (2013) Solving the Hybrid Job Shop Problem with Sequence Dependent Setups, 741--743 (Abstract) (link to paper)
(Menu for Neufeld) All papers - Full papers - Abstracts - Selected papers Newall
- Newall, J (2003) EventMAP – A Workable Solution, 570--573 (Abstract) (link to paper)
(Menu for Newall) All papers - Full papers - Abstracts - Selected papers Nezami
- Nezami, F.G (2017) Optimizing Production Schedule with Energy Consumption and Demand Charges in Parallel Machine Setting, 133--143 (Full Paper) (link to paper)
(Menu for Nezami) All papers - Full papers - Abstracts - Selected papers Ng
- Ng, D. S.T (2005) How to maximize rewards in an incentived made-to-order scheduling environment:, 69--69 (Abstract) (link to paper)
- Ng, T. S. A (2011) Robust Target Achievement for Decision-Making with Application to Workforce-Inventory Planning, 394--407 (Full Paper) (link to paper)
- Ng, T. S (2014) A resilience optimization approach for workforce-inventory control dynamics under uncertainty, 427--444 (Selected Paper) (link to paper)
- Ng, K. M. (2011) A water-flow algorithm for flexible flow shop scheduling with intermediate buffers, 483--500 (Selected Paper) (link to paper)
(Menu for Ng) All papers - Full papers - Abstracts - Selected papers Ngueveu
- Ngueveu, S. U. (2013) Solving a cooperative project scheduling with controllable processing times, self-interested agents and equal profit sharing, 125--132 (Full Paper) (link to paper)
- Ngueveu, S. U (2015) A mass-flow MILP formulation for energy-efficient supplying in assembly lines, 236--239 (Full Paper) (link to paper)
(Menu for Ngueveu) All papers - Full papers - Abstracts - Selected papers Nickel
- Nickel, S (2003) Scheduling In Software Development Using MultiObjective Evolutionary Algorithms, 438--465 (Full Paper) (link to paper)
- Nickel, S (2005) Scheduling in Software Development Using Multiobjective Evolutionary Algorithms, 57--81 (Selected Paper) (link to paper)
(Menu for Nickel) All papers - Full papers - Abstracts - Selected papers Nieuwelaar
- Nieuwelaar, B. v. (2003) Recognizing Finite Repetitive Scheduling Patterns in Manufacturing Systems, 291--319 (Full Paper) (link to paper)
(Menu for Nieuwelaar) All papers - Full papers - Abstracts - Selected papers Nikolakopoulos
- Nikolakopoulos, A (2005) A TSP Formulation Of The DNA Sequencing Problem, 8--10 (Abstract) (link to paper)
(Menu for Nikolakopoulos) All papers - Full papers - Abstracts - Selected papers Nishi
- Nishi, T (2009) Lagrangian Relaxation and Cut Generation for Sequence Dependent Setup Time Flowshop Scheduling Problems, 655--659 (Full Paper) (link to paper)
- Nishi, T (2013) Bilevel Decomposition Approach for Cyclic Staff Scheduling Problems, 65--79 (Full Paper) (link to paper)
- Nishi, T (2017) An Integrated Optimization of Dynamic Product Family Configuration and Supply Chain Configuration, 336--339 (Abstract) (link to paper)
(Menu for Nishi) All papers - Full papers - Abstracts - Selected papers Nissen
- Nissen, V (2017) Evolutionary Bilevel Approach for Integrated Long-Term Staffing and Scheduling, 144--157 (Full Paper) (link to paper)
(Menu for Nissen) All papers - Full papers - Abstracts - Selected papers Nobibon
- Nobibon, F. T. (2013) A resource loading problem in the aircraft line maintenance industry, 580--583 (Abstract) (link to paper)
- Nobibon, F.T (2013) Complexity analysis of the discrete sequential search problem with group activities, 670--672 (Abstract) (link to paper)
- Nobibon, F. T (2013) Exact algorithms for single-machine scheduling with time windows and precedence constraints, 656--658 (Abstract) (link to paper)
- Nobibon, F. T. (2016) Exact algorithms for single-machine scheduling with time windows and precedence constraints, 309--334 (Selected Paper) (link to paper)
- Nobibon, F. T (2009) Order acceptance and scheduling in a single-machine environment: exact and heuristic algorithms, 772--774 (Abstract) (link to paper)
- Nobibon, F.T (2013) Optimal scheduling policies for diagnosing k-out-of-n systems with imperfect tests, 624--627 (Abstract) (link to paper)
(Menu for Nobibon) All papers - Full papers - Abstracts - Selected papers Nocella
- Nocella, S (2003) Scheduling Commands on Satellite Constellation, 598--601 (Abstract) (link to paper)
(Menu for Nocella) All papers - Full papers - Abstracts - Selected papers Noronha
- Noronha, T.F (2015) A biased random-key genetic algorithm for scheduling divisible loads, 570--578 (Full Paper) (link to paper)
(Menu for Noronha) All papers - Full papers - Abstracts - Selected papers Noureldien
- Noureldien, Y (2017) Selection Hyper-heuristics for Solving the Wind Farm Layout Optimisation Problem, 393--395 (Abstract) (link to paper)
(Menu for Noureldien) All papers - Full papers - Abstracts - Selected papers Nourmohmmadzadeh
- Nourmohmmadzadeh, A (2015) An Efficient Simulated Annealing for the Integrated Problem of Berth Allocation and Quay Crane Assignment in Seaside Container Terminals, 154--164 (Full Paper) (link to paper)
(Menu for Nourmohmmadzadeh) All papers - Full papers - Abstracts - Selected papers Novais
- Novais, A. Q (2009) Scheduling of job shop, make-to-order industries with recirculation and assembly: discrete versus continuous time models, 802--807 (Abstract) (link to paper)
- Novais, A. Q (2005) Optimal Reactive Scheduling For Job Shop, Make-toorder Industries: A Mould Making Industry Case Study, 46--46 (Abstract) (link to paper)
(Menu for Novais) All papers - Full papers - Abstracts - Selected papers Novak
- Novak, A (2017) Efficient algorithms for non-preemptive mixed-criticality match-up scheduling problem, 377--379 (Abstract) (link to paper)
- Novak, A (2015) Nurse Rostering Problem: Tighter Upper Bound for Pricing Problem in Branch and Price Approach, 759--763 (Abstract) (link to paper)
(Menu for Novak) All papers - Full papers - Abstracts - Selected papers Nowe
- Nowe, A (2015) On Task Scheduling Policies for Work-Stealing Schedulers, 821--824 (Abstract) (link to paper)
- Nowe, A (2013) A Robust Multi-Agent Reinforcement Learning Approach for Scheduling Problems, 410--423 (Full Paper) (link to paper)
- Nowe, A (2013) A Reinforcement Learning Approach to Solving Hybrid Flexible Flowline Scheduling Problems, 402--409 (Full Paper) (link to paper)
(Menu for Nowe) All papers - Full papers - Abstracts - Selected papers Noyan
- Noyan, N (2011) Minimizing Value-at-Risk in the Single-Machine Total Weighted Tardiness Problem, 215--229 (Full Paper) (link to paper)
(Menu for Noyan) All papers - Full papers - Abstracts - Selected papers Nurmi
- Nurmi, K (2011) A Framework for Implementation-Oriented Staff Scheduling, 308--321 (Full Paper) (link to paper)
- Nurmi, K (2007) A Framework for School Timetabling Problem, 386--393 (Full Paper) (link to paper)
(Menu for Nurmi) All papers - Full papers - Abstracts - Selected papers Obeid
- Obeid, A (2011) Scheduling job families on parallel machines with a bi-criteria objective function under time constraints, 645--648 (Abstract) (link to paper)
(Menu for Obeid) All papers - Full papers - Abstracts - Selected papers Ochoa
- Ochoa, G (2009) HyFlex: A Flexible Framework for the Design and Analysis of Hyper-heuristics, 790--797 (Abstract) (link to paper)
(Menu for Ochoa) All papers - Full papers - Abstracts - Selected papers Oddi
- Oddi, A (2003) Constraint-Based Random Search for Solving Spacecraft Downlink Scheduling Problems, 574--597 (Full Paper) (link to paper)
- Oddi, A (2005) Constraint-Based Random Search for Solving Spacecraft Downlink Scheduling Problems, 133--160 (Selected Paper) (link to paper)
- Oddi, A (2017) A constraint programming approach for the energy-efficient job shop scheduling problem, 158--172 (Full Paper) (link to paper)
(Menu for Oddi) All papers - Full papers - Abstracts - Selected papers Oguz
- Oguz, C (2007) Order Acceptance and Scheduling Decisions in Make-to-Order Systems, 80--87 (Full Paper) (link to paper)
- Oguz, C (2005) On a certain berth scheduling problem, 694--697 (Abstract) (link to paper)
- Oguz, C (2009) Approximation algorithm for berth and quay crane allocation problem with bounds., 748--751 (Abstract) (link to paper)
- Oguz, C (2013) Scheduling chains with constant time lags and variable release times on asingle machine, 584--586 (Abstract) (link to paper)
- Oguz, C (2009) Solving Berth Allocation Problem with Column Generation, 744--747 (Abstract) (link to paper)
- Oguz, C (2003) A Lagrangian Relaxation Method for Hybrid Flow-Shop Scheduling with Multiprocessor Tasks to Minimize Total Weighted Completion Time, 638--655 (Full Paper) (link to paper)
- Oguz, C (2005) A Branch-and-bound Algorithm For Single Machine Total Tardiness Problem With Release Dates, 162--168 (Full Paper) (link to paper)
(Menu for Oguz) All papers - Full papers - Abstracts - Selected papers Oliveira
- Oliveira, J (2013) Container Stowage and Short Sea Ship Routing Problem Optimization, 111--124 (Full Paper) (link to paper)
(Menu for Oliveira) All papers - Full papers - Abstracts - Selected papers Olstad
- Olstad, A (2009) Using a set of fixed prices when solving Profit Maximization Capacitated Lot-Size Problems (PCLSP), 821--822 (Abstract) (link to paper)
(Menu for Olstad) All papers - Full papers - Abstracts - Selected papers Ong
- Ong, W.E (2017) A Weight Assignment Approach for Solving Multicriteria Global Path Planning of Unmanned Combat Vehicles, 043--058 (Full Paper) (link to paper)
(Menu for Ong) All papers - Full papers - Abstracts - Selected papers Ormsbee
- Ormsbee, L (2009) Optimal Pump Scheduling For Water Distribution Systems, 341--356 (Full Paper) (link to paper)
(Menu for Ormsbee) All papers - Full papers - Abstracts - Selected papers Osman
- Osman, I. H (2009) Hybrid of the weighted minimum slack and shortest processing time dispatching rules for the total weighted tardiness single machine scheduling problem with availability constraints, 202--215 (Full Paper) (link to paper)
(Menu for Osman) All papers - Full papers - Abstracts - Selected papers Ostberg
- Ostberg, P-O. (2015) Heuristics and Algorithms for Data Center Optimization, 921--927 (Abstract) (link to paper)
(Menu for Ostberg) All papers - Full papers - Abstracts - Selected papers Ostler
- Ostler, J (2015) Optimisation of Staff Absences, 360--369 (Full Paper) (link to paper)
- Ostler, J (2015) Comparison of EATTS and XHSTT - Towards a Uni?ed Description Language for Timetabling Problems, 862--866 (Abstract) (link to paper)
(Menu for Ostler) All papers - Full papers - Abstracts - Selected papers Oude Vrielink
- Oude Vrielink, R (2017) Towards improving tenders for Higher Education timetabling software: Uncovering the selection criteria of HEIs when choosing timetabling applications and using ERP as a reference, 173--188 (Full Paper) (link to paper)
(Menu for Oude Vrielink) All papers - Full papers - Abstracts - Selected papers Ouelhadj
- Ouelhadj, D (2003) Agents in Timetabling Problems, 67--73 (Abstract) (link to paper)
- Ouelhadj, D (2005) A Service Level Agreement Protocol And Tabu Search For Scheduling On Computational Grids, 238--243 (Full Paper) (link to paper)
(Menu for Ouelhadj) All papers - Full papers - Abstracts - Selected papers Ourari
- Ourari, S (2009) Minimizing the number of tardy jobs in single machine scheduling using MIP, 227--238 (Full Paper) (link to paper)
(Menu for Ourari) All papers - Full papers - Abstracts - Selected papers Owusu
- Owusu, G (2005) Retractable Contract Network for Distributed Scheduling, 485--500 (Full Paper) (link to paper)
(Menu for Owusu) All papers - Full papers - Abstracts - Selected papers Ozdamar
- Ozdamar, L (2013) A GIS-Based Emergency Response System for Disaster Relief Operations, 372--378 (Full Paper) (link to paper)
(Menu for Ozdamar) All papers - Full papers - Abstracts - Selected papers Ozsoydan
- Ozsoydan, F.B (2015) A GRASP based approach to dynamic scheduling of parallel heat treatment furnaces in a manufacturing company, 656--658 (Abstract) (link to paper)
(Menu for Ozsoydan) All papers - Full papers - Abstracts - Selected papers O’Brien
- O’Brien, R (2003) A Pheromone-based Look-ahead Hyper-heuristic for Time-tabling Problems, 174--179 (Abstract) (link to paper)
(Menu for O’Brien) All papers - Full papers - Abstracts - Selected papers Pabst
- Pabst, D (2011) Flexible Constraint Optimization of Product Profits: A responsive approach to determine profit-optimal product start rates subject to mean cycle time and product volume constraints in support of production planning for semiconductor fabrication facilities, 599--601 (Abstract) (link to paper)
(Menu for Pabst) All papers - Full papers - Abstracts - Selected papers Paelinck
- Paelinck, M.C.E (2003) Making Airline Schedules More Robust, 678--695 (Full Paper) (link to paper)
- Paelinck, M. C. E (2005) Measuring the Robustness of Airline Fleet Schedules, 381--392 (Selected Paper) (link to paper)
- Paelinck, M (2005) Forecasting Flight Schedule Robustness, 698--700 (Abstract) (link to paper)
(Menu for Paelinck) All papers - Full papers - Abstracts - Selected papers Pais
- Pais, T. C (2011) Using Differential Evolution to Identify Fuzzy Measures for the Exam Timetabling Problem, 335--351 (Full Paper) (link to paper)
(Menu for Pais) All papers - Full papers - Abstracts - Selected papers Pan
- Pan, C (2005) Integrated Scheduling of Different Types of Handling Equipment at Automated Container Terminals, 536--537 (Abstract) (link to paper)
(Menu for Pan) All papers - Full papers - Abstracts - Selected papers Papa
- Papa, G (2009) Metaheuristic Approach to Loading Schedule Problem, 616--627 (Full Paper) (link to paper)
(Menu for Papa) All papers - Full papers - Abstracts - Selected papers Pape
- Pape, C. L (2005) Scheduling A Single Machine To Minimize A Regular Objective Function Under Setup Constraints, 193--195 (Abstract) (link to paper)
(Menu for Pape) All papers - Full papers - Abstracts - Selected papers Pappis
- Pappis, C. P (2007) Scheduling in a Multi-Processor Environment with Deteriorating Job Processing Times and Decreasing Values: the Case of Forest Fires, 402--409 (Full Paper) (link to paper)
- Pappis, C. P (2009) A deterministic resource scheduling model in epidemic logistics, 570--580 (Full Paper) (link to paper)
(Menu for Pappis) All papers - Full papers - Abstracts - Selected papers Park
- Park, S (2005) On the Capacitated Packing-Delivering Problem with a Fixed Route, 70--70 (Abstract) (link to paper)
- Park, K (2011) Scheduling Wafer Release in Clustered Photolithography Tools, 639--641 (Abstract) (link to paper)
(Menu for Park) All papers - Full papers - Abstracts - Selected papers Parker
- Parker, M.E (2003) Recent Advancement in an Established Driver Scheduling System, 704--706 (Abstract) (link to paper)
(Menu for Parker) All papers - Full papers - Abstracts - Selected papers Parkes
- Parkes, A. J (2013) Combining Monte-Carlo and Hyper-heuristic methods for the Multi-mode Resource-constrained Multi-project Scheduling Problem, 836--839 (Full Paper) (link to paper)
- Parkes, A. J (2007) Clustering Within Timetabling Conflict Graphs, 553--556 (Abstract) (link to paper)
- Parkes, A.J (2013) Heuristic Pruning Methods For The Robust Shortest Path Problem, 767--769 (Abstract) (link to paper)
- Parkes, A. J (2011) Dynamic Data Structures for Taskgraph Scheduling Policies with Applications in OpenCL Accelerators, 322--334 (Full Paper) (link to paper)
- Parkes, A. J (2009) An Extended Great Deluge Approach to the Examination Timetabling Problem, 424--434 (Full Paper) (link to paper)
- Parkes, A. J (2013) Initial Results on Fairness in Examination Timetabling, 777--780 (Abstract) (link to paper)
- Parkes, A. J (2009) Recent Work on Planning and Management of University Teaching Space, 737--740 (Abstract) (link to paper)
(Menu for Parkes) All papers - Full papers - Abstracts - Selected papers Paschos
- Paschos, V. Th (2007) On a Generalized Graph Coloring/Batch Scheduling Problem, 353--360 (Full Paper) (link to paper)
(Menu for Paschos) All papers - Full papers - Abstracts - Selected papers Pascual
- Pascual, F (2005) How good Are SPT Schedules For Fair Optimality Criteria, 244--257 (Full Paper) (link to paper)
- Pascual, F (2008) How good are SPT schedules for fair optimality criteria, 53--64 (Selected Paper) (link to paper)
(Menu for Pascual) All papers - Full papers - Abstracts - Selected papers Patriksson
- Patriksson, M (2015) Scheduling optimization of a real flexible job shop including side constraints regarding maintenance, ?xtures, and night shifts, 78--101 (Full Paper) (link to paper)
(Menu for Patriksson) All papers - Full papers - Abstracts - Selected papers Patrinos
- Patrinos, P (2005) Optimal Production Scheduling For Dairy Industries, 324--325 (Abstract) (link to paper)
(Menu for Patrinos) All papers - Full papers - Abstracts - Selected papers Pattacini
- Pattacini, M (2015) Investigating Scheduling models for Power Plant Preventive Maintenance using Genetic Algorithm, 591--595 (Abstract) (link to paper)
(Menu for Pattacini) All papers - Full papers - Abstracts - Selected papers Paulus
- Paulus, J. J (2009) Time-constrained project scheduling with adjacent resources, 761--763 (Abstract) (link to paper)
- Paulus, J. Ja (2007) Online Scheduling of Parallel Jobs on Two Machines is 2-Competitive, 605--607 (Abstract) (link to paper)
(Menu for Paulus) All papers - Full papers - Abstracts - Selected papers Pawlak
- Pawlak, G (2009) Single machine re-entrant jobs scheduling in the car factory paint shop, 775--777 (Abstract) (link to paper)
(Menu for Pawlak) All papers - Full papers - Abstracts - Selected papers Pazienza
- Pazienza, G. E (2011) Optimization of Scheduling for Large-Scale Logistics Tasks, 489--492 (Abstract) (link to paper)
(Menu for Pazienza) All papers - Full papers - Abstracts - Selected papers Pecero
- Pecero, J. E (2013) A Three-Phases Based Algorithm for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem The MISTA 2013 Challenge, 812--814 (Full Paper) (link to paper)
