MISTA: List of papers by authors

This page was developed to give a summary of the papers that have been presented at MISTA, sorted by the authors. It is provided to give you a quick way to check all the papers that you have published at MISTA (or in the post conference publication).

The papers are NOT complete references. To see the complete reference, click on the link to paper link.

You can view the papers in various ways.

  • All papers (full papers, abstracts and selected papers)
  • Only full papers from the conference proceedings
  • Only abstracts from the conference proceedings
  • Only selected papers published in the post conference volumes

There is also a menu under each author, so that you can just display the data for just one author.

    Abdullah

  1. Abdullah, S (2009) An Investigation of a Genetic Algorithm and Sequential Local Search Approach for Curriculum-based Course Timetabling Problems, 727--731 (Abstract) (link to paper)
  2. Abdullah, S (2013) An Evolutionary Hill Climbing Algorithm for Dynamic Optimisation Problems, 795--799 (Abstract) (link to paper)

  3. (Menu for Abdullah) All papers - Full papers - Abstracts - Selected papers

    Ackermann

  4. Ackermann, H (2015) How to Unload Bulk Carriers Quickly? Mathematical Models to Identify Efficient Loading Patterns, 772--775 (Abstract) (link to paper)
  5. Ackermann, H (2013) Time-Hierarchical Scheduling A worst-case analysis of a rolling hierarchical approach for integrated production planning and scheduling i nmake-to-order environments, 617--619 (Abstract) (link to paper)

  6. (Menu for Ackermann) All papers - Full papers - Abstracts - Selected papers

    Adenso-Díaz

  7. Adenso-Díaz, B (2003) Rule-Based System for Platform Assignment in Bus Stations, 696--699 (Abstract) (link to paper)
  8. Adenso-Díaz, B (2005) Approximate Solutions For A New Version Of The Car Sequencing Problem (abstract), 93--96 (Abstract) (link to paper)

  9. (Menu for Adenso-Díaz) All papers - Full papers - Abstracts - Selected papers

    Adriaen

  10. Adriaen, M (2005) Course Timetabling Extended Tiles For University Timetabling, 669--670 (Abstract) (link to paper)
  11. Adriaen, M (2003) Decentralised Course Timetabling in a Large Hierarchical Organisation, 60--66 (Abstract) (link to paper)

  12. (Menu for Adriaen) All papers - Full papers - Abstracts - Selected papers

    Adriaensen

  13. Adriaensen, S (2015) On Task Scheduling Policies for Work-Stealing Schedulers, 821--824 (Abstract) (link to paper)

  14. (Menu for Adriaensen) All papers - Full papers - Abstracts - Selected papers

    Afifi

  15. Afifi, S (2015) Primal Heuristics for the Vehicle Routing Problem with Synchronized Visits, 859--861 (Abstract) (link to paper)

  16. (Menu for Afifi) All papers - Full papers - Abstracts - Selected papers

    Aggoune-Mtalaa

  17. Aggoune-Mtalaa, W (2013) Guiding wiki crowds through resource scheduling, 753--756 (Abstract) (link to paper)

  18. (Menu for Aggoune-Mtalaa) All papers - Full papers - Abstracts - Selected papers

    Aghezzaf

  19. Aghezzaf, E.-H (2013) A fast solution method for the Time-Dependent Orienteering Problem with time windows, 676--679 (Abstract) (link to paper)

  20. (Menu for Aghezzaf) All papers - Full papers - Abstracts - Selected papers

    Aharon

  21. Aharon, G (2013) Hierarchical Control Model for Several Stochastic Network Projects, 800--800 (Abstract) (link to paper)

  22. (Menu for Aharon) All papers - Full papers - Abstracts - Selected papers

    Ahmadi

  23. Ahmadi, S (2015) Optimisation of a Stagger Chart for Aviation Fleet Planning, 952--962 (Abstract) (link to paper)

  24. (Menu for Ahmadi) All papers - Full papers - Abstracts - Selected papers

    Aickelin

  25. Aickelin, U (2003) Explicit Learning: an Effort towards Human Scheduling Algorithms, 240--243 (Abstract) (link to paper)

  26. (Menu for Aickelin) All papers - Full papers - Abstracts - Selected papers

    Aizam

  27. Aizam, N.A.H (2017) Variation of Demands for a New Improvised University Course Timetabling Problem Mathematical Model, 320--320 (Abstract) (link to paper)
  28. Aizam, N.A. (2017) Mathematical model for a high quality examination timetabling problem: case study of a university in Malaysia, 319--319 (Abstract) (link to paper)

  29. (Menu for Aizam) All papers - Full papers - Abstracts - Selected papers

    Akartunah

  30. Akartunah, K (2015) Modeling Uncertainty in Vessel Crew Scheduling, 805--808 (Abstract) (link to paper)

  31. (Menu for Akartunah) All papers - Full papers - Abstracts - Selected papers

    Akhlaghi

  32. Akhlaghi, V. E. (2015) Shortest k-unit Cycle in a Multiple Part-Type Robotic Cell, 876--878 (Abstract) (link to paper)
  33. Akhlaghi, V.E (2017) Robotic Cell Scheduling Considering Energy Consumption of Robot Moves, 329--329 (Abstract) (link to paper)

  34. (Menu for Akhlaghi) All papers - Full papers - Abstracts - Selected papers

    Akkan

  35. Akkan, C (2011) Improving Schedule Stability in Single-Machine Rescheduling due to New Operation Insertion, 506--518 (Abstract) (link to paper)

  36. (Menu for Akkan) All papers - Full papers - Abstracts - Selected papers

    Al-Khair

  37. Al-Khair, W.S.A (2003) Simulation-Based Days-Off Scheduling of a Pipelines Maintenance Workforce, 524--525 (Abstract) (link to paper)

  38. (Menu for Al-Khair) All papers - Full papers - Abstracts - Selected papers

    Alexandridis

  39. Alexandridis, A (2005) Optimal Production Scheduling For Dairy Industries, 324--325 (Abstract) (link to paper)

  40. (Menu for Alexandridis) All papers - Full papers - Abstracts - Selected papers

    Alfares

  41. Alfares, H.K (2003) Simulation-Based Days-Off Scheduling of a Pipelines Maintenance Workforce, 524--525 (Abstract) (link to paper)

  42. (Menu for Alfares) All papers - Full papers - Abstracts - Selected papers

    Ali

  43. Ali, O (2015) Scheduling the operation of a phosphate pipeline for OCP: A Case Study, 622--625 (Abstract) (link to paper)

  44. (Menu for Ali) All papers - Full papers - Abstracts - Selected papers

    Alidaee

  45. Alidaee, B (2009) An Empirical Study of Impacts of Production Mix Efficiency, Product Route Efficiency on Operations Performance and Profitability: A Reverse Logistics Approach, 765--767 (Abstract) (link to paper)

  46. (Menu for Alidaee) All papers - Full papers - Abstracts - Selected papers

    Almakhla?

  47. Almakhla?, A (2015) Iterated Local Search for the Generator Maintenance Scheduling Problem, 708--742 (Abstract) (link to paper)

  48. (Menu for Almakhla?) All papers - Full papers - Abstracts - Selected papers

    Almeder

  49. Almeder, C (2011) A GRASP Approach for Scheduling Jobs with Incompatible Families on Parallel Batch Machines, 557--560 (Abstract) (link to paper)

  50. (Menu for Almeder) All papers - Full papers - Abstracts - Selected papers

    Almeida

  51. Almeida, A (2003) Reducing Job Throughput Time : Using Horizontal Scheduling and Simultaneous Manufacturing, 386--387 (Abstract) (link to paper)

  52. (Menu for Almeida) All papers - Full papers - Abstracts - Selected papers

    Arbaoui

  53. Arbaoui, T (2015) Student Scheduling Problem At Universite de Technologie de Compiegne, 871--875 (Abstract) (link to paper)

  54. (Menu for Arbaoui) All papers - Full papers - Abstracts - Selected papers

    Arkhipov

  55. Arkhipov, D (2015) Single machine scheduling: finding the Pareto Set for jobs with equal processing times with respect to criteria Lmax and Cmax., 797--800 (Abstract) (link to paper)

  56. (Menu for Arkhipov) All papers - Full papers - Abstracts - Selected papers

    Armellini

  57. Armellini, D (2017) Modeling and Solving the Steelmaking and Casting Planning and Scheduling Problem, 380--383 (Abstract) (link to paper)

  58. (Menu for Armellini) All papers - Full papers - Abstracts - Selected papers

    Artiba

  59. Artiba, A (2015) Scheduling preventive railway maintenance activities with resource constraints, 782--784 (Abstract) (link to paper)

  60. (Menu for Artiba) All papers - Full papers - Abstracts - Selected papers

    Artigues

  61. Artigues, C (2007) Dynamic Cooperative Search for Constraint Satisfaction and Combinatorial Optimization: Application to a Rostering Problem, 557--560 (Abstract) (link to paper)
  62. Artigues, C (2015) Multimode Time-Constrained Scheduling Problems with Generalized Temporal Constraints and Labor Skills, 809--813 (Abstract) (link to paper)

  63. (Menu for Artigues) All papers - Full papers - Abstracts - Selected papers

    Asmuni

  64. Asmuni, H (2015) A Hybrid Swarm Algorithm for Post Enrollment Course Timetabling, 931--942 (Abstract) (link to paper)

  65. (Menu for Asmuni) All papers - Full papers - Abstracts - Selected papers

    Audenaert

  66. Audenaert, P (2013) Modeling Real-World Vehicle Routing Problems with Dependencies, 711--713 (Abstract) (link to paper)

  67. (Menu for Audenaert) All papers - Full papers - Abstracts - Selected papers

    Aykin

  68. Aykin, T (2005) Skills-Based Agent Scheduling at Call Centers, 515--515 (Abstract) (link to paper)

  69. (Menu for Aykin) All papers - Full papers - Abstracts - Selected papers

    Ayob

  70. Ayob, M (2017) Modeling a Practical University Course Timetabling Problem with Reward and Penalty Objective Function: Case Study FTSM-UKM, 348--357 (Abstract) (link to paper)

  71. (Menu for Ayob) All papers - Full papers - Abstracts - Selected papers

    Aziz

  72. Aziz, N.L. (2017) Variation of Demands for a New Improvised University Course Timetabling Problem Mathematical Model, 320--320 (Abstract) (link to paper)
  73. Aziz, Z. Ab (2009) An Investigation of an Ant-based Hyperheuristic for the Capacitated Vehicle Routing Problem, 823--826 (Abstract) (link to paper)
  74. Aziz, N.L. (2017) Mathematical model for a high quality examination timetabling problem: case study of a university in Malaysia, 319--319 (Abstract) (link to paper)

  75. (Menu for Aziz) All papers - Full papers - Abstracts - Selected papers

    Azouni

  76. Azouni, A (2015) Student Scheduling Problem At Universite de Technologie de Compiegne, 871--875 (Abstract) (link to paper)

  77. (Menu for Azouni) All papers - Full papers - Abstracts - Selected papers

    Baarsma

  78. Baarsma, H (2007) Statistical Quality Analysis of Schedulers under Soft-Real-Time Constraints, 547--549 (Abstract) (link to paper)

  79. (Menu for Baarsma) All papers - Full papers - Abstracts - Selected papers

    Baatar

  80. Baatar, D (2017) Symmetry breaking in a special case of the RCPSP/max, 315--318 (Abstract) (link to paper)

  81. (Menu for Baatar) All papers - Full papers - Abstracts - Selected papers

    Bach

  82. Bach, L (2017) Railway Rolling Stock Maintenance, 373--376 (Abstract) (link to paper)
  83. Bach, L (2017) The "Orchestrator" approach to multimodal continental trip planning., 362--366 (Abstract) (link to paper)

  84. (Menu for Bach) All papers - Full papers - Abstracts - Selected papers

    Bagger

  85. Bagger, N-C. F. (2015) Flow Formulation-based Model for the Curriculum-based Course Timetabling Problem, 825--848 (Abstract) (link to paper)

  86. (Menu for Bagger) All papers - Full papers - Abstracts - Selected papers

    Balas

  87. Balas, E (2005) Good Neighborhoods And Well-matched Neighborhoods, 2--2 (Abstract) (link to paper)
  88. Balas, E (2005) Job Shop Scheduling with Setup Times, Deadlines and Precedence Constrainsts, 520--532 (Abstract) (link to paper)

  89. (Menu for Balas) All papers - Full papers - Abstracts - Selected papers

    Balasubramanian

  90. Balasubramanian, H (2015) The polynomial solvability of a bicriteria linear combination on parallel identical machines with release dates, 902--904 (Abstract) (link to paper)
  91. Balasubramanian, H (2011) Single Machine Scheduling with Interfering Job Sets to Minimize Total Weighted Completion Time and Maximum Lateness, 568--572 (Abstract) (link to paper)

  92. (Menu for Balasubramanian) All papers - Full papers - Abstracts - Selected papers

    Baltar

  93. Baltar, D.D (2015) LAHC applied to The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 905--908 (Abstract) (link to paper)

  94. (Menu for Baltar) All papers - Full papers - Abstracts - Selected papers

    Bansal

  95. Bansal, N (2005) Improved Approximation Algorithms For Broadcast Scheduling, 655--656 (Abstract) (link to paper)
  96. Bansal, N (2005) Algorithms for online buffer management, 518--518 (Abstract) (link to paper)

  97. (Menu for Bansal) All papers - Full papers - Abstracts - Selected papers

    Baptiste

  98. Baptiste, P (2005) Scheduling A Single Machine To Minimize A Regular Objective Function Under Setup Constraints, 193--195 (Abstract) (link to paper)
  99. Baptiste, P (2003) The One Machine Total Cost Scheduling Problem with Release Dates, 406--408 (Abstract) (link to paper)
  100. Baptiste, P (2003) Dominance Based Heuristics to Minimize a Total Cost on One Machine, 403--405 (Abstract) (link to paper)
  101. Baptiste, P (2005) Lower Bounds For Parallel Machine Scheduling, 215--216 (Abstract) (link to paper)

  102. (Menu for Baptiste) All papers - Full papers - Abstracts - Selected papers

    Barbosa

  103. Barbosa, A (2015) Solving the staff scheduling problem in a retail company, 611--613 (Abstract) (link to paper)

  104. (Menu for Barbosa) All papers - Full papers - Abstracts - Selected papers

    Barbosa-Póvoa

  105. Barbosa-Póvoa, A (2009) Scheduling of job shop, make-to-order industries with recirculation and assembly: discrete versus continuous time models, 802--807 (Abstract) (link to paper)
  106. Barbosa-Póvoa, A (2005) Optimal Reactive Scheduling For Job Shop, Make-toorder Industries: A Mould Making Industry Case Study, 46--46 (Abstract) (link to paper)

  107. (Menu for Barbosa-Póvoa) All papers - Full papers - Abstracts - Selected papers

    Bard

  108. Bard, J. F (2005) Scheduling Product Families In A High Volume, Flexible, Assemble-to-order Factory, 394--395 (Abstract) (link to paper)

  109. (Menu for Bard) All papers - Full papers - Abstracts - Selected papers

    Baron

  110. Baron, O (2015) Strategic Idling and Dynamic Scheduling in Open-Shop Service Network: Case Study and Analysis, 604--605 (Abstract) (link to paper)

  111. (Menu for Baron) All papers - Full papers - Abstracts - Selected papers

    Barth

  112. Barth, T.C (2013) Baggage Scheduling at Airports A framework for e?ciently allocating resources to flight events, 599--602 (Abstract) (link to paper)

  113. (Menu for Barth) All papers - Full papers - Abstracts - Selected papers

    Barták

  114. Barták, R (2005) Incremental Propagation Rules For A Precedence Graph With Optional Activities And Time Windows, 552--560 (Abstract) (link to paper)
  115. Barták, R (2015) Resource Failure Recovery in Production Scheduling, 852--858 (Abstract) (link to paper)
  116. Barták, R (2009) Planning Heuristics for Efficient Data Movement on the Grid, 768--771 (Abstract) (link to paper)

  117. (Menu for Barták) All papers - Full papers - Abstracts - Selected papers

    Baumann

  118. Baumann, P (2011) Minimizing changeover times of a make-and-pack production process: model and case study, 539--541 (Abstract) (link to paper)
  119. Baumann, M (2011) Scheduling of large dynamic job shop problems by concurrent non-blocking threads, 542--545 (Abstract) (link to paper)
  120. Baumann, P (2011) Decomposition approaches for multi-stage multi-product batch-production scheduling: a re ned batching model, 596--598 (Abstract) (link to paper)

  121. (Menu for Baumann) All papers - Full papers - Abstracts - Selected papers

    Baumelt

  122. Baumelt, Z (2011) A Parallel Approach for a Nurse Rerostering Problem on the GPU, 576--578 (Abstract) (link to paper)

  123. (Menu for Baumelt) All papers - Full papers - Abstracts - Selected papers

    Baumgartner

  124. Baumgartner, A (2009) Speeding up the optimal off-line algorithm for solving the k-server problem, 852--854 (Abstract) (link to paper)

  125. (Menu for Baumgartner) All papers - Full papers - Abstracts - Selected papers

    Bautista

  126. Bautista, J (2005) Approximate Solutions For A New Version Of The Car Sequencing Problem (abstract), 93--96 (Abstract) (link to paper)

  127. (Menu for Bautista) All papers - Full papers - Abstracts - Selected papers

    Baykasoglu

  128. Baykasoglu, A (2015) A GRASP based approach to dynamic scheduling of parallel heat treatment furnaces in a manufacturing company, 656--658 (Abstract) (link to paper)

  129. (Menu for Baykasoglu) All papers - Full papers - Abstracts - Selected papers

    Bedoya-Valencia

  130. Bedoya-Valencia, L (2005) A Genetic Algorithm with Random Keys Approach for the Job Shop Scheduling Problem with Earliness and Tardiness, 745--745 (Abstract) (link to paper)

  131. (Menu for Bedoya-Valencia) All papers - Full papers - Abstracts - Selected papers

    Belien

  132. Belien, J (2013) Building university course timetables with minimized resulting student flows, 737--740 (Abstract) (link to paper)
  133. Belien, J (2013) A resource loading problem in the aircraft line maintenance industry, 580--583 (Abstract) (link to paper)
  134. Belien, J (2013) Algorithms for building optimal aircraft maintenance personnel rosters, 633--635 (Abstract) (link to paper)

  135. (Menu for Belien) All papers - Full papers - Abstracts - Selected papers

    Beliën

  136. Beliën, J (2009) Integrated workforce staffing and scheduling: A case study at a major aircraft maintenance company, 724--726 (Abstract) (link to paper)
  137. Beliën, J (2003) Scheduling Trainees at a Hospital Department, 224--225 (Abstract) (link to paper)
  138. Beliën, J (2005) Integrating nurse and surgery scheduling, 408--409 (Abstract) (link to paper)

  139. (Menu for Beliën) All papers - Full papers - Abstracts - Selected papers

    Bellenguez-Morineau

  140. Bellenguez-Morineau, O (2013) A large neighborhood search for the Shift Design Personnel Task Scheduling Problem with Equity, 590--592 (Abstract) (link to paper)
  141. Bellenguez-Morineau, O (2007) Multi-skill Project Scheduling Problem and Total Productive Maintenance, 608--610 (Abstract) (link to paper)

  142. (Menu for Bellenguez-Morineau) All papers - Full papers - Abstracts - Selected papers

    Benmansour

  143. Benmansour, R (2015) Scheduling preventive railway maintenance activities with resource constraints, 782--784 (Abstract) (link to paper)

  144. (Menu for Benmansour) All papers - Full papers - Abstracts - Selected papers

    Bennell

  145. Bennell, J. A (2011) Train Scheduling in the UK using a Job Shop Scheduling Approach, 486--488 (Abstract) (link to paper)

  146. (Menu for Bennell) All papers - Full papers - Abstracts - Selected papers

    Bergh

  147. Bergh, J. V. (2013) A resource loading problem in the aircraft line maintenance industry, 580--583 (Abstract) (link to paper)
  148. Bergh, J. V. (2013) Algorithms for building optimal aircraft maintenance personnel rosters, 633--635 (Abstract) (link to paper)

  149. (Menu for Bergh) All papers - Full papers - Abstracts - Selected papers

    Berghman

  150. Berghman, L (2009) Solving a dock assignment problem as a three-stage flexible flow-shop problem, 752--755 (Abstract) (link to paper)
  151. Berghman, L (2013) Solving a time-indexed formulation by preprocessing and cutting planes, 603--605 (Abstract) (link to paper)

  152. (Menu for Berghman) All papers - Full papers - Abstracts - Selected papers

    Berman

  153. Berman, O (2015) Strategic Idling and Dynamic Scheduling in Open-Shop Service Network: Case Study and Analysis, 604--605 (Abstract) (link to paper)
  154. Berman, O (2015) Strategic Idling and Dynamic Scheduling in Open-Shop Service Network: Case Study and Analysis, 604--605 (Abstract) (link to paper)

  155. (Menu for Berman) All papers - Full papers - Abstracts - Selected papers

    Bertocchi

  156. Bertocchi, M (2011) Deterministic and stochastic models for investment in different technologies for electricity production in the long period, 607--623 (Abstract) (link to paper)

  157. (Menu for Bertocchi) All papers - Full papers - Abstracts - Selected papers

    Beyrouthy

  158. Beyrouthy, C (2007) Clustering Within Timetabling Conflict Graphs, 553--556 (Abstract) (link to paper)

  159. (Menu for Beyrouthy) All papers - Full papers - Abstracts - Selected papers

    Bierwirth

  160. Bierwirth, C (2011) Computational Comparison of Neighbourhoods for the Job Shop Scheduling Problem with Total Weighted Tardiness Objective, 536--538 (Abstract) (link to paper)
  161. Bierwirth, C (2013) A GRASP approach for the Job Shop Scheduling Problem with minimizing the Total Weighted Tardiness, 613--616 (Abstract) (link to paper)

  162. (Menu for Bierwirth) All papers - Full papers - Abstracts - Selected papers

    Bilgin

  163. Bilgin, B (2009) A Hyperheuristic Approach to Belgian Nurse Rostering Problems, 683--689 (Abstract) (link to paper)

  164. (Menu for Bilgin) All papers - Full papers - Abstracts - Selected papers

    Billaut

  165. Billaut, JC (2005) A Predictive-reactive Approach For Rcpsp With Labour Constraints And Time-dependent Activities Requirements, 671--672 (Abstract) (link to paper)
  166. Billaut, J-C. (2003) A Genetic Algorithm for Job Shop Scheduling with Flexibility, 417--418 (Abstract) (link to paper)

  167. (Menu for Billaut) All papers - Full papers - Abstracts - Selected papers

    Bist

  168. Bist, V (2007) Assigning Part-time Teachers to Courses via a Stable Marriage Algorithm, 625--627 (Abstract) (link to paper)

  169. (Menu for Bist) All papers - Full papers - Abstracts - Selected papers

    Bitar

  170. Bitar, A (2013) An unrelated parallel machine scheduling problem with auxiliary resources and sequence dependent setup times, 718--720 (Abstract) (link to paper)

  171. (Menu for Bitar) All papers - Full papers - Abstracts - Selected papers

    Blazewicz

  172. Blazewicz, J (2017) Multi-agent based approach for the origins of life hypothesis, 009--009 (Abstract) (link to paper)
  173. Blazewicz, J (2013) Dual Discounting Functions for Internet Shopping Optimization Problem, 667--669 (Abstract) (link to paper)
  174. Blazewicz, J (2005) On a certain berth scheduling problem, 694--697 (Abstract) (link to paper)
  175. Blazewicz, J (2009) Approximation algorithm for berth and quay crane allocation problem with bounds., 748--751 (Abstract) (link to paper)

  176. (Menu for Blazewicz) All papers - Full papers - Abstracts - Selected papers

    Bockman

  177. Bockman, F (2013) Baggage Scheduling at Airports A framework for e?ciently allocating resources to flight events, 599--602 (Abstract) (link to paper)

  178. (Menu for Bockman) All papers - Full papers - Abstracts - Selected papers

    Bocquillon

  179. Bocquillon, R (2013) Minimizing the dissemination length in the one-datum-unit data transfer problem, 587--589 (Abstract) (link to paper)

  180. (Menu for Bocquillon) All papers - Full papers - Abstracts - Selected papers

    Bontoux

  181. Bontoux, B (2007) Dynamic Cooperative Search for Constraint Satisfaction and Combinatorial Optimization: Application to a Rostering Problem, 557--560 (Abstract) (link to paper)

  182. (Menu for Bontoux) All papers - Full papers - Abstracts - Selected papers

    Boone

  183. Boone, A (2007) A Methodology for Integrated Risk Management and Proactive Scheduling of Construction Projects, 611--613 (Abstract) (link to paper)

  184. (Menu for Boone) All papers - Full papers - Abstracts - Selected papers

    Borgulya

  185. Borgulya, I (2009) Solving the Undirected Capacitated Arc Routing Problem with a memory based Method, 827--830 (Abstract) (link to paper)

  186. (Menu for Borgulya) All papers - Full papers - Abstracts - Selected papers

    Borne

  187. Borne, P (2005) Job Shop Scheduling Problem With Multi-purpose Machines And Availability Constraints, 217--231 (Abstract) (link to paper)

  188. (Menu for Borne) All papers - Full papers - Abstracts - Selected papers

    Borzone

  189. Borzone, P (2017) Modeling and Solving the Steelmaking and Casting Planning and Scheduling Problem, 380--383 (Abstract) (link to paper)

  190. (Menu for Borzone) All papers - Full papers - Abstracts - Selected papers

    Bou?et

  191. Bou?et, J-P. (2015) Student Scheduling Problem At Universite de Technologie de Compiegne, 871--875 (Abstract) (link to paper)

  192. (Menu for Bou?et) All papers - Full papers - Abstracts - Selected papers

    Boudier

  193. Boudier, I.S (2015) Ant Colony Optimisation for a Job Shop with Flexible Maintenance, 614--616 (Abstract) (link to paper)

  194. (Menu for Boudier) All papers - Full papers - Abstracts - Selected papers

    Bouquard

  195. Bouquard, J-L. (2013) Evacuation Scheduling of a Town after a Natural Disaster: Time-indexed Formulations, 680--683 (Abstract) (link to paper)

  196. (Menu for Bouquard) All papers - Full papers - Abstracts - Selected papers

    Bourreau

  197. Bourreau, E (2007) Dynamic Cooperative Search for Constraint Satisfaction and Combinatorial Optimization: Application to a Rostering Problem, 557--560 (Abstract) (link to paper)

  198. (Menu for Bourreau) All papers - Full papers - Abstracts - Selected papers

    Bouvry

  199. Bouvry, P (2013) Dual Discounting Functions for Internet Shopping Optimization Problem, 667--669 (Abstract) (link to paper)

  200. (Menu for Bouvry) All papers - Full papers - Abstracts - Selected papers

    Bowly

  201. Bowly, S (2017) Symmetry breaking in a special case of the RCPSP/max, 315--318 (Abstract) (link to paper)

  202. (Menu for Bowly) All papers - Full papers - Abstracts - Selected papers

    Bozejko

  203. Bozejko, W (2009) Scatter search for a weighted tardiness flow shop problem, 702--705 (Abstract) (link to paper)

  204. (Menu for Bozejko) All papers - Full papers - Abstracts - Selected papers

    Braeckmans

  205. Braeckmans, K (2005) Proactive Resource Allocation Heuristics For Robust Project Scheduling, 322--323 (Abstract) (link to paper)

  206. (Menu for Braeckmans) All papers - Full papers - Abstracts - Selected papers

    Braune

  207. Braune, R (2015) Packing-based approaches for a discrete malleable task schedulingproblem, 888--891 (Abstract) (link to paper)

  208. (Menu for Braune) All papers - Full papers - Abstracts - Selected papers

    Brauner

  209. Brauner, N (2013) Two extensions of Lawler’s min-max cost algorithm, 790--794 (Abstract) (link to paper)
  210. Brauner, N (2009) Polynomial complexity of the cyclic identical coupled task problem, 679--682 (Abstract) (link to paper)
  211. Brauner, N (2007) Scheduling Problems of Chemical Experiments, 581--583 (Abstract) (link to paper)

  212. (Menu for Brauner) All papers - Full papers - Abstracts - Selected papers

    Bril

  213. Bril, R. J (2009) Response time analysis in distributed real-time systems: An improvement based on best-case finalization time analysis, 839--842 (Abstract) (link to paper)

  214. (Menu for Bril) All papers - Full papers - Abstracts - Selected papers

    Bronnikov

  215. Bronnikov, S (2015) Three approaches to solving the problem of cosmonauts’ training planning, 750--754 (Abstract) (link to paper)

  216. (Menu for Bronnikov) All papers - Full papers - Abstracts - Selected papers

    Brucker

  217. Brucker, P (2005) Tabu Search Algorithms For Cyclic Machine Scheduling Problems with blocking, 107--108 (Abstract) (link to paper)

  218. (Menu for Brucker) All papers - Full papers - Abstracts - Selected papers

    Bukata

  219. Bukata, L (2015) A new lower bound for optimisation of energy consumption of robotic cells, 662--665 (Abstract) (link to paper)

  220. (Menu for Bukata) All papers - Full papers - Abstracts - Selected papers

    Bulbul

  221. Bulbul, K (2005) Job Shop Scheduling With Earliness, Tardiness And Intermediate Inventory Holding Costs, 188--192 (Abstract) (link to paper)

  222. (Menu for Bulbul) All papers - Full papers - Abstracts - Selected papers

    Bulh~oes

  223. Bulh~oes, T (2017) On the exact solution of a large class of parallel machine scheduling problems, 325--328 (Abstract) (link to paper)

  224. (Menu for Bulh~oes) All papers - Full papers - Abstracts - Selected papers

    Burda

  225. Burda, R (2005) Challenges in Matching Assets with Demand across All Supply Chain Management Decision Tiers in the IBM Microelectronics Division from Automated Fabs to Central Planning Engines to Collaborative Behavior (Work Arounds), 391--391 (Abstract) (link to paper)

  226. (Menu for Burda) All papers - Full papers - Abstracts - Selected papers

    Burgelman

  227. Burgelman, J (2015) A heuristic procedure for the personnel task re-scheduling problem, 666--668 (Abstract) (link to paper)

  228. (Menu for Burgelman) All papers - Full papers - Abstracts - Selected papers

    Burke

  229. Burke, E. K (2009) An Investigation of a Genetic Algorithm and Sequential Local Search Approach for Curriculum-based Course Timetabling Problems, 727--731 (Abstract) (link to paper)
  230. Burke, E. K (2007) Clustering Within Timetabling Conflict Graphs, 553--556 (Abstract) (link to paper)
  231. Burke, E (2005) Forecasting Flight Schedule Robustness, 698--700 (Abstract) (link to paper)
  232. Burke, E (2003) A Pheromone-based Look-ahead Hyper-heuristic for Time-tabling Problems, 174--179 (Abstract) (link to paper)
  233. Burke, E. K (2009) HyFlex: A Flexible Framework for the Design and Analysis of Hyper-heuristics, 790--797 (Abstract) (link to paper)
  234. Burke, E. K (2007) Constructive versus Improvement Heuristics:An Investigation of Examination Timetabling, 595--597 (Abstract) (link to paper)
  235. Burke, E. K (2009) Multilevel Search for Evolving the Acceptance Criteria of a Hyper-Heuristic, 798--801 (Abstract) (link to paper)
  236. Burke, E. K (2009) Multilevel search for choosing hyper-heuristics, 788--789 (Abstract) (link to paper)
  237. Burke, E. K (2009) A self-organising hyper-heuristic framework, 784--787 (Abstract) (link to paper)
  238. Burke, E. K (2009) Recent Work on Planning and Management of University Teaching Space, 737--740 (Abstract) (link to paper)

  239. (Menu for Burke) All papers - Full papers - Abstracts - Selected papers

    Buscher

  240. Buscher, U (2011) An Iterative Scheme for Parallel Machine Scheduling with Sequence Dependent Family Setups, 519--522 (Abstract) (link to paper)

  241. (Menu for Buscher) All papers - Full papers - Abstracts - Selected papers

    Buzon

  242. Buzon, I (2003) A Tabu Search Heuristic to Generate Shift Schedules, 526--527 (Abstract) (link to paper)

  243. (Menu for Buzon) All papers - Full papers - Abstracts - Selected papers

    Byde

  244. Byde, A (2009) Workforce Planning and Scheduling for the HP IT Services Business, 720--723 (Abstract) (link to paper)

  245. (Menu for Byde) All papers - Full papers - Abstracts - Selected papers

    Bykov

  246. Bykov, Y (2013) An initial study of a novel Step Counting Hill Climbing heuristic applied to timetabling problems, 691--693 (Abstract) (link to paper)

  247. (Menu for Bykov) All papers - Full papers - Abstracts - Selected papers

    Bürgy

  248. Bürgy, R (2011) Optimal Job Insertion in the No-Wait Job Shop, 553--556 (Abstract) (link to paper)

  249. (Menu for Bürgy) All papers - Full papers - Abstracts - Selected papers

    Cantais

  250. Cantais, B (2017) Three upper bounds for the speed meeting problem, 344--347 (Abstract) (link to paper)

  251. (Menu for Cantais) All papers - Full papers - Abstracts - Selected papers

    Capek

  252. Capek, R (2011) Minimizing Total Weighted Tardiness and Total Processing Costs for the Scheduling with Alternative Process Plans, 561--563 (Abstract) (link to paper)

  253. (Menu for Capek) All papers - Full papers - Abstracts - Selected papers

    Carlier

  254. Carlier, J (2003) The One Machine Total Cost Scheduling Problem with Release Dates, 406--408 (Abstract) (link to paper)
  255. Carlier, J (2003) Dominance Based Heuristics to Minimize a Total Cost on One Machine, 403--405 (Abstract) (link to paper)
  256. Carlier, J (2015) Lower bounds for Scheduling Problems with production and consumption of resources, 680--682 (Abstract) (link to paper)

  257. (Menu for Carlier) All papers - Full papers - Abstracts - Selected papers

    Cegarra

  258. Cegarra, J (2003) From Human Heuristics to the Design of Scheduling Interfaces, 236--239 (Abstract) (link to paper)

  259. (Menu for Cegarra) All papers - Full papers - Abstracts - Selected papers

    Cepek

  260. Cepek, O (2005) Incremental Propagation Rules For A Precedence Graph With Optional Activities And Time Windows, 552--560 (Abstract) (link to paper)

  261. (Menu for Cepek) All papers - Full papers - Abstracts - Selected papers

    Cerdeira

  262. Cerdeira, J. O (2013) Optimal scheduling of aircrafts engines repair process, 620--623 (Abstract) (link to paper)

  263. (Menu for Cerdeira) All papers - Full papers - Abstracts - Selected papers

    Ceschia

  264. Ceschia, S (2017) Modeling and Solving the Steelmaking and Casting Planning and Scheduling Problem, 380--383 (Abstract) (link to paper)
  265. Ceschia, S (2013) The Dynamic Patient Admission Scheduling with Operating Room Constraints, Flexible Horizon, and Patient Delays, 646--648 (Abstract) (link to paper)

  266. (Menu for Ceschia) All papers - Full papers - Abstracts - Selected papers

    Chaabane

  267. Chaabane, S (2003) Operating Theatre Management, 220--223 (Abstract) (link to paper)

  268. (Menu for Chaabane) All papers - Full papers - Abstracts - Selected papers

    Chakhlevitch

  269. Chakhlevitch, K (2009) Scheduling in a micro-biological laboratory: heuristics for sequencing food sample tests, to co-ordinate with production of perishable media materials, 782--783 (Abstract) (link to paper)

  270. (Menu for Chakhlevitch) All papers - Full papers - Abstracts - Selected papers

    Chan

  271. Chan, P (2007) Staff Rostering Problem: Choice of a Mathematical Model, 601--604 (Abstract) (link to paper)

  272. (Menu for Chan) All papers - Full papers - Abstracts - Selected papers

    Charalambous

  273. Charalambous, C (2011) Hybridizing local search with MIP for unrelated parallel machine scheduling problems with makespan minimization, 529--531 (Abstract) (link to paper)

  274. (Menu for Charalambous) All papers - Full papers - Abstracts - Selected papers

    Chen

  275. Chen, B (2015) Structural properties of an open problem in preemptive scheduling, 673--676 (Abstract) (link to paper)
  276. Chen, C (2013) Order acceptance and scheduling problem with time-dependent revenues, 593--595 (Abstract) (link to paper)
  277. Chen, H-C. (2017) Solving Tourist Trip Design Problems Using a Virus Optimization Algorithm, 384--388 (Abstract) (link to paper)
  278. Chen, M (2013) Optimal Parallel Systems for Random Scheduling Times, 573--576 (Abstract) (link to paper)
  279. Chen, Z-L. (2005) Integrated Production-Distribution Scheduling to Optimize the Tradeoff between Order Delivery Performance and Total Cost, 549--550 (Abstract) (link to paper)

  280. (Menu for Chen) All papers - Full papers - Abstracts - Selected papers

    Cheng

  281. Cheng, T.C E (2005) On a certain berth scheduling problem, 694--697 (Abstract) (link to paper)
  282. Cheng, T.C.E (2003) Customer Order Scheduling to Minimize Total Weighted Completion Time, 409--416 (Abstract) (link to paper)

  283. (Menu for Cheng) All papers - Full papers - Abstracts - Selected papers

    Choi

  284. Choi, J.Y (2015) An Efficient simulated annealing for two-agent scheduling with exponential job-dependent position-based learning consideration, 601--603 (Abstract) (link to paper)

  285. (Menu for Choi) All papers - Full papers - Abstracts - Selected papers

    Chopin

  286. Chopin, A (2003) Just-in-time Scheduling of a 2-Machine Flowshop Problem with Lot-streaming, 473--475 (Abstract) (link to paper)

  287. (Menu for Chopin) All papers - Full papers - Abstracts - Selected papers

    Chretienne

  288. Chretienne, P (2007) Selecting and Scheduling Tasks with Agreeable Time Windows and Setup Costs, 561--563 (Abstract) (link to paper)

  289. (Menu for Chretienne) All papers - Full papers - Abstracts - Selected papers

    Christiaens

  290. Christiaens, J (2013) A heuristic approach to the prisoner transportation problem, 786--789 (Abstract) (link to paper)

  291. (Menu for Christiaens) All papers - Full papers - Abstracts - Selected papers

    Chung

  292. Chung, C (2015) Fairness in employee scheduling, 687--698 (Abstract) (link to paper)

  293. (Menu for Chung) All papers - Full papers - Abstracts - Selected papers

    Ciavotta

  294. Ciavotta, M (2009) New results for the multi-objective sequence dependent setup times °owshop problem, 808--810 (Abstract) (link to paper)

  295. (Menu for Ciavotta) All papers - Full papers - Abstracts - Selected papers

    Clark

  296. Clark, M.D (2013) Heuristic Pruning Methods For The Robust Shortest Path Problem, 767--769 (Abstract) (link to paper)

  297. (Menu for Clark) All papers - Full papers - Abstracts - Selected papers

    Co?man

  298. Co?man, E (2015) Structural properties of an open problem in preemptive scheduling, 673--676 (Abstract) (link to paper)

  299. (Menu for Co?man) All papers - Full papers - Abstracts - Selected papers

    Coban

  300. Coban, B (2015) Shortest k-unit Cycle in a Multiple Part-Type Robotic Cell, 876--878 (Abstract) (link to paper)

  301. (Menu for Coban) All papers - Full papers - Abstracts - Selected papers

    Coffman

  302. Coffman, E (2005) Seamless Download Scheduling in Computer Networks, 3--3 (Abstract) (link to paper)

  303. (Menu for Coffman) All papers - Full papers - Abstracts - Selected papers

    Coolen

  304. Coolen, K (2013) Complexity analysis of the discrete sequential search problem with group activities, 670--672 (Abstract) (link to paper)

  305. (Menu for Coolen) All papers - Full papers - Abstracts - Selected papers

    Copado-Mendez

  306. Copado-Mendez, P.J (2017) Multi-commodity flow and station logistics resolution for train unit scheduling, 321--324 (Abstract) (link to paper)

  307. (Menu for Copado-Mendez) All papers - Full papers - Abstracts - Selected papers

    Coppersmith

  308. Coppersmith, D (2005) Improved Approximation Algorithms For Broadcast Scheduling, 655--656 (Abstract) (link to paper)

  309. (Menu for Coppersmith) All papers - Full papers - Abstracts - Selected papers

    Cortes

  310. Cortes, R (2013) On the effect of complexity and uncertainty in ELSP, 748--752 (Abstract) (link to paper)

  311. (Menu for Cortes) All papers - Full papers - Abstracts - Selected papers

    Creemers

  312. Creemers, S (2009) Project scheduling with alternative technologies and stochastic activity durations, 756--760 (Abstract) (link to paper)
  313. Creemers, S (2017) Optimal solutions for minimum-cost sequential system testing, 312--314 (Abstract) (link to paper)

  314. (Menu for Creemers) All papers - Full papers - Abstracts - Selected papers

    Critchley

  315. Critchley, M (2015) Optimisation of a Stagger Chart for Aviation Fleet Planning, 952--962 (Abstract) (link to paper)

  316. (Menu for Critchley) All papers - Full papers - Abstracts - Selected papers

    Croce

  317. Croce, F. D. (2015) A branch-and-reduce exact algorithm for the single machine total tardiness problem, 879--881 (Abstract) (link to paper)

  318. (Menu for Croce) All papers - Full papers - Abstracts - Selected papers

    Créput

  319. Créput, J. C (2011) Two Phases Parallel Hyperheuristic Approach to the Bus Driver Scheduling Problem, 633--636 (Abstract) (link to paper)

  320. (Menu for Créput) All papers - Full papers - Abstracts - Selected papers

    Cucu-Grosjean

  321. Cucu-Grosjean, L (2009) Response time analysis in distributed real-time systems: An improvement based on best-case finalization time analysis, 839--842 (Abstract) (link to paper)

  322. (Menu for Cucu-Grosjean) All papers - Full papers - Abstracts - Selected papers

    Cuervo

  323. Cuervo, D.P (2017) Railway Rolling Stock Maintenance, 373--376 (Abstract) (link to paper)

  324. (Menu for Cuervo) All papers - Full papers - Abstracts - Selected papers

    Curran

  325. Curran, D (2013) Compilation of Maintenance Schedules based on their Key Performance Indicators for Fast Iterative Interaction, 606--609 (Abstract) (link to paper)

  326. (Menu for Curran) All papers - Full papers - Abstracts - Selected papers

    Curtois

  327. Curtois, T (2009) HyFlex: A Flexible Framework for the Design and Analysis of Hyper-heuristics, 790--797 (Abstract) (link to paper)

  328. (Menu for Curtois) All papers - Full papers - Abstracts - Selected papers

    Côté

  329. Côté, M. G. · J-F. (2009) An Effective Heuristic for the Pickup and Delivery Traveling Salesman Problem with LIFO Loading and Multiple Stacks, 831--833 (Abstract) (link to paper)

  330. (Menu for Côté) All papers - Full papers - Abstracts - Selected papers

    Daffalla

  331. Daffalla, A (2017) Selection Hyper-heuristics for Solving the Wind Farm Layout Optimisation Problem, 393--395 (Abstract) (link to paper)

  332. (Menu for Daffalla) All papers - Full papers - Abstracts - Selected papers

    Dauz`ere-P'er`es

  333. Dauz`ere-P'er`es, S (2017) A Batch-oblivious Approach For Scheduling Complex Job-Shops with Batching Machines: From Non-delay to Active Scheduling, 340--343 (Abstract) (link to paper)

  334. (Menu for Dauz`ere-P'er`es) All papers - Full papers - Abstracts - Selected papers

    Dauzere-Peres

  335. Dauzere-Peres, S (2013) An unrelated parallel machine scheduling problem with auxiliary resources and sequence dependent setup times, 718--720 (Abstract) (link to paper)
  336. Dauzere-Peres, S (2013) New MILP Formulations for Minimizing the Number of Tardy Jobs on a Single Batch Machine, 687--690 (Abstract) (link to paper)
  337. Dauzere-Peres, S (2013) Solving the Hybrid Job Shop Problem with Sequence Dependent Setups, 741--743 (Abstract) (link to paper)
  338. Dauzere-Peres, S (2015) Scheduling Complex Job-Shops using Batch Oblivious Disjunctive Graphs, 788--793 (Abstract) (link to paper)

  339. (Menu for Dauzere-Peres) All papers - Full papers - Abstracts - Selected papers

    Dauzčre-Pérčs

  340. Dauzčre-Pérčs, S (2011) Scheduling job families on parallel machines with a bi-criteria objective function under time constraints, 645--648 (Abstract) (link to paper)

  341. (Menu for Dauzčre-Pérčs) All papers - Full papers - Abstracts - Selected papers

    Davari

  342. Davari, M (2013) Exact algorithms for single-machine scheduling with time windows and precedence constraints, 656--658 (Abstract) (link to paper)

  343. (Menu for Davari) All papers - Full papers - Abstracts - Selected papers

    Dawande

  344. Dawande, M (2005) Approximations to Optimal k-unit Cycles for Dual Gripper Robot Cells, 326--326 (Abstract) (link to paper)

  345. (Menu for Dawande) All papers - Full papers - Abstracts - Selected papers

    De Bruecker

  346. De Bruecker, P (2013) Algorithms for building optimal aircraft maintenance personnel rosters, 633--635 (Abstract) (link to paper)

  347. (Menu for De Bruecker) All papers - Full papers - Abstracts - Selected papers

    De Causmaecker

  348. De Causmaecker, P (2005) Course Timetabling Extended Tiles For University Timetabling, 669--670 (Abstract) (link to paper)
  349. De Causmaecker, P (2003) Decentralised Course Timetabling in a Large Hierarchical Organisation, 60--66 (Abstract) (link to paper)
  350. De Causmaecker, P (2009) A Hyperheuristic Approach to Belgian Nurse Rostering Problems, 683--689 (Abstract) (link to paper)
  351. De Causmaecker, P (2005) Forecasting Flight Schedule Robustness, 698--700 (Abstract) (link to paper)
  352. De Causmaecker, P (2005) Systems Design For Scheduling Open Tools, 40--41 (Abstract) (link to paper)
  353. De Causmaecker, P (2003) Agents in Timetabling Problems, 67--73 (Abstract) (link to paper)
  354. De Causmaecker, P (2011) Pareto Optimal Negotiation for Nurse Rostering Problems, 579--583 (Abstract) (link to paper)
  355. De Causmaecker, P (2009) A multi-agent system handling personnel shortages in hospitals, 693--695 (Abstract) (link to paper)
  356. De Causmaecker, P (2015) The Intermittent Traveling Salesman Problem, 794--796 (Abstract) (link to paper)

  357. (Menu for De Causmaecker) All papers - Full papers - Abstracts - Selected papers

    De Maere

  358. De Maere, G (2005) Forecasting Flight Schedule Robustness, 698--700 (Abstract) (link to paper)

  359. (Menu for De Maere) All papers - Full papers - Abstracts - Selected papers

    De Reyck

  360. De Reyck, B (2009) Project scheduling with alternative technologies and stochastic activity durations, 756--760 (Abstract) (link to paper)
  361. De Reyck, B (2007) Project Scheduling with Success or Failure in Individual Activities, 584--587 (Abstract) (link to paper)

  362. (Menu for De Reyck) All papers - Full papers - Abstracts - Selected papers

    De Wispelaere

  363. De Wispelaere, A (2013) A heuristic approach to the prisoner transportation problem, 786--789 (Abstract) (link to paper)

  364. (Menu for De Wispelaere) All papers - Full papers - Abstracts - Selected papers

    Deblaere

  365. Deblaere, F (2007) An Educational Tool for the Resource-Constrained Project Scheduling Problem, 564--566 (Abstract) (link to paper)

  366. (Menu for Deblaere) All papers - Full papers - Abstracts - Selected papers

    Degbotse

  367. Degbotse, A (2005) Challenges in Matching Assets with Demand across All Supply Chain Management Decision Tiers in the IBM Microelectronics Division from Automated Fabs to Central Planning Engines to Collaborative Behavior (Work Arounds), 391--391 (Abstract) (link to paper)

  368. (Menu for Degbotse) All papers - Full papers - Abstracts - Selected papers

    Deghdak

  369. Deghdak, K (2013) Evacuation Scheduling of a Town after a Natural Disaster: Time-indexed Formulations, 680--683 (Abstract) (link to paper)
  370. Deghdak, K (2015) A Decomposition Heuristic for a Bicriteria Evacuation Scheduling Problem, 704--707 (Abstract) (link to paper)
  371. Deghdak, K (2015) The Discrete Parallel Machine Makespan Scheduling-Location Problem, 659--661 (Abstract) (link to paper)

  372. (Menu for Deghdak) All papers - Full papers - Abstracts - Selected papers

    Demeester

  373. Demeester, P (2005) Systems Design For Scheduling Open Tools, 40--41 (Abstract) (link to paper)
  374. Demeester, P (2013) Modeling Real-World Vehicle Routing Problems with Dependencies, 711--713 (Abstract) (link to paper)

  375. (Menu for Demeester) All papers - Full papers - Abstracts - Selected papers

    Demeulemeester

  376. Demeulemeester, E (2009) Integrated workforce staffing and scheduling: A case study at a major aircraft maintenance company, 724--726 (Abstract) (link to paper)
  377. Demeulemeester, E (2003) Scheduling Trainees at a Hospital Department, 224--225 (Abstract) (link to paper)
  378. Demeulemeester, E (2005) Integrating nurse and surgery scheduling, 408--409 (Abstract) (link to paper)
  379. Demeulemeester, E (2005) Proactive Resource Allocation Heuristics For Robust Project Scheduling, 322--323 (Abstract) (link to paper)
  380. Demeulemeester, E (2013) Algorithms for building optimal aircraft maintenance personnel rosters, 633--635 (Abstract) (link to paper)
  381. Demeulemeester, E (2013) Exact algorithms for single-machine scheduling with time windows and precedence constraints, 656--658 (Abstract) (link to paper)
  382. Demeulemeester, E (2007) An Educational Tool for the Resource-Constrained Project Scheduling Problem, 564--566 (Abstract) (link to paper)
  383. Demeulemeester, E. L (2007) Dynamic Algorithms for Order Acceptance and Capacity Planning within a Multi-Project Environment, 572--574 (Abstract) (link to paper)
  384. Demeulemeester, E (2013) The stochastic resource-constrained project scheduling problem under different confidence levels, 774--776 (Abstract) (link to paper)
  385. Demeulemeester, E (2005) A Tabu-search Based Reactive Procedure For The Rcpsp With Stochastic Resource Availabilities, 335--336 (Abstract) (link to paper)
  386. Demeulemeester, E. L (2007) Exact and Suboptimal Reactive Strategies for Resource-Constrained Project Scheduling with Uncertain Resource Availabilities, 575--577 (Abstract) (link to paper)
  387. Demeulemeester, E (2005) An Evaluation Of Exact And Suboptimal Procedures For Constructing Stable Project Schedules, 341--342 (Abstract) (link to paper)

  388. (Menu for Demeulemeester) All papers - Full papers - Abstracts - Selected papers

    Denton

  389. Denton, B. T (2009) Bi-Criteria Scheduling of an Outpatient Procedure Center, 696--698 (Abstract) (link to paper)

  390. (Menu for Denton) All papers - Full papers - Abstracts - Selected papers

    Dereniowski

  391. Dereniowski, D (2015) Structural properties of an open problem in preemptive scheduling, 673--676 (Abstract) (link to paper)

  392. (Menu for Dereniowski) All papers - Full papers - Abstracts - Selected papers

    Desrosiers

  393. Desrosiers, J (2015) Vector space decomposition for linear programming, 652--655 (Abstract) (link to paper)

  394. (Menu for Desrosiers) All papers - Full papers - Abstracts - Selected papers

    Detienne

  395. Detienne, B (2015) The two-machine flowshop total completion time problem: A branch-and-bound based on Network-flow formulation, 635--637 (Abstract) (link to paper)

  396. (Menu for Detienne) All papers - Full papers - Abstracts - Selected papers

    Dimitrov

  397. Dimitrov, T (2011) Scheduling of large dynamic job shop problems by concurrent non-blocking threads, 542--545 (Abstract) (link to paper)

  398. (Menu for Dimitrov) All papers - Full papers - Abstracts - Selected papers

    Dios

  399. Dios, M (2015) Manufacturing Scheduling Systems: What are they made of?, 768--771 (Abstract) (link to paper)
  400. Dios, M (2015) A framework of constructive heuristics for permutation-type scheduling problems, 764--767 (Abstract) (link to paper)

  401. (Menu for Dios) All papers - Full papers - Abstracts - Selected papers

    Do

  402. Do, H (2007) Assigning Part-time Teachers to Courses via a Stable Marriage Algorithm, 625--627 (Abstract) (link to paper)
  403. Do, V.H (2003) Scheduling with Two Criteria, 468--472 (Abstract) (link to paper)

  404. (Menu for Do) All papers - Full papers - Abstracts - Selected papers

    Doerner

  405. Doerner, K.E (2017) Scheduling of maintenance tasks of a large-scale tram network, 367--369 (Abstract) (link to paper)
  406. Doerner, K.F (2015) Variable Neighborhood Search for a Rich Production Planning Problem, 896--898 (Abstract) (link to paper)