- Pecero, J. E (2013) Dual Discounting Functions for Internet Shopping Optimization Problem, 667--669 (Abstract) (link to paper)
- Pecero, J. E (2013) An Iterative Local Search Algorithm for Scheduling Precedence-Constrained Applications on Heterogeneous Machines, 472--485 (Full Paper) (link to paper)
(Menu for Pecero) All papers - Full papers - Abstracts - Selected papers Pereira
- Pereira, J (2008) A Beam Search approach for the optimization version of the Car Sequencing Problem, 233--244 (Selected Paper) (link to paper)
- Pereira, C.S (2013) Automatic Timetabling in Higher Education Institutions: a real scenario and solution, 151--170 (Full Paper) (link to paper)
- Pereira, C. S. (2016) A decision support approach to automatic timetabling in higher education institutions, 335--348 (Selected Paper) (link to paper)
(Menu for Pereira) All papers - Full papers - Abstracts - Selected papers Perez-Gonzalez
- Perez-Gonzalez, P (2015) Manufacturing Scheduling Systems: What are they made of?, 768--771 (Abstract) (link to paper)
- Perez-Gonzalez, P (2015) A framework of constructive heuristics for permutation-type scheduling problems, 764--767 (Abstract) (link to paper)
- Perez-Gonzalez, P (2015) Heuristic Methods for Single Machine Scheduling with Periodic Maintenance, 473--483 (Full Paper) (link to paper)
(Menu for Perez-Gonzalez) All papers - Full papers - Abstracts - Selected papers Peridy
- Peridy, L (2005) An O (N log N) Stable Algorithm for Immediate Selections Adjustments, 205--222 (Selected Paper) (link to paper)
(Menu for Peridy) All papers - Full papers - Abstracts - Selected papers Perira
- Perira, J (2005) Approximate Solutions For A New Version Of The Car Sequencing Problem (abstract), 93--96 (Abstract) (link to paper)
(Menu for Perira) All papers - Full papers - Abstracts - Selected papers Pernet
- Pernet, N (2008) Periodic real-time scheduling: from deadline-based model to latency-based model, 41--51 (Selected Paper) (link to paper)
(Menu for Pernet) All papers - Full papers - Abstracts - Selected papers Pesch
- Pesch, E (2009) Simulated Annealing Method for Maximizing Revenue on Parallel Machines, 699--701 (Abstract) (link to paper)
- Pesch, E (2007) Genetic Algorithm for Late Work Minimization in a Flow Shop System, 455--462 (Full Paper) (link to paper)
(Menu for Pesch) All papers - Full papers - Abstracts - Selected papers Pessan
- Pessan, C (2007) Multi-skill Project Scheduling Problem and Total Productive Maintenance, 608--610 (Abstract) (link to paper)
(Menu for Pessan) All papers - Full papers - Abstracts - Selected papers Petrovic
- Petrovic, S (2009) HyFlex: A Flexible Framework for the Design and Analysis of Hyper-heuristics, 790--797 (Abstract) (link to paper)
- Petrovic, S (2003) Similarity Measures for Exam Timetabling Problems, 120--136 (Full Paper) (link to paper)
- Petrovic, S (2013) An initial study of a novel Step Counting Hill Climbing heuristic applied to timetabling problems, 691--693 (Abstract) (link to paper)
- Petrovic, S. (2016) A Step Counting Hill Climbing Algorithm applied to University Examination Timetabling, 479--492 (Selected Paper) (link to paper)
- Petrovic, D (2003) Handling Preferences using Genetic Algorithms for the Nurse Scheduling Problem, 180--196 (Full Paper) (link to paper)
- Petrovic, D (2005) An Approach To Predictive-reactive Scheduling Of Parallel Machines Subject To Disruptions, 74--91 (Full Paper) (link to paper)
- Petrovic, D (2008) An approach to predictive-reactive scheduling of parallel machines subject to disruptions, 65--82 (Selected Paper) (link to paper)
- Petrovic, S (2005) Job Shop Scheduling With Lot-sizing And Batching In An Uncertain Real-world Environment, 363--379 (Full Paper) (link to paper)
- Petrovic, D (2005) Job Shop Scheduling With Lot-sizing And Batching In An Uncertain Real-world Environment, 363--379 (Full Paper) (link to paper)
- Petrovic, S (2008) Fuzzy job shop scheduling with lot-sizing, 275--292 (Selected Paper) (link to paper)
- Petrovic, D (2008) Fuzzy job shop scheduling with lot-sizing, 275--292 (Selected Paper) (link to paper)
- Petrovic, S (2005) Case-Based Initialisation of Metaheuristics for Examination, 289--308 (Selected Paper) (link to paper)
- Petrovic, S (2003) Case-Based Initialisation of Metaheuristics for Examination Timetabling, 137--154 (Full Paper) (link to paper)
- Petrovic, S (2007) A Combined Meta-Heuristic with Hyper-Heuristic Approach to the Scheduling of the Hybrid Flow Shop with Sequence Dependent Setup Times and Uniform Machines, 506--513 (Full Paper) (link to paper)
(Menu for Petrovic) All papers - Full papers - Abstracts - Selected papers Pfund
- Pfund, M (2005) Scheduling Wafer Fabrication Operations: State-of-the-practice And Future Needs, 392--393 (Abstract) (link to paper)
- Pfund, M. E (2014) Processing time generation schemes for parallel machine scheduling problems with various correlation structures, 569--586 (Selected Paper) (link to paper)
- Pfund, M (2005) A Deterministic Scheduling Approach For Wafer Fabrication Facilities, 42--43 (Abstract) (link to paper)
- Pfund, M (2005) A Bi-criteria Approach To Scheduling Wafer Fabrication Facilities, 276--287 (Full Paper) (link to paper)
- Pfund, M. E (2011) Investigating the boundary between scheduling and dispatching, 573--575 (Abstract) (link to paper)
(Menu for Pfund) All papers - Full papers - Abstracts - Selected papers Pham
- Pham, S (2015) The Intermittent Traveling Salesman Problem, 794--796 (Abstract) (link to paper)
(Menu for Pham) All papers - Full papers - Abstracts - Selected papers Pickavet
- Pickavet, M (2013) Modeling Real-World Vehicle Routing Problems with Dependencies, 711--713 (Abstract) (link to paper)
(Menu for Pickavet) All papers - Full papers - Abstracts - Selected papers Pickl
- Pickl, S (2017) Optimal Interdiction of Vehicle Routing on a Dynamic Network, 059--069 (Full Paper) (link to paper)
(Menu for Pickl) All papers - Full papers - Abstracts - Selected papers Pillay
- Pillay, N (2009) Evolving Hyper-Heuristics for the Uncapacitated Examination Timetabling Problem, 447--457 (Full Paper) (link to paper)
- Pillay, N (2011) A Hyper-Heuristic Approach to Solving School Timetabling Problems, 628--632 (Abstract) (link to paper)
- Pillay, N (2015) Automated Design of the Developmental Approach for Solving the Examination Timetabling Problem, 909--913 (Abstract) (link to paper)
(Menu for Pillay) All papers - Full papers - Abstracts - Selected papers Pimenta
- Pimenta, V (2015) Reliability Oriented DARP Models Involving Autonomous Vehicles, 218--235 (Full Paper) (link to paper)
(Menu for Pimenta) All papers - Full papers - Abstracts - Selected papers Pinaton
- Pinaton, J. (2017) A Batch-oblivious Approach For Scheduling Complex Job-Shops with Batching Machines: From Non-delay to Active Scheduling, 340--343 (Abstract) (link to paper)
(Menu for Pinaton) All papers - Full papers - Abstracts - Selected papers Pineda
- Pineda, A. A. S. (2013) An Iterative Local Search Algorithm for Scheduling Precedence-Constrained Applications on Heterogeneous Machines, 472--485 (Full Paper) (link to paper)
(Menu for Pineda) All papers - Full papers - Abstracts - Selected papers Pinedo
- Pinedo, M (2008) Preface, 1--3 (Selected Paper) (link to paper)
- Pinedo, M (2005) Inventory Control And Scheduling With Facilities In Parallel, 740--742 (Abstract) (link to paper)
- Pinedo, M (2003) Ordering Scheduling Models with Applications in Practice, 2--10 (Full Paper) (link to paper)
- Pinedo, M (2005) Order Scheduling Models: An Overview, 37--53 (Selected Paper) (link to paper)
- Pinedo, M (2005) Scheduling Orders In Dedicated And Flexible Machine Environments, 471--484 (Full Paper) (link to paper)
- Pinedo, M (2008) Scheduling orders on either dedicated or flexible machines in parallel to minimize total weighted completion time, 107--123 (Selected Paper) (link to paper)
- Pinedo, M (2007) Competitive Agent Scheduling with Controllable Processing Times, 514--522 (Full Paper) (link to paper)
(Menu for Pinedo) All papers - Full papers - Abstracts - Selected papers Piplani
- Piplani, R (2005) Combined Production and Distribution Scheduling of Ready-Mix Concrete, 551--551 (Abstract) (link to paper)
(Menu for Piplani) All papers - Full papers - Abstracts - Selected papers Pira
- Pira, C (2013) Line search method for solving a non-preemptive strictly periodic scheduling problem, 356--371 (Full Paper) (link to paper)
- Pira, C. (2016) Line search method for solving a non-preemptive strictly periodic scheduling problem, 227--243 (Selected Paper) (link to paper)
(Menu for Pira) All papers - Full papers - Abstracts - Selected papers Pochet
- Pochet, Y (2007) A Strengthened Continuous Time Formulation for the Cyclic Scheduling of a Plant, 621--624 (Abstract) (link to paper)
(Menu for Pochet) All papers - Full papers - Abstracts - Selected papers Policella
- Policella, N (2003) Constraint-Based Random Search for Solving Spacecraft Downlink Scheduling Problems, 574--597 (Full Paper) (link to paper)
- Policella, N (2005) Constraint-Based Random Search for Solving Spacecraft Downlink Scheduling Problems, 133--160 (Selected Paper) (link to paper)
(Menu for Policella) All papers - Full papers - Abstracts - Selected papers Politz
- Politz, A (2013) Algorithms and Complexity of Student Sectioning for Existing Timetables, 218--229 (Full Paper) (link to paper)
- Politz, A (2016) A complexity analysis and an algorithmic approach to student sectioning in existing timetables, 285--293 (Selected Paper) (link to paper)
(Menu for Politz) All papers - Full papers - Abstracts - Selected papers Portmann
- Portmann, M-C. (2005) An Efficient Proactive-Reactive Scheduling Approach to Hedge Against Shop Floor Disturbances, 223--246 (Selected Paper) (link to paper)
- Portmann, M- (2003) An Efficient Proactive Reactive Scheduling Approach to Hedge Against Shop Floor Disturbances, 337--362 (Full Paper) (link to paper)
- Portmann, M-C. (2007) A Window Time Negotiation Approach at the Scheduling Level inside Supply Chains, 410--417 (Full Paper) (link to paper)
(Menu for Portmann) All papers - Full papers - Abstracts - Selected papers Post
- Post, G (2005) A Decomposition, Construction And Post-processing Approach For Nurse Rostering, 397--406 (Full Paper) (link to paper)
(Menu for Post) All papers - Full papers - Abstracts - Selected papers Potts
- Potts, C.N (2003) The Coordination of Scheduling and Batch Deliveries, 656--659 (Abstract) (link to paper)
- Potts, C. N (2011) Train Scheduling in the UK using a Job Shop Scheduling Approach, 486--488 (Abstract) (link to paper)
(Menu for Potts) All papers - Full papers - Abstracts - Selected papers Potvin
- Potvin, J-Y. (2009) An Effective Heuristic for the Pickup and Delivery Traveling Salesman Problem with LIFO Loading and Multiple Stacks, 831--833 (Abstract) (link to paper)
(Menu for Potvin) All papers - Full papers - Abstracts - Selected papers Prajapat
- Prajapat, N (2015) Investigating Scheduling models for Power Plant Preventive Maintenance using Genetic Algorithm, 591--595 (Abstract) (link to paper)
(Menu for Prajapat) All papers - Full papers - Abstracts - Selected papers Premysl
- Premysl, S (2013) Roster Evaluation Based on the Classifiers for the Nurse Rostering Problem, 744--747 (Abstract) (link to paper)
(Menu for Premysl) All papers - Full papers - Abstracts - Selected papers Proll
- Proll, L (2003) Constraint-Based Local Search for Rail Container Service Planning, 660--677 (Full Paper) (link to paper)
- Proll, L (2005) Rail Container Service Planning: A Constraint-Based Approach, 343--368 (Selected Paper) (link to paper)
- Proll, L (2003) Recent Advancement in an Established Driver Scheduling System, 704--706 (Abstract) (link to paper)
(Menu for Proll) All papers - Full papers - Abstracts - Selected papers Prot
- Prot, D (2013) A large neighborhood search for the Shift Design Personnel Task Scheduling Problem with Equity, 590--592 (Abstract) (link to paper)
(Menu for Prot) All papers - Full papers - Abstracts - Selected papers Pundoor
- Pundoor, G (2005) Integrated Production-Distribution Scheduling to Optimize the Tradeoff between Order Delivery Performance and Total Cost, 549--550 (Abstract) (link to paper)
(Menu for Pundoor) All papers - Full papers - Abstracts - Selected papers Péridy
- Péridy, L (2003) Improving Immediate Selections Adjustments, 244--258 (Full Paper) (link to paper)
(Menu for Péridy) All papers - Full papers - Abstracts - Selected papers Qu
- Qu, R (2005) A Decomposition, Construction And Post-processing Approach For Nurse Rostering, 397--406 (Full Paper) (link to paper)
- Qu, R (2003) Similarity Measures for Exam Timetabling Problems, 120--136 (Full Paper) (link to paper)
- Qu, R (2009) Adaptive Selection of Heuristics within a GRASP for Exam Timetabling Problems, 409--423 (Full Paper) (link to paper)
- Qu, R (2007) Adaptive Decomposition and Construction for Examination Timetabling Problems, 418--425 (Full Paper) (link to paper)
- Qu, R (2009) Hybridizing Integer Programming Models with an Adaptive Decomposition Approach for Exam Timetabling Problems, 435--446 (Full Paper) (link to paper)
- Qu, R (2009) A GRASP approach for the delay-constrained multicast routing problem, 93--104 (Full Paper) (link to paper)
(Menu for Qu) All papers - Full papers - Abstracts - Selected papers Quadrifoglio
- Quadrifoglio, L (2011) An insertion heuristic for coordinated zoning paratransit systems, 502--505 (Abstract) (link to paper)
(Menu for Quadrifoglio) All papers - Full papers - Abstracts - Selected papers Quesnelle
- Quesnelle, J (2015) Scheduling a conference to minimize attendee preference Conflicts, 379--392 (Full Paper) (link to paper)
(Menu for Quesnelle) All papers - Full papers - Abstracts - Selected papers Quilliot
- Quilliot, A (2013) Transfers in the on-demand transportation: the DARPT Dial-a-Ride Problem with transfers allowed, 185--205 (Full Paper) (link to paper)
- Quilliot, A (2015) Reliability Oriented DARP Models Involving Autonomous Vehicles, 218--235 (Full Paper) (link to paper)
- Quilliot, A (2013) Homogeneously non-idling schedules of unit-time jobs on identical parallel machines, 39--54 (Full Paper) (link to paper)
- Quilliot, A (2003) Interval Graphs, Antichain Sets and Scheduling with Temporal and Resource Constraints, 620--637 (Full Paper) (link to paper)
- Quilliot, A (2013) RCPSP with Resource Transfers and Money Management, 91--110 (Full Paper) (link to paper)
- Quilliot, A (2007) Solving Resource-Constrained Project Scheduling Problem with Particle Swarm Optimization, 251--258 (Full Paper) (link to paper)
(Menu for Quilliot) All papers - Full papers - Abstracts - Selected papers R
- R, J. G. H. (2013) Use Matrixes Of Weighing for the scheduling in a sports Fantasy., 694--702 (Abstract) (link to paper)
(Menu for R) All papers - Full papers - Abstracts - Selected papers Raa
- Raa, B (2007) Aligning Frequencies in Cyclic Delivery Scheduling, 426--430 (Full Paper) (link to paper)
(Menu for Raa) All papers - Full papers - Abstracts - Selected papers Raap
- Raap, M (2017) Optimal Interdiction of Vehicle Routing on a Dynamic Network, 059--069 (Full Paper) (link to paper)
(Menu for Raap) All papers - Full papers - Abstracts - Selected papers Rabadi
- Rabadi, G (2005) A Genetic Algorithm with Random Keys Approach for the Job Shop Scheduling Problem with Earliness and Tardiness, 745--745 (Abstract) (link to paper)
(Menu for Rabadi) All papers - Full papers - Abstracts - Selected papers Rachaniotis
- Rachaniotis, N. P (2007) Scheduling in a Multi-Processor Environment with Deteriorating Job Processing Times and Decreasing Values: the Case of Forest Fires, 402--409 (Full Paper) (link to paper)
- Rachaniotis, N. P (2009) A deterministic resource scheduling model in epidemic logistics, 570--580 (Full Paper) (link to paper)
(Menu for Rachaniotis) All papers - Full papers - Abstracts - Selected papers Rahimian
- Rahimian, E (2015) A Hybrid Constraint Integer Programming Approach to Solve Nurse Scheduling Problems, 429--442 (Full Paper) (link to paper)
(Menu for Rahimian) All papers - Full papers - Abstracts - Selected papers Rahman
- Rahman, S. A (2013) An Investigation of Multistage Approaches to Examination Timetabling, 528--542 (Full Paper) (link to paper)
- Rahman, A (2017) A Weight Assignment Approach for Solving Multicriteria Global Path Planning of Unmanned Combat Vehicles, 043--058 (Full Paper) (link to paper)
(Menu for Rahman) All papers - Full papers - Abstracts - Selected papers Rainwater
- Rainwater, C. E (2011) Algorithmic Parallelization in Multi-Criteria Semiconductor Scheduling, 642--644 (Abstract) (link to paper)
(Menu for Rainwater) All papers - Full papers - Abstracts - Selected papers Ramacher
- Ramacher, R (2011) Hybridized Genetic Algorithms to Schedule Interfering Job Sets on a Single Machine, 185--194 (Full Paper) (link to paper)
(Menu for Ramacher) All papers - Full papers - Abstracts - Selected papers Ramos
- Ramos, C (2003) Reducing Job Throughput Time : Using Horizontal Scheduling and Simultaneous Manufacturing, 386--387 (Abstract) (link to paper)
- Ramos, C (2003) Using Tabu Search for Dynamic Scheduling: The Extended Job-Shop Scheduling Problem, 114--115 (Abstract) (link to paper)
(Menu for Ramos) All papers - Full papers - Abstracts - Selected papers Rana
- Rana, D (2009) An Empirical Study of Impacts of Production Mix Efficiency, Product Route Efficiency on Operations Performance and Profitability: A Reverse Logistics Approach, 765--767 (Abstract) (link to paper)
(Menu for Rana) All papers - Full papers - Abstracts - Selected papers Ranade
- Ranade, A (2015) Single Track Train Scheduling, 102--117 (Full Paper) (link to paper)
(Menu for Ranade) All papers - Full papers - Abstracts - Selected papers Ranson
- Ranson, D (2005) Graphical Tools for Heuristic Visualization, 658--667 (Full Paper) (link to paper)
(Menu for Ranson) All papers - Full papers - Abstracts - Selected papers Rapine
- Rapine, C (2005) Bicriteria Parallel Task Scheduling, 585--596 (Full Paper) (link to paper)
- Rapine, C (2008) Bicriteria scheduling for contiguous and non contiguous parallel tasks, 97--106 (Selected Paper) (link to paper)
- Rapine, C (2007) Scheduling Problems of Chemical Experiments, 581--583 (Abstract) (link to paper)
(Menu for Rapine) All papers - Full papers - Abstracts - Selected papers Rasconi
- Rasconi, R (2017) A constraint programming approach for the energy-efficient job shop scheduling problem, 158--172 (Full Paper) (link to paper)
(Menu for Rasconi) All papers - Full papers - Abstracts - Selected papers Rashidi
- Rashidi, H (2005) Applying The Extended Network Simplex Algorithm To Dynamic Automated Guided Vehicle Scheduling, 677--692 (Full Paper) (link to paper)
(Menu for Rashidi) All papers - Full papers - Abstracts - Selected papers Ravetti
- Ravetti, M. G. (2015) Scheduling with incompatible jobs: model and algorithms, 776--781 (Abstract) (link to paper)
(Menu for Ravetti) All papers - Full papers - Abstracts - Selected papers Ravizza
- Ravizza, S (2011) A more realistic approach for airport ground movement optimisation with stand holding, 146--160 (Full Paper) (link to paper)
(Menu for Ravizza) All papers - Full papers - Abstracts - Selected papers Rebaine
- Rebaine, D (2007) An Approximation Algorithm for the UET Two-Machine Open-Shop Problem with Time Delays, 377--385 (Full Paper) (link to paper)
(Menu for Rebaine) All papers - Full papers - Abstracts - Selected papers Redi
- Redi, A.A.N.P (2017) A Selective-Discrete Particle Swarm Optimization Algorithm for Solving a Class of Orienteering Problem, 229--243 (Full Paper) (link to paper)
(Menu for Redi) All papers - Full papers - Abstracts - Selected papers Redrup
- Redrup, D (2003) A Pheromone-based Look-ahead Hyper-heuristic for Time-tabling Problems, 174--179 (Abstract) (link to paper)
(Menu for Redrup) All papers - Full papers - Abstracts - Selected papers Reeves
- Reeves, C (2003) Making Airline Schedules More Robust, 678--695 (Full Paper) (link to paper)
- Reeves, C. (2005) Measuring the Robustness of Airline Fleet Schedules, 381--392 (Selected Paper) (link to paper)
- Reeves, C (2003) Handling Preferences using Genetic Algorithms for the Nurse Scheduling Problem, 180--196 (Full Paper) (link to paper)
- Reeves, C.R (2003) Multi-objective Scheduling: Threat or Opportunity?, 466--467 (Abstract) (link to paper)
(Menu for Reeves) All papers - Full papers - Abstracts - Selected papers Resende
- Resende, M.G.C (2015) A biased random-key genetic algorithm for scheduling divisible loads, 570--578 (Full Paper) (link to paper)
(Menu for Resende) All papers - Full papers - Abstracts - Selected papers Riane
- Riane, F (2003) Two-machine Flowshop Scheduling with the Availability Constraint on the Second Machine, 279--290 (Full Paper) (link to paper)
(Menu for Riane) All papers - Full papers - Abstracts - Selected papers Ribeiro
- Ribeiro, C. C (2015) A biased random-key genetic algorithm for scheduling divisible loads, 570--578 (Full Paper) (link to paper)
- Ribeiro, C. C (2011) A heuristic for minimizing weighted carry-over effects in round robin tournaments, 655--667 (Selected Paper) (link to paper)
- Ribeiro, C. C (2009) A heuristic for minimizing weighted carry-over effects in round robin tournaments, 115--129 (Full Paper) (link to paper)
- Ribeiro, C. C (2007) Scheduling Single Round Robin Tournaments with Fixed Venues, 431--438 (Full Paper) (link to paper)
- Ribeiro, C. C (2009) The traveling tournament problem with predefined venues, 607--622 (Selected Paper) (link to paper)
(Menu for Ribeiro) All papers - Full papers - Abstracts - Selected papers Righter
- Righter, R (2007) Scheduling in Highly Uncertain Environments, 27--32 (Full Paper) (link to paper)
(Menu for Righter) All papers - Full papers - Abstracts - Selected papers Rihm
- Rihm, T (2015) A lexicographic goal programming approach for staff assignment with acceptance levels, 526--540 (Full Paper) (link to paper)
(Menu for Rihm) All papers - Full papers - Abstracts - Selected papers Riise
- Riise, A (2015) Multi-level Benders Decomposition for Multi-modal Outpatient Scheduling in Hospitals, 892--895 (Abstract) (link to paper)
- Riise, A (2011) Operational Surgery scheduling problems: Modelling and solving, 592--595 (Abstract) (link to paper)
(Menu for Riise) All papers - Full papers - Abstracts - Selected papers Rinaldi
- Rinaldi, F (2007) A Compact Optimization Approach for Job-Shop Problems, 293--300 (Full Paper) (link to paper)
(Menu for Rinaldi) All papers - Full papers - Abstracts - Selected papers Ritt
- Ritt, M (2013) A simple stochastic local search for multi-mode resource-constrained multi-project scheduling, 826--830 (Full Paper) (link to paper)
(Menu for Ritt) All papers - Full papers - Abstracts - Selected papers Rivizza
- Rivizza, S (2014) A more realistic approach for airport ground movement optimisation with stand holding, 507--520 (Selected Paper) (link to paper)
(Menu for Rivizza) All papers - Full papers - Abstracts - Selected papers Rivreau
- Rivreau, D (2005) An O (N log N) Stable Algorithm for Immediate Selections Adjustments, 205--222 (Selected Paper) (link to paper)
- Rivreau, D (2003) Improving Immediate Selections Adjustments, 244--258 (Full Paper) (link to paper)
(Menu for Rivreau) All papers - Full papers - Abstracts - Selected papers Rizzo
- Rizzo, L. M (2011) A GRASP Heuristic to the Extended Car Sequencing Problem, 366--373 (Full Paper) (link to paper)
(Menu for Rizzo) All papers - Full papers - Abstracts - Selected papers Roberts
- Roberts, M (2005) Random Walks And Neighborhood Bias In Oversubscribed Scheduling, 98--105 (Full Paper) (link to paper)
(Menu for Roberts) All papers - Full papers - Abstracts - Selected papers Rocholl
- Rocholl, J (2017) Hybrid Heuristics for Multiple Orders per Job Scheduling Problems with Parallel Machines and a Common Due Date, 358--361 (Abstract) (link to paper)
(Menu for Rocholl) All papers - Full papers - Abstracts - Selected papers Rodr?guez
- Rodr?guez, V (2015) A mass-flow MILP formulation for energy-efficient supplying in assembly lines, 236--239 (Full Paper) (link to paper)
(Menu for Rodr?guez) All papers - Full papers - Abstracts - Selected papers Rodrigues
- Rodrigues, L. U (2013) Local search techniques applied to the Unrelated Parallel Machine Scheduling Problem with Sequence Dependent Setup Time, 458--471 (Full Paper) (link to paper)
(Menu for Rodrigues) All papers - Full papers - Abstracts - Selected papers Rodriguez
- Rodriguez, J. A. V. (2007) A Combined Meta-Heuristic with Hyper-Heuristic Approach to the Scheduling of the Hybrid Flow Shop with Sequence Dependent Setup Times and Uniform Machines, 506--513 (Full Paper) (link to paper)
(Menu for Rodriguez) All papers - Full papers - Abstracts - Selected papers Rodriguez-Velásquez
- Rodriguez-Velásquez, E (2005) A Genetic Algorithm with Random Keys Approach for the Job Shop Scheduling Problem with Earliness and Tardiness, 745--745 (Abstract) (link to paper)
(Menu for Rodriguez-Velásquez) All papers - Full papers - Abstracts - Selected papers Rogerie
- Rogerie, J (2013) Temporal Linear Relaxation in IBM ILOG CP Optimizer, 379--391 (Full Paper) (link to paper)
- Rogerie, J. (2016) Temporal linear relaxation in IBM ILOG CP Optimizer, 391--400 (Selected Paper) (link to paper)
(Menu for Rogerie) All papers - Full papers - Abstracts - Selected papers Roman
- Roman, V (2013) Roster Evaluation Based on the Classifiers for the Nurse Rostering Problem, 744--747 (Abstract) (link to paper)
(Menu for Roman) All papers - Full papers - Abstracts - Selected papers Romano
- Romano, C. A. (2007) A Decision Support System for Scheduling a Painting Facility in an Automotive Supplier, 175--183 (Full Paper) (link to paper)
(Menu for Romano) All papers - Full papers - Abstracts - Selected papers Romeijnders
- Romeijnders, W (2011) Off-shore Helicopter Routing with Asymmetric Demands and Refueling Options, 637--638 (Abstract) (link to paper)
(Menu for Romeijnders) All papers - Full papers - Abstracts - Selected papers Romero
- Romero, D (2013) A Three-Phases Based Algorithm for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem The MISTA 2013 Challenge, 812--814 (Full Paper) (link to paper)
(Menu for Romero) All papers - Full papers - Abstracts - Selected papers Rose
- Rose, O (2009) Scheduling Semiconductor Manufacturing Operations: Problems, Solution Techniques, and Future Challenges, 192--201 (Full Paper) (link to paper)
- Rose, O (2011) A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations, 583--599 (Selected Paper) (link to paper)
- Rose, O (2011) A Multi Species Evolutionary Algorithm for Tool Group Scheduling in Semiconductor Manufacturing, 459--468 (Full Paper) (link to paper)
(Menu for Rose) All papers - Full papers - Abstracts - Selected papers Rossi
- Rossi, F (2003) Scheduling Commands on Satellite Constellation, 598--601 (Abstract) (link to paper)
(Menu for Rossi) All papers - Full papers - Abstracts - Selected papers Rostami
- Rostami, S (2017) Optimal solutions for minimum-cost sequential system testing, 312--314 (Abstract) (link to paper)
(Menu for Rostami) All papers - Full papers - Abstracts - Selected papers Roussel
- Roussel, R. (2016) A memetic algorithm to solve an unrelated parallel machine scheduling problem with auxiliary resources in semiconductor manufacturing, 367--376 (Selected Paper) (link to paper)
(Menu for Roussel) All papers - Full papers - Abstracts - Selected papers Rucinski
- Rucinski, M (2009) Single machine re-entrant jobs scheduling in the car factory paint shop, 775--777 (Abstract) (link to paper)
(Menu for Rucinski) All papers - Full papers - Abstracts - Selected papers Rudec
- Rudec, T (2009) Speeding up the optimal off-line algorithm for solving the k-server problem, 852--854 (Abstract) (link to paper)
(Menu for Rudec) All papers - Full papers - Abstracts - Selected papers Rudek
- Rudek, R (2015) A novel Approximate/Exact objective based search technique for precedence constrained scheduling problems, 484--491 (Full Paper) (link to paper)
(Menu for Rudek) All papers - Full papers - Abstracts - Selected papers Rudova
- Rudova, H (2015) Model for planning of distributed data production, 699--703 (Abstract) (link to paper)
(Menu for Rudova) All papers - Full papers - Abstracts - Selected papers Rudová
- Rudová, H (2013) Student Scheduling for Bachelor State Examinations, 762--766 (Abstract) (link to paper)
- Rudová, H. (2009) Interactive Course Timetabling, 732--736 (Abstract) (link to paper)
- Rudová, H (2011) Rapid Development of University Course Timetables, 649--652 (Abstract) (link to paper)
- Rudová, H (2005) Multi-Criteria Soft Constraints in Timetabling, 11--15 (Abstract) (link to paper)
(Menu for Rudová) All papers - Full papers - Abstracts - Selected papers Ruiz
- Ruiz, R (2009) New results for the multi-objective sequence dependent setup times °owshop problem, 808--810 (Abstract) (link to paper)
- Ruiz, R (2007) Unrelated Parallel Machines Scheduling with Resource-Assignable Sequence Dependent Setup Times, 439--446 (Full Paper) (link to paper)
- Ruiz, R (2009) Variable Neighborhood Descent methods for the Distributed Permutation Flowshop Problem, 834--836 (Abstract) (link to paper)
(Menu for Ruiz) All papers - Full papers - Abstracts - Selected papers Runarsson
- Runarsson, T.P (2013) Bandit Algorithms using Monte Carlo Rollouts for Job Shop Scheduling, 318--330 (Full Paper) (link to paper)
(Menu for Runarsson) All papers - Full papers - Abstracts - Selected papers Rusdi
- Rusdi, I (2003) Making Airline Schedules More Robust, 678--695 (Full Paper) (link to paper)
- Rusdi, I (2005) Measuring the Robustness of Airline Fleet Schedules, 381--392 (Selected Paper) (link to paper)
(Menu for Rusdi) All papers - Full papers - Abstracts - Selected papers S'anchez
- S'anchez, A. G. (2015) Multimode Time-Constrained Scheduling Problems with Generalized Temporal Constraints and Labor Skills, 809--813 (Abstract) (link to paper)
(Menu for S'anchez) All papers - Full papers - Abstracts - Selected papers Sabar
- Sabar, N.R (2013) A Hybrid of Differential Evolution and Simulated Annealing Algorithms for the Capacitated Arc Routing Problems, 549--554 (Full Paper) (link to paper)
- Sabar, N.R (2013) An Iterated Local Search Algorithm for the Technician Routing and Scheduling Problems, 641--645 (Abstract) (link to paper)
- Sabar, N. R (2009) Solving Examination Timetabling Problems using Honey-bee Mating Optimization (ETP-HBMO), 399--408 (Full Paper) (link to paper)
- Sabar, N. R (2013) An Evolutionary Hill Climbing Algorithm for Dynamic Optimisation Problems, 795--799 (Abstract) (link to paper)
(Menu for Sabar) All papers - Full papers - Abstracts - Selected papers Sadr
- Sadr, J (2003) A Tabu Search Heuristic to Generate Shift Schedules, 526--527 (Abstract) (link to paper)
(Menu for Sadr) All papers - Full papers - Abstracts - Selected papers Sadykov
- Sadykov, R (2017) On the exact solution of a large class of parallel machine scheduling problems, 325--328 (Abstract) (link to paper)
- Sadykov, R (2015) The two-machine flowshop total completion time problem: A branch-and-bound based on Network-flow formulation, 635--637 (Abstract) (link to paper)
- Sadykov, R (2013) Parallel Machine Scheduling with Generalized Precedence Relations, 733--736 (Abstract) (link to paper)
- Sadykov, R (2007) Computing Lower Bounds for the Schedule of a Multifunction Radar, 523--530 (Full Paper) (link to paper)
(Menu for Sadykov) All papers - Full papers - Abstracts - Selected papers Saffar
- Saffar, M (2009) Hybrid of the weighted minimum slack and shortest processing time dispatching rules for the total weighted tardiness single machine scheduling problem with availability constraints, 202--215 (Full Paper) (link to paper)
(Menu for Saffar) All papers - Full papers - Abstracts - Selected papers Sagir
- Sagir, M (2009) Mathematical Modeling for Maximising Gate Receipt Problem, 709--714 (Abstract) (link to paper)
(Menu for Sagir) All papers - Full papers - Abstracts - Selected papers Sahin
- Sahin, G. (2013) The Balanced Path Problem in Crew Scheduling Applications, 729--732 (Abstract) (link to paper)
(Menu for Sahin) All papers - Full papers - Abstracts - Selected papers Sahli
- Sahli, A (2015) Lower bounds for Scheduling Problems with production and consumption of resources, 680--682 (Abstract) (link to paper)
(Menu for Sahli) All papers - Full papers - Abstracts - Selected papers Sakellariou
- Sakellariou, R (2005) A Service Level Agreement Protocol And Tabu Search For Scheduling On Computational Grids, 238--243 (Full Paper) (link to paper)
(Menu for Sakellariou) All papers - Full papers - Abstracts - Selected papers Salassa
- Salassa, F (2013) A computational study of a stock cutting problem with sequence dependent cut losses, 703--706 (Abstract) (link to paper)
(Menu for Salassa) All papers - Full papers - Abstracts - Selected papers Salehipour
- Salehipour, A (2007) The Cost of Scheduling Customers in Routing Problems, 136--143 (Full Paper) (link to paper)
(Menu for Salehipour) All papers - Full papers - Abstracts - Selected papers Salhi
- Salhi, A (2007) A Combined Meta-Heuristic with Hyper-Heuristic Approach to the Scheduling of the Hybrid Flow Shop with Sequence Dependent Setup Times and Uniform Machines, 506--513 (Full Paper) (link to paper)
(Menu for Salhi) All papers - Full papers - Abstracts - Selected papers Salido
- Salido, M.A (2003) A Constraint Ordering Heuristic for Scheduling Problems, 476--491 (Full Paper) (link to paper)
(Menu for Salido) All papers - Full papers - Abstracts - Selected papers Salman
- Salman, S (2007) Order Acceptance and Scheduling Decisions in Make-to-Order Systems, 80--87 (Full Paper) (link to paper)
(Menu for Salman) All papers - Full papers - Abstracts - Selected papers Sanchidri'an
- Sanchidri'an, T. B. (2015) Multimode Time-Constrained Scheduling Problems with Generalized Temporal Constraints and Labor Skills, 809--813 (Abstract) (link to paper)
(Menu for Sanchidri'an) All papers - Full papers - Abstracts - Selected papers Saner
- Saner, N (2011) Decomposition approaches for multi-stage multi-product batch-production scheduling: a re ned batching model, 596--598 (Abstract) (link to paper)
(Menu for Saner) All papers - Full papers - Abstracts - Selected papers Sankaran
- Sankaran, V (2011) Adapting Particle Swarm Optimization for the Flexible Flow Line, 653--656 (Abstract) (link to paper)
(Menu for Sankaran) All papers - Full papers - Abstracts - Selected papers Sannomiya
- Sannomiya, N (2003) Genetic Algorithm Approach to a Multiobjective Rescheduling Problem in a Job Shop, 422--437 (Full Paper) (link to paper)
(Menu for Sannomiya) All papers - Full papers - Abstracts - Selected papers Santos
- Santos, H.G (2015) Improving Upper Bounds in High School Timetabling by Matheuristics, 267--275 (Full Paper) (link to paper)
- Santos, H. G (2013) A New Integer Linear Programming Formulation to the Examination Timetabling Problem, 345--355 (Full Paper) (link to paper)
- Santos, H. G (2013) Late Acceptance Hill-Climbing Applied to the High School Timetabling Problem, 331--344 (Full Paper) (link to paper)
- Santos, H. G (2016) Late acceptance hill-climbing for high school timetabling, 453--465 (Selected Paper) (link to paper)
- Santos, H. G (2013) Local search techniques applied to the Unrelated Parallel Machine Scheduling Problem with Sequence Dependent Setup Time, 458--471 (Full Paper) (link to paper)
- Santos, C. A (2009) Workforce Planning and Scheduling for the HP IT Services Business, 720--723 (Abstract) (link to paper)
- Santos, H.G (2015) LAHC applied to The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 905--908 (Abstract) (link to paper)
- Santos, H. G (2013) An Integer Programming Approach for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 840--847 (Full Paper) (link to paper)