  407. (Menu for Doerner) All papers - Full papers - Abstracts - Selected papers

    Doganis

  408. Doganis, P (2005) Optimal Production Scheduling For Dairy Industries, 324--325 (Abstract) (link to paper)

  409. (Menu for Doganis) All papers - Full papers - Abstracts - Selected papers

    Dolgui

  410. Dolgui, A (2013) Solution algorithms for the two-station single track railway scheduling problem, 636--640 (Abstract) (link to paper)

  411. (Menu for Dolgui) All papers - Full papers - Abstracts - Selected papers

    Donaldson

  412. Donaldson, J (2011) Ring Out the Bells, 624--627 (Abstract) (link to paper)

  413. (Menu for Donaldson) All papers - Full papers - Abstracts - Selected papers

    Dooren

  414. Dooren, D. V. (2015) Multi-objective energy-aware scheduling, 946--948 (Abstract) (link to paper)

  415. (Menu for Dooren) All papers - Full papers - Abstracts - Selected papers

    Dowsland

  416. Dowsland, K (2011) An Exact and Heuristic Hybrid for Solving a Medical Student Scheduling Problem, 584--586 (Abstract) (link to paper)

  417. (Menu for Dowsland) All papers - Full papers - Abstracts - Selected papers

    Drezet

  418. Drezet, LE (2005) A Predictive-reactive Approach For Rcpsp With Labour Constraints And Time-dependent Activities Requirements, 671--672 (Abstract) (link to paper)

  419. (Menu for Drezet) All papers - Full papers - Abstracts - Selected papers

    Dror

  420. Dror, M (2003) A Pheromone-based Look-ahead Hyper-heuristic for Time-tabling Problems, 174--179 (Abstract) (link to paper)

  421. (Menu for Dror) All papers - Full papers - Abstracts - Selected papers

    Drwal

  422. Drwal, M (2015) Complexity of minimizing the total flow time on parallel machines with interval data and minmax regret criterion, 617--621 (Abstract) (link to paper)

  423. (Menu for Drwal) All papers - Full papers - Abstracts - Selected papers

    Duarte

  424. Duarte, A (2003) A Software Pipelining Method Based on a Hierarchical Social Algorithm, 382--385 (Abstract) (link to paper)

  425. (Menu for Duarte) All papers - Full papers - Abstracts - Selected papers

    Ducatelle

  426. Ducatelle, F (2003) Ants Can Solve Difficult Bin Packing Problems, 90--91 (Abstract) (link to paper)

  427. (Menu for Ducatelle) All papers - Full papers - Abstracts - Selected papers

    Duin

  428. Duin, C.W (2005) Models For Adjacent Resource Scheduling, 16--17 (Abstract) (link to paper)
  429. Duin, C.W (2005) On The Complexity Of Adjacent Resource Scheduling, 653--654 (Abstract) (link to paper)

  430. (Menu for Duin) All papers - Full papers - Abstracts - Selected papers

    Earl

  431. Earl, M (2013) Innovative teaching and the death of the utilisation survey, 781--785 (Abstract) (link to paper)

  432. (Menu for Earl) All papers - Full papers - Abstracts - Selected papers

    Edwards

  433. Edwards, S (2017) Symmetry breaking in a special case of the RCPSP/max, 315--318 (Abstract) (link to paper)

  434. (Menu for Edwards) All papers - Full papers - Abstracts - Selected papers

    Eglese

  435. Eglese, R (2003) Vehicle Routing and Scheduling with a Road Timetable, 700--700 (Abstract) (link to paper)
  436. Eglese, R (2005) Vehicle Routing And Scheduling With Time Varying Travel Times, 724--724 (Abstract) (link to paper)

  437. (Menu for Eglese) All papers - Full papers - Abstracts - Selected papers

    Elalouf

  438. Elalouf, A (2015) A general technique for improving the complexity of FPTAS for scheduling problems, 743--745 (Abstract) (link to paper)
  439. Elalouf, A (2015) Floating Patients method based on scheduling algorithm for emergency department's service improvement, 683--686 (Abstract) (link to paper)

  440. (Menu for Elalouf) All papers - Full papers - Abstracts - Selected papers

    Elhag

  441. Elhag, A (2013) A Grouping Hyper-heuristic for Graph Colouring, 770--773 (Abstract) (link to paper)

  442. (Menu for Elhag) All papers - Full papers - Abstracts - Selected papers

    Ermis

  443. Ermis, G (2013) Scheduling chains with constant time lags and variable release times on asingle machine, 584--586 (Abstract) (link to paper)

  444. (Menu for Ermis) All papers - Full papers - Abstracts - Selected papers

    Esswein

  445. Esswein, C (2003) A Genetic Algorithm for Job Shop Scheduling with Flexibility, 417--418 (Abstract) (link to paper)

  446. (Menu for Esswein) All papers - Full papers - Abstracts - Selected papers

    Esteve

  447. Esteve, B (2003) Just-in-time Scheduling of a 2-Machine Flowshop Problem with Lot-streaming, 473--475 (Abstract) (link to paper)

  448. (Menu for Esteve) All papers - Full papers - Abstracts - Selected papers

    Fan

  449. Fan, C (2005) Scheduling The Production And Transportation Operations Subject To Dynamic Arrivals, 701--701 (Abstract) (link to paper)

  450. (Menu for Fan) All papers - Full papers - Abstracts - Selected papers

    Fathy

  451. Fathy, Y (2015) On Task Scheduling Policies for Work-Stealing Schedulers, 821--824 (Abstract) (link to paper)

  452. (Menu for Fathy) All papers - Full papers - Abstracts - Selected papers

    Feillet

  453. Feillet, D (2007) Dynamic Cooperative Search for Constraint Satisfaction and Combinatorial Optimization: Application to a Rostering Problem, 557--560 (Abstract) (link to paper)

  454. (Menu for Feillet) All papers - Full papers - Abstracts - Selected papers

    Feng

  455. Feng, G (2005) Efficient Algorithms For Machine Scheduling Problems With Earliness And Tardiness Penalties, 196--212 (Abstract) (link to paper)

  456. (Menu for Feng) All papers - Full papers - Abstracts - Selected papers

    Fernandes

  457. Fernandes, F (2015) Solving the staff scheduling problem in a retail company, 611--613 (Abstract) (link to paper)

  458. (Menu for Fernandes) All papers - Full papers - Abstracts - Selected papers

    Fernandez-Viagas

  459. Fernandez-Viagas, V (2015) Manufacturing Scheduling Systems: What are they made of?, 768--771 (Abstract) (link to paper)
  460. Fernandez-Viagas, V (2015) A framework of constructive heuristics for permutation-type scheduling problems, 764--767 (Abstract) (link to paper)

  461. (Menu for Fernandez-Viagas) All papers - Full papers - Abstracts - Selected papers

    Fernández

  462. Fernández, F (2003) A Software Pipelining Method Based on a Hierarchical Social Algorithm, 382--385 (Abstract) (link to paper)

  463. (Menu for Fernández) All papers - Full papers - Abstracts - Selected papers

    Finke

  464. Finke, G (2013) Two extensions of Lawler’s min-max cost algorithm, 790--794 (Abstract) (link to paper)
  465. Finke, G (2009) Polynomial complexity of the cyclic identical coupled task problem, 679--682 (Abstract) (link to paper)
  466. Finke, G (2007) Scheduling Problems of Chemical Experiments, 581--583 (Abstract) (link to paper)

  467. (Menu for Finke) All papers - Full papers - Abstracts - Selected papers

    Fleischer

  468. Fleischer, L. (2005) Algorithms for online buffer management, 518--518 (Abstract) (link to paper)

  469. (Menu for Fleischer) All papers - Full papers - Abstracts - Selected papers

    Fleszar

  470. Fleszar, K (2011) Hybridizing local search with MIP for unrelated parallel machine scheduling problems with makespan minimization, 529--531 (Abstract) (link to paper)

  471. (Menu for Fleszar) All papers - Full papers - Abstracts - Selected papers

    Fong

  472. Fong, C-W. (2015) A Hybrid Swarm Algorithm for Post Enrollment Course Timetabling, 931--942 (Abstract) (link to paper)
  473. Fong, P. Y. (2005) Combined Production and Distribution Scheduling of Ready-Mix Concrete, 551--551 (Abstract) (link to paper)

  474. (Menu for Fong) All papers - Full papers - Abstracts - Selected papers

    Fontes

  475. Fontes, B.B.M.M (2017) Integrated Scheduling of Machines and Vehicles and and Storage Tasks in Flexible Manufacturing Systems, 388--392 (Abstract) (link to paper)

  476. (Menu for Fontes) All papers - Full papers - Abstracts - Selected papers

    Foong

  477. Foong, W. K. (2005) Ant Colony Optimization for Power Plant Maintenance Scheduling Optimization:A Simplified Hydro Tasmania System, 72--72 (Abstract) (link to paper)

  478. (Menu for Foong) All papers - Full papers - Abstracts - Selected papers

    Fordyce

  479. Fordyce, K (2005) Challenges in Matching Assets with Demand across All Supply Chain Management Decision Tiers in the IBM Microelectronics Division from Automated Fabs to Central Planning Engines to Collaborative Behavior (Work Arounds), 391--391 (Abstract) (link to paper)

  480. (Menu for Fordyce) All papers - Full papers - Abstracts - Selected papers

    Fores

  481. Fores, S (2003) Recent Advancement in an Established Driver Scheduling System, 704--706 (Abstract) (link to paper)

  482. (Menu for Fores) All papers - Full papers - Abstracts - Selected papers

    Fowler

  483. Fowler, J (2015) The polynomial solvability of a bicriteria linear combination on parallel identical machines with release dates, 902--904 (Abstract) (link to paper)
  484. Fowler, J (2005) Multiple Orders Per Job Scheduling Problems, 44--45 (Abstract) (link to paper)
  485. Fowler, J (2005) Scheduling Wafer Fabrication Operations: State-of-the-practice And Future Needs, 392--393 (Abstract) (link to paper)
  486. Fowler, J. W (2009) Bi-Criteria Scheduling of an Outpatient Procedure Center, 696--698 (Abstract) (link to paper)
  487. Fowler, J (2005) A Divide-and-merge Heuristic For Single Machine Weighted Tardiness Problem, 186--187 (Abstract) (link to paper)
  488. Fowler, J (2011) Single Machine Scheduling with Interfering Job Sets to Minimize Total Weighted Completion Time and Maximum Lateness, 568--572 (Abstract) (link to paper)
  489. Fowler, J. W (2007) Interactive Evolutionary Multicriteria Scheduling, 591--594 (Abstract) (link to paper)
  490. Fowler, J (2005) A Deterministic Scheduling Approach For Wafer Fabrication Facilities, 42--43 (Abstract) (link to paper)
  491. Fowler, J. W (2011) Flexible Constraint Optimization of Product Profits: A responsive approach to determine profit-optimal product start rates subject to mean cycle time and product volume constraints in support of production planning for semiconductor fabrication facilities, 599--601 (Abstract) (link to paper)
  492. Fowler, J. W (2011) Investigating the boundary between scheduling and dispatching, 573--575 (Abstract) (link to paper)
  493. Fowler, J. W (2011) Algorithmic Parallelization in Multi-Criteria Semiconductor Scheduling, 642--644 (Abstract) (link to paper)
  494. Fowler, J. W (2011) Job Scheduling to Minimize Weighted Completion Time Variance on Identical Parallel Machines, 546--548 (Abstract) (link to paper)
  495. Fowler, J (2015) Scheduling Jobs in a Two-Stage Flexible Flow Shop with Batch Processing Machines, 801--804 (Abstract) (link to paper)

  496. (Menu for Fowler) All papers - Full papers - Abstracts - Selected papers

    Framinan

  497. Framinan, J. M (2015) Manufacturing Scheduling Systems: What are they made of?, 768--771 (Abstract) (link to paper)
  498. Framinan, J.M (2015) A framework of constructive heuristics for permutation-type scheduling problems, 764--767 (Abstract) (link to paper)

  499. (Menu for Framinan) All papers - Full papers - Abstracts - Selected papers

    Froncek

  500. Froncek, D (2003) Round Robin Tournaments with No Breaks in Home-Away Patterns, 602--603 (Abstract) (link to paper)

  501. (Menu for Froncek) All papers - Full papers - Abstracts - Selected papers

    Fuchigami

  502. Fuchigami, H.Y (2017) A parametric priority rule for just-in-time scheduling problem with sequence-dependent setup times, 370--372 (Abstract) (link to paper)

  503. (Menu for Fuchigami) All papers - Full papers - Abstracts - Selected papers

    G

  504. G, J. J. H. (2013) Use Matrixes Of Weighing for the scheduling in a sports Fantasy., 694--702 (Abstract) (link to paper)
  505. G, M. J. G. (2013) Use Matrixes Of Weighing for the scheduling in a sports Fantasy., 694--702 (Abstract) (link to paper)

  506. (Menu for G) All papers - Full papers - Abstracts - Selected papers

    Gafarov

  507. Gafarov, E.R (2013) Solution algorithms for the two-station single track railway scheduling problem, 636--640 (Abstract) (link to paper)
  508. Gafarov, E. R (2009) Estimation of absolute error for the resources-constrained project scheduling problem, 671--678 (Abstract) (link to paper)

  509. (Menu for Gafarov) All papers - Full papers - Abstracts - Selected papers

    Gao

  510. Gao, J (2011) Two-Stage Shipment Planning with Uncertainties: A Stochastic Programming Approach, 602--604 (Abstract) (link to paper)
  511. Gao, H (2009) An Empirical Study of Impacts of Production Mix Efficiency, Product Route Efficiency on Operations Performance and Profitability: A Reverse Logistics Approach, 765--767 (Abstract) (link to paper)

  512. (Menu for Gao) All papers - Full papers - Abstracts - Selected papers

    Garcia-Sabater

  513. Garcia-Sabater, J.P (2013) On the effect of complexity and uncertainty in ELSP, 748--752 (Abstract) (link to paper)

  514. (Menu for Garcia-Sabater) All papers - Full papers - Abstracts - Selected papers

    Garra?a

  515. Garra?a, M (2015) A branch-and-reduce exact algorithm for the single machine total tardiness problem, 879--881 (Abstract) (link to paper)
  516. Garra?a, M (2013) A computational study of a stock cutting problem with sequence dependent cut losses, 703--706 (Abstract) (link to paper)

  517. (Menu for Garra?a) All papers - Full papers - Abstracts - Selected papers

    Gaspero

  518. Gaspero, L. D (2017) Modeling and Solving the Steelmaking and Casting Planning and Scheduling Problem, 380--383 (Abstract) (link to paper)

  519. (Menu for Gaspero) All papers - Full papers - Abstracts - Selected papers

    Gather

  520. Gather, T (2009) Exact methods for the resource levelling problem, 811--820 (Abstract) (link to paper)

  521. (Menu for Gather) All papers - Full papers - Abstracts - Selected papers

    Gauthier

  522. Gauthier, J.B (2015) Vector space decomposition for linear programming, 652--655 (Abstract) (link to paper)

  523. (Menu for Gauthier) All papers - Full papers - Abstracts - Selected papers

    Gawiejnowicz

  524. Gawiejnowicz, S. la (2007) Scheduling Resumable Deteriorating Jobs, 567--569 (Abstract) (link to paper)

  525. (Menu for Gawiejnowicz) All papers - Full papers - Abstracts - Selected papers

    Geismar

  526. Geismar, H. N (2005) Approximations to Optimal k-unit Cycles for Dual Gripper Robot Cells, 326--326 (Abstract) (link to paper)

  527. (Menu for Geismar) All papers - Full papers - Abstracts - Selected papers

    Gel

  528. Gel, E (2007) Interactive Evolutionary Multicriteria Scheduling, 591--594 (Abstract) (link to paper)

  529. (Menu for Gel) All papers - Full papers - Abstracts - Selected papers

    Gendreau

  530. Gendreau, M (2003) A Tabu Search Heuristic to Generate Shift Schedules, 526--527 (Abstract) (link to paper)

  531. (Menu for Gendreau) All papers - Full papers - Abstracts - Selected papers

    Glass

  532. Glass, C. A (2005) How to maximize rewards in an incentived made-to-order scheduling environment:, 69--69 (Abstract) (link to paper)
  533. Glass, C (2009) Scheduling in a micro-biological laboratory: heuristics for sequencing food sample tests, to co-ordinate with production of perishable media materials, 782--783 (Abstract) (link to paper)

  534. (Menu for Glass) All papers - Full papers - Abstracts - Selected papers

    Glazebrook

  535. Glazebrook, K (2015) Ant Colony Optimisation for a Job Shop with Flexible Maintenance, 614--616 (Abstract) (link to paper)

  536. (Menu for Glazebrook) All papers - Full papers - Abstracts - Selected papers

    Goel

  537. Goel, A (2015) Scheduling of jobs in the continuous casting stage of steel production, 899--901 (Abstract) (link to paper)

  538. (Menu for Goel) All papers - Full papers - Abstracts - Selected papers

    Goldrick

  539. Goldrick, J. M (2009) Decision Support Systems for Tankering within the Airline Industry, 837--838 (Abstract) (link to paper)

  540. (Menu for Goldrick) All papers - Full papers - Abstracts - Selected papers

    Gomes

  541. Gomes, M. C (2009) Scheduling of job shop, make-to-order industries with recirculation and assembly: discrete versus continuous time models, 802--807 (Abstract) (link to paper)
  542. Gomes, M. C (2005) Optimal Reactive Scheduling For Job Shop, Make-toorder Industries: A Mould Making Industry Case Study, 46--46 (Abstract) (link to paper)

  543. (Menu for Gomes) All papers - Full papers - Abstracts - Selected papers

    Gonzalez

  544. Gonzalez, M. T (2009) Workforce Planning and Scheduling for the HP IT Services Business, 720--723 (Abstract) (link to paper)

  545. (Menu for Gonzalez) All papers - Full papers - Abstracts - Selected papers

    Goossens

  546. Goossens, J (2009) Response time analysis in distributed real-time systems: An improvement based on best-case finalization time analysis, 839--842 (Abstract) (link to paper)
  547. Goossens, D. R (2009) Soccer schedules in Europe: an overview, 715--717 (Abstract) (link to paper)
  548. Goossens, D. R (2013) Scheduling round robin tournaments for amateur sport leagues, 596--598 (Abstract) (link to paper)

  549. (Menu for Goossens) All papers - Full papers - Abstracts - Selected papers

    Gorczyca

  550. Gorczyca, M (2015) A dynamic model of task processing for scheduling problems without additional resources, 649--651 (Abstract) (link to paper)

  551. (Menu for Gorczyca) All papers - Full papers - Abstracts - Selected papers

    Grigoreva

  552. Grigoreva, N.S (2015) Multiprocessor Scheduling with Inserted Idle Time to Minimize the Maximum Lateness, 814--816 (Abstract) (link to paper)

  553. (Menu for Grigoreva) All papers - Full papers - Abstracts - Selected papers

    Gröflin

  554. Gröflin, H (2011) Optimal Job Insertion in the No-Wait Job Shop, 553--556 (Abstract) (link to paper)

  555. (Menu for Gröflin) All papers - Full papers - Abstracts - Selected papers

    Gude

  556. Gude, J. P. (2007) Sequencing JIT Mixed Model Assembly Lines Under Station-Load and Part-Usage Constraints using Lagrangean Relaxations, 550--552 (Abstract) (link to paper)

  557. (Menu for Gude) All papers - Full papers - Abstracts - Selected papers

    Guedes

  558. Guedes, A.F. M. (2013) Scheduling with MS Project: an add-in, 707--710 (Abstract) (link to paper)

  559. (Menu for Guedes) All papers - Full papers - Abstracts - Selected papers

    Gui

  560. Gui, H (2011) Supply Logistics Synchronization: Scale Development and Empirical Study of Chinese Manufacturing, 497--501 (Abstract) (link to paper)

  561. (Menu for Gui) All papers - Full papers - Abstracts - Selected papers

    Guinet

  562. Guinet, A (2003) Operating Theatre Management, 220--223 (Abstract) (link to paper)

  563. (Menu for Guinet) All papers - Full papers - Abstracts - Selected papers

    Guirchoun

  564. Guirchoun, S (2005) Complexity Results For Parallel Machine Scheduling Problems With A Server In Computer Systems, 232--236 (Abstract) (link to paper)

  565. (Menu for Guirchoun) All papers - Full papers - Abstracts - Selected papers

    Gul

  566. Gul, S (2009) Bi-Criteria Scheduling of an Outpatient Procedure Center, 696--698 (Abstract) (link to paper)

  567. (Menu for Gul) All papers - Full papers - Abstracts - Selected papers

    Gultekin

  568. Gultekin, H (2015) Shortest k-unit Cycle in a Multiple Part-Type Robotic Cell, 876--878 (Abstract) (link to paper)
  569. Gultekin, H (2017) Robotic Cell Scheduling Considering Energy Consumption of Robot Moves, 329--329 (Abstract) (link to paper)

  570. (Menu for Gultekin) All papers - Full papers - Abstracts - Selected papers

    Gunawan

  571. Gunawan, A (2017) Solving Tourist Trip Design Problems Using a Virus Optimization Algorithm, 384--388 (Abstract) (link to paper)

  572. (Menu for Gunawan) All papers - Full papers - Abstracts - Selected papers

    Gupta

  573. Gupta, J.N.D (2015) Family Scheduling in Flow Shop Manufacturing Systems with Batch Availability, 746--749 (Abstract) (link to paper)

  574. (Menu for Gupta) All papers - Full papers - Abstracts - Selected papers

    Gurel

  575. Gurel, S (2017) Robotic Cell Scheduling Considering Energy Consumption of Robot Moves, 329--329 (Abstract) (link to paper)

  576. (Menu for Gurel) All papers - Full papers - Abstracts - Selected papers

    Gushchina

  577. Gushchina, V (2015) Three approaches to solving the problem of cosmonauts’ training planning, 750--754 (Abstract) (link to paper)

  578. (Menu for Gushchina) All papers - Full papers - Abstracts - Selected papers

    Günther

  579. Günther, H-O. (2009) An MILP-based approach to short-term production scheduling and lot sizing with major and minor setups: A case study from the beverage industry, 741--743 (Abstract) (link to paper)

  580. (Menu for Günther) All papers - Full papers - Abstracts - Selected papers

    Hajjam

  581. Hajjam, A (2011) Two Phases Parallel Hyperheuristic Approach to the Bus Driver Scheduling Problem, 633--636 (Abstract) (link to paper)

  582. (Menu for Hajjam) All papers - Full papers - Abstracts - Selected papers

    Hall

  583. Hall, N.G (2003) The Coordination of Scheduling and Batch Deliveries, 656--659 (Abstract) (link to paper)

  584. (Menu for Hall) All papers - Full papers - Abstracts - Selected papers

    Hamid

  585. Hamid, N. H. A (2009) Mathematical Modeling for Maximising Gate Receipt Problem, 709--714 (Abstract) (link to paper)

  586. (Menu for Hamid) All papers - Full papers - Abstracts - Selected papers

    Han

  587. Han, J (2013) Parallel Machine Scheduling with Generalized Precedence Relations, 733--736 (Abstract) (link to paper)
  588. Han, L (2003) Application of Genetic Algorithm Based Hyper-heuristics to Personnel Scheduling Problems, 528--539 (Abstract) (link to paper)

  589. (Menu for Han) All papers - Full papers - Abstracts - Selected papers

    Hanayama

  590. Hanayama, N (2015) Routing Strategy for Prioritized Limited Multi-server Processor-Sharing System that includes Servers with Various Capacities, 596--600 (Abstract) (link to paper)

  591. (Menu for Hanayama) All papers - Full papers - Abstracts - Selected papers

    Hanen

  592. Hanen, C (2013) Grouping tasks to save energy in a cyclic wireless sensor network scheduling problem, 721--724 (Abstract) (link to paper)

  593. (Menu for Hanen) All papers - Full papers - Abstracts - Selected papers

    Hanzalek

  594. Hanzalek, Z (2011) A Parallel Approach for a Nurse Rerostering Problem on the GPU, 576--578 (Abstract) (link to paper)
  595. Hanzalek, Z (2015) A new lower bound for optimisation of energy consumption of robotic cells, 662--665 (Abstract) (link to paper)
  596. Hanzalek, Z (2011) Minimizing Total Weighted Tardiness and Total Processing Costs for the Scheduling with Alternative Process Plans, 561--563 (Abstract) (link to paper)
  597. Hanzalek, Z (2013) Grouping tasks to save energy in a cyclic wireless sensor network scheduling problem, 721--724 (Abstract) (link to paper)
  598. Hanzalek, Z (2017) Efficient algorithms for non-preemptive mixed-criticality match-up scheduling problem, 377--379 (Abstract) (link to paper)
  599. Hanzalek, Z (2015) Nurse Rostering Problem: Tighter Upper Bound for Pricing Problem in Branch and Price Approach, 759--763 (Abstract) (link to paper)
  600. Hanzalek, Z (2015) Mixed-criticality scheduling with known probabilities, 867--870 (Abstract) (link to paper)

  601. (Menu for Hanzalek) All papers - Full papers - Abstracts - Selected papers

    Hao

  602. Hao, J-K. (2007) Integrated Vehicle and Crew Scheduling for Extra-Urban Transport, 578--580 (Abstract) (link to paper)

  603. (Menu for Hao) All papers - Full papers - Abstracts - Selected papers

    Hartl

  604. Hartl, R. F (2009) A VNS-based solution approach for a flexible flow shop problem with limited buffer, 706--708 (Abstract) (link to paper)

  605. (Menu for Hartl) All papers - Full papers - Abstracts - Selected papers

    Haspeslagh

  606. Haspeslagh, S (2011) Pareto Optimal Negotiation for Nurse Rostering Problems, 579--583 (Abstract) (link to paper)
  607. Haspeslagh, S (2009) A multi-agent system handling personnel shortages in hospitals, 693--695 (Abstract) (link to paper)

  608. (Menu for Haspeslagh) All papers - Full papers - Abstracts - Selected papers

    Haugen

  609. Haugen, K (2009) Using a set of fixed prices when solving Profit Maximization Capacitated Lot-Size Problems (PCLSP), 821--822 (Abstract) (link to paper)

  610. (Menu for Haugen) All papers - Full papers - Abstracts - Selected papers

    Haz?r

  611. Haz?r, O (2013) Batch Sizing and Just-In-Time Scheduling: Analysis of Some Special Cases, 757--761 (Abstract) (link to paper)

  612. (Menu for Haz?r) All papers - Full papers - Abstracts - Selected papers

    Hendel

  613. Hendel, Y (2007) The Parallel Machine Scheduling Problem with Path-like Constraints, 570--571 (Abstract) (link to paper)

  614. (Menu for Hendel) All papers - Full papers - Abstracts - Selected papers

    Herbots

  615. Herbots, J (2007) Dynamic Algorithms for Order Acceptance and Capacity Planning within a Multi-Project Environment, 572--574 (Abstract) (link to paper)
  616. Herbots, J (2009) Order acceptance and scheduling in a single-machine environment: exact and heuristic algorithms, 772--774 (Abstract) (link to paper)