- Santos, H. G (2016) An integer programming approach to the multimode resource-constrained multiproject scheduling problem, 295--307 (Selected Paper) (link to paper)
(Menu for Santos) All papers - Full papers - Abstracts - Selected papers Saridarq
- Saridarq, F. D. (2013) The Balanced Path Problem in Crew Scheduling Applications, 729--732 (Abstract) (link to paper)
(Menu for Saridarq) All papers - Full papers - Abstracts - Selected papers Sarimveis
- Sarimveis, H (2008) Optimal production scheduling for the dairy industry, 315--331 (Selected Paper) (link to paper)
- Sarimveis, H (2005) Optimal Production Scheduling For Dairy Industries, 324--325 (Abstract) (link to paper)
- Sarimveis, H (2005) A TSP Formulation Of The DNA Sequencing Problem, 8--10 (Abstract) (link to paper)
(Menu for Sarimveis) All papers - Full papers - Abstracts - Selected papers Sarin
- Sarin, S. C (2005) Analytic Evaluation of the Expectation and Variance of Different Performance Measures for Scheduling Jobs on a Single Machine under Processing Time Variability, 744--744 (Abstract) (link to paper)
- Sarin, S. C (2005) Solving a Timetabling Problem using Benders’ Decomposition, 673--675 (Abstract) (link to paper)
(Menu for Sarin) All papers - Full papers - Abstracts - Selected papers Sato
- Sato, S (2009) An exact algorithm for the precedence-constrained single-machine scheduling problem, 216--226 (Full Paper) (link to paper)
(Menu for Sato) All papers - Full papers - Abstracts - Selected papers Savourey
- Savourey, D (2017) Three upper bounds for the speed meeting problem, 344--347 (Abstract) (link to paper)
- Savourey, D (2003) Dominance Based Heuristics to Minimize a Total Cost on One Machine, 403--405 (Abstract) (link to paper)
- Savourey, D (2005) Lower Bounds For Parallel Machine Scheduling, 215--216 (Abstract) (link to paper)
(Menu for Savourey) All papers - Full papers - Abstracts - Selected papers Saw
- Saw, V (2017) A Weight Assignment Approach for Solving Multicriteria Global Path Planning of Unmanned Combat Vehicles, 043--058 (Full Paper) (link to paper)
(Menu for Saw) All papers - Full papers - Abstracts - Selected papers Schaerf
- Schaerf, A (2017) Modeling and Solving the Steelmaking and Casting Planning and Scheduling Problem, 380--383 (Abstract) (link to paper)
- Schaerf, A (2015) Thesis Defense Timetabling, 507--514 (Full Paper) (link to paper)
- Schaerf, A (2013) A simulated annealing approach to the curriculum-based course timetabling problem, 314--317 (Full Paper) (link to paper)
- Schaerf, A (2011) Tabu search techniques for the heterogeneous vehicle routing problem with time windows and carrier-dependent costs, 601--615 (Selected Paper) (link to paper)
- Schaerf, A (2009) Tabu Search Techniques for the Heterogeneous Vehicle Routing Problem with Time Windows and Carrier-Dependent Costs, 594--605 (Full Paper) (link to paper)
- Schaerf, A (2013) The Dynamic Patient Admission Scheduling with Operating Room Constraints, Flexible Horizon, and Patient Delays, 646--648 (Abstract) (link to paper)
- Schaerf, A. (2016) Dynamic patient admission scheduling with operating room constraints, flexible horizons, and patient delays, 377--389 (Selected Paper) (link to paper)
(Menu for Schaerf) All papers - Full papers - Abstracts - Selected papers Schafer
- Schafer, A (2013) Baggage Scheduling at Airports A framework for e?ciently allocating resources to flight events, 599--602 (Abstract) (link to paper)
(Menu for Schafer) All papers - Full papers - Abstracts - Selected papers Schatteman
- Schatteman, D (2007) A Methodology for Integrated Risk Management and Proactive Scheduling of Construction Projects, 611--613 (Abstract) (link to paper)
(Menu for Schatteman) All papers - Full papers - Abstracts - Selected papers Schenk
- Schenk, M (2011) Scheduling of large dynamic job shop problems by concurrent non-blocking threads, 542--545 (Abstract) (link to paper)
(Menu for Schenk) All papers - Full papers - Abstracts - Selected papers Schieber
- Schieber, B (2005) Algorithms for online buffer management, 518--518 (Abstract) (link to paper)
(Menu for Schieber) All papers - Full papers - Abstracts - Selected papers Schilde
- Schilde, M (2017) Scheduling of maintenance tasks of a large-scale tram network, 367--369 (Abstract) (link to paper)
- Schilde, M (2015) Variable Neighborhood Search for a Rich Production Planning Problem, 896--898 (Abstract) (link to paper)
(Menu for Schilde) All papers - Full papers - Abstracts - Selected papers Schmidt
- Schmidt, M (2015) Single Track Train Scheduling, 102--117 (Full Paper) (link to paper)
(Menu for Schmidt) All papers - Full papers - Abstracts - Selected papers Schmitz
- Schmitz, H (2013) Algorithms and Complexity of Student Sectioning for Existing Timetables, 218--229 (Full Paper) (link to paper)
- Schmitz, H (2016) A complexity analysis and an algorithmic approach to student sectioning in existing timetables, 285--293 (Selected Paper) (link to paper)
(Menu for Schmitz) All papers - Full papers - Abstracts - Selected papers Schneeberger
- Schneeberger, K (2015) Variable Neighborhood Search for a Rich Production Planning Problem, 896--898 (Abstract) (link to paper)
(Menu for Schneeberger) All papers - Full papers - Abstracts - Selected papers Schnell
- Schnell, A (2013) A hybrid local search algorithm integrating an exact CP-SAT approach to solve the multi-mode resource-constrained multi-project scheduling problem, 802--806 (Full Paper) (link to paper)
(Menu for Schnell) All papers - Full papers - Abstracts - Selected papers Scholz-Reiter
- Scholz-Reiter, B (2013) A computational study of shifting bottleneck procedures for job shop total weighted tardiness scheduling problems, 437--457 (Full Paper) (link to paper)
- Scholz-Reiter, B. (2016) Configuration and the advantages of the shifting bottleneck procedure for optimizing the job shop total weighted tardiness scheduling problem, 429--452 (Selected Paper) (link to paper)
(Menu for Scholz-Reiter) All papers - Full papers - Abstracts - Selected papers Schulte
- Schulte, J (2017) Evolutionary Bilevel Approach for Integrated Long-Term Staffing and Scheduling, 144--157 (Full Paper) (link to paper)
(Menu for Schulte) All papers - Full papers - Abstracts - Selected papers Schultmann
- Schultmann, F (2015) Robust multi-mode resource constrained project scheduling of building deconstruction under uncertainty, 638--644 (Abstract) (link to paper)
(Menu for Schultmann) All papers - Full papers - Abstracts - Selected papers Schutten
- Schutten, J. M. J (2009) Time-constrained project scheduling with adjacent resources, 761--763 (Abstract) (link to paper)
(Menu for Schutten) All papers - Full papers - Abstracts - Selected papers Schwarzfischer
- Schwarzfischer, T (2003) Using Value Dependencies to Schedule Complex Soft-Real-Time Applications with Precedence Constraints, 92--113 (Full Paper) (link to paper)
(Menu for Schwarzfischer) All papers - Full papers - Abstracts - Selected papers Schwiegelshohn
- Schwiegelshohn, U (2007) Scheduling Tests on Vehicle Prototypes using Constraint Programming, 336--343 (Full Paper) (link to paper)
- Schwiegelshohn, U (2009) An Owner-centric Metric for the Evaluation of Online Job Schedules, 557--569 (Full Paper) (link to paper)
- Schwiegelshohn, U (2011) A system-centric metric for the evaluation of online job schedules, 571--581 (Selected Paper) (link to paper)
(Menu for Schwiegelshohn) All papers - Full papers - Abstracts - Selected papers Schwindt
- Schwindt, C (2007) Large-Scale Short-Term Planning in Chemical Batch Production, 490--497 (Full Paper) (link to paper)
- Schwindt, C (2009) A cyclic approach to large-scale short-term planning in chemical batch production, 595--606 (Selected Paper) (link to paper)
(Menu for Schwindt) All papers - Full papers - Abstracts - Selected papers Schäfer
- Schäfer, T (2011) Decomposition approaches for multi-stage multi-product batch-production scheduling: a re ned batching model, 596--598 (Abstract) (link to paper)
(Menu for Schäfer) All papers - Full papers - Abstracts - Selected papers Scott
- Scott, S (2011) Ring Out the Bells, 624--627 (Abstract) (link to paper)
(Menu for Scott) All papers - Full papers - Abstracts - Selected papers Seddik
- Seddik, Y (2011) Single machine scheduling with delivery dates and cumulative payoffs, 261--274 (Full Paper) (link to paper)
- Seddik, Y (2013) A polynomial time OPT-1 algorithm for a scheduling problem with two delivery dates and cumulative payoffs, 268--289 (Full Paper) (link to paper)
- Seddik, Y (2015) Mixed-criticality scheduling with known probabilities, 867--870 (Abstract) (link to paper)
(Menu for Seddik) All papers - Full papers - Abstracts - Selected papers Serafini
- Serafini, P (2007) A Compact Optimization Approach for Job-Shop Problems, 293--300 (Full Paper) (link to paper)
- Serafini, P (2013) Scheduling teams for aircraft ground maintenance, 649--651 (Abstract) (link to paper)
- Serafini, P (2009) On some combinatorial properties of PESP, 59--67 (Full Paper) (link to paper)
(Menu for Serafini) All papers - Full papers - Abstracts - Selected papers Sgalambro
- Sgalambro, A (2007) Optimization of the Departure Schedule at a Public Transit Terminal with Multiple Destinations, 104--111 (Full Paper) (link to paper)
(Menu for Sgalambro) All papers - Full papers - Abstracts - Selected papers Shabtay
- Shabtay, D (2015) Online and semi-online scheduling of two job types on a set of multipurpose machines, 626--628 (Abstract) (link to paper)
- Shabtay, D (2009) Bicriteria models to minimize the total weighted number of tardy jobs with convex controllable processing times and common due date assignment, 301--310 (Full Paper) (link to paper)
- Shabtay, D (2011) A bicriteria approach to minimize the total weighted number of tardy jobs with convex controllable processing times and assignable due dates, 455--469 (Selected Paper) (link to paper)
- Shabtay, D (2008) The single-machine earliness-tardiness scheduling problem with due date assignment and resource-dependent processing times, 25--40 (Selected Paper) (link to paper)
- Shabtay, D (2015) The resource dependent assignment problem with a convex assignment cost function and its relation to scheduling with controllable processing times, 629--634 (Abstract) (link to paper)
- Shabtay, D (2005) The Single-machine Earliness-tardiness Scheduling Problem With Due Date Assignment And Resource-dependent Processing Times, 149--161 (Full Paper) (link to paper)
(Menu for Shabtay) All papers - Full papers - Abstracts - Selected papers Shafransky
- Shafransky, Y (2013) Two extensions of Lawler’s min-max cost algorithm, 790--794 (Abstract) (link to paper)
- Shafransky, Y. (2016) Lawler's minmax cost algorithm: optimality conditions and uncertainty, 401--408 (Selected Paper) (link to paper)
(Menu for Shafransky) All papers - Full papers - Abstracts - Selected papers Shaker
- Shaker, K (2015) Bacteria Swarm Optimisation Approach for Enrolment-Based Course Timetabling Problems, 515--525 (Full Paper) (link to paper)
(Menu for Shaker) All papers - Full papers - Abstracts - Selected papers Shang
- Shang, L (2015) A branch-and-reduce exact algorithm for the single machine total tardiness problem, 879--881 (Abstract) (link to paper)
- Shang, L (2015) An exponential dynamic programming algorithm for the 3-machine ?owshop scheduling problem to minimize the makespan, 755--758 (Abstract) (link to paper)
(Menu for Shang) All papers - Full papers - Abstracts - Selected papers Sharma
- Sharma, N (2007) Assigning Part-time Teachers to Courses via a Stable Marriage Algorithm, 625--627 (Abstract) (link to paper)
(Menu for Sharma) All papers - Full papers - Abstracts - Selected papers Shchepin
- Shchepin, E (2005) New Tight Np-hardness Of Preemptive Multiprocessor And Open Shop Scheduling, 606--629 (Full Paper) (link to paper)
- Shchepin, E. V (2008) On the geometry, preemptions and complexity of multiprocessor and shop scheduling, 183--213 (Selected Paper) (link to paper)
(Menu for Shchepin) All papers - Full papers - Abstracts - Selected papers Shen
- Shen, L (2013) Solving the Hybrid Job Shop Problem with Sequence Dependent Setups, 741--743 (Abstract) (link to paper)
- Shen, C-W. (2011) An insertion heuristic for coordinated zoning paratransit systems, 502--505 (Abstract) (link to paper)
- Shen, L (2015) Family Scheduling in Flow Shop Manufacturing Systems with Batch Availability, 746--749 (Abstract) (link to paper)
- Shen, L (2014) A simultaneous and iterative approach for parallel machine scheduling with sequence-dependent family setups, 471--487 (Selected Paper) (link to paper)
- Shen, L (2011) An Iterative Scheme for Parallel Machine Scheduling with Sequence Dependent Family Setups, 519--522 (Abstract) (link to paper)
(Menu for Shen) All papers - Full papers - Abstracts - Selected papers Shikata
- Shikata, Y (2015) Routing Strategy for Prioritized Limited Multi-server Processor-Sharing System that includes Servers with Various Capacities, 596--600 (Abstract) (link to paper)
(Menu for Shikata) All papers - Full papers - Abstracts - Selected papers Shufan
- Shufan, E (2015) A Fixed Route Dial-a-Ride Problem, 313--324 (Full Paper) (link to paper)
- Shufan, E (2014) A reduction approach to the two-campus transport problem, 587--599 (Selected Paper) (link to paper)
- Shufan, E (2011) A Two-Campus Transport Problem, 173--184 (Full Paper) (link to paper)
(Menu for Shufan) All papers - Full papers - Abstracts - Selected papers Sierksma
- Sierksma, G (2011) Off-shore Helicopter Routing with Asymmetric Demands and Refueling Options, 637--638 (Abstract) (link to paper)
(Menu for Sierksma) All papers - Full papers - Abstracts - Selected papers Silva
- Silva, S. do C. (2003) Reducing Job Throughput Time : Using Horizontal Scheduling and Simultaneous Manufacturing, 386--387 (Abstract) (link to paper)
- Silva, J.D. L. (2003) Making Airline Schedules More Robust, 678--695 (Full Paper) (link to paper)
- Silva, E. C. (2013) Optimal scheduling of aircrafts engines repair process, 620--623 (Abstract) (link to paper)
- Silva, S. do C. (2003) Using Tabu Search for Dynamic Scheduling: The Extended Job-Shop Scheduling Problem, 114--115 (Abstract) (link to paper)
- Silva, C. L.T.F. (2013) Local search techniques applied to the Unrelated Parallel Machine Scheduling Problem with Sequence Dependent Setup Time, 458--471 (Full Paper) (link to paper)
- Silva, S. do C. (2005) A Scheduling Web Service, 187--201 (Selected Paper) (link to paper)
- Silva, S. (2003) A Scheduling Web Service, 540--553 (Full Paper) (link to paper)
(Menu for Silva) All papers - Full papers - Abstracts - Selected papers Silva-Lugo
- Silva-Lugo, R (2011) Optimization of Scheduling for Large-Scale Logistics Tasks, 489--492 (Abstract) (link to paper)
(Menu for Silva-Lugo) All papers - Full papers - Abstracts - Selected papers Simonetti
- Simonetti, N (2005) Job Shop Scheduling with Setup Times, Deadlines and Precedence Constrainsts, 520--532 (Abstract) (link to paper)
(Menu for Simonetti) All papers - Full papers - Abstracts - Selected papers Simonin
- Simonin, G (2009) Isomorphic coupled-task scheduling problem with compatibility constraints on a single processor, 378--388 (Full Paper) (link to paper)
- Simonin, G (2011) Isomorphic coupled-task scheduling problem with compatibility constraints on a single processor, 501--509 (Selected Paper) (link to paper)
(Menu for Simonin) All papers - Full papers - Abstracts - Selected papers Simpson
- Simpson, A. R (2005) Ant Colony Optimization for Power Plant Maintenance Scheduling Optimization:A Simplified Hydro Tasmania System, 72--72 (Abstract) (link to paper)
- Simpson, A. R (2008) Ant colony optimization for power plant maintenance scheduling optimization—a five-station hydropower system, 433--450 (Selected Paper) (link to paper)
(Menu for Simpson) All papers - Full papers - Abstracts - Selected papers Singh
- Singh, R (2015) Simulation Based Cause and Effect analysis of Input Variables in Wafer Fabrication, 345--359 (Full Paper) (link to paper)
(Menu for Singh) All papers - Full papers - Abstracts - Selected papers Sioud
- Sioud, A (2013) A new ant colony optimization for minimizing tardiness in the single machine scheduling problem with sequence-dependent setups times, 17--20 (Full Paper) (link to paper)
(Menu for Sioud) All papers - Full papers - Abstracts - Selected papers Skalicky
- Skalicky, T (2009) A local approach to automated correction of violated precedence and resource constraints in manually altered schedules, 507--517 (Full Paper) (link to paper)
(Menu for Skalicky) All papers - Full papers - Abstracts - Selected papers Sledneu
- Sledneu, D (2013) Two extensions of Lawler’s min-max cost algorithm, 790--794 (Abstract) (link to paper)
- Sledneu, D. (2016) Lawler's minmax cost algorithm: optimality conditions and uncertainty, 401--408 (Selected Paper) (link to paper)
(Menu for Sledneu) All papers - Full papers - Abstracts - Selected papers Sluis
- Sluis, H.J. v. (2005) Models For Adjacent Resource Scheduling, 16--17 (Abstract) (link to paper)
- Sluis, H.J. v. (2005) On The Complexity Of Adjacent Resource Scheduling, 653--654 (Abstract) (link to paper)
(Menu for Sluis) All papers - Full papers - Abstracts - Selected papers Smet
- Smet, P (2015) Variable neighbourhood search for rich personnel rostering problems, 928--930 (Abstract) (link to paper)
- Smet, P (2013) A heuristic approach to an integrated personnel rostering and task assignment problem, 664--666 (Abstract) (link to paper)
- Smet, P (2017) Integer programming for home care scheduling with flexible task frequency and controllable processing times, 121--132 (Full Paper) (link to paper)
- Smet, P (2011) Automated scheduling at a joinery site, 549--552 (Abstract) (link to paper)
- Smet, P. (2016) The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 271--283 (Selected Paper) (link to paper)