  617. (Menu for Herbots) All papers - Full papers - Abstracts - Selected papers

    Herding

  618. Herding, R (2015) Using Adaptive Large Neighborhood Search to Solve Parallel Machine Scheduling Problems with Dedications and Unequal Ready Times of the Jobs, 817--820 (Abstract) (link to paper)

  619. (Menu for Herding) All papers - Full papers - Abstracts - Selected papers

    Herr

  620. Herr, O (2015) Scheduling of jobs in the continuous casting stage of steel production, 899--901 (Abstract) (link to paper)

  621. (Menu for Herr) All papers - Full papers - Abstracts - Selected papers

    Herring

  622. Herring, W. L (2011) Scheduling Impatient Jobs with Diminishing Rewards: The Impact of Deteriorating Survival Probabilities on Mass Casualty Incident Triage, 587--591 (Abstract) (link to paper)

  623. (Menu for Herring) All papers - Full papers - Abstracts - Selected papers

    Herrmann

  624. Herrmann, J. W (2011) Scheduling Impatient Jobs with Diminishing Rewards: The Impact of Deteriorating Survival Probabilities on Mass Casualty Incident Triage, 587--591 (Abstract) (link to paper)

  625. (Menu for Herrmann) All papers - Full papers - Abstracts - Selected papers

    Herroelen

  626. Herroelen, W (2005) Proactive Resource Allocation Heuristics For Robust Project Scheduling, 322--323 (Abstract) (link to paper)
  627. Herroelen, W. S (2007) An Educational Tool for the Resource-Constrained Project Scheduling Problem, 564--566 (Abstract) (link to paper)
  628. Herroelen, W. S (2007) Dynamic Algorithms for Order Acceptance and Capacity Planning within a Multi-Project Environment, 572--574 (Abstract) (link to paper)
  629. Herroelen, W (2005) A Tabu-search Based Reactive Procedure For The Rcpsp With Stochastic Resource Availabilities, 335--336 (Abstract) (link to paper)
  630. Herroelen, W. S (2007) Exact and Suboptimal Reactive Strategies for Resource-Constrained Project Scheduling with Uncertain Resource Availabilities, 575--577 (Abstract) (link to paper)
  631. Herroelen, W (2003) Resource Allocation for Stability in Reactive Project Scheduling, 116--119 (Abstract) (link to paper)
  632. Herroelen, W (2005) Stable Single-machine Schedules, 213--214 (Abstract) (link to paper)
  633. Herroelen, W. S (2007) A Methodology for Integrated Risk Management and Proactive Scheduling of Construction Projects, 611--613 (Abstract) (link to paper)
  634. Herroelen, W (2005) An Evaluation Of Exact And Suboptimal Procedures For Constructing Stable Project Schedules, 341--342 (Abstract) (link to paper)

  635. (Menu for Herroelen) All papers - Full papers - Abstracts - Selected papers

    Heßler

  636. Heßler, C (2015) The Discrete Parallel Machine Makespan Scheduling-Location Problem, 659--661 (Abstract) (link to paper)

  637. (Menu for Heßler) All papers - Full papers - Abstracts - Selected papers

    Hieu

  638. Hieu, T. T (2011) Two-level water-flow algorithm for vehicle routing problems, 493--496 (Abstract) (link to paper)

  639. (Menu for Hieu) All papers - Full papers - Abstracts - Selected papers

    Hiroux

  640. Hiroux, M (2007) Staff Rostering Problem: Choice of a Mathematical Model, 601--604 (Abstract) (link to paper)

  641. (Menu for Hiroux) All papers - Full papers - Abstracts - Selected papers

    Hoc

  642. Hoc, J-M. (2003) From Human Heuristics to the Design of Scheduling Interfaces, 236--239 (Abstract) (link to paper)

  643. (Menu for Hoc) All papers - Full papers - Abstracts - Selected papers

    Hojati

  644. Hojati, M (2015) A Greedy-based Heuristic for Shift Minimization Personnel Task Scheduling Problem, 949--951 (Abstract) (link to paper)

  645. (Menu for Hojati) All papers - Full papers - Abstracts - Selected papers

    Homayouni

  646. Homayouni, S.M (2017) Integrated Scheduling of Machines and Vehicles and and Storage Tasks in Flexible Manufacturing Systems, 388--392 (Abstract) (link to paper)

  647. (Menu for Homayouni) All papers - Full papers - Abstracts - Selected papers

    Horn

  648. Horn, G (2015) Scheduling Time Variant Jobs on a Time Variant Resource, 914--917 (Abstract) (link to paper)

  649. (Menu for Horn) All papers - Full papers - Abstracts - Selected papers

    Horvath

  650. Horvath, M (2015) Solving resource constrained shortest path problems with branch-and-cut, 677--679 (Abstract) (link to paper)

  651. (Menu for Horvath) All papers - Full papers - Abstracts - Selected papers

    Houbraken

  652. Houbraken, M (2013) Modeling Real-World Vehicle Routing Problems with Dependencies, 711--713 (Abstract) (link to paper)

  653. (Menu for Houbraken) All papers - Full papers - Abstracts - Selected papers

    Huang

  654. Huang, P (2011) Supply Logistics Synchronization: Scale Development and Empirical Study of Chinese Manufacturing, 497--501 (Abstract) (link to paper)

  655. (Menu for Huang) All papers - Full papers - Abstracts - Selected papers

    Hurink

  656. Hurink, J (2007) Statistical Quality Analysis of Schedulers under Soft-Real-Time Constraints, 547--549 (Abstract) (link to paper)
  657. Hurink, J. L (2009) Time-constrained project scheduling with adjacent resources, 761--763 (Abstract) (link to paper)
  658. Hurink, J. L (2007) Online Scheduling of Parallel Jobs on Two Machines is 2-Competitive, 605--607 (Abstract) (link to paper)

  659. (Menu for Hurink) All papers - Full papers - Abstracts - Selected papers

    Huschka

  660. Huschka, T. R (2009) Bi-Criteria Scheduling of an Outpatient Procedure Center, 696--698 (Abstract) (link to paper)

  661. (Menu for Huschka) All papers - Full papers - Abstracts - Selected papers

    Hussin

  662. Hussin, N. M. (2003) An Investigation of a Tabu Search Based Hyper-heuristic for Examination Timetabling, 226--235 (Abstract) (link to paper)

  663. (Menu for Hussin) All papers - Full papers - Abstracts - Selected papers

    Hutabarat

  664. Hutabarat, W (2015) Investigating Scheduling models for Power Plant Preventive Maintenance using Genetic Algorithm, 591--595 (Abstract) (link to paper)

  665. (Menu for Hutabarat) All papers - Full papers - Abstracts - Selected papers

    Hyde

  666. Hyde, M (2009) HyFlex: A Flexible Framework for the Design and Analysis of Hyper-heuristics, 790--797 (Abstract) (link to paper)
  667. Hyde, M (2009) Multilevel Search for Evolving the Acceptance Criteria of a Hyper-Heuristic, 798--801 (Abstract) (link to paper)

  668. (Menu for Hyde) All papers - Full papers - Abstracts - Selected papers

    Hübner

  669. Hübner, F (2015) Robust multi-mode resource constrained project scheduling of building deconstruction under uncertainty, 638--644 (Abstract) (link to paper)

  670. (Menu for Hübner) All papers - Full papers - Abstracts - Selected papers

    Ingels

  671. Ingels, J (2015) A heuristic procedure to proactively increase employee substitutability and personnel roster robustness, 669--672 (Abstract) (link to paper)
  672. Ingels, J (2013) The Impact of Problem Characteristics on the Robustness of a Personnel Schedule: An Empirical Investigation, 684--686 (Abstract) (link to paper)

  673. (Menu for Ingels) All papers - Full papers - Abstracts - Selected papers

    Innorta

  674. Innorta, M (2011) Deterministic and stochastic models for investment in different technologies for electricity production in the long period, 607--623 (Abstract) (link to paper)

  675. (Menu for Innorta) All papers - Full papers - Abstracts - Selected papers

    Ionescu

  676. Ionescu, L (2015) Stability and Flexibility of Crew and Aircraft Schedules, 785--787 (Abstract) (link to paper)

  677. (Menu for Ionescu) All papers - Full papers - Abstracts - Selected papers

    Jain

  678. Jain, S (2009) Workforce Planning and Scheduling for the HP IT Services Business, 720--723 (Abstract) (link to paper)

  679. (Menu for Jain) All papers - Full papers - Abstracts - Selected papers

    Jamaluddin

  680. Jamaluddin, N.F (2017) Variation of Demands for a New Improvised University Course Timetabling Problem Mathematical Model, 320--320 (Abstract) (link to paper)
  681. Jamaluddin, N.F (2017) Mathematical model for a high quality examination timetabling problem: case study of a university in Malaysia, 319--319 (Abstract) (link to paper)

  682. (Menu for Jamaluddin) All papers - Full papers - Abstracts - Selected papers

    Janiak

  683. Janiak, A (2015) A dynamic model of task processing for scheduling problems without additional resources, 649--651 (Abstract) (link to paper)

  684. (Menu for Janiak) All papers - Full papers - Abstracts - Selected papers

    Jansen

  685. Jansen, P (2007) Statistical Quality Analysis of Schedulers under Soft-Real-Time Constraints, 547--549 (Abstract) (link to paper)

  686. (Menu for Jansen) All papers - Full papers - Abstracts - Selected papers

    Jennings

  687. Jennings, P (2015) Ant Colony Optimisation for a Job Shop with Flexible Maintenance, 614--616 (Abstract) (link to paper)

  688. (Menu for Jennings) All papers - Full papers - Abstracts - Selected papers

    Jougle

  689. Jougle, A (2017) Three upper bounds for the speed meeting problem, 344--347 (Abstract) (link to paper)

  690. (Menu for Jougle) All papers - Full papers - Abstracts - Selected papers

    Jouglet

  691. Jouglet, A (2013) Minimizing the dissemination length in the one-datum-unit data transfer problem, 587--589 (Abstract) (link to paper)
  692. Jouglet, A (2003) The One Machine Total Cost Scheduling Problem with Release Dates, 406--408 (Abstract) (link to paper)
  693. Jouglet, A (2003) Dominance Based Heuristics to Minimize a Total Cost on One Machine, 403--405 (Abstract) (link to paper)
  694. Jouglet, A (2005) Lower Bounds For Parallel Machine Scheduling, 215--216 (Abstract) (link to paper)

  695. (Menu for Jouglet) All papers - Full papers - Abstracts - Selected papers

    Juarez

  696. Juarez, J.R.C (2017) Solving Tourist Trip Design Problems Using a Virus Optimization Algorithm, 384--388 (Abstract) (link to paper)

  697. (Menu for Juarez) All papers - Full papers - Abstracts - Selected papers

    Juhn

  698. Juhn, J. H (2005) Single Machine Product Scheduling With Outsourcing Allowed., 340--340 (Abstract) (link to paper)

  699. (Menu for Juhn) All papers - Full papers - Abstracts - Selected papers

    Juraszek

  700. Juraszek, J (2009) Simulated Annealing Method for Maximizing Revenue on Parallel Machines, 699--701 (Abstract) (link to paper)

  701. (Menu for Juraszek) All papers - Full papers - Abstracts - Selected papers

    Kaihara

  702. Kaihara, T (2017) An Integrated Optimization of Dynamic Product Family Configuration and Supply Chain Configuration, 336--339 (Abstract) (link to paper)

  703. (Menu for Kaihara) All papers - Full papers - Abstracts - Selected papers

    Kamel

  704. Kamel, A. E (2005) Job Shop Scheduling Problem With Multi-purpose Machines And Availability Constraints, 217--231 (Abstract) (link to paper)

  705. (Menu for Kamel) All papers - Full papers - Abstracts - Selected papers

    Kampmeyer

  706. Kampmeyer, T (2005) Tabu Search Algorithms For Cyclic Machine Scheduling Problems with blocking, 107--108 (Abstract) (link to paper)

  707. (Menu for Kampmeyer) All papers - Full papers - Abstracts - Selected papers

    Kaplansky

  708. Kaplansky, E (2003) University Timetabling – A Case Study for Scheduling Agents, 56--59 (Abstract) (link to paper)

  709. (Menu for Kaplansky) All papers - Full papers - Abstracts - Selected papers

    Karhi

  710. Karhi, S (2015) Online and semi-online scheduling of two job types on a set of multipurpose machines, 626--628 (Abstract) (link to paper)

  711. (Menu for Karhi) All papers - Full papers - Abstracts - Selected papers

    Karim

  712. Karim, A (2013) Reentrance and exact time lag on flow shop scheduling problem, 610--612 (Abstract) (link to paper)

  713. (Menu for Karim) All papers - Full papers - Abstracts - Selected papers

    Kasirzadeh

  714. Kasirzadeh, A (2015) An integrated simultaneous approach for pilots and copilots re-scheduling problem, 943--945 (Abstract) (link to paper)

  715. (Menu for Kasirzadeh) All papers - Full papers - Abstracts - Selected papers

    Katzensteiner

  716. Katzensteiner, C. A. · S (2009) A VNS-based solution approach for a flexible flow shop problem with limited buffer, 706--708 (Abstract) (link to paper)

  717. (Menu for Katzensteiner) All papers - Full papers - Abstracts - Selected papers

    Kedad-Sidhoum

  718. Kedad-Sidhoum, S (2013) Batch Sizing and Just-In-Time Scheduling: Analysis of Some Special Cases, 757--761 (Abstract) (link to paper)

  719. (Menu for Kedad-Sidhoum) All papers - Full papers - Abstracts - Selected papers

    Keha

  720. Keha, A (2015) The polynomial solvability of a bicriteria linear combination on parallel identical machines with release dates, 902--904 (Abstract) (link to paper)
  721. Keha, A (2005) A Divide-and-merge Heuristic For Single Machine Weighted Tardiness Problem, 186--187 (Abstract) (link to paper)
  722. Keha, A (2011) Single Machine Scheduling with Interfering Job Sets to Minimize Total Weighted Completion Time and Maximum Lateness, 568--572 (Abstract) (link to paper)

  723. (Menu for Keha) All papers - Full papers - Abstracts - Selected papers

    Kellerer

  724. Kellerer, H (2013) Fast Approximation Schemes for Boolean Programming and Scheduling Problems Related to Positive Convex Half-Product, 577--579 (Abstract) (link to paper)

  725. (Menu for Kellerer) All papers - Full papers - Abstracts - Selected papers

    Kelly

  726. Kelly, J. D. (2005) The Unit-Operation-Stock Superstructure (UOSS) and the Quantity-Logic-Quality Paradigm (QLQP) for Production Scheduling in the Process Industries, 327--333 (Abstract) (link to paper)

  727. (Menu for Kelly) All papers - Full papers - Abstracts - Selected papers

    Kendall

  728. Kendall, G (2009) An Investigation of an Ant-based Hyperheuristic for the Capacitated Vehicle Routing Problem, 823--826 (Abstract) (link to paper)
  729. Kendall, G (2003) A Pheromone-based Look-ahead Hyper-heuristic for Time-tabling Problems, 174--179 (Abstract) (link to paper)
  730. Kendall, G (2009) HyFlex: A Flexible Framework for the Design and Analysis of Hyper-heuristics, 790--797 (Abstract) (link to paper)
  731. Kendall, G (2007) Constructive versus Improvement Heuristics:An Investigation of Examination Timetabling, 595--597 (Abstract) (link to paper)
  732. Kendall, G (2015) A Hybrid Swarm Algorithm for Post Enrollment Course Timetabling, 931--942 (Abstract) (link to paper)
  733. Kendall, G (2009) Mathematical Modeling for Maximising Gate Receipt Problem, 709--714 (Abstract) (link to paper)
  734. Kendall, G (2003) Application of Genetic Algorithm Based Hyper-heuristics to Personnel Scheduling Problems, 528--539 (Abstract) (link to paper)
  735. Kendall, G (2003) An Investigation of a Tabu Search Based Hyper-heuristic for Examination Timetabling, 226--235 (Abstract) (link to paper)
  736. Kendall, G (2003) Channel Assignment Optimisation Using an Adaptive Heuristic, 492--505 (Abstract) (link to paper)
  737. Kendall, G (2009) Decision Support Systems for Tankering within the Airline Industry, 837--838 (Abstract) (link to paper)

  738. (Menu for Kendall) All papers - Full papers - Abstracts - Selected papers

    Kheiri

  739. Kheiri, A (2017) Selection Hyper-heuristics for Solving the Wind Farm Layout Optimisation Problem, 393--395 (Abstract) (link to paper)

  740. (Menu for Kheiri) All papers - Full papers - Abstracts - Selected papers

    Khosravi

  741. Khosravi, B (2011) Train Scheduling in the UK using a Job Shop Scheduling Approach, 486--488 (Abstract) (link to paper)

  742. (Menu for Khosravi) All papers - Full papers - Abstracts - Selected papers

    Khowala

  743. Khowala, K (2011) Single Machine Scheduling with Interfering Job Sets to Minimize Total Weighted Completion Time and Maximum Lateness, 568--572 (Abstract) (link to paper)

  744. (Menu for Khowala) All papers - Full papers - Abstracts - Selected papers

    Kiefer

  745. Kiefer, A (2017) Scheduling of maintenance tasks of a large-scale tram network, 367--369 (Abstract) (link to paper)

  746. (Menu for Kiefer) All papers - Full papers - Abstracts - Selected papers

    Kim

  747. Kim, Y.K (2003) Using an Artificial Intelligence Search Technique in a Manufacturing Planning and Scheduling Environment, 388--402 (Abstract) (link to paper)

  748. (Menu for Kim) All papers - Full papers - Abstracts - Selected papers

    Kimbrel

  749. Kimbrel, T (2005) Algorithms for online buffer management, 518--518 (Abstract) (link to paper)
  750. Kimbrel, T (2005) A survey on minimizing makespan for the preemptive job with two machine, 337--339 (Abstract) (link to paper)

  751. (Menu for Kimbrel) All papers - Full papers - Abstracts - Selected papers

    Kirchner

  752. Kirchner, S (2015) Appointment scheduling in hospitals Sequencing and scheduling using timeaggregation, 849--851 (Abstract) (link to paper)

  753. (Menu for Kirchner) All papers - Full papers - Abstracts - Selected papers

    Kis

  754. Kis, T (2015) Solving resource constrained shortest path problems with branch-and-cut, 677--679 (Abstract) (link to paper)

  755. (Menu for Kis) All papers - Full papers - Abstracts - Selected papers

    Kjenstad

  756. Kjenstad, D (2017) The "Orchestrator" approach to multimodal continental trip planning., 362--366 (Abstract) (link to paper)

  757. (Menu for Kjenstad) All papers - Full papers - Abstracts - Selected papers

    Kliewer

  758. Kliewer, N (2015) Stability and Flexibility of Crew and Aircraft Schedules, 785--787 (Abstract) (link to paper)

  759. (Menu for Kliewer) All papers - Full papers - Abstracts - Selected papers

    Knopp

  760. Knopp, S (2015) Scheduling Complex Job-Shops using Batch Oblivious Disjunctive Graphs, 788--793 (Abstract) (link to paper)

  761. (Menu for Knopp) All papers - Full papers - Abstracts - Selected papers

    Knowles

  762. Knowles, J (2015) Iterated Local Search for the Generator Maintenance Scheduling Problem, 708--742 (Abstract) (link to paper)

  763. (Menu for Knowles) All papers - Full papers - Abstracts - Selected papers

    Ko

  764. Ko, J (2003) Using an Artificial Intelligence Search Technique in a Manufacturing Planning and Scheduling Environment, 388--402 (Abstract) (link to paper)

  765. (Menu for Ko) All papers - Full papers - Abstracts - Selected papers

    Kochaniková

  766. Kochaniková, B (2013) Student Scheduling for Bachelor State Examinations, 762--766 (Abstract) (link to paper)

  767. (Menu for Kochaniková) All papers - Full papers - Abstracts - Selected papers

    Kok

  768. Kok, A.L (2009) Time-constrained project scheduling with adjacent resources, 761--763 (Abstract) (link to paper)

  769. (Menu for Kok) All papers - Full papers - Abstracts - Selected papers

    Koksalan

  770. Koksalan, M (2007) Interactive Evolutionary Multicriteria Scheduling, 591--594 (Abstract) (link to paper)

  771. (Menu for Koksalan) All papers - Full papers - Abstracts - Selected papers

    Kononov

  772. Kononov, A (2007) Scheduling Resumable Deteriorating Jobs, 567--569 (Abstract) (link to paper)

  773. (Menu for Kononov) All papers - Full papers - Abstracts - Selected papers

    Korhonen

  774. Korhonen, P (2007) Interactive Evolutionary Multicriteria Scheduling, 591--594 (Abstract) (link to paper)

  775. (Menu for Korhonen) All papers - Full papers - Abstracts - Selected papers

    Koukam

  776. Koukam, A (2011) Two Phases Parallel Hyperheuristic Approach to the Bus Driver Scheduling Problem, 633--636 (Abstract) (link to paper)

  777. (Menu for Koukam) All papers - Full papers - Abstracts - Selected papers

    Kozma

  778. Kozma, R. (2011) Optimization of Scheduling for Large-Scale Logistics Tasks, 489--492 (Abstract) (link to paper)

  779. (Menu for Kozma) All papers - Full papers - Abstracts - Selected papers

    Krasik

  780. Krasik, V (2005) Inventory Control And Scheduling With Facilities In Parallel, 740--742 (Abstract) (link to paper)

  781. (Menu for Krasik) All papers - Full papers - Abstracts - Selected papers

    Krass

  782. Krass, D (2015) Strategic Idling and Dynamic Scheduling in Open-Shop Service Network: Case Study and Analysis, 604--605 (Abstract) (link to paper)

  783. (Menu for Krass) All papers - Full papers - Abstracts - Selected papers

    Kristiansen

  784. Kristiansen, S (2015) Flow Formulation-based Model for the Curriculum-based Course Timetabling Problem, 825--848 (Abstract) (link to paper)
  785. Kristiansen, S (2013) Student Sectioning at High Schools in Denmark, 628--632 (Abstract) (link to paper)

  786. (Menu for Kristiansen) All papers - Full papers - Abstracts - Selected papers

    Krogt

  787. Krogt, R. v. (2013) Compilation of Maintenance Schedules based on their Key Performance Indicators for Fast Iterative Interaction, 606--609 (Abstract) (link to paper)

  788. (Menu for Krogt) All papers - Full papers - Abstracts - Selected papers

    Kubiak

  789. Kubiak, W (2015) Structural properties of an open problem in preemptive scheduling, 673--676 (Abstract) (link to paper)
  790. Kubiak, W (2007) The Parallel Machine Scheduling Problem with Path-like Constraints, 570--571 (Abstract) (link to paper)

  791. (Menu for Kubiak) All papers - Full papers - Abstracts - Selected papers

    Kufer

  792. Kufer, K-H. (2015) How to Unload Bulk Carriers Quickly? Mathematical Models to Identify Efficient Loading Patterns, 772--775 (Abstract) (link to paper)
  793. Kufer, K-H. (2013) Time-Hierarchical Scheduling A worst-case analysis of a rolling hierarchical approach for integrated production planning and scheduling i nmake-to-order environments, 617--619 (Abstract) (link to paper)

  794. (Menu for Kufer) All papers - Full papers - Abstracts - Selected papers

    Kuhpfahl

  795. Kuhpfahl, J (2011) Computational Comparison of Neighbourhoods for the Job Shop Scheduling Problem with Total Weighted Tardiness Objective, 536--538 (Abstract) (link to paper)
  796. Kuhpfahl, J (2013) A GRASP approach for the Job Shop Scheduling Problem with minimizing the Total Weighted Tardiness, 613--616 (Abstract) (link to paper)

  797. (Menu for Kuhpfahl) All papers - Full papers - Abstracts - Selected papers

    Kumar

  798. Kumar, M (2005) Scheduling The Production And Transportation Operations Subject To Dynamic Arrivals, 701--701 (Abstract) (link to paper)

  799. (Menu for Kumar) All papers - Full papers - Abstracts - Selected papers

    Kurz

  800. Kurz, M. E (2011) Adapting Particle Swarm Optimization for the Flexible Flow Line, 653--656 (Abstract) (link to paper)

  801. (Menu for Kurz) All papers - Full papers - Abstracts - Selected papers

    Kutanoglu

  802. Kutanoglu, E (2005) Multiple Orders Per Job Scheduling Problems, 44--45 (Abstract) (link to paper)
  803. Kutanoglu, E (2005) Forming And Scheduling Jobs With Order Weights In Semiconductor Manufacturing, 334--334 (Abstract) (link to paper)

  804. (Menu for Kutanoglu) All papers - Full papers - Abstracts - Selected papers

    Kwan

  805. Kwan, A.S.K (2003) Recent Advancement in an Established Driver Scheduling System, 704--706 (Abstract) (link to paper)
  806. Kwan, R.S.K (2003) Recent Advancement in an Established Driver Scheduling System, 704--706 (Abstract) (link to paper)
  807. Kwan, A. S. K (2005) Building Robustness Into Train Driver Schedules, 702--703 (Abstract) (link to paper)
  808. Kwan, R. S. K (2005) Building Robustness Into Train Driver Schedules, 702--703 (Abstract) (link to paper)
  809. Kwan, R.S. (2017) Multi-commodity flow and station logistics resolution for train unit scheduling, 321--324 (Abstract) (link to paper)
  810. Kwan, R.S.K (2003) A Co-Evolutionary Approach for Train Timetabling, 701--703 (Abstract) (link to paper)
  811. Kwan, R. S. K (2005) Repair-cost-guided Local Search For Scheduling, 109--110 (Abstract) (link to paper)
  812. Kwan, A. S. K (2005) Repair-cost-guided Local Search For Scheduling, 109--110 (Abstract) (link to paper)
  813. Kwan, R. S. K (2009) Real World Optimisation through Spin Out Activity, 778--781 (Abstract) (link to paper)

  814. (Menu for Kwan) All papers - Full papers - Abstracts - Selected papers

    Labane

  815. Labane, M (2003) A Genetic Algorithm for Job Shop Scheduling with Flexibility, 417--418 (Abstract) (link to paper)

  816. (Menu for Labane) All papers - Full papers - Abstracts - Selected papers

    Lam

  817. Lam, W- (2015) A Hybrid Swarm Algorithm for Post Enrollment Course Timetabling, 931--942 (Abstract) (link to paper)

  818. (Menu for Lam) All papers - Full papers - Abstracts - Selected papers

    Lamas

  819. Lamas, P (2013) The stochastic resource-constrained project scheduling problem under different confidence levels, 774--776 (Abstract) (link to paper)

  820. (Menu for Lamas) All papers - Full papers - Abstracts - Selected papers

    Lambrecht

  821. Lambrecht, M (2009) Project scheduling with alternative technologies and stochastic activity durations, 756--760 (Abstract) (link to paper)