(Menu for Smet) All papers - Full papers - Abstracts - Selected papers Smith
- Smith, S. F (2007) Analyzing Basic Representation Choices in Oversubscribed Scheduling Problems, 259--266 (Full Paper) (link to paper)
- Smith, S. F (2003) Is Scheduling a Solved Problem?, 11--20 (Full Paper) (link to paper)
- Smith, S. F (2005) Is Scheduling a Solved Problem?, 3--17 (Selected Paper) (link to paper)
(Menu for Smith) All papers - Full papers - Abstracts - Selected papers Smith-Miles
- Smith-Miles, K (2017) Symmetry breaking in a special case of the RCPSP/max, 315--318 (Abstract) (link to paper)
(Menu for Smith-Miles) All papers - Full papers - Abstracts - Selected papers Smriglio
- Smriglio, S (2003) Scheduling Commands on Satellite Constellation, 598--601 (Abstract) (link to paper)
(Menu for Smriglio) All papers - Full papers - Abstracts - Selected papers Soares
- Soares, J.A (2015) LAHC applied to The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 905--908 (Abstract) (link to paper)
- Soares, J.A (2013) An Integer Programming Approach for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 840--847 (Full Paper) (link to paper)
- Soares, J. A (2016) An integer programming approach to the multimode resource-constrained multiproject scheduling problem, 295--307 (Selected Paper) (link to paper)
(Menu for Soares) All papers - Full papers - Abstracts - Selected papers Soghier
- Soghier, A (2009) Adaptive Selection of Heuristics within a GRASP for Exam Timetabling Problems, 409--423 (Full Paper) (link to paper)
(Menu for Soghier) All papers - Full papers - Abstracts - Selected papers Solis
- Solis, Y. A. R. (2005) Large Neighborhood For A Parallel Scheduling Problem With Earlinesstardiness Penalties And A Common Due Date, 169--184 (Full Paper) (link to paper)
(Menu for Solis) All papers - Full papers - Abstracts - Selected papers Sologub
- Sologub, A. (2015) Three approaches to solving the problem of cosmonauts’ training planning, 750--754 (Abstract) (link to paper)
(Menu for Sologub) All papers - Full papers - Abstracts - Selected papers Sorel
- Sorel, Y (2008) Periodic real-time scheduling: from deadline-based model to latency-based model, 41--51 (Selected Paper) (link to paper)
- Sorel, Y (2005) Periodic real-time scheduling:from latency-based model to deadline-based model, 344--352 (Full Paper) (link to paper)
- Sorel, Y (2009) Schedulability Analysis for non Necessarily Harmonic Real-Time Systems with Precedence and Strict Periodicity Constraints using the Exact Number of Preemptions and no Idle Time, 843--851 (Abstract) (link to paper)
(Menu for Sorel) All papers - Full papers - Abstracts - Selected papers Soriano
- Soriano, P (2003) A Tabu Search Heuristic to Generate Shift Schedules, 526--527 (Abstract) (link to paper)
(Menu for Soriano) All papers - Full papers - Abstracts - Selected papers Soto
- Soto, I (2011) SDP Relaxations for Two Stage OFDMA Networks with and without Probabilistic Constraints, 445--458 (Full Paper) (link to paper)
- Soto, I (2013) Scheduling in Wireless OFDMA-TDMA Networks using Variable Neighborhood Search Metaheuristic, 55--64 (Full Paper) (link to paper)
(Menu for Soto) All papers - Full papers - Abstracts - Selected papers Soubeiga
- Soubeiga, E (2003) A Pheromone-based Look-ahead Hyper-heuristic for Time-tabling Problems, 174--179 (Abstract) (link to paper)
- Soubeiga, E (2003) Scheduling Nurses Using a Tabu-Search Hyperheuristic, 197--219 (Full Paper) (link to paper)
(Menu for Soubeiga) All papers - Full papers - Abstracts - Selected papers Souhkal
- Souhkal, A (2005) Complexity Results For Parallel Machine Scheduling Problems With A Server In Computer Systems, 232--236 (Abstract) (link to paper)
(Menu for Souhkal) All papers - Full papers - Abstracts - Selected papers Soukhal
- Soukhal, A (2011) Sort & Search exponential-time algorithms for scheduling problems, 523--528 (Abstract) (link to paper)
- Soukhal, A (2007) Single Machine and Parallel Machine Scheduling Problems with a Common Due Date to Minimize Total Weighted Tardiness, 498--505 (Full Paper) (link to paper)
- Soukhal, A (2017) Fixed jobs scheduling on a single machine with renewable resources, 084--092 (Full Paper) (link to paper)
(Menu for Soukhal) All papers - Full papers - Abstracts - Selected papers Soumis
- Soumis, F (2015) An integrated simultaneous approach for pilots and copilots re-scheduling problem, 943--945 (Abstract) (link to paper)
(Menu for Soumis) All papers - Full papers - Abstracts - Selected papers Sourd
- Sourd, F (2009) Preface, 563--564 (Selected Paper) (link to paper)
- Sourd, F (2007) Selecting and Scheduling Tasks with Agreeable Time Windows and Setup Costs, 561--563 (Abstract) (link to paper)
- Sourd, F (2005) The Single Machine Just-in-time Scheduling Problem With Preemptions, 140--148 (Full Paper) (link to paper)
- Sourd, F (2005) Large Neighborhood For A Parallel Scheduling Problem With Earlinesstardiness Penalties And A Common Due Date, 169--184 (Full Paper) (link to paper)
(Menu for Sourd) All papers - Full papers - Abstracts - Selected papers Speranza
- Speranza, M. G. (2007) Semi On-Line Scheduling on Two Uniform Processors, 51--58 (Full Paper) (link to paper)
(Menu for Speranza) All papers - Full papers - Abstracts - Selected papers Spieksma
- Spieksma, F.C.R (2013) Solving a time-indexed formulation by preprocessing and cutting planes, 603--605 (Abstract) (link to paper)
- Spieksma, F. C .R (2009) Soccer schedules in Europe: an overview, 715--717 (Abstract) (link to paper)
- Spieksma, F. C. R (2013) Scheduling round robin tournaments for amateur sport leagues, 596--598 (Abstract) (link to paper)
- Spieksma, F. C.R (2007) Interval Scheduling, 33--40 (Full Paper) (link to paper)
(Menu for Spieksma) All papers - Full papers - Abstracts - Selected papers Sriskandarajah
- Sriskandarajah, C (2005) Approximations to Optimal k-unit Cycles for Dual Gripper Robot Cells, 326--326 (Abstract) (link to paper)
(Menu for Sriskandarajah) All papers - Full papers - Abstracts - Selected papers Srour
- Srour, A (2017) Evolving Adaptive Evolutionary Algorithms, 070--083 (Full Paper) (link to paper)
(Menu for Srour) All papers - Full papers - Abstracts - Selected papers Steffy
- Steffy, D (2015) Scheduling a conference to minimize attendee preference Conflicts, 379--392 (Full Paper) (link to paper)
(Menu for Steffy) All papers - Full papers - Abstracts - Selected papers Steiner
- Steiner, G (2009) Strong-Weak Precedence in Scheduling: Extended Order Implications, 28--42 (Full Paper) (link to paper)
- Steiner, G (2009) Bicriteria models to minimize the total weighted number of tardy jobs with convex controllable processing times and common due date assignment, 301--310 (Full Paper) (link to paper)
- Steiner, G (2011) A bicriteria approach to minimize the total weighted number of tardy jobs with convex controllable processing times and assignable due dates, 455--469 (Selected Paper) (link to paper)
- Steiner, G (2008) The single-machine earliness-tardiness scheduling problem with due date assignment and resource-dependent processing times, 25--40 (Selected Paper) (link to paper)
- Steiner, G (2005) The Single-machine Earliness-tardiness Scheduling Problem With Due Date Assignment And Resource-dependent Processing Times, 149--161 (Full Paper) (link to paper)
- Steiner, G (2007) Minimizing the Total Weighted Number of Late Jobs with Late Deliveries in Two-Level Supply Chains, 447--454 (Full Paper) (link to paper)
- Steiner, G (2009) Approximation algorithms for minimizing the total weighted number of late jobs with late deliveries in two-level supply chains, 565--574 (Selected Paper) (link to paper)
(Menu for Steiner) All papers - Full papers - Abstracts - Selected papers Steinhöfel
- Steinhöfel, K (2011) Low Energy Scheduling with Power Heterogeneous Multiprocessor Systems, 297--307 (Full Paper) (link to paper)
(Menu for Steinhöfel) All papers - Full papers - Abstracts - Selected papers Sterna
- Sterna, M (2009) Simulated Annealing Method for Maximizing Revenue on Parallel Machines, 699--701 (Abstract) (link to paper)
- Sterna, M (2007) Genetic Algorithm for Late Work Minimization in a Flow Shop System, 455--462 (Full Paper) (link to paper)
- Sterna, M (2009) Scheduling policy for on-line translation service, 266--276 (Full Paper) (link to paper)
(Menu for Sterna) All papers - Full papers - Abstracts - Selected papers Stidsen
- Stidsen, T.R (2015) Flow Formulation-based Model for the Curriculum-based Course Timetabling Problem, 825--848 (Abstract) (link to paper)
- Stidsen, T.R (2013) Student Sectioning at High Schools in Denmark, 628--632 (Abstract) (link to paper)
- Stidsen, T. R (2015) A Matheuristic for Curriculum-Based Course Timetabling, 606--610 (Abstract) (link to paper)
(Menu for Stidsen) All papers - Full papers - Abstracts - Selected papers Stockwell-Alpert
- Stockwell-Alpert, E (2015) Fairness in employee scheduling, 687--698 (Abstract) (link to paper)
(Menu for Stockwell-Alpert) All papers - Full papers - Abstracts - Selected papers Stolp
- Stolp, S (2008) Ant colony optimization for power plant maintenance scheduling optimization—a five-station hydropower system, 433--450 (Selected Paper) (link to paper)
(Menu for Stolp) All papers - Full papers - Abstracts - Selected papers Stromberg
- Stromberg, A-B. (2015) Scheduling optimization of a real flexible job shop including side constraints regarding maintenance, ?xtures, and night shifts, 78--101 (Full Paper) (link to paper)
(Menu for Stromberg) All papers - Full papers - Abstracts - Selected papers Strusevich
- Strusevich, V (2013) Fast Approximation Schemes for Boolean Programming and Scheduling Problems Related to Positive Convex Half-Product, 577--579 (Abstract) (link to paper)
(Menu for Strusevich) All papers - Full papers - Abstracts - Selected papers Stutzle
- Stutzle, T (2013) Automatic Design of a Hybrid Iterated Local Search for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 820--825 (Full Paper) (link to paper)
(Menu for Stutzle) All papers - Full papers - Abstracts - Selected papers Stølevik
- Stølevik, M (2011) A Framework for Implementation-Oriented Staff Scheduling, 308--321 (Full Paper) (link to paper)
(Menu for Stølevik) All papers - Full papers - Abstracts - Selected papers Subramanian
- Subramanian, A (2017) On the exact solution of a large class of parallel machine scheduling problems, 325--328 (Abstract) (link to paper)
(Menu for Subramanian) All papers - Full papers - Abstracts - Selected papers Sucha
- Sucha, P (2011) A Parallel Approach for a Nurse Rerostering Problem on the GPU, 576--578 (Abstract) (link to paper)
- Sucha, P (2013) Solving a cooperative project scheduling with controllable processing times, self-interested agents and equal profit sharing, 125--132 (Full Paper) (link to paper)
- Sucha, P (2015) A new lower bound for optimisation of energy consumption of robotic cells, 662--665 (Abstract) (link to paper)
- Sucha, P (2011) Minimizing Total Weighted Tardiness and Total Processing Costs for the Scheduling with Alternative Process Plans, 561--563 (Abstract) (link to paper)
- Sucha, P (2009) Time Symmetry of Project Scheduling with Time Windows and Take-give Resources, 239--253 (Full Paper) (link to paper)
- Sucha, P (2017) Efficient algorithms for non-preemptive mixed-criticality match-up scheduling problem, 377--379 (Abstract) (link to paper)
- Sucha, P (2015) Nurse Rostering Problem: Tighter Upper Bound for Pricing Problem in Branch and Price Approach, 759--763 (Abstract) (link to paper)
- Sucha, P (2007) Cyclic Scheduling of Tasks with Unit Processing Time on Dedicated Sets of Parallel Identical Processors, 463--470 (Full Paper) (link to paper)
- Sucha, P (2011) Flow Shop Scheduling on GPU, 532--535 (Abstract) (link to paper)
(Menu for Sucha) All papers - Full papers - Abstracts - Selected papers Sucu
- Sucu, S (2015) Modeling Uncertainty in Vessel Crew Scheduling, 805--808 (Abstract) (link to paper)
(Menu for Sucu) All papers - Full papers - Abstracts - Selected papers Sugiyama
- Sugiyama, T (2013) Bilevel Decomposition Approach for Cyclic Staff Scheduling Problems, 65--79 (Full Paper) (link to paper)
(Menu for Sugiyama) All papers - Full papers - Abstracts - Selected papers Suleman
- Suleman, M.O (2003) Making Airline Schedules More Robust, 678--695 (Full Paper) (link to paper)
- Suleman, M. O (2005) Measuring the Robustness of Airline Fleet Schedules, 381--392 (Selected Paper) (link to paper)
(Menu for Suleman) All papers - Full papers - Abstracts - Selected papers Sumbera
- Sumbera, M (2015) Model for planning of distributed data production, 699--703 (Abstract) (link to paper)
- Sumbera, M (2009) Planning Heuristics for Efficient Data Movement on the Grid, 768--771 (Abstract) (link to paper)
(Menu for Sumbera) All papers - Full papers - Abstracts - Selected papers Sun
- Sun, Y (2011) Job Scheduling to Minimize Weighted Completion Time Variance on Identical Parallel Machines, 546--548 (Abstract) (link to paper)
(Menu for Sun) All papers - Full papers - Abstracts - Selected papers Sung
- Sung, C.S (2005) Single Machine Product Scheduling With Outsourcing Allowed., 340--340 (Abstract) (link to paper)
(Menu for Sung) All papers - Full papers - Abstracts - Selected papers Svancara
- Svancara, J. (2017) Scheduling Models for Multi-Agent Path Finding, 189--200 (Full Paper) (link to paper)
(Menu for Svancara) All papers - Full papers - Abstracts - Selected papers Sviridenko
- Sviridenko, M (2005) Improved Approximation Algorithms For Broadcast Scheduling, 655--656 (Abstract) (link to paper)
- Sviridenko, M. (2005) Algorithms for online buffer management, 518--518 (Abstract) (link to paper)
(Menu for Sviridenko) All papers - Full papers - Abstracts - Selected papers Sy
- Sy, C.L (2017) A Robust Crew Pairing Model for Airline Operations using Crew Swaps and Slack Times, 103--120 (Full Paper) (link to paper)
- Sy, C. L (2011) Robust Target Achievement for Decision-Making with Application to Workforce-Inventory Planning, 394--407 (Full Paper) (link to paper)
- Sy, C. (2014) A resilience optimization approach for workforce-inventory control dynamics under uncertainty, 427--444 (Selected Paper) (link to paper)
(Menu for Sy) All papers - Full papers - Abstracts - Selected papers Sys
- Sys, T (2015) Multi-objective energy-aware scheduling, 946--948 (Abstract) (link to paper)
(Menu for Sys) All papers - Full papers - Abstracts - Selected papers Szczerbicka
- Szczerbicka, H (2007) Evaluating Online Scheduling Techniques in Uncertain Environments, 471--479 (Full Paper) (link to paper)
(Menu for Szczerbicka) All papers - Full papers - Abstracts - Selected papers Sánchez
- Sánchez, A (2003) A Software Pipelining Method Based on a Hierarchical Social Algorithm, 382--385 (Abstract) (link to paper)
(Menu for Sánchez) All papers - Full papers - Abstracts - Selected papers Sørensen
- Sørensen, M (2015) Flow Formulation-based Model for the Curriculum-based Course Timetabling Problem, 825--848 (Abstract) (link to paper)
- Sørensen, M (2015) A Matheuristic for Curriculum-Based Course Timetabling, 606--610 (Abstract) (link to paper)
(Menu for Sørensen) All papers - Full papers - Abstracts - Selected papers T'kindt
- T'kindt, V (2013) Evacuation Scheduling of a Town after a Natural Disaster: Time-indexed Formulations, 680--683 (Abstract) (link to paper)
- T'kindt, V. (2016) Scheduling evacuation operations, 467--478 (Selected Paper) (link to paper)
- T'kindt, V (2009) Scheduling two interfering job sets on uniform parallel machines with makespan and cost functions, 645--654 (Full Paper) (link to paper)
(Menu for T'kindt) All papers - Full papers - Abstracts - Selected papers Tamssaouet
- Tamssaouet, K (2017) A Batch-oblivious Approach For Scheduling Complex Job-Shops with Batching Machines: From Non-delay to Active Scheduling, 340--343 (Abstract) (link to paper)
(Menu for Tamssaouet) All papers - Full papers - Abstracts - Selected papers Tan
- Tan, Y (2013) A computational study of shifting bottleneck procedures for job shop total weighted tardiness scheduling problems, 437--457 (Full Paper) (link to paper)
- Tan, Yi (2016) Configuration and the advantages of the shifting bottleneck procedure for optimizing the job shop total weighted tardiness scheduling problem, 429--452 (Selected Paper) (link to paper)
- Tan, Y (2015) Scheduling Jobs in a Two-Stage Flexible Flow Shop with Batch Processing Machines, 801--804 (Abstract) (link to paper)
(Menu for Tan) All papers - Full papers - Abstracts - Selected papers Tanaka
- Tanaka, S (2015) The two-machine flowshop total completion time problem: A branch-and-bound based on Network-flow formulation, 635--637 (Abstract) (link to paper)
- Tanaka, S (2007) An Exact Algorithm for Single-Machine Scheduling without Idle Time, 614--617 (Abstract) (link to paper)
- Tanaka, S (2013) The single-machine scheduling problem with a finite capacity input buffer, 171--184 (Full Paper) (link to paper)
- Tanaka, S (2009) An exact algorithm for single-machine scheduling without machine idle time, 575--593 (Selected Paper) (link to paper)
- Tanaka, S (2009) An exact algorithm for the precedence-constrained single-machine scheduling problem, 216--226 (Full Paper) (link to paper)
(Menu for Tanaka) All papers - Full papers - Abstracts - Selected papers Tang
- Tang, L (2003) A Lagrangian Relaxation Method for Hybrid Flow-Shop Scheduling with Multiprocessor Tasks to Minimize Total Weighted Completion Time, 638--655 (Full Paper) (link to paper)
(Menu for Tang) All papers - Full papers - Abstracts - Selected papers Tanimizu
- Tanimizu, Y (2017) An Integrated Optimization of Dynamic Product Family Configuration and Supply Chain Configuration, 336--339 (Abstract) (link to paper)
(Menu for Tanimizu) All papers - Full papers - Abstracts - Selected papers Tanrisever
- Tanrisever, F (2005) Forming And Scheduling Jobs With Order Weights In Semiconductor Manufacturing, 334--334 (Abstract) (link to paper)