  822. (Menu for Lambrecht) All papers - Full papers - Abstracts - Selected papers

    Lambrechts

  823. Lambrechts, O (2005) A Tabu-search Based Reactive Procedure For The Rcpsp With Stochastic Resource Availabilities, 335--336 (Abstract) (link to paper)
  824. Lambrechts, O (2007) Exact and Suboptimal Reactive Strategies for Resource-Constrained Project Scheduling with Uncertain Resource Availabilities, 575--577 (Abstract) (link to paper)

  825. (Menu for Lambrechts) All papers - Full papers - Abstracts - Selected papers

    Lamorgese

  826. Lamorgese, L (2015) Multi-level Benders Decomposition for Multi-modal Outpatient Scheduling in Hospitals, 892--895 (Abstract) (link to paper)

  827. (Menu for Lamorgese) All papers - Full papers - Abstracts - Selected papers

    Lancia

  828. Lancia, G (2013) Scheduling teams for aircraft ground maintenance, 649--651 (Abstract) (link to paper)

  829. (Menu for Lancia) All papers - Full papers - Abstracts - Selected papers

    Landa-Silva

  830. Landa-Silva, D (2007) Clustering Within Timetabling Conflict Graphs, 553--556 (Abstract) (link to paper)

  831. (Menu for Landa-Silva) All papers - Full papers - Abstracts - Selected papers

    Lane

  832. Lane, J.P (2003) EventMAP – A Workable Solution, 570--573 (Abstract) (link to paper)

  833. (Menu for Lane) All papers - Full papers - Abstracts - Selected papers

    Lange

  834. Lange, J (2015) Approaches to modeling job-shop problems with blocking constraints, 645--648 (Abstract) (link to paper)

  835. (Menu for Lange) All papers - Full papers - Abstracts - Selected papers

    Lanquepin

  836. Lanquepin, G (2009) Using a set of fixed prices when solving Profit Maximization Capacitated Lot-Size Problems (PCLSP), 821--822 (Abstract) (link to paper)

  837. (Menu for Lanquepin) All papers - Full papers - Abstracts - Selected papers

    Lapierre

  838. Lapierre, S (2003) A Tabu Search Heuristic to Generate Shift Schedules, 526--527 (Abstract) (link to paper)

  839. (Menu for Lapierre) All papers - Full papers - Abstracts - Selected papers

    Laplagne

  840. Laplagne, I (2005) Building Robustness Into Train Driver Schedules, 702--703 (Abstract) (link to paper)
  841. Laplagne, I (2005) Repair-cost-guided Local Search For Scheduling, 109--110 (Abstract) (link to paper)

  842. (Menu for Laplagne) All papers - Full papers - Abstracts - Selected papers

    Lapčgue

  843. Lapčgue, T (2013) A large neighborhood search for the Shift Design Personnel Task Scheduling Problem with Equity, 590--592 (Abstract) (link to paper)

  844. (Menu for Lapčgue) All papers - Full papers - Abstracts - Selected papers

    Lau

  845. Lau, H. C. (2005) Efficient Algorithms For Machine Scheduling Problems With Earliness And Tardiness Penalties, 196--212 (Abstract) (link to paper)
  846. Lau, H.C (2017) Combining Machine Learning and Optimization for Real-World Scheduling Applications, 011--011 (Abstract) (link to paper)
  847. Lau, H. Y. K (2005) Integrated Scheduling of Different Types of Handling Equipment at Automated Container Terminals, 536--537 (Abstract) (link to paper)

  848. (Menu for Lau) All papers - Full papers - Abstracts - Selected papers

    Laurent

  849. Laurent, B (2007) Integrated Vehicle and Crew Scheduling for Extra-Urban Transport, 578--580 (Abstract) (link to paper)

  850. (Menu for Laurent) All papers - Full papers - Abstracts - Selected papers

    Lauret

  851. Lauret, J (2015) Model for planning of distributed data production, 699--703 (Abstract) (link to paper)
  852. Lauret, J (2009) Planning Heuristics for Efficient Data Movement on the Grid, 768--771 (Abstract) (link to paper)

  853. (Menu for Lauret) All papers - Full papers - Abstracts - Selected papers

    Lazarev

  854. Lazarev, A (2015) Three approaches to solving the problem of cosmonauts’ training planning, 750--754 (Abstract) (link to paper)
  855. Lazarev, A. A (2009) Estimation of absolute error for the resources-constrained project scheduling problem, 671--678 (Abstract) (link to paper)
  856. Lazarev, A (2015) Single machine scheduling: finding the Pareto Set for jobs with equal processing times with respect to criteria Lmax and Cmax., 797--800 (Abstract) (link to paper)

  857. (Menu for Lazarev) All papers - Full papers - Abstracts - Selected papers

    Lazarov

  858. Lazarov, A.A (2013) Solution algorithms for the two-station single track railway scheduling problem, 636--640 (Abstract) (link to paper)

  859. (Menu for Lazarov) All papers - Full papers - Abstracts - Selected papers

    Lee

  860. Lee, I. S (2005) Single Machine Product Scheduling With Outsourcing Allowed., 340--340 (Abstract) (link to paper)

  861. (Menu for Lee) All papers - Full papers - Abstracts - Selected papers

    Leggate

  862. Leggate, A (2015) Modeling Uncertainty in Vessel Crew Scheduling, 805--808 (Abstract) (link to paper)

  863. (Menu for Leggate) All papers - Full papers - Abstracts - Selected papers

    Lehoux-Lebacque

  864. Lehoux-Lebacque, V (2009) Polynomial complexity of the cyclic identical coupled task problem, 679--682 (Abstract) (link to paper)
  865. Lehoux-Lebacque, V (2007) Scheduling Problems of Chemical Experiments, 581--583 (Abstract) (link to paper)

  866. (Menu for Lehoux-Lebacque) All papers - Full papers - Abstracts - Selected papers

    Lei

  867. Lei, L (2005) Scheduling The Production And Transportation Operations Subject To Dynamic Arrivals, 701--701 (Abstract) (link to paper)
  868. Lei, L (2017) Multi-commodity flow and station logistics resolution for train unit scheduling, 321--324 (Abstract) (link to paper)
  869. Lei, L (2005) On the Capacitated Packing-Delivering Problem with a Fixed Route, 70--70 (Abstract) (link to paper)

  870. (Menu for Lei) All papers - Full papers - Abstracts - Selected papers

    Leithauser

  871. Leithauser, N (2015) How to Unload Bulk Carriers Quickly? Mathematical Models to Identify Efficient Loading Patterns, 772--775 (Abstract) (link to paper)

  872. (Menu for Leithauser) All papers - Full papers - Abstracts - Selected papers

    Lennartz

  873. Lennartz, P (2003) The Relation Between the No-Wait Job Shop Problem and the Traveling Salesman Problem, 419--421 (Abstract) (link to paper)

  874. (Menu for Lennartz) All papers - Full papers - Abstracts - Selected papers

    Lenstra

  875. Lenstra, J. K. (2005) Scheduling, a Critical Biography, 4--4 (Abstract) (link to paper)

  876. (Menu for Lenstra) All papers - Full papers - Abstracts - Selected papers

    Lente

  877. Lente, C (2015) An exponential dynamic programming algorithm for the 3-machine ?owshop scheduling problem to minimize the makespan, 755--758 (Abstract) (link to paper)

  878. (Menu for Lente) All papers - Full papers - Abstracts - Selected papers

    Lenté

  879. Lenté, C (2011) Sort & Search exponential-time algorithms for scheduling problems, 523--528 (Abstract) (link to paper)

  880. (Menu for Lenté) All papers - Full papers - Abstracts - Selected papers

    Leoff

  881. Leoff, J (2013) Time-Hierarchical Scheduling A worst-case analysis of a rolling hierarchical approach for integrated production planning and scheduling i nmake-to-order environments, 617--619 (Abstract) (link to paper)

  882. (Menu for Leoff) All papers - Full papers - Abstracts - Selected papers

    Leung

  883. Leung, L. C. K (2011) Two-Stage Shipment Planning with Uncertainties: A Stochastic Programming Approach, 602--604 (Abstract) (link to paper)
  884. Leung, J (2005) Inventory Control And Scheduling With Facilities In Parallel, 740--742 (Abstract) (link to paper)
  885. Leung, J. M.Y (2005) Timetable Synchronization for Mass Transit, 516--517 (Abstract) (link to paper)

  886. (Menu for Leung) All papers - Full papers - Abstracts - Selected papers

    Leus

  887. Leus, R (2013) A resource loading problem in the aircraft line maintenance industry, 580--583 (Abstract) (link to paper)
  888. Leus, R (2009) Solving a dock assignment problem as a three-stage flexible flow-shop problem, 752--755 (Abstract) (link to paper)
  889. Leus, R (2013) Complexity analysis of the discrete sequential search problem with group activities, 670--672 (Abstract) (link to paper)
  890. Leus, R (2009) Project scheduling with alternative technologies and stochastic activity durations, 756--760 (Abstract) (link to paper)
  891. Leus, R (2013) Exact algorithms for single-machine scheduling with time windows and precedence constraints, 656--658 (Abstract) (link to paper)
  892. Leus, R (2007) Dynamic Algorithms for Order Acceptance and Capacity Planning within a Multi-Project Environment, 572--574 (Abstract) (link to paper)
  893. Leus, R (2003) Resource Allocation for Stability in Reactive Project Scheduling, 116--119 (Abstract) (link to paper)
  894. Leus, R (2005) Stable Single-machine Schedules, 213--214 (Abstract) (link to paper)
  895. Leus, R (2007) Project Scheduling with Success or Failure in Individual Activities, 584--587 (Abstract) (link to paper)
  896. Leus, R (2017) Optimal solutions for minimum-cost sequential system testing, 312--314 (Abstract) (link to paper)
  897. Leus, R (2009) Order acceptance and scheduling in a single-machine environment: exact and heuristic algorithms, 772--774 (Abstract) (link to paper)
  898. Leus, R (2013) Optimal scheduling policies for diagnosing k-out-of-n systems with imperfect tests, 624--627 (Abstract) (link to paper)

  899. (Menu for Leus) All papers - Full papers - Abstracts - Selected papers

    Levine

  900. Levine, J (2003) Ants Can Solve Difficult Bin Packing Problems, 90--91 (Abstract) (link to paper)

  901. (Menu for Levine) All papers - Full papers - Abstracts - Selected papers

    Levner

  902. Levner, E (2015) A general technique for improving the complexity of FPTAS for scheduling problems, 743--745 (Abstract) (link to paper)

  903. (Menu for Levner) All papers - Full papers - Abstracts - Selected papers

    Lewis

  904. Lewis, R (2009) Round-robin Sports Scheduling from a Graph Colouring Perspective: A Case Study in Rugby Union Scheduling, 718--719 (Abstract) (link to paper)

  905. (Menu for Lewis) All papers - Full papers - Abstracts - Selected papers

    Li

  906. Li, J (2003) Explicit Learning: an Effort towards Human Scheduling Algorithms, 240--243 (Abstract) (link to paper)
  907. Li, S (2011) Two Phases Parallel Hyperheuristic Approach to the Bus Driver Scheduling Problem, 633--636 (Abstract) (link to paper)
  908. Li, J-Q. (2011) Schedule Recovery Strategies in Public and Freight Transportation Systems under Disruptions, 484--485 (Abstract) (link to paper)
  909. Li, X (2011) Job Scheduling to Minimize Weighted Completion Time Variance on Identical Parallel Machines, 546--548 (Abstract) (link to paper)

  910. (Menu for Li) All papers - Full papers - Abstracts - Selected papers

    Liang

  911. Liang, Y-C. (2017) Solving Tourist Trip Design Problems Using a Virus Optimization Algorithm, 384--388 (Abstract) (link to paper)

  912. (Menu for Liang) All papers - Full papers - Abstracts - Selected papers

    Lichtenstein

  913. Lichtenstein, M (2015) A dynamic model of task processing for scheduling problems without additional resources, 649--651 (Abstract) (link to paper)

  914. (Menu for Lichtenstein) All papers - Full papers - Abstracts - Selected papers

    Liedlo?

  915. Liedlo?, M (2015) An exponential dynamic programming algorithm for the 3-machine ?owshop scheduling problem to minimize the makespan, 755--758 (Abstract) (link to paper)

  916. (Menu for Liedlo?) All papers - Full papers - Abstracts - Selected papers

    Liedloff

  917. Liedloff, M (2011) Sort & Search exponential-time algorithms for scheduling problems, 523--528 (Abstract) (link to paper)

  918. (Menu for Liedloff) All papers - Full papers - Abstracts - Selected papers

    Lin

  919. Lin, Z (2017) Multi-commodity flow and station logistics resolution for train unit scheduling, 321--324 (Abstract) (link to paper)
  920. Lin, E. Y.H (2009) On the Effective Approach of Teaching Activity Scheduling in Project Management, 764--764 (Abstract) (link to paper)

  921. (Menu for Lin) All papers - Full papers - Abstracts - Selected papers

    Lindahl

  922. Lindahl, M (2015) A Matheuristic for Curriculum-Based Course Timetabling, 606--610 (Abstract) (link to paper)

  923. (Menu for Lindahl) All papers - Full papers - Abstracts - Selected papers

    Lisovoy

  924. Lisovoy, A (2015) The resource dependent assignment problem with a convex assignment cost function and its relation to scheduling with controllable processing times, 629--634 (Abstract) (link to paper)

  925. (Menu for Lisovoy) All papers - Full papers - Abstracts - Selected papers

    Little

  926. Little, J (2013) Compilation of Maintenance Schedules based on their Key Performance Indicators for Fast Iterative Interaction, 606--609 (Abstract) (link to paper)

  927. (Menu for Little) All papers - Full papers - Abstracts - Selected papers

    Liu

  928. Liu, S (2005) On the Capacitated Packing-Delivering Problem with a Fixed Route, 70--70 (Abstract) (link to paper)

  929. (Menu for Liu) All papers - Full papers - Abstracts - Selected papers

    Lopes

  930. Lopes, I.C (2013) Optimal scheduling of aircrafts engines repair process, 620--623 (Abstract) (link to paper)

  931. (Menu for Lopes) All papers - Full papers - Abstracts - Selected papers

    Lopez

  932. Lopez, P (2015) Multimode Time-Constrained Scheduling Problems with Generalized Temporal Constraints and Labor Skills, 809--813 (Abstract) (link to paper)

  933. (Menu for Lopez) All papers - Full papers - Abstracts - Selected papers

    Lozano

  934. Lozano, A. J (2011) Scheduling of parallel machines with sequence-dependent batches and product incompatibilities in an automotive glass facility, 564--567 (Abstract) (link to paper)

  935. (Menu for Lozano) All papers - Full papers - Abstracts - Selected papers

    Lubbecke

  936. Lubbecke, M.E (2015) Vector space decomposition for linear programming, 652--655 (Abstract) (link to paper)
  937. Lubbecke, M (2015) Appointment scheduling in hospitals Sequencing and scheduling using timeaggregation, 849--851 (Abstract) (link to paper)

  938. (Menu for Lubbecke) All papers - Full papers - Abstracts - Selected papers

    Lykourentzou

  939. Lykourentzou, I (2013) Guiding wiki crowds through resource scheduling, 753--756 (Abstract) (link to paper)

  940. (Menu for Lykourentzou) All papers - Full papers - Abstracts - Selected papers

    Lřkketangen

  941. Lřkketangen, A (2009) Using a set of fixed prices when solving Profit Maximization Capacitated Lot-Size Problems (PCLSP), 821--822 (Abstract) (link to paper)

  942. (Menu for Lřkketangen) All papers - Full papers - Abstracts - Selected papers

    M"onch

  943. M"onch, L (2017) Hybrid Heuristics for Multiple Orders per Job Scheduling Problems with Parallel Machines and a Common Due Date, 358--361 (Abstract) (link to paper)

  944. (Menu for M"onch) All papers - Full papers - Abstracts - Selected papers

    M. Mahdian

  945. M. Mahdian, (2005) Algorithms for online buffer management, 518--518 (Abstract) (link to paper)

  946. (Menu for M. Mahdian) All papers - Full papers - Abstracts - Selected papers

    Ma

  947. Ma, S (2011) Supply Logistics Synchronization: Scale Development and Empirical Study of Chinese Manufacturing, 497--501 (Abstract) (link to paper)

  948. (Menu for Ma) All papers - Full papers - Abstracts - Selected papers

    Macedo

  949. Macedo, R (2015) Scheduling preventive railway maintenance activities with resource constraints, 782--784 (Abstract) (link to paper)

  950. (Menu for Macedo) All papers - Full papers - Abstracts - Selected papers

    Machowiak

  951. Machowiak, M (2005) On a certain berth scheduling problem, 694--697 (Abstract) (link to paper)
  952. Machowiak, M (2009) Approximation algorithm for berth and quay crane allocation problem with bounds., 748--751 (Abstract) (link to paper)

  953. (Menu for Machowiak) All papers - Full papers - Abstracts - Selected papers

    Mackulak

  954. Mackulak, G. T (2011) Flexible Constraint Optimization of Product Profits: A responsive approach to determine profit-optimal product start rates subject to mean cycle time and product volume constraints in support of production planning for semiconductor fabrication facilities, 599--601 (Abstract) (link to paper)

  955. (Menu for Mackulak) All papers - Full papers - Abstracts - Selected papers

    Maden

  956. Maden, W (2003) Vehicle Routing and Scheduling with a Road Timetable, 700--700 (Abstract) (link to paper)
  957. Maden, W (2005) Vehicle Routing And Scheduling With Time Varying Travel Times, 724--724 (Abstract) (link to paper)

  958. (Menu for Maden) All papers - Full papers - Abstracts - Selected papers

    Madureira

  959. Madureira, A (2003) Using Tabu Search for Dynamic Scheduling: The Extended Job-Shop Scheduling Problem, 114--115 (Abstract) (link to paper)

  960. (Menu for Madureira) All papers - Full papers - Abstracts - Selected papers

    Maenhout

  961. Maenhout, B (2015) A heuristic procedure to proactively increase employee substitutability and personnel roster robustness, 669--672 (Abstract) (link to paper)
  962. Maenhout, B (2013) The Impact of Problem Characteristics on the Robustness of a Personnel Schedule: An Empirical Investigation, 684--686 (Abstract) (link to paper)
  963. Maenhout, B (2015) A heuristic procedure for the personnel task re-scheduling problem, 666--668 (Abstract) (link to paper)
  964. Maenhout, B (2007) A Branch-and-Price Procedure for Nurse Staffing Incorporating Roster Preferences, 588--590 (Abstract) (link to paper)
  965. Maenhout, B (2009) Reactive Nurse Scheduling in Hospitals, 690--692 (Abstract) (link to paper)
  966. Maenhout, B (2005) An Electromagnetic Meta-heuristic For The Nurse Scheduling Problem, 410--411 (Abstract) (link to paper)
  967. Maenhout, B (2013) An exact procedure for an integrated project staffing problem, 673--675 (Abstract) (link to paper)

  968. (Menu for Maenhout) All papers - Full papers - Abstracts - Selected papers

    Maier

  969. Maier, H. R (2005) Ant Colony Optimization for Power Plant Maintenance Scheduling Optimization:A Simplified Hydro Tasmania System, 72--72 (Abstract) (link to paper)

  970. (Menu for Maier) All papers - Full papers - Abstracts - Selected papers

    Makatun

  971. Makatun, D (2015) Model for planning of distributed data production, 699--703 (Abstract) (link to paper)

  972. (Menu for Makatun) All papers - Full papers - Abstracts - Selected papers

    Manger

  973. Manger, R (2009) Speeding up the optimal off-line algorithm for solving the k-server problem, 852--854 (Abstract) (link to paper)

  974. (Menu for Manger) All papers - Full papers - Abstracts - Selected papers

    Mannino

  975. Mannino, C (2017) The "Orchestrator" approach to multimodal continental trip planning., 362--366 (Abstract) (link to paper)
  976. Mannino, C (2015) Multi-level Benders Decomposition for Multi-modal Outpatient Scheduling in Hospitals, 892--895 (Abstract) (link to paper)
  977. Mannino, C (2011) Operational Surgery scheduling problems: Modelling and solving, 592--595 (Abstract) (link to paper)

  978. (Menu for Mannino) All papers - Full papers - Abstracts - Selected papers

    Maravelias

  979. Maravelias, C. T (2005) A Decomposition Approach For Batch Scheduling In The Process Industry, 66--67 (Abstract) (link to paper)

  980. (Menu for Maravelias) All papers - Full papers - Abstracts - Selected papers

    Marinelli

  981. Marinelli, F (2003) Scheduling Commands on Satellite Constellation, 598--601 (Abstract) (link to paper)

  982. (Menu for Marinelli) All papers - Full papers - Abstracts - Selected papers

    Marquis

  983. Marquis, J (2007) Interactive Evolutionary Multicriteria Scheduling, 591--594 (Abstract) (link to paper)

  984. (Menu for Marquis) All papers - Full papers - Abstracts - Selected papers

    Marszalkowski

  985. Marszalkowski, J (2015) Budgeted Internet Shopping Optimization Problem (B-ISOP), 885--887 (Abstract) (link to paper)

  986. (Menu for Marszalkowski) All papers - Full papers - Abstracts - Selected papers

    Martineau

  987. Martineau, P (2005) Complexity Results For Parallel Machine Scheduling Problems With A Server In Computer Systems, 232--236 (Abstract) (link to paper)

  988. (Menu for Martineau) All papers - Full papers - Abstracts - Selected papers

    Mason

  989. Mason, S (2005) Multiple Orders Per Job Scheduling Problems, 44--45 (Abstract) (link to paper)
  990. Mason, A (2013) Student Sectioning at High Schools in Denmark, 628--632 (Abstract) (link to paper)
  991. Mason, S. J (2005) A Deterministic Scheduling Approach For Wafer Fabrication Facilities, 42--43 (Abstract) (link to paper)
  992. Mason, S. J (2011) Algorithmic Parallelization in Multi-Criteria Semiconductor Scheduling, 642--644 (Abstract) (link to paper)

  993. (Menu for Mason) All papers - Full papers - Abstracts - Selected papers

    Mateo

  994. Mateo, M (2013) An efficient metaheuristic for the inventory orienteering problem and the single-vehicle cyclic inventory routing problem, 659--663 (Abstract) (link to paper)

  995. (Menu for Mateo) All papers - Full papers - Abstracts - Selected papers

    Mateus

  996. Mateus, G. R. (2015) Scheduling with incompatible jobs: model and algorithms, 776--781 (Abstract) (link to paper)

  997. (Menu for Mateus) All papers - Full papers - Abstracts - Selected papers

    McCollum

  998. McCollum, B (2009) An Investigation of a Genetic Algorithm and Sequential Local Search Approach for Curriculum-based Course Timetabling Problems, 727--731 (Abstract) (link to paper)
  999. McCollum, B (2007) Clustering Within Timetabling Conflict Graphs, 553--556 (Abstract) (link to paper)
  1000. McCollum, B (2007) Constructive versus Improvement Heuristics:An Investigation of Examination Timetabling, 595--597 (Abstract) (link to paper)
  1001. McCollum, B (2011) Ring Out the Bells, 624--627 (Abstract) (link to paper)
  1002. McCollum, B (2015) A Hybrid Swarm Algorithm for Post Enrollment Course Timetabling, 931--942 (Abstract) (link to paper)
  1003. McCollum, B (2009) Decision Support Systems for Tankering within the Airline Industry, 837--838 (Abstract) (link to paper)
  1004. McCollum, B (2009) Real World Optimisation through Spin Out Activity, 778--781 (Abstract) (link to paper)
  1005. McCollum, B (2003) EventMAP – A Workable Solution, 570--573 (Abstract) (link to paper)
  1006. McCollum, B (2013) Initial Results on Fairness in Examination Timetabling, 777--780 (Abstract) (link to paper)
  1007. McCollum, B (2015) Heuristics and Algorithms for Data Center Optimization, 921--927 (Abstract) (link to paper)
  1008. McCollum, B. (2009) Recent Work on Planning and Management of University Teaching Space, 737--740 (Abstract) (link to paper)
  1009. McCollum, B (2013) An Evolutionary Hill Climbing Algorithm for Dynamic Optimisation Problems, 795--799 (Abstract) (link to paper)

  1010. (Menu for McCollum) All papers - Full papers - Abstracts - Selected papers

    McKenna

  1011. McKenna, J. S (2005) Skills-Based Agent Scheduling at Call Centers, 515--515 (Abstract) (link to paper)

  1012. (Menu for McKenna) All papers - Full papers - Abstracts - Selected papers

    McMullan

  1013. McMullan, P (2007) Clustering Within Timetabling Conflict Graphs, 553--556 (Abstract) (link to paper)
  1014. McMullan, P (2007) Constructive versus Improvement Heuristics:An Investigation of Examination Timetabling, 595--597 (Abstract) (link to paper)
  1015. McMullan, P (2015) A Hybrid Swarm Algorithm for Post Enrollment Course Timetabling, 931--942 (Abstract) (link to paper)
  1016. McMullan, P (2009) Decision Support Systems for Tankering within the Airline Industry, 837--838 (Abstract) (link to paper)
  1017. McMullan, P. J (2009) Real World Optimisation through Spin Out Activity, 778--781 (Abstract) (link to paper)
  1018. McMullan, P (2003) EventMAP – A Workable Solution, 570--573 (Abstract) (link to paper)
  1019. McMullan, P (2009) Recent Work on Planning and Management of University Teaching Space, 737--740 (Abstract) (link to paper)

  1020. (Menu for McMullan) All papers - Full papers - Abstracts - Selected papers

    Medaglia

  1021. Medaglia, A. L (2011) Scheduling of parallel machines with sequence-dependent batches and product incompatibilities in an automotive glass facility, 564--567 (Abstract) (link to paper)

  1022. (Menu for Medaglia) All papers - Full papers - Abstracts - Selected papers

    Meer

  1023. Meer, R. V. (2015) Modeling Uncertainty in Vessel Crew Scheduling, 805--808 (Abstract) (link to paper)

  1024. (Menu for Meer) All papers - Full papers - Abstracts - Selected papers

    Meisels

  1025. Meisels, A (2003) University Timetabling – A Case Study for Scheduling Agents, 56--59 (Abstract) (link to paper)

  1026. (Menu for Meisels) All papers - Full papers - Abstracts - Selected papers

    Menezes

  1027. Menezes, G. C. (2015) Scheduling with incompatible jobs: model and algorithms, 776--781 (Abstract) (link to paper)

  1028. (Menu for Menezes) All papers - Full papers - Abstracts - Selected papers

    Mercy

  1029. Mercy, A (2013) Building university course timetables with minimized resulting student flows, 737--740 (Abstract) (link to paper)