- Tanrisever, F (2008) Forming and scheduling jobs with capacitated containers in semiconductor manufacturing: Single machine problem, 5--24 (Selected Paper) (link to paper)
(Menu for Tanrisever) All papers - Full papers - Abstracts - Selected papers Tarasevich
- Tarasevich, A. A (2005) Heuristic Approaches To A Common Due Date Earliness-tardiness Scheduling Problem, 132--139 (Full Paper) (link to paper)
(Menu for Tarasevich) All papers - Full papers - Abstracts - Selected papers Tavakkoli-Moghaddam
- Tavakkoli-Moghaddam, R (2015) Cross-training performance of nurse scheduling with the learning effect, 296--312 (Full Paper) (link to paper)
(Menu for Tavakkoli-Moghaddam) All papers - Full papers - Abstracts - Selected papers Tayur
- Tayur, S (2005) Scheduling Multiple Types of Time-Shared Aircraft: Models and Methods for Practice, 19--38 (Full Paper) (link to paper)
- Tayur, S (2008) Aircraft and crew scheduling for fractional ownership programs, 415--431 (Selected Paper) (link to paper)
(Menu for Tayur) All papers - Full papers - Abstracts - Selected papers Tchernev
- Tchernev, N (2015) An Optimization Framework for Job-shop with Energy Threshold Issue With consideration of machining operations with consumption peaks, 118--133 (Full Paper) (link to paper)
- Tchernev, N (2007) A Disjunctive Graph for the Job-Shop with Several Robots, 285--292 (Full Paper) (link to paper)
(Menu for Tchernev) All papers - Full papers - Abstracts - Selected papers Tchikou
- Tchikou, H (2007) Scheduling with Special Case of Multipurpose Machines, 88--95 (Full Paper) (link to paper)
(Menu for Tchikou) All papers - Full papers - Abstracts - Selected papers Tchomt´e
- Tchomt´e, S. K. (2007) Solving Resource-Constrained Project Scheduling Problem with Particle Swarm Optimization, 251--258 (Full Paper) (link to paper)
(Menu for Tchomt´e) All papers - Full papers - Abstracts - Selected papers Tereso
- Tereso, A. P. (2013) Scheduling with MS Project: an add-in, 707--710 (Abstract) (link to paper)
(Menu for Tereso) All papers - Full papers - Abstracts - Selected papers Tezel
- Tezel, B (2011) Minimizing Value-at-Risk in the Single-Machine Total Weighted Tardiness Problem, 215--229 (Full Paper) (link to paper)
(Menu for Tezel) All papers - Full papers - Abstracts - Selected papers Thanos
- Thanos, E (2017) Scheduling container transportation through conflict-free trajectories in a warehouse layout: A local search approach, 330--335 (Abstract) (link to paper)
(Menu for Thanos) All papers - Full papers - Abstracts - Selected papers Theodoridis
- Theodoridis, G (2017) Exploration of Logic-Based Benders Decomposition Approach for Mapping Applications on Heterogeneous Multi-Core Platforms, 030--042 (Full Paper) (link to paper)
(Menu for Theodoridis) All papers - Full papers - Abstracts - Selected papers Thomas
- Thomas, M (2007) Evaluating Online Scheduling Techniques in Uncertain Environments, 471--479 (Full Paper) (link to paper)
(Menu for Thomas) All papers - Full papers - Abstracts - Selected papers Thompson
- Thompson, J (2009) Round-robin Sports Scheduling from a Graph Colouring Perspective: A Case Study in Rugby Union Scheduling, 718--719 (Abstract) (link to paper)
- Thompson, J (2011) An Exact and Heuristic Hybrid for Solving a Medical Student Scheduling Problem, 584--586 (Abstract) (link to paper)
(Menu for Thompson) All papers - Full papers - Abstracts - Selected papers Thornblad
- Thornblad, K (2015) Scheduling optimization of a real flexible job shop including side constraints regarding maintenance, ?xtures, and night shifts, 78--101 (Full Paper) (link to paper)
(Menu for Thornblad) All papers - Full papers - Abstracts - Selected papers Tiwari
- Tiwari, A (2015) Investigating Scheduling models for Power Plant Preventive Maintenance using Genetic Algorithm, 591--595 (Abstract) (link to paper)
(Menu for Tiwari) All papers - Full papers - Abstracts - Selected papers To?olo
- To?olo, T. A.M (2013) Late Acceptance Hill-Climbing Applied to the High School Timetabling Problem, 331--344 (Full Paper) (link to paper)
- To?olo, T. A.M (2013) Local search techniques applied to the Unrelated Parallel Machine Scheduling Problem with Sequence Dependent Setup Time, 458--471 (Full Paper) (link to paper)
- To?olo, T.A.M (2015) LAHC applied to The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 905--908 (Abstract) (link to paper)
- To?olo, T. A.M (2013) An Integer Programming Approach for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 840--847 (Full Paper) (link to paper)
- To?olo, T.A M (2015) Time-based Decomposition Strategies for the Traveling Umpire Problem, 918--920 (Abstract) (link to paper)
(Menu for To?olo) All papers - Full papers - Abstracts - Selected papers Toffolo
- Toffolo, T.A.M (2017) Integer programming for home care scheduling with flexible task frequency and controllable processing times, 121--132 (Full Paper) (link to paper)
- Toffolo, T. A. M (2016) An integer programming approach to the multimode resource-constrained multiproject scheduling problem, 295--307 (Selected Paper) (link to paper)
(Menu for Toffolo) All papers - Full papers - Abstracts - Selected papers Torres
- Torres, S (2003) Masplan: A Multi-Agent System for Automated Planning and Scheduling in a University Research Group Scenario, 42--55 (Full Paper) (link to paper)
(Menu for Torres) All papers - Full papers - Abstracts - Selected papers Touati
- Touati, S-A. (2007) Optimal and Approximate Periodic Task Scheduling with Storage Requirement Minimization, 480--489 (Full Paper) (link to paper)
(Menu for Touati) All papers - Full papers - Abstracts - Selected papers Toussaint
- Toussaint, H (2015) Reliability Oriented DARP Models Involving Autonomous Vehicles, 218--235 (Full Paper) (link to paper)
- Toussaint, H (2013) RCPSP with Resource Transfers and Money Management, 91--110 (Full Paper) (link to paper)
(Menu for Toussaint) All papers - Full papers - Abstracts - Selected papers Tran
- Tran, T. H. (2011) A water-flow algorithm for flexible flow shop scheduling with intermediate buffers, 483--500 (Selected Paper) (link to paper)
- Tran, T. T (2015) Resource-Aware Scheduling for Data Centers with Heterogenous Servers, 240--259 (Full Paper) (link to paper)
(Menu for Tran) All papers - Full papers - Abstracts - Selected papers Trautmann
- Trautmann, N (2011) Minimizing changeover times of a make-and-pack production process: model and case study, 539--541 (Abstract) (link to paper)
- Trautmann, N (2011) An MILP-approach to the optimization of event-bus schedules: a scheduling application in the tourism sector, 137--145 (Full Paper) (link to paper)
- Trautmann, N (2014) A mixed-integer linear programming approach to the optimization of event-bus schedules: a scheduling application in the tourism sector, 621--629 (Selected Paper) (link to paper)
- Trautmann, N (2011) Decomposition approaches for multi-stage multi-product batch-production scheduling: a re ned batching model, 596--598 (Abstract) (link to paper)
- Trautmann, N (2007) Large-Scale Short-Term Planning in Chemical Batch Production, 490--497 (Full Paper) (link to paper)
- Trautmann, N (2009) A cyclic approach to large-scale short-term planning in chemical batch production, 595--606 (Selected Paper) (link to paper)
- Trautmann, N (2015) A list-scheduling approach for the planning of assessment centers, 541--554 (Full Paper) (link to paper)
(Menu for Trautmann) All papers - Full papers - Abstracts - Selected papers Trietsch
- Trietsch, D (2009) Three Heuristic Procedures for the Stochastic Flow Shop Problem, 330--340 (Full Paper) (link to paper)
- Trietsch, D (2011) Three heuristic procedures for the stochastic, two-machine flow shop problem, 445--454 (Selected Paper) (link to paper)
(Menu for Trietsch) All papers - Full papers - Abstracts - Selected papers Triki
- Triki, C (2015) Integrated production and outbound distribution scheduling problem with setup times and delivery time windows, 174--188 (Full Paper) (link to paper)
(Menu for Triki) All papers - Full papers - Abstracts - Selected papers Trung
- Trung, H.T (2017) Balanced clustering based decomposition applied to Master thesis defense timetabling problem, 214--228 (Full Paper) (link to paper)
(Menu for Trung) All papers - Full papers - Abstracts - Selected papers Trystram
- Trystram, D. (2013) Dual Discounting Functions for Internet Shopping Optimization Problem, 667--669 (Abstract) (link to paper)
- Trystram, D. (2016) Novel dual discounting functions for the Internet shopping optimization problem: new algorithms, 245--255 (Selected Paper) (link to paper)
(Menu for Trystram) All papers - Full papers - Abstracts - Selected papers Tsang
- Tsang, E (2009) Empowerment-based Workforce Scheduling Problem, 130--144 (Full Paper) (link to paper)
- Tsang, E. P.K (2011) Empowerment scheduling for a field workforce, 639--654 (Selected Paper) (link to paper)
- Tsang, E. P. K (2005) Applying The Extended Network Simplex Algorithm To Dynamic Automated Guided Vehicle Scheduling, 677--692 (Full Paper) (link to paper)
- Tsang, E.P.K (2005) Retractable Contract Network for Distributed Scheduling, 485--500 (Full Paper) (link to paper)
(Menu for Tsang) All papers - Full papers - Abstracts - Selected papers Tsuboi
- Tsuboi, T (2017) An Integrated Optimization of Dynamic Product Family Configuration and Supply Chain Configuration, 336--339 (Abstract) (link to paper)
(Menu for Tsuboi) All papers - Full papers - Abstracts - Selected papers Tuong
- Tuong, N. H. (2007) Single Machine and Parallel Machine Scheduling Problems with a Common Due Date to Minimize Total Weighted Tardiness, 498--505 (Full Paper) (link to paper)
(Menu for Tuong) All papers - Full papers - Abstracts - Selected papers Turabieh
- Turabieh, H (2009) An Investigation of a Genetic Algorithm and Sequential Local Search Approach for Curriculum-based Course Timetabling Problems, 727--731 (Abstract) (link to paper)
(Menu for Turabieh) All papers - Full papers - Abstracts - Selected papers Turetsky
- Turetsky, V (2015) Optimal schedule of a statistical process control with a nonlinear expected loss, 42--54 (Full Paper) (link to paper)
(Menu for Turetsky) All papers - Full papers - Abstracts - Selected papers Turky
- Turky, A. M (2013) An Evolutionary Hill Climbing Algorithm for Dynamic Optimisation Problems, 795--799 (Abstract) (link to paper)
(Menu for Turky) All papers - Full papers - Abstracts - Selected papers Tuza
- Tuza, Z (2007) Semi On-Line Scheduling on Two Uniform Processors, 51--58 (Full Paper) (link to paper)
(Menu for Tuza) All papers - Full papers - Abstracts - Selected papers T’Kindt
- T’Kindt, V (2013) Solving a time-indexed formulation by preprocessing and cutting planes, 603--605 (Abstract) (link to paper)
- T’Kindt, V (2015) An exponential dynamic programming algorithm for the 3-machine ?owshop scheduling problem to minimize the makespan, 755--758 (Abstract) (link to paper)
(Menu for T’Kindt) All papers - Full papers - Abstracts - Selected papers T’kindt
- T’kindt, V (2007) Sequencing a Single Machine with Due Dates and Deadlines: an ILP-based Approach to Solve Very Large Instances, 71--79 (Full Paper) (link to paper)
- T’kindt, V (2005) Enumeration Of Pareto Optima For Uniform Parallel Machine Scheduling With Two Criteria, 123--131 (Full Paper) (link to paper)
- T’kindt, V (2015) A branch-and-reduce exact algorithm for the single machine total tardiness problem, 879--881 (Abstract) (link to paper)
- T’kindt, V (2015) A Decomposition Heuristic for a Bicriteria Evacuation Scheduling Problem, 704--707 (Abstract) (link to paper)
- T’kindt, V (2011) Scheduling two agents on uniform parallel machines with makespan and cost functions, 471--481 (Selected Paper) (link to paper)
- T’kindt, V (2003) Just-in-time Scheduling of a 2-Machine Flowshop Problem with Lot-streaming, 473--475 (Abstract) (link to paper)
- T’kindt, V (2011) Sort & Search exponential-time algorithms for scheduling problems, 523--528 (Abstract) (link to paper)
(Menu for T’kindt) All papers - Full papers - Abstracts - Selected papers Uchoa
- Uchoa, E (2017) On the exact solution of a large class of parallel machine scheduling problems, 325--328 (Abstract) (link to paper)
(Menu for Uchoa) All papers - Full papers - Abstracts - Selected papers Uchronski
- Uchronski, M. (2009) Scatter search for a weighted tardiness flow shop problem, 702--705 (Abstract) (link to paper)
(Menu for Uchronski) All papers - Full papers - Abstracts - Selected papers Uhlig
- Uhlig, T (2011) A Multi Species Evolutionary Algorithm for Tool Group Scheduling in Semiconductor Manufacturing, 459--468 (Full Paper) (link to paper)
(Menu for Uhlig) All papers - Full papers - Abstracts - Selected papers Urli
- Urli, T. (2013) A simulated annealing approach to the curriculum-based course timetabling problem, 314--317 (Full Paper) (link to paper)
(Menu for Urli) All papers - Full papers - Abstracts - Selected papers Urosevic
- Urosevic, D (2015) Scheduling preventive railway maintenance activities with resource constraints, 782--784 (Abstract) (link to paper)
(Menu for Urosevic) All papers - Full papers - Abstracts - Selected papers Urrutia
- Urrutia, S (2007) Scheduling Single Round Robin Tournaments with Fixed Venues, 431--438 (Full Paper) (link to paper)
- Urrutia, S (2009) The traveling tournament problem with predefined venues, 607--622 (Selected Paper) (link to paper)
- Urrutia, S (2011) A GRASP Heuristic to the Extended Car Sequencing Problem, 366--373 (Full Paper) (link to paper)
(Menu for Urrutia) All papers - Full papers - Abstracts - Selected papers Uyar
- Uyar, A. S. (2007) Memetic Algorithms and Hyperhill-climbers, 159--166 (Full Paper) (link to paper)
(Menu for Uyar) All papers - Full papers - Abstracts - Selected papers Vaandrager
- Vaandrager, F (2003) Recognizing Finite Repetitive Scheduling Patterns in Manufacturing Systems, 291--319 (Full Paper) (link to paper)
(Menu for Vaandrager) All papers - Full papers - Abstracts - Selected papers Vaclav?k
- Vaclav?k, R (2015) Nurse Rostering Problem: Tighter Upper Bound for Pricing Problem in Branch and Price Approach, 759--763 (Abstract) (link to paper)
(Menu for Vaclav?k) All papers - Full papers - Abstracts - Selected papers Vakhania
- Vakhania, N (2005) New Tight Np-hardness Of Preemptive Multiprocessor And Open Shop Scheduling, 606--629 (Full Paper) (link to paper)
- Vakhania, N (2008) On the geometry, preemptions and complexity of multiprocessor and shop scheduling, 183--213 (Selected Paper) (link to paper)
- Vakhania, N (2009) An effcient implicit enumeration for scheduling equal-length jobs with release times on a single processor to maximize throughput, 366--377 (Full Paper) (link to paper)
- Vakhania, N (2009) Scheduling jobs with release times preemptively on a single machine to minimize the number of late jobs, 389--398 (Full Paper) (link to paper)
- Vakhania, N (2011) Minimizing the maximal lateness on a single-machine: a new polynomially solvable case, 230--239 (Full Paper) (link to paper)
(Menu for Vakhania) All papers - Full papers - Abstracts - Selected papers Valero-Herrero
- Valero-Herrero, M (2013) In-depth analysis of the quality sequence to resolve CRSP, 515--527 (Full Paper) (link to paper)
(Menu for Valero-Herrero) All papers - Full papers - Abstracts - Selected papers Valhondo
- Valhondo, J. B. (2007) Sequencing JIT Mixed Model Assembly Lines Under Station-Load and Part-Usage Constraints using Lagrangean Relaxations, 550--552 (Abstract) (link to paper)
(Menu for Valhondo) All papers - Full papers - Abstracts - Selected papers Valouxis
- Valouxis, C (2013) DAG Scheduling using Integer Programming in heterogenous parallel execution environments, 392--401 (Full Paper) (link to paper)
(Menu for Valouxis) All papers - Full papers - Abstracts - Selected papers Van Hentenryck
- Van Hentenryck, P (2007) Online Stochastic Routing and Scheduling, 41--41 (Abstract) (link to paper)
(Menu for Van Hentenryck) All papers - Full papers - Abstracts - Selected papers Van Hui
- Van Hui, Y (2011) Two-Stage Shipment Planning with Uncertainties: A Stochastic Programming Approach, 602--604 (Abstract) (link to paper)
(Menu for Van Hui) All papers - Full papers - Abstracts - Selected papers Van Marcke
- Van Marcke, K (2015) Scheduling the operation of a phosphate pipeline for OCP: A Case Study, 622--625 (Abstract) (link to paper)
(Menu for Van Marcke) All papers - Full papers - Abstracts - Selected papers Van Peteghem
- Van Peteghem, V (2007) An Efficient Heuristic Procedure for the Resource Availability Cost Problem, 618--620 (Abstract) (link to paper)
(Menu for Van Peteghem) All papers - Full papers - Abstracts - Selected papers Van Vreckem
- Van Vreckem, B (2011) Case study: an effective genetic algorithm for the chemical batch production scheduling, 469--482 (Full Paper) (link to paper)
- Van Vreckem, B (2013) A Reinforcement Learning Approach to Solving Hybrid Flexible Flowline Scheduling Problems, 402--409 (Full Paper) (link to paper)
(Menu for Van Vreckem) All papers - Full papers - Abstracts - Selected papers Van de Vonder
- Van de Vonder, S (2007) A Methodology for Integrated Risk Management and Proactive Scheduling of Construction Projects, 611--613 (Abstract) (link to paper)
- Van de Vonder, S (2005) An Evaluation Of Exact And Suboptimal Procedures For Constructing Stable Project Schedules, 341--342 (Abstract) (link to paper)
(Menu for Van de Vonder) All papers - Full papers - Abstracts - Selected papers Vancroonenburg
- Vancroonenburg, W (2013) A computational study of a stock cutting problem with sequence dependent cut losses, 703--706 (Abstract) (link to paper)
- Vancroonenburg, W (2011) Automated scheduling at a joinery site, 549--552 (Abstract) (link to paper)
- Vancroonenburg, W (2013) Extending the late acceptance metaheuristic for multi-objective optimization, 652--655 (Abstract) (link to paper)
- Vancroonenburg, W. (2016) The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 271--283 (Selected Paper) (link to paper)