  1030. (Menu for Mercy) All papers - Full papers - Abstracts - Selected papers

    Meszka

  1031. Meszka, M (2003) Round Robin Tournaments with No Breaks in Home-Away Patterns, 602--603 (Abstract) (link to paper)

  1032. (Menu for Meszka) All papers - Full papers - Abstracts - Selected papers

    Meyer

  1033. Meyer, A (2015) How to Unload Bulk Carriers Quickly? Mathematical Models to Identify Efficient Loading Patterns, 772--775 (Abstract) (link to paper)

  1034. (Menu for Meyer) All papers - Full papers - Abstracts - Selected papers

    Mier

  1035. Mier, M. O. (2015) Multimode Time-Constrained Scheduling Problems with Generalized Temporal Constraints and Labor Skills, 809--813 (Abstract) (link to paper)

  1036. (Menu for Mier) All papers - Full papers - Abstracts - Selected papers

    Mihaylov

  1037. Mihaylov, M (2013) A 3-phase approach to geographically distributed exam timetabling, 725--728 (Abstract) (link to paper)

  1038. (Menu for Mihaylov) All papers - Full papers - Abstracts - Selected papers

    Miller

  1039. Miller, T (2005) A Practitioner’s Approach To Distribution And Supply Chain Planning And Management, 519--519 (Abstract) (link to paper)

  1040. (Menu for Miller) All papers - Full papers - Abstracts - Selected papers

    Milne

  1041. Milne, J (2005) Challenges in Matching Assets with Demand across All Supply Chain Management Decision Tiers in the IBM Microelectronics Division from Automated Fabs to Central Planning Engines to Collaborative Behavior (Work Arounds), 391--391 (Abstract) (link to paper)

  1042. (Menu for Milne) All papers - Full papers - Abstracts - Selected papers

    Minella

  1043. Minella, G (2009) New results for the multi-objective sequence dependent setup times °owshop problem, 808--810 (Abstract) (link to paper)

  1044. (Menu for Minella) All papers - Full papers - Abstracts - Selected papers

    Ming

  1045. Ming, N. K (2011) Two-level water-flow algorithm for vehicle routing problems, 493--496 (Abstract) (link to paper)

  1046. (Menu for Ming) All papers - Full papers - Abstracts - Selected papers

    Miori

  1047. Miori, V. M (2005) A Dynamic Programming Approach To The Truckload Routing Problem Using A Triplet Formulation, 725--738 (Abstract) (link to paper)

  1048. (Menu for Miori) All papers - Full papers - Abstracts - Selected papers

    Mirault

  1049. Mirault, A (2003) Just-in-time Scheduling of a 2-Machine Flowshop Problem with Lot-streaming, 473--475 (Abstract) (link to paper)

  1050. (Menu for Mirault) All papers - Full papers - Abstracts - Selected papers

    Mirchandani

  1051. Mirchandani, P (2011) Schedule Recovery Strategies in Public and Freight Transportation Systems under Disruptions, 484--485 (Abstract) (link to paper)

  1052. (Menu for Mirchandani) All papers - Full papers - Abstracts - Selected papers

    Misir

  1053. Misir, M (2009) A self-organising hyper-heuristic framework, 784--787 (Abstract) (link to paper)

  1054. (Menu for Misir) All papers - Full papers - Abstracts - Selected papers

    Mistry

  1055. Mistry, P (2003) A Co-Evolutionary Approach for Train Timetabling, 701--703 (Abstract) (link to paper)

  1056. (Menu for Mistry) All papers - Full papers - Abstracts - Selected papers

    Mladenovic

  1057. Mladenovic, N. (2015) Scheduling preventive railway maintenance activities with resource constraints, 782--784 (Abstract) (link to paper)

  1058. (Menu for Mladenovic) All papers - Full papers - Abstracts - Selected papers

    Mohamad

  1059. Mohamad, M (2003) Channel Assignment Optimisation Using an Adaptive Heuristic, 492--505 (Abstract) (link to paper)

  1060. (Menu for Mohamad) All papers - Full papers - Abstracts - Selected papers

    Molina

  1061. Molina, P (2013) On the effect of complexity and uncertainty in ELSP, 748--752 (Abstract) (link to paper)

  1062. (Menu for Molina) All papers - Full papers - Abstracts - Selected papers

    Monch

  1063. Monch, L (2013) New MILP Formulations for Minimizing the Number of Tardy Jobs on a Single Batch Machine, 687--690 (Abstract) (link to paper)
  1064. Monch, L (2015) Scheduling Jobs in a Two-Stage Flexible Flow Shop with Batch Processing Machines, 801--804 (Abstract) (link to paper)

  1065. (Menu for Monch) All papers - Full papers - Abstracts - Selected papers

    Monkman

  1066. Monkman, S. K (2005) Scheduling Product Families In A High Volume, Flexible, Assemble-to-order Factory, 394--395 (Abstract) (link to paper)

  1067. (Menu for Monkman) All papers - Full papers - Abstracts - Selected papers

    Montana

  1068. Montana, D (2003) A Comparison of Vishnu and OPL Studio, 554--565 (Abstract) (link to paper)

  1069. (Menu for Montana) All papers - Full papers - Abstracts - Selected papers

    Morozov

  1070. Morozov, N (2015) Three approaches to solving the problem of cosmonauts’ training planning, 750--754 (Abstract) (link to paper)

  1071. (Menu for Morozov) All papers - Full papers - Abstracts - Selected papers

    Morrice

  1072. Morrice, D. J (2005) Scheduling Product Families In A High Volume, Flexible, Assemble-to-order Factory, 394--395 (Abstract) (link to paper)

  1073. (Menu for Morrice) All papers - Full papers - Abstracts - Selected papers

    Morrison

  1074. Morrison, J. R (2005) Challenges in Matching Assets with Demand across All Supply Chain Management Decision Tiers in the IBM Microelectronics Division from Automated Fabs to Central Planning Engines to Collaborative Behavior (Work Arounds), 391--391 (Abstract) (link to paper)
  1075. Morrison, J. R (2011) Scheduling Wafer Release in Clustered Photolithography Tools, 639--641 (Abstract) (link to paper)

  1076. (Menu for Morrison) All papers - Full papers - Abstracts - Selected papers

    Moukrim

  1077. Moukrim, A (2015) Primal Heuristics for the Vehicle Routing Problem with Synchronized Visits, 859--861 (Abstract) (link to paper)
  1078. Moukrim, A (2015) Student Scheduling Problem At Universite de Technologie de Compiegne, 871--875 (Abstract) (link to paper)
  1079. Moukrim, A (2015) Lower bounds for Scheduling Problems with production and consumption of resources, 680--682 (Abstract) (link to paper)

  1080. (Menu for Moukrim) All papers - Full papers - Abstracts - Selected papers

    Mourad

  1081. Mourad, B (2013) Reentrance and exact time lag on flow shop scheduling problem, 610--612 (Abstract) (link to paper)

  1082. (Menu for Mourad) All papers - Full papers - Abstracts - Selected papers

    Muklason

  1083. Muklason, A (2013) Initial Results on Fairness in Examination Timetabling, 777--780 (Abstract) (link to paper)

  1084. (Menu for Muklason) All papers - Full papers - Abstracts - Selected papers

    Mulder

  1085. Mulder, J (2005) Forecasting Flight Schedule Robustness, 698--700 (Abstract) (link to paper)

  1086. (Menu for Mulder) All papers - Full papers - Abstracts - Selected papers

    Murray

  1087. Murray, K. (2009) Interactive Course Timetabling, 732--736 (Abstract) (link to paper)
  1088. Murray, K (2007) Real-time Student Sectioning, 598--600 (Abstract) (link to paper)

  1089. (Menu for Murray) All papers - Full papers - Abstracts - Selected papers

    Musial

  1090. Musial, J (2013) Dual Discounting Functions for Internet Shopping Optimization Problem, 667--669 (Abstract) (link to paper)

  1091. (Menu for Musial) All papers - Full papers - Abstracts - Selected papers

    Mönch

  1092. Mönch, L (2011) A GRASP Approach for Scheduling Jobs with Incompatible Families on Parallel Batch Machines, 557--560 (Abstract) (link to paper)
  1093. Mönch, L (2015) Using Adaptive Large Neighborhood Search to Solve Parallel Machine Scheduling Problems with Dedications and Unequal Ready Times of the Jobs, 817--820 (Abstract) (link to paper)
  1094. Mönch, L. (2011) Algorithmic Parallelization in Multi-Criteria Semiconductor Scheduling, 642--644 (Abstract) (link to paper)
  1095. Mönch, L (2011) An Iterative Scheme for Parallel Machine Scheduling with Sequence Dependent Family Setups, 519--522 (Abstract) (link to paper)

  1096. (Menu for Mönch) All papers - Full papers - Abstracts - Selected papers

    Müller

  1097. Müller, M (2015) Comparison of EATTS and XHSTT - Towards a Uni?ed Description Language for Timetabling Problems, 862--866 (Abstract) (link to paper)
  1098. Müller, T (2009) Interactive Course Timetabling, 732--736 (Abstract) (link to paper)
  1099. Müller, T (2007) Real-time Student Sectioning, 598--600 (Abstract) (link to paper)
  1100. Müller, T. (2011) Rapid Development of University Course Timetables, 649--652 (Abstract) (link to paper)

  1101. (Menu for Müller) All papers - Full papers - Abstracts - Selected papers

    Naderi

  1102. Naderi, B (2009) Variable Neighborhood Descent methods for the Distributed Permutation Flowshop Problem, 834--836 (Abstract) (link to paper)

  1103. (Menu for Naderi) All papers - Full papers - Abstracts - Selected papers

    Nagarajan

  1104. Nagarajan, B (2005) Analytic Evaluation of the Expectation and Variance of Different Performance Measures for Scheduling Jobs on a Single Machine under Processing Time Variability, 744--744 (Abstract) (link to paper)

  1105. (Menu for Nagarajan) All papers - Full papers - Abstracts - Selected papers

    Nakamura

  1106. Nakamura, S (2013) Optimal Parallel Systems for Random Scheduling Times, 573--576 (Abstract) (link to paper)

  1107. (Menu for Nakamura) All papers - Full papers - Abstracts - Selected papers

    Nakayama

  1108. Nakayama, K (2013) Optimal Parallel Systems for Random Scheduling Times, 573--576 (Abstract) (link to paper)

  1109. (Menu for Nakayama) All papers - Full papers - Abstracts - Selected papers

    Narin

  1110. Narin, O (2009) Solving Berth Allocation Problem with Column Generation, 744--747 (Abstract) (link to paper)

  1111. (Menu for Narin) All papers - Full papers - Abstracts - Selected papers

    Naudet

  1112. Naudet, Y. (2013) Guiding wiki crowds through resource scheduling, 753--756 (Abstract) (link to paper)

  1113. (Menu for Naudet) All papers - Full papers - Abstracts - Selected papers

    Naudin

  1114. Naudin, E (2007) Staff Rostering Problem: Choice of a Mathematical Model, 601--604 (Abstract) (link to paper)

  1115. (Menu for Naudin) All papers - Full papers - Abstracts - Selected papers

    Nazri

  1116. Nazri, M.Z. A. (2013) An Iterated Local Search Algorithm for the Technician Routing and Scheduling Problems, 641--645 (Abstract) (link to paper)
  1117. Nazri, M.Z.A (2017) Modeling a Practical University Course Timetabling Problem with Reward and Penalty Objective Function: Case Study FTSM-UKM, 348--357 (Abstract) (link to paper)

  1118. (Menu for Nazri) All papers - Full papers - Abstracts - Selected papers

    Neron

  1119. Neron, E (2007) Multi-skill Project Scheduling Problem and Total Productive Maintenance, 608--610 (Abstract) (link to paper)

  1120. (Menu for Neron) All papers - Full papers - Abstracts - Selected papers

    Neufeld

  1121. Neufeld, J.Sebastia (2013) Solving the Hybrid Job Shop Problem with Sequence Dependent Setups, 741--743 (Abstract) (link to paper)

  1122. (Menu for Neufeld) All papers - Full papers - Abstracts - Selected papers

    Newall

  1123. Newall, J (2003) EventMAP – A Workable Solution, 570--573 (Abstract) (link to paper)

  1124. (Menu for Newall) All papers - Full papers - Abstracts - Selected papers

    Ng

  1125. Ng, D. S.T (2005) How to maximize rewards in an incentived made-to-order scheduling environment:, 69--69 (Abstract) (link to paper)

  1126. (Menu for Ng) All papers - Full papers - Abstracts - Selected papers

    Nikolakopoulos

  1127. Nikolakopoulos, A (2005) A TSP Formulation Of The DNA Sequencing Problem, 8--10 (Abstract) (link to paper)

  1128. (Menu for Nikolakopoulos) All papers - Full papers - Abstracts - Selected papers

    Nishi

  1129. Nishi, T (2017) An Integrated Optimization of Dynamic Product Family Configuration and Supply Chain Configuration, 336--339 (Abstract) (link to paper)

  1130. (Menu for Nishi) All papers - Full papers - Abstracts - Selected papers

    Nobibon

  1131. Nobibon, F. T. (2013) A resource loading problem in the aircraft line maintenance industry, 580--583 (Abstract) (link to paper)
  1132. Nobibon, F.T (2013) Complexity analysis of the discrete sequential search problem with group activities, 670--672 (Abstract) (link to paper)
  1133. Nobibon, F. T (2013) Exact algorithms for single-machine scheduling with time windows and precedence constraints, 656--658 (Abstract) (link to paper)
  1134. Nobibon, F. T (2009) Order acceptance and scheduling in a single-machine environment: exact and heuristic algorithms, 772--774 (Abstract) (link to paper)
  1135. Nobibon, F.T (2013) Optimal scheduling policies for diagnosing k-out-of-n systems with imperfect tests, 624--627 (Abstract) (link to paper)

  1136. (Menu for Nobibon) All papers - Full papers - Abstracts - Selected papers

    Nocella

  1137. Nocella, S (2003) Scheduling Commands on Satellite Constellation, 598--601 (Abstract) (link to paper)

  1138. (Menu for Nocella) All papers - Full papers - Abstracts - Selected papers

    Noureldien

  1139. Noureldien, Y (2017) Selection Hyper-heuristics for Solving the Wind Farm Layout Optimisation Problem, 393--395 (Abstract) (link to paper)

  1140. (Menu for Noureldien) All papers - Full papers - Abstracts - Selected papers

    Novais

  1141. Novais, A. Q (2009) Scheduling of job shop, make-to-order industries with recirculation and assembly: discrete versus continuous time models, 802--807 (Abstract) (link to paper)
  1142. Novais, A. Q (2005) Optimal Reactive Scheduling For Job Shop, Make-toorder Industries: A Mould Making Industry Case Study, 46--46 (Abstract) (link to paper)

  1143. (Menu for Novais) All papers - Full papers - Abstracts - Selected papers

    Novak

  1144. Novak, A (2017) Efficient algorithms for non-preemptive mixed-criticality match-up scheduling problem, 377--379 (Abstract) (link to paper)
  1145. Novak, A (2015) Nurse Rostering Problem: Tighter Upper Bound for Pricing Problem in Branch and Price Approach, 759--763 (Abstract) (link to paper)

  1146. (Menu for Novak) All papers - Full papers - Abstracts - Selected papers

    Nowe

  1147. Nowe, A (2015) On Task Scheduling Policies for Work-Stealing Schedulers, 821--824 (Abstract) (link to paper)

  1148. (Menu for Nowe) All papers - Full papers - Abstracts - Selected papers

    Obeid

  1149. Obeid, A (2011) Scheduling job families on parallel machines with a bi-criteria objective function under time constraints, 645--648 (Abstract) (link to paper)

  1150. (Menu for Obeid) All papers - Full papers - Abstracts - Selected papers

    Ochoa

  1151. Ochoa, G (2009) HyFlex: A Flexible Framework for the Design and Analysis of Hyper-heuristics, 790--797 (Abstract) (link to paper)

  1152. (Menu for Ochoa) All papers - Full papers - Abstracts - Selected papers

    Oguz

  1153. Oguz, C (2005) On a certain berth scheduling problem, 694--697 (Abstract) (link to paper)
  1154. Oguz, C (2009) Approximation algorithm for berth and quay crane allocation problem with bounds., 748--751 (Abstract) (link to paper)
  1155. Oguz, C (2013) Scheduling chains with constant time lags and variable release times on asingle machine, 584--586 (Abstract) (link to paper)
  1156. Oguz, C (2009) Solving Berth Allocation Problem with Column Generation, 744--747 (Abstract) (link to paper)

  1157. (Menu for Oguz) All papers - Full papers - Abstracts - Selected papers

    Olstad

  1158. Olstad, A (2009) Using a set of fixed prices when solving Profit Maximization Capacitated Lot-Size Problems (PCLSP), 821--822 (Abstract) (link to paper)

  1159. (Menu for Olstad) All papers - Full papers - Abstracts - Selected papers

    Ostberg

  1160. Ostberg, P-O. (2015) Heuristics and Algorithms for Data Center Optimization, 921--927 (Abstract) (link to paper)

  1161. (Menu for Ostberg) All papers - Full papers - Abstracts - Selected papers

    Ostler

  1162. Ostler, J (2015) Comparison of EATTS and XHSTT - Towards a Uni?ed Description Language for Timetabling Problems, 862--866 (Abstract) (link to paper)

  1163. (Menu for Ostler) All papers - Full papers - Abstracts - Selected papers

    Ouelhadj

  1164. Ouelhadj, D (2003) Agents in Timetabling Problems, 67--73 (Abstract) (link to paper)

  1165. (Menu for Ouelhadj) All papers - Full papers - Abstracts - Selected papers

    Ozsoydan

  1166. Ozsoydan, F.B (2015) A GRASP based approach to dynamic scheduling of parallel heat treatment furnaces in a manufacturing company, 656--658 (Abstract) (link to paper)

  1167. (Menu for Ozsoydan) All papers - Full papers - Abstracts - Selected papers

    O’Brien

  1168. O’Brien, R (2003) A Pheromone-based Look-ahead Hyper-heuristic for Time-tabling Problems, 174--179 (Abstract) (link to paper)

  1169. (Menu for O’Brien) All papers - Full papers - Abstracts - Selected papers

    Pabst

  1170. Pabst, D (2011) Flexible Constraint Optimization of Product Profits: A responsive approach to determine profit-optimal product start rates subject to mean cycle time and product volume constraints in support of production planning for semiconductor fabrication facilities, 599--601 (Abstract) (link to paper)

  1171. (Menu for Pabst) All papers - Full papers - Abstracts - Selected papers

    Paelinck

  1172. Paelinck, M (2005) Forecasting Flight Schedule Robustness, 698--700 (Abstract) (link to paper)

  1173. (Menu for Paelinck) All papers - Full papers - Abstracts - Selected papers

    Pan

  1174. Pan, C (2005) Integrated Scheduling of Different Types of Handling Equipment at Automated Container Terminals, 536--537 (Abstract) (link to paper)

  1175. (Menu for Pan) All papers - Full papers - Abstracts - Selected papers

    Pape

  1176. Pape, C. L (2005) Scheduling A Single Machine To Minimize A Regular Objective Function Under Setup Constraints, 193--195 (Abstract) (link to paper)

  1177. (Menu for Pape) All papers - Full papers - Abstracts - Selected papers

    Park

  1178. Park, S (2005) On the Capacitated Packing-Delivering Problem with a Fixed Route, 70--70 (Abstract) (link to paper)
  1179. Park, K (2011) Scheduling Wafer Release in Clustered Photolithography Tools, 639--641 (Abstract) (link to paper)

  1180. (Menu for Park) All papers - Full papers - Abstracts - Selected papers

    Parker

  1181. Parker, M.E (2003) Recent Advancement in an Established Driver Scheduling System, 704--706 (Abstract) (link to paper)

  1182. (Menu for Parker) All papers - Full papers - Abstracts - Selected papers

    Parkes

  1183. Parkes, A. J (2007) Clustering Within Timetabling Conflict Graphs, 553--556 (Abstract) (link to paper)
  1184. Parkes, A.J (2013) Heuristic Pruning Methods For The Robust Shortest Path Problem, 767--769 (Abstract) (link to paper)
  1185. Parkes, A. J (2013) Initial Results on Fairness in Examination Timetabling, 777--780 (Abstract) (link to paper)
  1186. Parkes, A. J (2009) Recent Work on Planning and Management of University Teaching Space, 737--740 (Abstract) (link to paper)

  1187. (Menu for Parkes) All papers - Full papers - Abstracts - Selected papers

    Patrinos

  1188. Patrinos, P (2005) Optimal Production Scheduling For Dairy Industries, 324--325 (Abstract) (link to paper)

  1189. (Menu for Patrinos) All papers - Full papers - Abstracts - Selected papers

    Pattacini

  1190. Pattacini, M (2015) Investigating Scheduling models for Power Plant Preventive Maintenance using Genetic Algorithm, 591--595 (Abstract) (link to paper)

  1191. (Menu for Pattacini) All papers - Full papers - Abstracts - Selected papers

    Paulus

  1192. Paulus, J. J (2009) Time-constrained project scheduling with adjacent resources, 761--763 (Abstract) (link to paper)
  1193. Paulus, J. Ja (2007) Online Scheduling of Parallel Jobs on Two Machines is 2-Competitive, 605--607 (Abstract) (link to paper)

  1194. (Menu for Paulus) All papers - Full papers - Abstracts - Selected papers

    Pawlak

  1195. Pawlak, G (2009) Single machine re-entrant jobs scheduling in the car factory paint shop, 775--777 (Abstract) (link to paper)

  1196. (Menu for Pawlak) All papers - Full papers - Abstracts - Selected papers

    Pazienza

  1197. Pazienza, G. E (2011) Optimization of Scheduling for Large-Scale Logistics Tasks, 489--492 (Abstract) (link to paper)

  1198. (Menu for Pazienza) All papers - Full papers - Abstracts - Selected papers

    Pecero

  1199. Pecero, J. E (2013) Dual Discounting Functions for Internet Shopping Optimization Problem, 667--669 (Abstract) (link to paper)

  1200. (Menu for Pecero) All papers - Full papers - Abstracts - Selected papers

    Perez-Gonzalez

  1201. Perez-Gonzalez, P (2015) Manufacturing Scheduling Systems: What are they made of?, 768--771 (Abstract) (link to paper)
  1202. Perez-Gonzalez, P (2015) A framework of constructive heuristics for permutation-type scheduling problems, 764--767 (Abstract) (link to paper)

  1203. (Menu for Perez-Gonzalez) All papers - Full papers - Abstracts - Selected papers

    Perira

  1204. Perira, J (2005) Approximate Solutions For A New Version Of The Car Sequencing Problem (abstract), 93--96 (Abstract) (link to paper)

  1205. (Menu for Perira) All papers - Full papers - Abstracts - Selected papers

    Pesch

  1206. Pesch, E (2009) Simulated Annealing Method for Maximizing Revenue on Parallel Machines, 699--701 (Abstract) (link to paper)

  1207. (Menu for Pesch) All papers - Full papers - Abstracts - Selected papers

    Pessan

  1208. Pessan, C (2007) Multi-skill Project Scheduling Problem and Total Productive Maintenance, 608--610 (Abstract) (link to paper)

  1209. (Menu for Pessan) All papers - Full papers - Abstracts - Selected papers

    Petrovic

  1210. Petrovic, S (2009) HyFlex: A Flexible Framework for the Design and Analysis of Hyper-heuristics, 790--797 (Abstract) (link to paper)
  1211. Petrovic, S (2013) An initial study of a novel Step Counting Hill Climbing heuristic applied to timetabling problems, 691--693 (Abstract) (link to paper)

  1212. (Menu for Petrovic) All papers - Full papers - Abstracts - Selected papers

    Pfund

  1213. Pfund, M (2005) Scheduling Wafer Fabrication Operations: State-of-the-practice And Future Needs, 392--393 (Abstract) (link to paper)
  1214. Pfund, M (2005) A Deterministic Scheduling Approach For Wafer Fabrication Facilities, 42--43 (Abstract) (link to paper)
  1215. Pfund, M. E (2011) Investigating the boundary between scheduling and dispatching, 573--575 (Abstract) (link to paper)

  1216. (Menu for Pfund) All papers - Full papers - Abstracts - Selected papers

    Pham

  1217. Pham, S (2015) The Intermittent Traveling Salesman Problem, 794--796 (Abstract) (link to paper)

  1218. (Menu for Pham) All papers - Full papers - Abstracts - Selected papers

    Pickavet

  1219. Pickavet, M (2013) Modeling Real-World Vehicle Routing Problems with Dependencies, 711--713 (Abstract) (link to paper)

  1220. (Menu for Pickavet) All papers - Full papers - Abstracts - Selected papers

    Pillay

  1221. Pillay, N (2011) A Hyper-Heuristic Approach to Solving School Timetabling Problems, 628--632 (Abstract) (link to paper)
  1222. Pillay, N (2015) Automated Design of the Developmental Approach for Solving the Examination Timetabling Problem, 909--913 (Abstract) (link to paper)

  1223. (Menu for Pillay) All papers - Full papers - Abstracts - Selected papers

    Pinaton

  1224. Pinaton, J. (2017) A Batch-oblivious Approach For Scheduling Complex Job-Shops with Batching Machines: From Non-delay to Active Scheduling, 340--343 (Abstract) (link to paper)

  1225. (Menu for Pinaton) All papers - Full papers - Abstracts - Selected papers

    Pinedo

  1226. Pinedo, M (2005) Inventory Control And Scheduling With Facilities In Parallel, 740--742 (Abstract) (link to paper)

  1227. (Menu for Pinedo) All papers - Full papers - Abstracts - Selected papers

    Piplani

  1228. Piplani, R (2005) Combined Production and Distribution Scheduling of Ready-Mix Concrete, 551--551 (Abstract) (link to paper)

  1229. (Menu for Piplani) All papers - Full papers - Abstracts - Selected papers

    Pochet

  1230. Pochet, Y (2007) A Strengthened Continuous Time Formulation for the Cyclic Scheduling of a Plant, 621--624 (Abstract) (link to paper)

  1231. (Menu for Pochet) All papers - Full papers - Abstracts - Selected papers

    Potts

  1232. Potts, C.N (2003) The Coordination of Scheduling and Batch Deliveries, 656--659 (Abstract) (link to paper)
  1233. Potts, C. N (2011) Train Scheduling in the UK using a Job Shop Scheduling Approach, 486--488 (Abstract) (link to paper)

  1234. (Menu for Potts) All papers - Full papers - Abstracts - Selected papers

    Potvin

  1235. Potvin, J-Y. (2009) An Effective Heuristic for the Pickup and Delivery Traveling Salesman Problem with LIFO Loading and Multiple Stacks, 831--833 (Abstract) (link to paper)

  1236. (Menu for Potvin) All papers - Full papers - Abstracts - Selected papers

    Prajapat

  1237. Prajapat, N (2015) Investigating Scheduling models for Power Plant Preventive Maintenance using Genetic Algorithm, 591--595 (Abstract) (link to paper)