(Menu for Vancroonenburg) All papers - Full papers - Abstracts - Selected papers Vanden Berghe
- Vanden Berghe, G (2005) Course Timetabling Extended Tiles For University Timetabling, 669--670 (Abstract) (link to paper)
- Vanden Berghe, G (2003) Decentralised Course Timetabling in a Large Hierarchical Organisation, 60--66 (Abstract) (link to paper)
- Vanden Berghe, G (2009) A Hyperheuristic Approach to Belgian Nurse Rostering Problems, 683--689 (Abstract) (link to paper)
- Vanden Berghe, G (2005) Systems Design For Scheduling Open Tools, 40--41 (Abstract) (link to paper)
- Vanden Berghe, G (2003) Agents in Timetabling Problems, 67--73 (Abstract) (link to paper)
- Vanden Berghe, G (2013) A heuristic approach to the prisoner transportation problem, 786--789 (Abstract) (link to paper)
- Vanden Berghe, G (2015) Multi-objective energy-aware scheduling, 946--948 (Abstract) (link to paper)
- Vanden Berghe, G (2013) A computational study of a stock cutting problem with sequence dependent cut losses, 703--706 (Abstract) (link to paper)
- Vanden Berghe, G (2007) Distributed Decision Making in Hospital Wide Nurse Rostering Problems, 192--199 (Full Paper) (link to paper)
- Vanden Berghe, G (2009) A multi-agent system handling personnel shortages in hospitals, 693--695 (Abstract) (link to paper)
- Vanden Berghe, G (2013) Extended Roster Quality Staffng Problem A medium term roster quality to support staffing decisions, 424--436 (Full Paper) (link to paper)
- Vanden Berghe, G (2013) A 3-phase approach to geographically distributed exam timetabling, 725--728 (Abstract) (link to paper)
- Vanden Berghe, G (2011) A new hyper-heuristic implementation in HyFlex: a study on generality, 374--393 (Full Paper) (link to paper)
- Vanden Berghe, G (2015) Variable neighbourhood search for rich personnel rostering problems, 928--930 (Abstract) (link to paper)
- Vanden Berghe, G (2013) A heuristic approach to an integrated personnel rostering and task assignment problem, 664--666 (Abstract) (link to paper)
- Vanden Berghe, G (2017) Integer programming for home care scheduling with flexible task frequency and controllable processing times, 121--132 (Full Paper) (link to paper)
- Vanden Berghe, G (2011) Automated scheduling at a joinery site, 549--552 (Abstract) (link to paper)
- Vanden Berghe, G (2017) Scheduling container transportation through conflict-free trajectories in a warehouse layout: A local search approach, 330--335 (Abstract) (link to paper)
- Vanden Berghe, G (2015) Time-based Decomposition Strategies for the Traveling Umpire Problem, 918--920 (Abstract) (link to paper)
- Vanden Berghe, G. (2016) The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 271--283 (Selected Paper) (link to paper)
(Menu for Vanden Berghe) All papers - Full papers - Abstracts - Selected papers Vanderbeck
- Vanderbeck, F (2013) Parallel Machine Scheduling with Generalized Precedence Relations, 733--736 (Abstract) (link to paper)
- Vanderbeck, F (2007) Inventory Routing Problem Solved by Heuristic Based on Column Generation, 361--367 (Full Paper) (link to paper)
(Menu for Vanderbeck) All papers - Full papers - Abstracts - Selected papers Vanhoucke
- Vanhoucke, M (2015) A heuristic procedure for the personnel task re-scheduling problem, 666--668 (Abstract) (link to paper)
- Vanhoucke, M (2007) A Branch-and-Price Procedure for Nurse Staffing Incorporating Roster Preferences, 588--590 (Abstract) (link to paper)
- Vanhoucke, M (2009) Reactive Nurse Scheduling in Hospitals, 690--692 (Abstract) (link to paper)
- Vanhoucke, M (2005) An Electromagnetic Meta-heuristic For The Nurse Scheduling Problem, 410--411 (Abstract) (link to paper)
- Vanhoucke, M (2013) An exact procedure for an integrated project staffing problem, 673--675 (Abstract) (link to paper)
- Vanhoucke, M (2008) Comparison and hybridization of crossover operators for the nurse scheduling problem, 333--353 (Selected Paper) (link to paper)
- Vanhoucke, M (2007) An Efficient Heuristic Procedure for the Resource Availability Cost Problem, 618--620 (Abstract) (link to paper)
(Menu for Vanhoucke) All papers - Full papers - Abstracts - Selected papers Vansteenwegen
- Vansteenwegen, P (2013) An efficient metaheuristic for the inventory orienteering problem and the single-vehicle cyclic inventory routing problem, 659--663 (Abstract) (link to paper)
- Vansteenwegen, P (2013) A fast solution method for the Time-Dependent Orienteering Problem with time windows, 676--679 (Abstract) (link to paper)
(Menu for Vansteenwegen) All papers - Full papers - Abstracts - Selected papers Varadarajan
- Varadarajan, A (2005) Solving a Timetabling Problem using Benders’ Decomposition, 673--675 (Abstract) (link to paper)
(Menu for Varadarajan) All papers - Full papers - Abstracts - Selected papers Varela
- Varela, L (2005) A Scheduling Web Service, 187--201 (Selected Paper) (link to paper)
- Varela, L (2003) A Scheduling Web Service, 540--553 (Full Paper) (link to paper)
(Menu for Varela) All papers - Full papers - Abstracts - Selected papers Vazacopoulos
- Vazacopoulos, A (2005) Job Shop Scheduling with Setup Times, Deadlines and Precedence Constrainsts, 520--532 (Abstract) (link to paper)
(Menu for Vazacopoulos) All papers - Full papers - Abstracts - Selected papers Velten
- Velten, S. (2015) How to Unload Bulk Carriers Quickly? Mathematical Models to Identify Efficient Loading Patterns, 772--775 (Abstract) (link to paper)
(Menu for Velten) All papers - Full papers - Abstracts - Selected papers Verbeeck
- Verbeeck, K (2011) A new hyper-heuristic implementation in HyFlex: a study on generality, 374--393 (Full Paper) (link to paper)
- Verbeeck, C (2013) A fast solution method for the Time-Dependent Orienteering Problem with time windows, 676--679 (Abstract) (link to paper)
(Menu for Verbeeck) All papers - Full papers - Abstracts - Selected papers Verbeke
- Verbeke, B (2005) Systems Design For Scheduling Open Tools, 40--41 (Abstract) (link to paper)
(Menu for Verbeke) All papers - Full papers - Abstracts - Selected papers Vergados
- Vergados, D. J (2013) Guiding wiki crowds through resource scheduling, 753--756 (Abstract) (link to paper)
(Menu for Vergados) All papers - Full papers - Abstracts - Selected papers Verstichel
- Verstichel, J. (2016) The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 271--283 (Selected Paper) (link to paper)
(Menu for Verstichel) All papers - Full papers - Abstracts - Selected papers Vespucci
- Vespucci, M. T (2011) Deterministic and stochastic models for investment in different technologies for electricity production in the long period, 607--623 (Abstract) (link to paper)
(Menu for Vespucci) All papers - Full papers - Abstracts - Selected papers Vianna
- Vianna, D. S. (2008) A GRASP algorithm for the multi-criteria minimum spanning tree problem, 125--133 (Selected Paper) (link to paper)
(Menu for Vianna) All papers - Full papers - Abstracts - Selected papers Vidal-Carreras
- Vidal-Carreras, P.I (2013) In-depth analysis of the quality sequence to resolve CRSP, 515--527 (Full Paper) (link to paper)
(Menu for Vidal-Carreras) All papers - Full papers - Abstracts - Selected papers Vieira
- Vieira, P. S. (2008) A GRASP algorithm for the multi-criteria minimum spanning tree problem, 125--133 (Selected Paper) (link to paper)
(Menu for Vieira) All papers - Full papers - Abstracts - Selected papers Vigo
- Vigo, D (2015) Reliability Oriented DARP Models Involving Autonomous Vehicles, 218--235 (Full Paper) (link to paper)
(Menu for Vigo) All papers - Full papers - Abstracts - Selected papers Vilcot
- Vilcot, G (2003) A Genetic Algorithm for Job Shop Scheduling with Flexibility, 417--418 (Abstract) (link to paper)
(Menu for Vilcot) All papers - Full papers - Abstracts - Selected papers Virginas
- Virginas, B (2005) Retractable Contract Network for Distributed Scheduling, 485--500 (Full Paper) (link to paper)
(Menu for Virginas) All papers - Full papers - Abstracts - Selected papers Visentini
- Visentini, M. S (2014) Review of real-time vehicle schedule recovery methods in transportation services, 541--567 (Selected Paper) (link to paper)
(Menu for Visentini) All papers - Full papers - Abstracts - Selected papers Vlk
- Vlk, M (2017) Scheduling Models for Multi-Agent Path Finding, 189--200 (Full Paper) (link to paper)
- Vlk, M (2015) Resource Failure Recovery in Production Scheduling, 852--858 (Abstract) (link to paper)
- Vlk, M (2005) Multi-Criteria Soft Constraints in Timetabling, 11--15 (Abstract) (link to paper)
- Vlk, M (2017) Benders Decomposition in SMT for Rescheduling of Hierarchical Workflow, 295--310 (Full Paper) (link to paper)
(Menu for Vlk) All papers - Full papers - Abstracts - Selected papers Volk
- Volk, R (2015) Robust multi-mode resource constrained project scheduling of building deconstruction under uncertainty, 638--644 (Abstract) (link to paper)
(Menu for Volk) All papers - Full papers - Abstracts - Selected papers Voros
- Voros, N (2017) Exploration of Logic-Based Benders Decomposition Approach for Mapping Applications on Heterogeneous Multi-Core Platforms, 030--042 (Full Paper) (link to paper)
- Voros, N (2013) DAG Scheduling using Integer Programming in heterogenous parallel execution environments, 392--401 (Full Paper) (link to paper)
(Menu for Voros) All papers - Full papers - Abstracts - Selected papers Voudouris
- Voudouris, C (2007) iSchedule, an Optimisation Toolkit for Complex Scheduling, 344--352 (Full Paper) (link to paper)
- Voudouris, C (2005) Retractable Contract Network for Distributed Scheduling, 485--500 (Full Paper) (link to paper)
(Menu for Voudouris) All papers - Full papers - Abstracts - Selected papers Vázquez-Rodriguez
- Vázquez-Rodriguez, J. A (2009) HyFlex: A Flexible Framework for the Design and Analysis of Hyper-heuristics, 790--797 (Abstract) (link to paper)
(Menu for Vázquez-Rodriguez) All papers - Full papers - Abstracts - Selected papers Wachtel
- Wachtel, G (2015) Floating Patients method based on scheduling algorithm for emergency department's service improvement, 683--686 (Abstract) (link to paper)
(Menu for Wachtel) All papers - Full papers - Abstracts - Selected papers Walcarius
- Walcarius, P (2013) Modeling Real-World Vehicle Routing Problems with Dependencies, 711--713 (Abstract) (link to paper)
(Menu for Walcarius) All papers - Full papers - Abstracts - Selected papers Walker
- Walker, S (2013) New Solvable Cases of the Maximum Lateness Problem with Preemptions, 714--717 (Abstract) (link to paper)
(Menu for Walker) All papers - Full papers - Abstracts - Selected papers Wallace
- Wallace, S. W (2011) Two-Stage Shipment Planning with Uncertainties: A Stochastic Programming Approach, 602--604 (Abstract) (link to paper)
- Wallace, S. W (2011) Facility layout with random demand: A reduction to the classical deterministic QAP, 605--606 (Abstract) (link to paper)
(Menu for Wallace) All papers - Full papers - Abstracts - Selected papers Wallenius
- Wallenius, J (2007) Interactive Evolutionary Multicriteria Scheduling, 591--594 (Abstract) (link to paper)
(Menu for Wallenius) All papers - Full papers - Abstracts - Selected papers Wan
- Wan, G (2007) Competitive Agent Scheduling with Controllable Processing Times, 514--522 (Full Paper) (link to paper)
(Menu for Wan) All papers - Full papers - Abstracts - Selected papers Wang
- Wang, C (2013) Scheduling in Wireless OFDMA-TDMA Networks using Variable Neighborhood Search Metaheuristic, 55--64 (Full Paper) (link to paper)
- Wang, J (2015) Strategic Idling and Dynamic Scheduling in Open-Shop Service Network: Case Study and Analysis, 604--605 (Abstract) (link to paper)
- Wang, Y (2005) Solving a Timetabling Problem using Benders’ Decomposition, 673--675 (Abstract) (link to paper)
- Wang, G (2003) Customer Order Scheduling to Minimize Total Weighted Completion Time, 409--416 (Abstract) (link to paper)
- Wang, Z (2005) Worst-case Analysis for Queueing Service Policies, 533--535 (Abstract) (link to paper)
- Wang, Z (2008) Performance of service policies in a specialized service system with parallel servers, 451--460 (Selected Paper) (link to paper)
(Menu for Wang) All papers - Full papers - Abstracts - Selected papers Wangsom
- Wangsom, P (2017) The Application of Nondominated Sorting Genetic Algorithm (NSGA-III) for Scientific-workflow Scheduling on Cloud, 269--287 (Full Paper) (link to paper)
(Menu for Wangsom) All papers - Full papers - Abstracts - Selected papers Wanka
- Wanka, R (2013) A Decomposition of the Max-min Fair Curriculum-based Course Timetabling Problem: The Impact of Solving Subproblems to Optimality, 300--313 (Full Paper) (link to paper)
(Menu for Wanka) All papers - Full papers - Abstracts - Selected papers Warichet
- Warichet, F (2007) A Strengthened Continuous Time Formulation for the Cyclic Scheduling of a Plant, 621--624 (Abstract) (link to paper)
(Menu for Warichet) All papers - Full papers - Abstracts - Selected papers Watson
- Watson, J-P. (2003) A Dynamic Model of Tabu Search for the Job-Shop Scheduling Problem, 320--336 (Full Paper) (link to paper)
- Watson, J-P. (2005) A Dynamic Model of Tabu Search for the Job-Shop Scheduling Problem, 247--266 (Selected Paper) (link to paper)
(Menu for Watson) All papers - Full papers - Abstracts - Selected papers Wauters
- Wauters, T (2013) A heuristic approach to the prisoner transportation problem, 786--789 (Abstract) (link to paper)
- Wauters, T (2015) Multi-objective energy-aware scheduling, 946--948 (Abstract) (link to paper)
- Wauters, T (2013) A computational study of a stock cutting problem with sequence dependent cut losses, 703--706 (Abstract) (link to paper)
- Wauters, T (2013) A 3-phase approach to geographically distributed exam timetabling, 725--728 (Abstract) (link to paper)
- Wauters, T (2017) Scheduling container transportation through conflict-free trajectories in a warehouse layout: A local search approach, 330--335 (Abstract) (link to paper)
- Wauters, T (2015) Time-based Decomposition Strategies for the Traveling Umpire Problem, 918--920 (Abstract) (link to paper)
- Wauters, T (2013) Extending the late acceptance metaheuristic for multi-objective optimization, 652--655 (Abstract) (link to paper)
- Wauters, T. (2016) The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 271--283 (Selected Paper) (link to paper)
(Menu for Wauters) All papers - Full papers - Abstracts - Selected papers Weedon
- Weedon, R (2015) Optimisation of a Stagger Chart for Aviation Fleet Planning, 579--589 (Full Paper) (link to paper)
- Weedon, R (2015) Optimisation of a Stagger Chart for Aviation Fleet Planning, 952--962 (Abstract) (link to paper)
(Menu for Weedon) All papers - Full papers - Abstracts - Selected papers Weeks
- Weeks, K. O (2009) An Empirical Study of Impacts of Production Mix Efficiency, Product Route Efficiency on Operations Performance and Profitability: A Reverse Logistics Approach, 765--767 (Abstract) (link to paper)
(Menu for Weeks) All papers - Full papers - Abstracts - Selected papers Wei
- Wei, W (2013) Optimal scheduling policies for diagnosing k-out-of-n systems with imperfect tests, 624--627 (Abstract) (link to paper)
(Menu for Wei) All papers - Full papers - Abstracts - Selected papers Weil
- Weil, G (2007) Staff Rostering Problem: Choice of a Mathematical Model, 601--604 (Abstract) (link to paper)
(Menu for Weil) All papers - Full papers - Abstracts - Selected papers Weng
- Weng, F.C (2013) Tackling University Timetabling Problems Using Hybridization of Swarm Based Approach, 543--548 (Full Paper) (link to paper)
(Menu for Weng) All papers - Full papers - Abstracts - Selected papers Werbos
- Werbos, L (2011) Optimization of Scheduling for Large-Scale Logistics Tasks, 489--492 (Abstract) (link to paper)
(Menu for Werbos) All papers - Full papers - Abstracts - Selected papers Werner
- Werner, F (2013) A Graphical Algorithm for Solving an Investment Optimization Problem, 290--299 (Full Paper) (link to paper)
- Werner, F (2009) Parallel Machine Problems with Equal Processing Times, 458--468 (Full Paper) (link to paper)
- Werner, F (2011) Parallel machine problems with equal processing times: a survey, 435--444 (Selected Paper) (link to paper)
- Werner, F (2015) Single machine scheduling: finding the Pareto Set for jobs with equal processing times with respect to criteria Lmax and Cmax., 797--800 (Abstract) (link to paper)
(Menu for Werner) All papers - Full papers - Abstracts - Selected papers Westphal
- Westphal, S (2005) Improved Pruningin Columngeneration Of A Vehicle Routing Problem, 705--722 (Full Paper) (link to paper)
- Westphal, S (2008) Pruning in column generation for service vehicle dispatching, 355--371 (Selected Paper) (link to paper)
(Menu for Westphal) All papers - Full papers - Abstracts - Selected papers White
- White, G. M (2007) Assigning Part-time Teachers to Courses via a Stable Marriage Algorithm, 625--627 (Abstract) (link to paper)
(Menu for White) All papers - Full papers - Abstracts - Selected papers Whitley
- Whitley, L. D (2005) Random Walks And Neighborhood Bias In Oversubscribed Scheduling, 98--105 (Full Paper) (link to paper)
- Whitley, D (2003) A Dynamic Model of Tabu Search for the Job-Shop Scheduling Problem, 320--336 (Full Paper) (link to paper)
- Whitley, L. D (2005) A Dynamic Model of Tabu Search for the Job-Shop Scheduling Problem, 247--266 (Selected Paper) (link to paper)
- Whitley, D (2011) Quasi-Elementary Landscapes, 113--125 (Full Paper) (link to paper)
(Menu for Whitley) All papers - Full papers - Abstracts - Selected papers Wilke
- Wilke, P (2015) Optimisation of Staff Absences, 360--369 (Full Paper) (link to paper)
- Wilke, P (2015) Comparison of EATTS and XHSTT - Towards a Uni?ed Description Language for Timetabling Problems, 862--866 (Abstract) (link to paper)
(Menu for Wilke) All papers - Full papers - Abstracts - Selected papers Williamson
- Williamson, E (2005) Challenges in Matching Assets with Demand across All Supply Chain Management Decision Tiers in the IBM Microelectronics Division from Automated Fabs to Central Planning Engines to Collaborative Behavior (Work Arounds), 391--391 (Abstract) (link to paper)
(Menu for Williamson) All papers - Full papers - Abstracts - Selected papers Wilmer
- Wilmer, D (2015) Robustness of Partial Order Schedules: Understanding the Chaining algorithm, 457--472 (Full Paper) (link to paper)
(Menu for Wilmer) All papers - Full papers - Abstracts - Selected papers Wilson
- Wilson, N (2013) Compilation of Maintenance Schedules based on their Key Performance Indicators for Fast Iterative Interaction, 606--609 (Abstract) (link to paper)
- Wilson, M (2013) Flexibility Metrics for Time and Resource Constrained Scheduling Problems, 555--572 (Full Paper) (link to paper)
(Menu for Wilson) All papers - Full papers - Abstracts - Selected papers Winter
- Winter, E (2007) Computing Lower Bounds for the Schedule of a Multifunction Radar, 523--530 (Full Paper) (link to paper)
(Menu for Winter) All papers - Full papers - Abstracts - Selected papers Witteveen
- Witteveen, C (2013) Flexibility Metrics for Time and Resource Constrained Scheduling Problems, 555--572 (Full Paper) (link to paper)
- Witteveen, C (2015) Exact and heuristic methods for trading-off makespan and stability in stochastic project scheduling, 25--41 (Full Paper) (link to paper)
(Menu for Witteveen) All papers - Full papers - Abstracts - Selected papers Wodecki
- Wodecki, M (2009) Scatter search for a weighted tardiness flow shop problem, 702--705 (Abstract) (link to paper)
- Wodecki, M (2007) A Parallel Metaheuristics for the Single Machine Total Weighted Tardiness Problem with Sequence-Dependent Setup Times, 96--103 (Full Paper) (link to paper)
(Menu for Wodecki) All papers - Full papers - Abstracts - Selected papers Woeginger
- Woeginger, G. J (2003) Formulations, Relaxations, Approximations, and Gaps in the World of Scheduling, 21--41 (Full Paper) (link to paper)
- Woeginger, G. J (2005) Formulations, Relaxations, Approximations and Gaps in the World of Scheduling, 19--36 (Selected Paper) (link to paper)
(Menu for Woeginger) All papers - Full papers - Abstracts - Selected papers Wong
- Wong, R. C.W (2005) Timetable Synchronization for Mass Transit, 516--517 (Abstract) (link to paper)
(Menu for Wong) All papers - Full papers - Abstracts - Selected papers Wren
- Wren, A (2003) Recent Advancement in an Established Driver Scheduling System, 704--706 (Abstract) (link to paper)
(Menu for Wren) All papers - Full papers - Abstracts - Selected papers Wright
- Wright, M (2015) Ant Colony Optimisation for a Job Shop with Flexible Maintenance, 614--616 (Abstract) (link to paper)
- Wright, M.B (2003) Dynamic Weight Variation in Metaheuristic Search, 604--605 (Abstract) (link to paper)
(Menu for Wright) All papers - Full papers - Abstracts - Selected papers Wu
- Wu, X (2005) Single-machine Scheduling With General Costs Under Compound-type Distributions, 630--642 (Full Paper) (link to paper)
(Menu for Wu) All papers - Full papers - Abstracts - Selected papers Xie
- Xie, L (2011) Supply Logistics Synchronization: Scale Development and Empirical Study of Chinese Manufacturing, 497--501 (Abstract) (link to paper)
(Menu for Xie) All papers - Full papers - Abstracts - Selected papers Xing
- Xing, W (2005) Worst-case Analysis for Queueing Service Policies, 533--535 (Abstract) (link to paper)
- Xing, W (2008) Performance of service policies in a specialized service system with parallel servers, 451--460 (Selected Paper) (link to paper)
(Menu for Xing) All papers - Full papers - Abstracts - Selected papers Xu
- Xu, H (2013) Evolutionary algorithm and post-processing to minimize the total delay in multi-project scheduling, 831--835 (Full Paper) (link to paper)
- Xu, X (2017) Customer Order Scheduling on Unrelated Parallel Machines to Minimize Total Weighted Completion Time, 013--029 (Full Paper) (link to paper)
- Xu, Y (2009) A GRASP approach for the delay-constrained multicast routing problem, 93--104 (Full Paper) (link to paper)
(Menu for Xu) All papers - Full papers - Abstracts - Selected papers Xue
- Xue, N (2017) Responsive Single Bus Corridor Scheduling Based on Machine Learning and Optimisation, 288--294 (Full Paper) (link to paper)
(Menu for Xue) All papers - Full papers - Abstracts - Selected papers Yadrentsev
- Yadrentsev, D (2015) Three approaches to solving the problem of cosmonauts’ training planning, 750--754 (Abstract) (link to paper)
(Menu for Yadrentsev) All papers - Full papers - Abstracts - Selected papers Yang
- Yang, Z (2013) Order acceptance and scheduling problem with time-dependent revenues, 593--595 (Abstract) (link to paper)
- Yang, J (2005) Scheduling The Production And Transportation Operations Subject To Dynamic Arrivals, 701--701 (Abstract) (link to paper)
- Yang, S (2009) A Guided Search Genetic Algorithm for the University Course Timetabling Problem, 180--191 (Full Paper) (link to paper)
- Yang, S (2011) A hybrid genetic algorithm and tabu search approach for post enrolment course timetabling, 617--637 (Selected Paper) (link to paper)
- Yang, We (2005) Scheduling Multiple Types of Time-Shared Aircraft: Models and Methods for Practice, 19--38 (Full Paper) (link to paper)
- Yang, W (2007) Optimization vs. Persistence in Scheduling: Heuristics to Manage Uncertainty in On-Demand Air Travel, 242--250 (Full Paper) (link to paper)
- Yang, Y (2005) Case-Based Initialisation of Metaheuristics for Examination, 289--308 (Selected Paper) (link to paper)
- Yang, W (2008) Aircraft and crew scheduling for fractional ownership programs, 415--431 (Selected Paper) (link to paper)
- Yang, X.F (2017) Modeling a Practical University Course Timetabling Problem with Reward and Penalty Objective Function: Case Study FTSM-UKM, 348--357 (Abstract) (link to paper)
(Menu for Yang) All papers - Full papers - Abstracts - Selected papers Yao
- Yao, R. He. F (2013) Order acceptance and scheduling problem with time-dependent revenues, 593--595 (Abstract) (link to paper)
(Menu for Yao) All papers - Full papers - Abstracts - Selected papers Yedision
- Yedision, L (2015) The resource dependent assignment problem with a convex assignment cost function and its relation to scheduling with controllable processing times, 629--634 (Abstract) (link to paper)
(Menu for Yedision) All papers - Full papers - Abstracts - Selected papers Yomsi
- Yomsi, P. M (2009) Schedulability Analysis for non Necessarily Harmonic Real-Time Systems with Precedence and Strict Periodicity Constraints using the Exact Number of Preemptions and no Idle Time, 843--851 (Abstract) (link to paper)
(Menu for Yomsi) All papers - Full papers - Abstracts - Selected papers Yong
- Yong, Y (2003) Case-Based Initialisation of Metaheuristics for Examination Timetabling, 137--154 (Full Paper) (link to paper)
(Menu for Yong) All papers - Full papers - Abstracts - Selected papers Yoon
- Yoon, S.H (2005) Single Machine Product Scheduling With Outsourcing Allowed., 340--340 (Abstract) (link to paper)
(Menu for Yoon) All papers - Full papers - Abstracts - Selected papers Youssef
- Youssef, B. Be (2015) Lower bounds for the parallel processing scheduling problem with multiprocessor tasks, release date and delivery time, 403--411 (Full Paper) (link to paper)
(Menu for Youssef) All papers - Full papers - Abstracts - Selected papers Yu
- Yu, V.F (2017) A Selective-Discrete Particle Swarm Optimization Algorithm for Solving a Class of Orienteering Problem, 229--243 (Full Paper) (link to paper)
(Menu for Yu) All papers - Full papers - Abstracts - Selected papers Yuan
- Yuan, Z (2015) Home Health Care Scheduling: A Case Study, 555--569 (Full Paper) (link to paper)
(Menu for Yuan) All papers - Full papers - Abstracts - Selected papers Yucel
- Yucel, E (2005) A Branch-and-bound Algorithm For Single Machine Total Tardiness Problem With Release Dates, 162--168 (Full Paper) (link to paper)
(Menu for Yucel) All papers - Full papers - Abstracts - Selected papers Yugma
- Yugma, C (2013) An unrelated parallel machine scheduling problem with auxiliary resources and sequence dependent setup times, 718--720 (Abstract) (link to paper)
- Yugma, C. (2016) A memetic algorithm to solve an unrelated parallel machine scheduling problem with auxiliary resources in semiconductor manufacturing, 367--376 (Selected Paper) (link to paper)
- Yugma, C (2009) Scheduling Inspection Operations subject to a Fixed Production Schedule, 581--593 (Full Paper) (link to paper)
- Yugma, C (2011) Scheduling jobs on parallel machines to minimize a regular step total cost function, 523--538 (Selected Paper) (link to paper)
- Yugma, C (2011) Erratum to: Scheduling jobs on parallel machines to minimize a regular step total cost function, 539--540 (Selected Paper) (link to paper)
- Yugma, C (2015) Scheduling Complex Job-Shops using Batch Oblivious Disjunctive Graphs, 788--793 (Abstract) (link to paper)
- Yugma, C (2011) Scheduling job families on parallel machines with a bi-criteria objective function under time constraints, 645--648 (Abstract) (link to paper)
- Yugma, C (2017) A Batch-oblivious Approach For Scheduling Complex Job-Shops with Batching Machines: From Non-delay to Active Scheduling, 340--343 (Abstract) (link to paper)
(Menu for Yugma) All papers - Full papers - Abstracts - Selected papers Zahout
- Zahout, B (2017) Fixed jobs scheduling on a single machine with renewable resources, 084--092 (Full Paper) (link to paper)
(Menu for Zahout) All papers - Full papers - Abstracts - Selected papers Zajicek
- Zajicek, T (2011) Flow Shop Scheduling on GPU, 532--535 (Abstract) (link to paper)
(Menu for Zajicek) All papers - Full papers - Abstracts - Selected papers Zdenek
- Zdenek, H (2013) Roster Evaluation Based on the Classifiers for the Nurse Rostering Problem, 744--747 (Abstract) (link to paper)
(Menu for Zdenek) All papers - Full papers - Abstracts - Selected papers Zeltzer
- Zeltzer, L (2013) Balancing and Sequencing Mixed-Model Assembly Lines to Minimize Work Overload in Real World Workstations, 230--239 (Full Paper) (link to paper)
(Menu for Zeltzer) All papers - Full papers - Abstracts - Selected papers Zemmouri
- Zemmouri, T (2007) Staff Rostering Problem: Choice of a Mathematical Model, 601--604 (Abstract) (link to paper)
(Menu for Zemmouri) All papers - Full papers - Abstracts - Selected papers Zerola
- Zerola, M (2009) Planning Heuristics for Efficient Data Movement on the Grid, 768--771 (Abstract) (link to paper)
(Menu for Zerola) All papers - Full papers - Abstracts - Selected papers Zhang
- Zhang, Q (2009) Development of E ective Estimation of Distribution Algorithms for Scheduling Problems, 531--556 (Full Paper) (link to paper)
- Zhang, J (2005) Inventory Control And Scheduling With Facilities In Parallel, 740--742 (Abstract) (link to paper)
- Zhang, A (2009) Workforce Planning and Scheduling for the HP IT Services Business, 720--723 (Abstract) (link to paper)
- Zhang, R (2007) Minimizing the Total Weighted Number of Late Jobs with Late Deliveries in Two-Level Supply Chains, 447--454 (Full Paper) (link to paper)
- Zhang, R (2009) Approximation algorithms for minimizing the total weighted number of late jobs with late deliveries in two-level supply chains, 565--574 (Selected Paper) (link to paper)
- Zhang, P. Y (2015) Resource-Aware Scheduling for Data Centers with Heterogenous Servers, 240--259 (Full Paper) (link to paper)
- Zhang, X (2007) Two-machine Shop Floor Scheduling Problem with Multi-Predecessor Constraints*, 538--545 (Full Paper) (link to paper)
(Menu for Zhang) All papers - Full papers - Abstracts - Selected papers Zhao
- Zhao, Y (2008) Integrated scheduling of handling equipment at automated container terminals, 373--394 (Selected Paper) (link to paper)
- Zhao, H (2005) Scheduling Algorithms for Master-Slave System, 501--513 (Full Paper) (link to paper)
- Zhao, H (2008) Scheduling problems in master-slave model, 215--231 (Selected Paper) (link to paper)
- Zhao, Y (2017) Customer Order Scheduling on Unrelated Parallel Machines to Minimize Total Weighted Completion Time, 013--029 (Full Paper) (link to paper)
- Zhao, Y (2011) Facility layout with random demand: A reduction to the classical deterministic QAP, 605--606 (Abstract) (link to paper)
(Menu for Zhao) All papers - Full papers - Abstracts - Selected papers Zhaoa
- Zhaoa, Y (2005) Integrated Scheduling of Different Types of Handling Equipment at Automated Container Terminals, 536--537 (Abstract) (link to paper)
(Menu for Zhaoa) All papers - Full papers - Abstracts - Selected papers Zhou
- Zhou, X (2005) Single-machine Scheduling With General Costs Under Compound-type Distributions, 630--642 (Full Paper) (link to paper)
(Menu for Zhou) All papers - Full papers - Abstracts - Selected papers Zigrino
- Zigrino, S (2011) Deterministic and stochastic models for investment in different technologies for electricity production in the long period, 607--623 (Abstract) (link to paper)
(Menu for Zigrino) All papers - Full papers - Abstracts - Selected papers Zimmermann
- Zimmermann, J (2009) Exact methods for the resource levelling problem, 811--820 (Abstract) (link to paper)
- Zimmermann, J (2011) Exact methods for the resource levelling problem, 557--569 (Selected Paper) (link to paper)
- Zimmermann, J (2007) Medium-Term Production and Staff Planning in the Automotive Industry, 209--216 (Full Paper) (link to paper)
- Zimmermann, A (2015) A list-scheduling approach for the planning of assessment centers, 541--554 (Full Paper) (link to paper)
(Menu for Zimmermann) All papers - Full papers - Abstracts - Selected papers Zinder
- Zinder, Y (2005) Scheduling UET-UCT task systems under the out-forest precedence constraints, 445--452 (Full Paper) (link to paper)
- Zinder, Y (2005) The Worst-case Analysis of the Carey-Johnson Algorithm for preemptive tasks on m processors, 453--470 (Full Paper) (link to paper)
- Zinder, Y (2013) New Solvable Cases of the Maximum Lateness Problem with Preemptions, 714--717 (Abstract) (link to paper)
- Zinder, Y (2007) The Strength of Priority Algorithms, 531--537 (Full Paper) (link to paper)
- Zinder, Y (2003) Scheduling with Two Criteria, 468--472 (Abstract) (link to paper)
- Zinder, Y (2005) Scheduling UET Tasks on Two Parallel Machines with the Criteria of Makespan and Total Completion Time, 83--109 (Selected Paper) (link to paper)
(Menu for Zinder) All papers - Full papers - Abstracts - Selected papers Zorn
- Zorn, E (2015) An IP-based Model for the Post-Enrollment-based Course Timetabling Problem at TU Berlin, 331--344 (Full Paper) (link to paper)
- Zorn, E (2015) Solving Huge Real-World Timetabling Instances, 360--369 (Full Paper) (link to paper)
- Zorn, E (2015) Examination timetabling at Technische Universit¨at Berlin, 260--266 (Full Paper) (link to paper)
(Menu for Zorn) All papers - Full papers - Abstracts - Selected papers Zribi
- Zribi, N (2005) Job Shop Scheduling Problem With Multi-purpose Machines And Availability Constraints, 217--231 (Abstract) (link to paper)
(Menu for Zribi) All papers - Full papers - Abstracts - Selected papers Zsifkovits
- Zsifkovits, M (2017) Optimal Interdiction of Vehicle Routing on a Dynamic Network, 059--069 (Full Paper) (link to paper)
(Menu for Zsifkovits) All papers - Full papers - Abstracts - Selected papers Zubaran
- Zubaran, T (2013) A simple stochastic local search for multi-mode resource-constrained multi-project scheduling, 826--830 (Full Paper) (link to paper)
(Menu for Zubaran) All papers - Full papers - Abstracts - Selected papers omarudin
- omarudin, K. (2013) Extended Roster Quality Staffng Problem A medium term roster quality to support staffing decisions, 424--436 (Full Paper) (link to paper)
(Menu for omarudin) All papers - Full papers - Abstracts - Selected papers van Hillegersberg
- van Hillegersberg, J (2017) Towards improving tenders for Higher Education timetabling software: Uncovering the selection criteria of HEIs when choosing timetabling applications and using ERP as a reference, 173--188 (Full Paper) (link to paper)
(Menu for van Hillegersberg) All papers - Full papers - Abstracts - Selected papers Ásgeirsson
- Ásgeirsson, E. I (2011) A Framework for Implementation-Oriented Staff Scheduling, 308--321 (Full Paper) (link to paper)
(Menu for Ásgeirsson) All papers - Full papers - Abstracts - Selected papers Özcan
- Özcan, E (2013) Combining Monte-Carlo and Hyper-heuristic methods for the Multi-mode Resource-constrained Multi-project Scheduling Problem, 836--839 (Full Paper) (link to paper)
- Özcan, E (2013) A Grouping Hyper-heuristic for Graph Colouring, 770--773 (Abstract) (link to paper)
- Özcan, E (2007) Memetic Algorithms and Hyperhill-climbers, 159--166 (Full Paper) (link to paper)
- Özcan, E (2009) Multilevel Search for Evolving the Acceptance Criteria of a Hyper-Heuristic, 798--801 (Abstract) (link to paper)
- Özcan, E (2017) Selection Hyper-heuristics for Solving the Wind Farm Layout Optimisation Problem, 393--395 (Abstract) (link to paper)
- Özcan, E (2013) Initial Results on Fairness in Examination Timetabling, 777--780 (Abstract) (link to paper)
- Özcan, E (2017) A Review of Selection Hyper-heuristics: Recent Advances, 010--010 (Abstract) (link to paper)
- Özcan, E (2003) Towards an XML Based Standard for Timetabling Problems: TTML, 566--569 (Abstract) (link to paper)
- Özcan, E (2005) Towards and XML based standard for Timetabling Problems:TTML, 163--185 (Selected Paper) (link to paper)
- Özcan, E (2007) A Memetic Algorithm for Solving a Timetabling Problem:An Incremental Strategy, 394--401 (Full Paper) (link to paper)
- Özcan, E (2009) Multilevel search for choosing hyper-heuristics, 788--789 (Abstract) (link to paper)
- Özcan, E (2009) A self-organising hyper-heuristic framework, 784--787 (Abstract) (link to paper)
- Özcan, B. M. E (2013) An Investigation of Multistage Approaches to Examination Timetabling, 528--542 (Full Paper) (link to paper)
(Menu for Özcan) All papers - Full papers - Abstracts - Selected papers