  1238. (Menu for Prajapat) All papers - Full papers - Abstracts - Selected papers

    Premysl

  1239. Premysl, S (2013) Roster Evaluation Based on the Classifiers for the Nurse Rostering Problem, 744--747 (Abstract) (link to paper)

  1240. (Menu for Premysl) All papers - Full papers - Abstracts - Selected papers

    Proll

  1241. Proll, L (2003) Recent Advancement in an Established Driver Scheduling System, 704--706 (Abstract) (link to paper)

  1242. (Menu for Proll) All papers - Full papers - Abstracts - Selected papers

    Prot

  1243. Prot, D (2013) A large neighborhood search for the Shift Design Personnel Task Scheduling Problem with Equity, 590--592 (Abstract) (link to paper)

  1244. (Menu for Prot) All papers - Full papers - Abstracts - Selected papers

    Pundoor

  1245. Pundoor, G (2005) Integrated Production-Distribution Scheduling to Optimize the Tradeoff between Order Delivery Performance and Total Cost, 549--550 (Abstract) (link to paper)

  1246. (Menu for Pundoor) All papers - Full papers - Abstracts - Selected papers

    Quadrifoglio

  1247. Quadrifoglio, L (2011) An insertion heuristic for coordinated zoning paratransit systems, 502--505 (Abstract) (link to paper)

  1248. (Menu for Quadrifoglio) All papers - Full papers - Abstracts - Selected papers

    R

  1249. R, J. G. H. (2013) Use Matrixes Of Weighing for the scheduling in a sports Fantasy., 694--702 (Abstract) (link to paper)

  1250. (Menu for R) All papers - Full papers - Abstracts - Selected papers

    Rabadi

  1251. Rabadi, G (2005) A Genetic Algorithm with Random Keys Approach for the Job Shop Scheduling Problem with Earliness and Tardiness, 745--745 (Abstract) (link to paper)

  1252. (Menu for Rabadi) All papers - Full papers - Abstracts - Selected papers

    Rainwater

  1253. Rainwater, C. E (2011) Algorithmic Parallelization in Multi-Criteria Semiconductor Scheduling, 642--644 (Abstract) (link to paper)

  1254. (Menu for Rainwater) All papers - Full papers - Abstracts - Selected papers

    Ramos

  1255. Ramos, C (2003) Reducing Job Throughput Time : Using Horizontal Scheduling and Simultaneous Manufacturing, 386--387 (Abstract) (link to paper)
  1256. Ramos, C (2003) Using Tabu Search for Dynamic Scheduling: The Extended Job-Shop Scheduling Problem, 114--115 (Abstract) (link to paper)

  1257. (Menu for Ramos) All papers - Full papers - Abstracts - Selected papers

    Rana

  1258. Rana, D (2009) An Empirical Study of Impacts of Production Mix Efficiency, Product Route Efficiency on Operations Performance and Profitability: A Reverse Logistics Approach, 765--767 (Abstract) (link to paper)

  1259. (Menu for Rana) All papers - Full papers - Abstracts - Selected papers

    Rapine

  1260. Rapine, C (2007) Scheduling Problems of Chemical Experiments, 581--583 (Abstract) (link to paper)

  1261. (Menu for Rapine) All papers - Full papers - Abstracts - Selected papers

    Ravetti

  1262. Ravetti, M. G. (2015) Scheduling with incompatible jobs: model and algorithms, 776--781 (Abstract) (link to paper)

  1263. (Menu for Ravetti) All papers - Full papers - Abstracts - Selected papers

    Redrup

  1264. Redrup, D (2003) A Pheromone-based Look-ahead Hyper-heuristic for Time-tabling Problems, 174--179 (Abstract) (link to paper)

  1265. (Menu for Redrup) All papers - Full papers - Abstracts - Selected papers

    Reeves

  1266. Reeves, C.R (2003) Multi-objective Scheduling: Threat or Opportunity?, 466--467 (Abstract) (link to paper)

  1267. (Menu for Reeves) All papers - Full papers - Abstracts - Selected papers

    Riise

  1268. Riise, A (2015) Multi-level Benders Decomposition for Multi-modal Outpatient Scheduling in Hospitals, 892--895 (Abstract) (link to paper)
  1269. Riise, A (2011) Operational Surgery scheduling problems: Modelling and solving, 592--595 (Abstract) (link to paper)

  1270. (Menu for Riise) All papers - Full papers - Abstracts - Selected papers

    Rocholl

  1271. Rocholl, J (2017) Hybrid Heuristics for Multiple Orders per Job Scheduling Problems with Parallel Machines and a Common Due Date, 358--361 (Abstract) (link to paper)

  1272. (Menu for Rocholl) All papers - Full papers - Abstracts - Selected papers

    Rodriguez-Velásquez

  1273. Rodriguez-Velásquez, E (2005) A Genetic Algorithm with Random Keys Approach for the Job Shop Scheduling Problem with Earliness and Tardiness, 745--745 (Abstract) (link to paper)

  1274. (Menu for Rodriguez-Velásquez) All papers - Full papers - Abstracts - Selected papers

    Roman

  1275. Roman, V (2013) Roster Evaluation Based on the Classifiers for the Nurse Rostering Problem, 744--747 (Abstract) (link to paper)

  1276. (Menu for Roman) All papers - Full papers - Abstracts - Selected papers

    Romeijnders

  1277. Romeijnders, W (2011) Off-shore Helicopter Routing with Asymmetric Demands and Refueling Options, 637--638 (Abstract) (link to paper)

  1278. (Menu for Romeijnders) All papers - Full papers - Abstracts - Selected papers

    Rossi

  1279. Rossi, F (2003) Scheduling Commands on Satellite Constellation, 598--601 (Abstract) (link to paper)

  1280. (Menu for Rossi) All papers - Full papers - Abstracts - Selected papers

    Rostami

  1281. Rostami, S (2017) Optimal solutions for minimum-cost sequential system testing, 312--314 (Abstract) (link to paper)

  1282. (Menu for Rostami) All papers - Full papers - Abstracts - Selected papers

    Rucinski

  1283. Rucinski, M (2009) Single machine re-entrant jobs scheduling in the car factory paint shop, 775--777 (Abstract) (link to paper)

  1284. (Menu for Rucinski) All papers - Full papers - Abstracts - Selected papers

    Rudec

  1285. Rudec, T (2009) Speeding up the optimal off-line algorithm for solving the k-server problem, 852--854 (Abstract) (link to paper)

  1286. (Menu for Rudec) All papers - Full papers - Abstracts - Selected papers

    Rudova

  1287. Rudova, H (2015) Model for planning of distributed data production, 699--703 (Abstract) (link to paper)

  1288. (Menu for Rudova) All papers - Full papers - Abstracts - Selected papers

    Rudová

  1289. Rudová, H (2013) Student Scheduling for Bachelor State Examinations, 762--766 (Abstract) (link to paper)
  1290. Rudová, H. (2009) Interactive Course Timetabling, 732--736 (Abstract) (link to paper)
  1291. Rudová, H (2011) Rapid Development of University Course Timetables, 649--652 (Abstract) (link to paper)
  1292. Rudová, H (2005) Multi-Criteria Soft Constraints in Timetabling, 11--15 (Abstract) (link to paper)

  1293. (Menu for Rudová) All papers - Full papers - Abstracts - Selected papers

    Ruiz

  1294. Ruiz, R (2009) New results for the multi-objective sequence dependent setup times °owshop problem, 808--810 (Abstract) (link to paper)
  1295. Ruiz, R (2009) Variable Neighborhood Descent methods for the Distributed Permutation Flowshop Problem, 834--836 (Abstract) (link to paper)

  1296. (Menu for Ruiz) All papers - Full papers - Abstracts - Selected papers

    S'anchez

  1297. S'anchez, A. G. (2015) Multimode Time-Constrained Scheduling Problems with Generalized Temporal Constraints and Labor Skills, 809--813 (Abstract) (link to paper)

  1298. (Menu for S'anchez) All papers - Full papers - Abstracts - Selected papers

    Sabar

  1299. Sabar, N.R (2013) An Iterated Local Search Algorithm for the Technician Routing and Scheduling Problems, 641--645 (Abstract) (link to paper)
  1300. Sabar, N. R (2013) An Evolutionary Hill Climbing Algorithm for Dynamic Optimisation Problems, 795--799 (Abstract) (link to paper)

  1301. (Menu for Sabar) All papers - Full papers - Abstracts - Selected papers

    Sadr

  1302. Sadr, J (2003) A Tabu Search Heuristic to Generate Shift Schedules, 526--527 (Abstract) (link to paper)

  1303. (Menu for Sadr) All papers - Full papers - Abstracts - Selected papers

    Sadykov

  1304. Sadykov, R (2017) On the exact solution of a large class of parallel machine scheduling problems, 325--328 (Abstract) (link to paper)
  1305. Sadykov, R (2015) The two-machine flowshop total completion time problem: A branch-and-bound based on Network-flow formulation, 635--637 (Abstract) (link to paper)
  1306. Sadykov, R (2013) Parallel Machine Scheduling with Generalized Precedence Relations, 733--736 (Abstract) (link to paper)

  1307. (Menu for Sadykov) All papers - Full papers - Abstracts - Selected papers

    Sagir

  1308. Sagir, M (2009) Mathematical Modeling for Maximising Gate Receipt Problem, 709--714 (Abstract) (link to paper)

  1309. (Menu for Sagir) All papers - Full papers - Abstracts - Selected papers

    Sahin

  1310. Sahin, G. (2013) The Balanced Path Problem in Crew Scheduling Applications, 729--732 (Abstract) (link to paper)

  1311. (Menu for Sahin) All papers - Full papers - Abstracts - Selected papers

    Sahli

  1312. Sahli, A (2015) Lower bounds for Scheduling Problems with production and consumption of resources, 680--682 (Abstract) (link to paper)

  1313. (Menu for Sahli) All papers - Full papers - Abstracts - Selected papers

    Salassa

  1314. Salassa, F (2013) A computational study of a stock cutting problem with sequence dependent cut losses, 703--706 (Abstract) (link to paper)

  1315. (Menu for Salassa) All papers - Full papers - Abstracts - Selected papers

    Sanchidri'an

  1316. Sanchidri'an, T. B. (2015) Multimode Time-Constrained Scheduling Problems with Generalized Temporal Constraints and Labor Skills, 809--813 (Abstract) (link to paper)

  1317. (Menu for Sanchidri'an) All papers - Full papers - Abstracts - Selected papers

    Saner

  1318. Saner, N (2011) Decomposition approaches for multi-stage multi-product batch-production scheduling: a re ned batching model, 596--598 (Abstract) (link to paper)

  1319. (Menu for Saner) All papers - Full papers - Abstracts - Selected papers

    Sankaran

  1320. Sankaran, V (2011) Adapting Particle Swarm Optimization for the Flexible Flow Line, 653--656 (Abstract) (link to paper)

  1321. (Menu for Sankaran) All papers - Full papers - Abstracts - Selected papers

    Santos

  1322. Santos, C. A (2009) Workforce Planning and Scheduling for the HP IT Services Business, 720--723 (Abstract) (link to paper)
  1323. Santos, H.G (2015) LAHC applied to The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 905--908 (Abstract) (link to paper)

  1324. (Menu for Santos) All papers - Full papers - Abstracts - Selected papers

    Saridarq

  1325. Saridarq, F. D. (2013) The Balanced Path Problem in Crew Scheduling Applications, 729--732 (Abstract) (link to paper)

  1326. (Menu for Saridarq) All papers - Full papers - Abstracts - Selected papers

    Sarimveis

  1327. Sarimveis, H (2005) Optimal Production Scheduling For Dairy Industries, 324--325 (Abstract) (link to paper)
  1328. Sarimveis, H (2005) A TSP Formulation Of The DNA Sequencing Problem, 8--10 (Abstract) (link to paper)

  1329. (Menu for Sarimveis) All papers - Full papers - Abstracts - Selected papers

    Sarin

  1330. Sarin, S. C (2005) Analytic Evaluation of the Expectation and Variance of Different Performance Measures for Scheduling Jobs on a Single Machine under Processing Time Variability, 744--744 (Abstract) (link to paper)
  1331. Sarin, S. C (2005) Solving a Timetabling Problem using Benders’ Decomposition, 673--675 (Abstract) (link to paper)

  1332. (Menu for Sarin) All papers - Full papers - Abstracts - Selected papers

    Savourey

  1333. Savourey, D (2017) Three upper bounds for the speed meeting problem, 344--347 (Abstract) (link to paper)
  1334. Savourey, D (2003) Dominance Based Heuristics to Minimize a Total Cost on One Machine, 403--405 (Abstract) (link to paper)
  1335. Savourey, D (2005) Lower Bounds For Parallel Machine Scheduling, 215--216 (Abstract) (link to paper)

  1336. (Menu for Savourey) All papers - Full papers - Abstracts - Selected papers

    Schaerf

  1337. Schaerf, A (2017) Modeling and Solving the Steelmaking and Casting Planning and Scheduling Problem, 380--383 (Abstract) (link to paper)
  1338. Schaerf, A (2013) The Dynamic Patient Admission Scheduling with Operating Room Constraints, Flexible Horizon, and Patient Delays, 646--648 (Abstract) (link to paper)

  1339. (Menu for Schaerf) All papers - Full papers - Abstracts - Selected papers

    Schafer

  1340. Schafer, A (2013) Baggage Scheduling at Airports A framework for e?ciently allocating resources to flight events, 599--602 (Abstract) (link to paper)

  1341. (Menu for Schafer) All papers - Full papers - Abstracts - Selected papers

    Schatteman

  1342. Schatteman, D (2007) A Methodology for Integrated Risk Management and Proactive Scheduling of Construction Projects, 611--613 (Abstract) (link to paper)

  1343. (Menu for Schatteman) All papers - Full papers - Abstracts - Selected papers

    Schenk

  1344. Schenk, M (2011) Scheduling of large dynamic job shop problems by concurrent non-blocking threads, 542--545 (Abstract) (link to paper)

  1345. (Menu for Schenk) All papers - Full papers - Abstracts - Selected papers

    Schieber

  1346. Schieber, B (2005) Algorithms for online buffer management, 518--518 (Abstract) (link to paper)

  1347. (Menu for Schieber) All papers - Full papers - Abstracts - Selected papers

    Schilde

  1348. Schilde, M (2017) Scheduling of maintenance tasks of a large-scale tram network, 367--369 (Abstract) (link to paper)
  1349. Schilde, M (2015) Variable Neighborhood Search for a Rich Production Planning Problem, 896--898 (Abstract) (link to paper)

  1350. (Menu for Schilde) All papers - Full papers - Abstracts - Selected papers

    Schneeberger

  1351. Schneeberger, K (2015) Variable Neighborhood Search for a Rich Production Planning Problem, 896--898 (Abstract) (link to paper)

  1352. (Menu for Schneeberger) All papers - Full papers - Abstracts - Selected papers

    Schultmann

  1353. Schultmann, F (2015) Robust multi-mode resource constrained project scheduling of building deconstruction under uncertainty, 638--644 (Abstract) (link to paper)

  1354. (Menu for Schultmann) All papers - Full papers - Abstracts - Selected papers

    Schutten

  1355. Schutten, J. M. J (2009) Time-constrained project scheduling with adjacent resources, 761--763 (Abstract) (link to paper)

  1356. (Menu for Schutten) All papers - Full papers - Abstracts - Selected papers

    Schäfer

  1357. Schäfer, T (2011) Decomposition approaches for multi-stage multi-product batch-production scheduling: a re ned batching model, 596--598 (Abstract) (link to paper)

  1358. (Menu for Schäfer) All papers - Full papers - Abstracts - Selected papers

    Scott

  1359. Scott, S (2011) Ring Out the Bells, 624--627 (Abstract) (link to paper)

  1360. (Menu for Scott) All papers - Full papers - Abstracts - Selected papers

    Seddik

  1361. Seddik, Y (2015) Mixed-criticality scheduling with known probabilities, 867--870 (Abstract) (link to paper)

  1362. (Menu for Seddik) All papers - Full papers - Abstracts - Selected papers

    Serafini

  1363. Serafini, P (2013) Scheduling teams for aircraft ground maintenance, 649--651 (Abstract) (link to paper)

  1364. (Menu for Serafini) All papers - Full papers - Abstracts - Selected papers

    Shabtay

  1365. Shabtay, D (2015) Online and semi-online scheduling of two job types on a set of multipurpose machines, 626--628 (Abstract) (link to paper)
  1366. Shabtay, D (2015) The resource dependent assignment problem with a convex assignment cost function and its relation to scheduling with controllable processing times, 629--634 (Abstract) (link to paper)

  1367. (Menu for Shabtay) All papers - Full papers - Abstracts - Selected papers

    Shafransky

  1368. Shafransky, Y (2013) Two extensions of Lawler’s min-max cost algorithm, 790--794 (Abstract) (link to paper)

  1369. (Menu for Shafransky) All papers - Full papers - Abstracts - Selected papers

    Shang

  1370. Shang, L (2015) A branch-and-reduce exact algorithm for the single machine total tardiness problem, 879--881 (Abstract) (link to paper)
  1371. Shang, L (2015) An exponential dynamic programming algorithm for the 3-machine ?owshop scheduling problem to minimize the makespan, 755--758 (Abstract) (link to paper)

  1372. (Menu for Shang) All papers - Full papers - Abstracts - Selected papers

    Sharma

  1373. Sharma, N (2007) Assigning Part-time Teachers to Courses via a Stable Marriage Algorithm, 625--627 (Abstract) (link to paper)

  1374. (Menu for Sharma) All papers - Full papers - Abstracts - Selected papers

    Shen

  1375. Shen, L (2013) Solving the Hybrid Job Shop Problem with Sequence Dependent Setups, 741--743 (Abstract) (link to paper)
  1376. Shen, C-W. (2011) An insertion heuristic for coordinated zoning paratransit systems, 502--505 (Abstract) (link to paper)
  1377. Shen, L (2015) Family Scheduling in Flow Shop Manufacturing Systems with Batch Availability, 746--749 (Abstract) (link to paper)
  1378. Shen, L (2011) An Iterative Scheme for Parallel Machine Scheduling with Sequence Dependent Family Setups, 519--522 (Abstract) (link to paper)

  1379. (Menu for Shen) All papers - Full papers - Abstracts - Selected papers

    Shikata

  1380. Shikata, Y (2015) Routing Strategy for Prioritized Limited Multi-server Processor-Sharing System that includes Servers with Various Capacities, 596--600 (Abstract) (link to paper)

  1381. (Menu for Shikata) All papers - Full papers - Abstracts - Selected papers

    Sierksma

  1382. Sierksma, G (2011) Off-shore Helicopter Routing with Asymmetric Demands and Refueling Options, 637--638 (Abstract) (link to paper)

  1383. (Menu for Sierksma) All papers - Full papers - Abstracts - Selected papers

    Silva

  1384. Silva, S. do C. (2003) Reducing Job Throughput Time : Using Horizontal Scheduling and Simultaneous Manufacturing, 386--387 (Abstract) (link to paper)
  1385. Silva, E. C. (2013) Optimal scheduling of aircrafts engines repair process, 620--623 (Abstract) (link to paper)
  1386. Silva, S. do C. (2003) Using Tabu Search for Dynamic Scheduling: The Extended Job-Shop Scheduling Problem, 114--115 (Abstract) (link to paper)

  1387. (Menu for Silva) All papers - Full papers - Abstracts - Selected papers

    Silva-Lugo

  1388. Silva-Lugo, R (2011) Optimization of Scheduling for Large-Scale Logistics Tasks, 489--492 (Abstract) (link to paper)

  1389. (Menu for Silva-Lugo) All papers - Full papers - Abstracts - Selected papers

    Simonetti

  1390. Simonetti, N (2005) Job Shop Scheduling with Setup Times, Deadlines and Precedence Constrainsts, 520--532 (Abstract) (link to paper)

  1391. (Menu for Simonetti) All papers - Full papers - Abstracts - Selected papers

    Simpson

  1392. Simpson, A. R (2005) Ant Colony Optimization for Power Plant Maintenance Scheduling Optimization:A Simplified Hydro Tasmania System, 72--72 (Abstract) (link to paper)

  1393. (Menu for Simpson) All papers - Full papers - Abstracts - Selected papers

    Sledneu

  1394. Sledneu, D (2013) Two extensions of Lawler’s min-max cost algorithm, 790--794 (Abstract) (link to paper)

  1395. (Menu for Sledneu) All papers - Full papers - Abstracts - Selected papers

    Sluis

  1396. Sluis, H.J. v. (2005) Models For Adjacent Resource Scheduling, 16--17 (Abstract) (link to paper)
  1397. Sluis, H.J. v. (2005) On The Complexity Of Adjacent Resource Scheduling, 653--654 (Abstract) (link to paper)

  1398. (Menu for Sluis) All papers - Full papers - Abstracts - Selected papers

    Smet

  1399. Smet, P (2015) Variable neighbourhood search for rich personnel rostering problems, 928--930 (Abstract) (link to paper)
  1400. Smet, P (2013) A heuristic approach to an integrated personnel rostering and task assignment problem, 664--666 (Abstract) (link to paper)
  1401. Smet, P (2011) Automated scheduling at a joinery site, 549--552 (Abstract) (link to paper)

  1402. (Menu for Smet) All papers - Full papers - Abstracts - Selected papers

    Smith-Miles

  1403. Smith-Miles, K (2017) Symmetry breaking in a special case of the RCPSP/max, 315--318 (Abstract) (link to paper)

  1404. (Menu for Smith-Miles) All papers - Full papers - Abstracts - Selected papers

    Smriglio

  1405. Smriglio, S (2003) Scheduling Commands on Satellite Constellation, 598--601 (Abstract) (link to paper)

  1406. (Menu for Smriglio) All papers - Full papers - Abstracts - Selected papers

    Soares

  1407. Soares, J.A (2015) LAHC applied to The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 905--908 (Abstract) (link to paper)

  1408. (Menu for Soares) All papers - Full papers - Abstracts - Selected papers

    Sologub

  1409. Sologub, A. (2015) Three approaches to solving the problem of cosmonauts’ training planning, 750--754 (Abstract) (link to paper)

  1410. (Menu for Sologub) All papers - Full papers - Abstracts - Selected papers

    Sorel

  1411. Sorel, Y (2009) Schedulability Analysis for non Necessarily Harmonic Real-Time Systems with Precedence and Strict Periodicity Constraints using the Exact Number of Preemptions and no Idle Time, 843--851 (Abstract) (link to paper)

  1412. (Menu for Sorel) All papers - Full papers - Abstracts - Selected papers

    Soriano

  1413. Soriano, P (2003) A Tabu Search Heuristic to Generate Shift Schedules, 526--527 (Abstract) (link to paper)

  1414. (Menu for Soriano) All papers - Full papers - Abstracts - Selected papers

    Soubeiga

  1415. Soubeiga, E (2003) A Pheromone-based Look-ahead Hyper-heuristic for Time-tabling Problems, 174--179 (Abstract) (link to paper)

  1416. (Menu for Soubeiga) All papers - Full papers - Abstracts - Selected papers

    Souhkal

  1417. Souhkal, A (2005) Complexity Results For Parallel Machine Scheduling Problems With A Server In Computer Systems, 232--236 (Abstract) (link to paper)

  1418. (Menu for Souhkal) All papers - Full papers - Abstracts - Selected papers

    Soukhal

  1419. Soukhal, A (2011) Sort & Search exponential-time algorithms for scheduling problems, 523--528 (Abstract) (link to paper)

  1420. (Menu for Soukhal) All papers - Full papers - Abstracts - Selected papers

    Soumis

  1421. Soumis, F (2015) An integrated simultaneous approach for pilots and copilots re-scheduling problem, 943--945 (Abstract) (link to paper)

  1422. (Menu for Soumis) All papers - Full papers - Abstracts - Selected papers

    Sourd

  1423. Sourd, F (2007) Selecting and Scheduling Tasks with Agreeable Time Windows and Setup Costs, 561--563 (Abstract) (link to paper)

  1424. (Menu for Sourd) All papers - Full papers - Abstracts - Selected papers

    Spieksma

  1425. Spieksma, F.C.R (2013) Solving a time-indexed formulation by preprocessing and cutting planes, 603--605 (Abstract) (link to paper)
  1426. Spieksma, F. C .R (2009) Soccer schedules in Europe: an overview, 715--717 (Abstract) (link to paper)
  1427. Spieksma, F. C. R (2013) Scheduling round robin tournaments for amateur sport leagues, 596--598 (Abstract) (link to paper)

  1428. (Menu for Spieksma) All papers - Full papers - Abstracts - Selected papers

    Sriskandarajah

  1429. Sriskandarajah, C (2005) Approximations to Optimal k-unit Cycles for Dual Gripper Robot Cells, 326--326 (Abstract) (link to paper)

  1430. (Menu for Sriskandarajah) All papers - Full papers - Abstracts - Selected papers

    Sterna

  1431. Sterna, M (2009) Simulated Annealing Method for Maximizing Revenue on Parallel Machines, 699--701 (Abstract) (link to paper)

  1432. (Menu for Sterna) All papers - Full papers - Abstracts - Selected papers

    Stidsen

  1433. Stidsen, T.R (2015) Flow Formulation-based Model for the Curriculum-based Course Timetabling Problem, 825--848 (Abstract) (link to paper)
  1434. Stidsen, T.R (2013) Student Sectioning at High Schools in Denmark, 628--632 (Abstract) (link to paper)
  1435. Stidsen, T. R (2015) A Matheuristic for Curriculum-Based Course Timetabling, 606--610 (Abstract) (link to paper)

  1436. (Menu for Stidsen) All papers - Full papers - Abstracts - Selected papers

    Stockwell-Alpert

  1437. Stockwell-Alpert, E (2015) Fairness in employee scheduling, 687--698 (Abstract) (link to paper)

  1438. (Menu for Stockwell-Alpert) All papers - Full papers - Abstracts - Selected papers

    Strusevich

  1439. Strusevich, V (2013) Fast Approximation Schemes for Boolean Programming and Scheduling Problems Related to Positive Convex Half-Product, 577--579 (Abstract) (link to paper)

  1440. (Menu for Strusevich) All papers - Full papers - Abstracts - Selected papers

    Subramanian

  1441. Subramanian, A (2017) On the exact solution of a large class of parallel machine scheduling problems, 325--328 (Abstract) (link to paper)

  1442. (Menu for Subramanian) All papers - Full papers - Abstracts - Selected papers

    Sucha

  1443. Sucha, P (2011) A Parallel Approach for a Nurse Rerostering Problem on the GPU, 576--578 (Abstract) (link to paper)
  1444. Sucha, P (2015) A new lower bound for optimisation of energy consumption of robotic cells, 662--665 (Abstract) (link to paper)
  1445. Sucha, P (2011) Minimizing Total Weighted Tardiness and Total Processing Costs for the Scheduling with Alternative Process Plans, 561--563 (Abstract) (link to paper)
  1446. Sucha, P (2017) Efficient algorithms for non-preemptive mixed-criticality match-up scheduling problem, 377--379 (Abstract) (link to paper)
  1447. Sucha, P (2015) Nurse Rostering Problem: Tighter Upper Bound for Pricing Problem in Branch and Price Approach, 759--763 (Abstract) (link to paper)
  1448. Sucha, P (2011) Flow Shop Scheduling on GPU, 532--535 (Abstract) (link to paper)

  1449. (Menu for Sucha) All papers - Full papers - Abstracts - Selected papers

    Sucu

  1450. Sucu, S (2015) Modeling Uncertainty in Vessel Crew Scheduling, 805--808 (Abstract) (link to paper)

  1451. (Menu for Sucu) All papers - Full papers - Abstracts - Selected papers

    Sumbera

  1452. Sumbera, M (2015) Model for planning of distributed data production, 699--703 (Abstract) (link to paper)
  1453. Sumbera, M (2009) Planning Heuristics for Efficient Data Movement on the Grid, 768--771 (Abstract) (link to paper)

  1454. (Menu for Sumbera) All papers - Full papers - Abstracts - Selected papers

    Sun

  1455. Sun, Y (2011) Job Scheduling to Minimize Weighted Completion Time Variance on Identical Parallel Machines, 546--548 (Abstract) (link to paper)

  1456. (Menu for Sun) All papers - Full papers - Abstracts - Selected papers

    Sung

  1457. Sung, C.S (2005) Single Machine Product Scheduling With Outsourcing Allowed., 340--340 (Abstract) (link to paper)

  1458. (Menu for Sung) All papers - Full papers - Abstracts - Selected papers

    Sviridenko

  1459. Sviridenko, M (2005) Improved Approximation Algorithms For Broadcast Scheduling, 655--656 (Abstract) (link to paper)
  1460. Sviridenko, M. (2005) Algorithms for online buffer management, 518--518 (Abstract) (link to paper)

  1461. (Menu for Sviridenko) All papers - Full papers - Abstracts - Selected papers

    Sys

  1462. Sys, T (2015) Multi-objective energy-aware scheduling, 946--948 (Abstract) (link to paper)

  1463. (Menu for Sys) All papers - Full papers - Abstracts - Selected papers

    Sánchez

  1464. Sánchez, A (2003) A Software Pipelining Method Based on a Hierarchical Social Algorithm, 382--385 (Abstract) (link to paper)

  1465. (Menu for Sánchez) All papers - Full papers - Abstracts - Selected papers

    Sřrensen

  1466. Sřrensen, M (2015) Flow Formulation-based Model for the Curriculum-based Course Timetabling Problem, 825--848 (Abstract) (link to paper)
  1467. Sřrensen, M (2015) A Matheuristic for Curriculum-Based Course Timetabling, 606--610 (Abstract) (link to paper)

  1468. (Menu for Sřrensen) All papers - Full papers - Abstracts - Selected papers

    T'kindt

  1469. T'kindt, V (2013) Evacuation Scheduling of a Town after a Natural Disaster: Time-indexed Formulations, 680--683 (Abstract) (link to paper)

  1470. (Menu for T'kindt) All papers - Full papers - Abstracts - Selected papers

    Tamssaouet

  1471. Tamssaouet, K (2017) A Batch-oblivious Approach For Scheduling Complex Job-Shops with Batching Machines: From Non-delay to Active Scheduling, 340--343 (Abstract) (link to paper)

  1472. (Menu for Tamssaouet) All papers - Full papers - Abstracts - Selected papers

    Tan

  1473. Tan, Y (2015) Scheduling Jobs in a Two-Stage Flexible Flow Shop with Batch Processing Machines, 801--804 (Abstract) (link to paper)

  1474. (Menu for Tan) All papers - Full papers - Abstracts - Selected papers

    Tanaka

  1475. Tanaka, S (2015) The two-machine flowshop total completion time problem: A branch-and-bound based on Network-flow formulation, 635--637 (Abstract) (link to paper)
  1476. Tanaka, S (2007) An Exact Algorithm for Single-Machine Scheduling without Idle Time, 614--617 (Abstract) (link to paper)

  1477. (Menu for Tanaka) All papers - Full papers - Abstracts - Selected papers

    Tanimizu

  1478. Tanimizu, Y (2017) An Integrated Optimization of Dynamic Product Family Configuration and Supply Chain Configuration, 336--339 (Abstract) (link to paper)

  1479. (Menu for Tanimizu) All papers - Full papers - Abstracts - Selected papers

    Tanrisever

  1480. Tanrisever, F (2005) Forming And Scheduling Jobs With Order Weights In Semiconductor Manufacturing, 334--334 (Abstract) (link to paper)

  1481. (Menu for Tanrisever) All papers - Full papers - Abstracts - Selected papers

    Tereso

  1482. Tereso, A. P. (2013) Scheduling with MS Project: an add-in, 707--710 (Abstract) (link to paper)

  1483. (Menu for Tereso) All papers - Full papers - Abstracts - Selected papers

    Thanos

  1484. Thanos, E (2017) Scheduling container transportation through conflict-free trajectories in a warehouse layout: A local search approach, 330--335 (Abstract) (link to paper)

  1485. (Menu for Thanos) All papers - Full papers - Abstracts - Selected papers

    Thompson

  1486. Thompson, J (2009) Round-robin Sports Scheduling from a Graph Colouring Perspective: A Case Study in Rugby Union Scheduling, 718--719 (Abstract) (link to paper)
  1487. Thompson, J (2011) An Exact and Heuristic Hybrid for Solving a Medical Student Scheduling Problem, 584--586 (Abstract) (link to paper)

  1488. (Menu for Thompson) All papers - Full papers - Abstracts - Selected papers

    Tiwari

  1489. Tiwari, A (2015) Investigating Scheduling models for Power Plant Preventive Maintenance using Genetic Algorithm, 591--595 (Abstract) (link to paper)

  1490. (Menu for Tiwari) All papers - Full papers - Abstracts - Selected papers

    To?olo

  1491. To?olo, T.A.M (2015) LAHC applied to The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 905--908 (Abstract) (link to paper)
  1492. To?olo, T.A M (2015) Time-based Decomposition Strategies for the Traveling Umpire Problem, 918--920 (Abstract) (link to paper)

  1493. (Menu for To?olo) All papers - Full papers - Abstracts - Selected papers

    Trautmann

  1494. Trautmann, N (2011) Minimizing changeover times of a make-and-pack production process: model and case study, 539--541 (Abstract) (link to paper)
  1495. Trautmann, N (2011) Decomposition approaches for multi-stage multi-product batch-production scheduling: a re ned batching model, 596--598 (Abstract) (link to paper)

  1496. (Menu for Trautmann) All papers - Full papers - Abstracts - Selected papers

    Trystram

  1497. Trystram, D. (2013) Dual Discounting Functions for Internet Shopping Optimization Problem, 667--669 (Abstract) (link to paper)

  1498. (Menu for Trystram) All papers - Full papers - Abstracts - Selected papers

    Tsuboi

  1499. Tsuboi, T (2017) An Integrated Optimization of Dynamic Product Family Configuration and Supply Chain Configuration, 336--339 (Abstract) (link to paper)

  1500. (Menu for Tsuboi) All papers - Full papers - Abstracts - Selected papers

    Turabieh

  1501. Turabieh, H (2009) An Investigation of a Genetic Algorithm and Sequential Local Search Approach for Curriculum-based Course Timetabling Problems, 727--731 (Abstract) (link to paper)

  1502. (Menu for Turabieh) All papers - Full papers - Abstracts - Selected papers

    Turky

  1503. Turky, A. M (2013) An Evolutionary Hill Climbing Algorithm for Dynamic Optimisation Problems, 795--799 (Abstract) (link to paper)

  1504. (Menu for Turky) All papers - Full papers - Abstracts - Selected papers

    T’Kindt

  1505. T’Kindt, V (2013) Solving a time-indexed formulation by preprocessing and cutting planes, 603--605 (Abstract) (link to paper)
  1506. T’Kindt, V (2015) An exponential dynamic programming algorithm for the 3-machine ?owshop scheduling problem to minimize the makespan, 755--758 (Abstract) (link to paper)

  1507. (Menu for T’Kindt) All papers - Full papers - Abstracts - Selected papers

    T’kindt

  1508. T’kindt, V (2015) A branch-and-reduce exact algorithm for the single machine total tardiness problem, 879--881 (Abstract) (link to paper)
  1509. T’kindt, V (2015) A Decomposition Heuristic for a Bicriteria Evacuation Scheduling Problem, 704--707 (Abstract) (link to paper)
  1510. T’kindt, V (2003) Just-in-time Scheduling of a 2-Machine Flowshop Problem with Lot-streaming, 473--475 (Abstract) (link to paper)
  1511. T’kindt, V (2011) Sort & Search exponential-time algorithms for scheduling problems, 523--528 (Abstract) (link to paper)

  1512. (Menu for T’kindt) All papers - Full papers - Abstracts - Selected papers

    Uchoa

  1513. Uchoa, E (2017) On the exact solution of a large class of parallel machine scheduling problems, 325--328 (Abstract) (link to paper)

  1514. (Menu for Uchoa) All papers - Full papers - Abstracts - Selected papers

    Uchronski

  1515. Uchronski, M. (2009) Scatter search for a weighted tardiness flow shop problem, 702--705 (Abstract) (link to paper)

  1516. (Menu for Uchronski) All papers - Full papers - Abstracts - Selected papers

    Urosevic

  1517. Urosevic, D (2015) Scheduling preventive railway maintenance activities with resource constraints, 782--784 (Abstract) (link to paper)

  1518. (Menu for Urosevic) All papers - Full papers - Abstracts - Selected papers

    Vaclav?k

  1519. Vaclav?k, R (2015) Nurse Rostering Problem: Tighter Upper Bound for Pricing Problem in Branch and Price Approach, 759--763 (Abstract) (link to paper)

  1520. (Menu for Vaclav?k) All papers - Full papers - Abstracts - Selected papers

    Valhondo

  1521. Valhondo, J. B. (2007) Sequencing JIT Mixed Model Assembly Lines Under Station-Load and Part-Usage Constraints using Lagrangean Relaxations, 550--552 (Abstract) (link to paper)

  1522. (Menu for Valhondo) All papers - Full papers - Abstracts - Selected papers

    Van Hentenryck

  1523. Van Hentenryck, P (2007) Online Stochastic Routing and Scheduling, 41--41 (Abstract) (link to paper)

  1524. (Menu for Van Hentenryck) All papers - Full papers - Abstracts - Selected papers

    Van Hui

  1525. Van Hui, Y (2011) Two-Stage Shipment Planning with Uncertainties: A Stochastic Programming Approach, 602--604 (Abstract) (link to paper)

  1526. (Menu for Van Hui) All papers - Full papers - Abstracts - Selected papers

    Van Marcke

  1527. Van Marcke, K (2015) Scheduling the operation of a phosphate pipeline for OCP: A Case Study, 622--625 (Abstract) (link to paper)

  1528. (Menu for Van Marcke) All papers - Full papers - Abstracts - Selected papers

    Van Peteghem

  1529. Van Peteghem, V (2007) An Efficient Heuristic Procedure for the Resource Availability Cost Problem, 618--620 (Abstract) (link to paper)

  1530. (Menu for Van Peteghem) All papers - Full papers - Abstracts - Selected papers

    Van de Vonder

  1531. Van de Vonder, S (2007) A Methodology for Integrated Risk Management and Proactive Scheduling of Construction Projects, 611--613 (Abstract) (link to paper)
  1532. Van de Vonder, S (2005) An Evaluation Of Exact And Suboptimal Procedures For Constructing Stable Project Schedules, 341--342 (Abstract) (link to paper)

  1533. (Menu for Van de Vonder) All papers - Full papers - Abstracts - Selected papers

    Vancroonenburg

  1534. Vancroonenburg, W (2013) A computational study of a stock cutting problem with sequence dependent cut losses, 703--706 (Abstract) (link to paper)
  1535. Vancroonenburg, W (2011) Automated scheduling at a joinery site, 549--552 (Abstract) (link to paper)
  1536. Vancroonenburg, W (2013) Extending the late acceptance metaheuristic for multi-objective optimization, 652--655 (Abstract) (link to paper)

  1537. (Menu for Vancroonenburg) All papers - Full papers - Abstracts - Selected papers

    Vanden Berghe

  1538. Vanden Berghe, G (2005) Course Timetabling Extended Tiles For University Timetabling, 669--670 (Abstract) (link to paper)
  1539. Vanden Berghe, G (2003) Decentralised Course Timetabling in a Large Hierarchical Organisation, 60--66 (Abstract) (link to paper)
  1540. Vanden Berghe, G (2009) A Hyperheuristic Approach to Belgian Nurse Rostering Problems, 683--689 (Abstract) (link to paper)
  1541. Vanden Berghe, G (2005) Systems Design For Scheduling Open Tools, 40--41 (Abstract) (link to paper)
  1542. Vanden Berghe, G (2003) Agents in Timetabling Problems, 67--73 (Abstract) (link to paper)
  1543. Vanden Berghe, G (2013) A heuristic approach to the prisoner transportation problem, 786--789 (Abstract) (link to paper)
  1544. Vanden Berghe, G (2015) Multi-objective energy-aware scheduling, 946--948 (Abstract) (link to paper)
  1545. Vanden Berghe, G (2013) A computational study of a stock cutting problem with sequence dependent cut losses, 703--706 (Abstract) (link to paper)
  1546. Vanden Berghe, G (2009) A multi-agent system handling personnel shortages in hospitals, 693--695 (Abstract) (link to paper)
  1547. Vanden Berghe, G (2013) A 3-phase approach to geographically distributed exam timetabling, 725--728 (Abstract) (link to paper)
  1548. Vanden Berghe, G (2015) Variable neighbourhood search for rich personnel rostering problems, 928--930 (Abstract) (link to paper)
  1549. Vanden Berghe, G (2013) A heuristic approach to an integrated personnel rostering and task assignment problem, 664--666 (Abstract) (link to paper)
  1550. Vanden Berghe, G (2011) Automated scheduling at a joinery site, 549--552 (Abstract) (link to paper)
  1551. Vanden Berghe, G (2017) Scheduling container transportation through conflict-free trajectories in a warehouse layout: A local search approach, 330--335 (Abstract) (link to paper)
  1552. Vanden Berghe, G (2015) Time-based Decomposition Strategies for the Traveling Umpire Problem, 918--920 (Abstract) (link to paper)

  1553. (Menu for Vanden Berghe) All papers - Full papers - Abstracts - Selected papers

    Vanderbeck

  1554. Vanderbeck, F (2013) Parallel Machine Scheduling with Generalized Precedence Relations, 733--736 (Abstract) (link to paper)

  1555. (Menu for Vanderbeck) All papers - Full papers - Abstracts - Selected papers

    Vanhoucke

  1556. Vanhoucke, M (2015) A heuristic procedure for the personnel task re-scheduling problem, 666--668 (Abstract) (link to paper)
  1557. Vanhoucke, M (2007) A Branch-and-Price Procedure for Nurse Staffing Incorporating Roster Preferences, 588--590 (Abstract) (link to paper)
  1558. Vanhoucke, M (2009) Reactive Nurse Scheduling in Hospitals, 690--692 (Abstract) (link to paper)
  1559. Vanhoucke, M (2005) An Electromagnetic Meta-heuristic For The Nurse Scheduling Problem, 410--411 (Abstract) (link to paper)
  1560. Vanhoucke, M (2013) An exact procedure for an integrated project staffing problem, 673--675 (Abstract) (link to paper)
  1561. Vanhoucke, M (2007) An Efficient Heuristic Procedure for the Resource Availability Cost Problem, 618--620 (Abstract) (link to paper)

  1562. (Menu for Vanhoucke) All papers - Full papers - Abstracts - Selected papers

    Vansteenwegen

  1563. Vansteenwegen, P (2013) An efficient metaheuristic for the inventory orienteering problem and the single-vehicle cyclic inventory routing problem, 659--663 (Abstract) (link to paper)
  1564. Vansteenwegen, P (2013) A fast solution method for the Time-Dependent Orienteering Problem with time windows, 676--679 (Abstract) (link to paper)

  1565. (Menu for Vansteenwegen) All papers - Full papers - Abstracts - Selected papers

    Varadarajan

  1566. Varadarajan, A (2005) Solving a Timetabling Problem using Benders’ Decomposition, 673--675 (Abstract) (link to paper)

  1567. (Menu for Varadarajan) All papers - Full papers - Abstracts - Selected papers

    Vazacopoulos

  1568. Vazacopoulos, A (2005) Job Shop Scheduling with Setup Times, Deadlines and Precedence Constrainsts, 520--532 (Abstract) (link to paper)

  1569. (Menu for Vazacopoulos) All papers - Full papers - Abstracts - Selected papers

    Velten

  1570. Velten, S. (2015) How to Unload Bulk Carriers Quickly? Mathematical Models to Identify Efficient Loading Patterns, 772--775 (Abstract) (link to paper)

  1571. (Menu for Velten) All papers - Full papers - Abstracts - Selected papers

    Verbeeck

  1572. Verbeeck, C (2013) A fast solution method for the Time-Dependent Orienteering Problem with time windows, 676--679 (Abstract) (link to paper)

  1573. (Menu for Verbeeck) All papers - Full papers - Abstracts - Selected papers

    Verbeke

  1574. Verbeke, B (2005) Systems Design For Scheduling Open Tools, 40--41 (Abstract) (link to paper)

  1575. (Menu for Verbeke) All papers - Full papers - Abstracts - Selected papers

    Vergados

  1576. Vergados, D. J (2013) Guiding wiki crowds through resource scheduling, 753--756 (Abstract) (link to paper)

  1577. (Menu for Vergados) All papers - Full papers - Abstracts - Selected papers

    Vespucci

  1578. Vespucci, M. T (2011) Deterministic and stochastic models for investment in different technologies for electricity production in the long period, 607--623 (Abstract) (link to paper)

  1579. (Menu for Vespucci) All papers - Full papers - Abstracts - Selected papers

    Vilcot

  1580. Vilcot, G (2003) A Genetic Algorithm for Job Shop Scheduling with Flexibility, 417--418 (Abstract) (link to paper)

  1581. (Menu for Vilcot) All papers - Full papers - Abstracts - Selected papers

    Vlk

  1582. Vlk, M (2015) Resource Failure Recovery in Production Scheduling, 852--858 (Abstract) (link to paper)
  1583. Vlk, M (2005) Multi-Criteria Soft Constraints in Timetabling, 11--15 (Abstract) (link to paper)

  1584. (Menu for Vlk) All papers - Full papers - Abstracts - Selected papers

    Volk

  1585. Volk, R (2015) Robust multi-mode resource constrained project scheduling of building deconstruction under uncertainty, 638--644 (Abstract) (link to paper)

  1586. (Menu for Volk) All papers - Full papers - Abstracts - Selected papers

    Vázquez-Rodriguez

  1587. Vázquez-Rodriguez, J. A (2009) HyFlex: A Flexible Framework for the Design and Analysis of Hyper-heuristics, 790--797 (Abstract) (link to paper)

  1588. (Menu for Vázquez-Rodriguez) All papers - Full papers - Abstracts - Selected papers

    Wachtel

  1589. Wachtel, G (2015) Floating Patients method based on scheduling algorithm for emergency department's service improvement, 683--686 (Abstract) (link to paper)

  1590. (Menu for Wachtel) All papers - Full papers - Abstracts - Selected papers

    Walcarius

  1591. Walcarius, P (2013) Modeling Real-World Vehicle Routing Problems with Dependencies, 711--713 (Abstract) (link to paper)

  1592. (Menu for Walcarius) All papers - Full papers - Abstracts - Selected papers

    Walker

  1593. Walker, S (2013) New Solvable Cases of the Maximum Lateness Problem with Preemptions, 714--717 (Abstract) (link to paper)

  1594. (Menu for Walker) All papers - Full papers - Abstracts - Selected papers

    Wallace

  1595. Wallace, S. W (2011) Two-Stage Shipment Planning with Uncertainties: A Stochastic Programming Approach, 602--604 (Abstract) (link to paper)
  1596. Wallace, S. W (2011) Facility layout with random demand: A reduction to the classical deterministic QAP, 605--606 (Abstract) (link to paper)

  1597. (Menu for Wallace) All papers - Full papers - Abstracts - Selected papers

    Wallenius

  1598. Wallenius, J (2007) Interactive Evolutionary Multicriteria Scheduling, 591--594 (Abstract) (link to paper)

  1599. (Menu for Wallenius) All papers - Full papers - Abstracts - Selected papers

    Wang

  1600. Wang, J (2015) Strategic Idling and Dynamic Scheduling in Open-Shop Service Network: Case Study and Analysis, 604--605 (Abstract) (link to paper)
  1601. Wang, Y (2005) Solving a Timetabling Problem using Benders’ Decomposition, 673--675 (Abstract) (link to paper)
  1602. Wang, G (2003) Customer Order Scheduling to Minimize Total Weighted Completion Time, 409--416 (Abstract) (link to paper)
  1603. Wang, Z (2005) Worst-case Analysis for Queueing Service Policies, 533--535 (Abstract) (link to paper)

  1604. (Menu for Wang) All papers - Full papers - Abstracts - Selected papers

    Warichet

  1605. Warichet, F (2007) A Strengthened Continuous Time Formulation for the Cyclic Scheduling of a Plant, 621--624 (Abstract) (link to paper)

  1606. (Menu for Warichet) All papers - Full papers - Abstracts - Selected papers

    Wauters

  1607. Wauters, T (2013) A heuristic approach to the prisoner transportation problem, 786--789 (Abstract) (link to paper)
  1608. Wauters, T (2015) Multi-objective energy-aware scheduling, 946--948 (Abstract) (link to paper)
  1609. Wauters, T (2013) A computational study of a stock cutting problem with sequence dependent cut losses, 703--706 (Abstract) (link to paper)
  1610. Wauters, T (2013) A 3-phase approach to geographically distributed exam timetabling, 725--728 (Abstract) (link to paper)
  1611. Wauters, T (2017) Scheduling container transportation through conflict-free trajectories in a warehouse layout: A local search approach, 330--335 (Abstract) (link to paper)
  1612. Wauters, T (2015) Time-based Decomposition Strategies for the Traveling Umpire Problem, 918--920 (Abstract) (link to paper)
  1613. Wauters, T (2013) Extending the late acceptance metaheuristic for multi-objective optimization, 652--655 (Abstract) (link to paper)

  1614. (Menu for Wauters) All papers - Full papers - Abstracts - Selected papers

    Weedon

  1615. Weedon, R (2015) Optimisation of a Stagger Chart for Aviation Fleet Planning, 952--962 (Abstract) (link to paper)

  1616. (Menu for Weedon) All papers - Full papers - Abstracts - Selected papers

    Weeks

  1617. Weeks, K. O (2009) An Empirical Study of Impacts of Production Mix Efficiency, Product Route Efficiency on Operations Performance and Profitability: A Reverse Logistics Approach, 765--767 (Abstract) (link to paper)

  1618. (Menu for Weeks) All papers - Full papers - Abstracts - Selected papers

    Wei

  1619. Wei, W (2013) Optimal scheduling policies for diagnosing k-out-of-n systems with imperfect tests, 624--627 (Abstract) (link to paper)

  1620. (Menu for Wei) All papers - Full papers - Abstracts - Selected papers

    Weil

  1621. Weil, G (2007) Staff Rostering Problem: Choice of a Mathematical Model, 601--604 (Abstract) (link to paper)

  1622. (Menu for Weil) All papers - Full papers - Abstracts - Selected papers

    Werbos

  1623. Werbos, L (2011) Optimization of Scheduling for Large-Scale Logistics Tasks, 489--492 (Abstract) (link to paper)

  1624. (Menu for Werbos) All papers - Full papers - Abstracts - Selected papers

    Werner

  1625. Werner, F (2015) Single machine scheduling: finding the Pareto Set for jobs with equal processing times with respect to criteria Lmax and Cmax., 797--800 (Abstract) (link to paper)

  1626. (Menu for Werner) All papers - Full papers - Abstracts - Selected papers

    White

  1627. White, G. M (2007) Assigning Part-time Teachers to Courses via a Stable Marriage Algorithm, 625--627 (Abstract) (link to paper)

  1628. (Menu for White) All papers - Full papers - Abstracts - Selected papers

    Wilke

  1629. Wilke, P (2015) Comparison of EATTS and XHSTT - Towards a Uni?ed Description Language for Timetabling Problems, 862--866 (Abstract) (link to paper)

  1630. (Menu for Wilke) All papers - Full papers - Abstracts - Selected papers

    Williamson

  1631. Williamson, E (2005) Challenges in Matching Assets with Demand across All Supply Chain Management Decision Tiers in the IBM Microelectronics Division from Automated Fabs to Central Planning Engines to Collaborative Behavior (Work Arounds), 391--391 (Abstract) (link to paper)

  1632. (Menu for Williamson) All papers - Full papers - Abstracts - Selected papers

    Wilson

  1633. Wilson, N (2013) Compilation of Maintenance Schedules based on their Key Performance Indicators for Fast Iterative Interaction, 606--609 (Abstract) (link to paper)

  1634. (Menu for Wilson) All papers - Full papers - Abstracts - Selected papers

    Wodecki

  1635. Wodecki, M (2009) Scatter search for a weighted tardiness flow shop problem, 702--705 (Abstract) (link to paper)

  1636. (Menu for Wodecki) All papers - Full papers - Abstracts - Selected papers

    Wong

  1637. Wong, R. C.W (2005) Timetable Synchronization for Mass Transit, 516--517 (Abstract) (link to paper)

  1638. (Menu for Wong) All papers - Full papers - Abstracts - Selected papers

    Wren

  1639. Wren, A (2003) Recent Advancement in an Established Driver Scheduling System, 704--706 (Abstract) (link to paper)

  1640. (Menu for Wren) All papers - Full papers - Abstracts - Selected papers

    Wright

  1641. Wright, M (2015) Ant Colony Optimisation for a Job Shop with Flexible Maintenance, 614--616 (Abstract) (link to paper)
  1642. Wright, M.B (2003) Dynamic Weight Variation in Metaheuristic Search, 604--605 (Abstract) (link to paper)

  1643. (Menu for Wright) All papers - Full papers - Abstracts - Selected papers

    Xie

  1644. Xie, L (2011) Supply Logistics Synchronization: Scale Development and Empirical Study of Chinese Manufacturing, 497--501 (Abstract) (link to paper)

  1645. (Menu for Xie) All papers - Full papers - Abstracts - Selected papers

    Xing

  1646. Xing, W (2005) Worst-case Analysis for Queueing Service Policies, 533--535 (Abstract) (link to paper)

  1647. (Menu for Xing) All papers - Full papers - Abstracts - Selected papers

    Yadrentsev

  1648. Yadrentsev, D (2015) Three approaches to solving the problem of cosmonauts’ training planning, 750--754 (Abstract) (link to paper)

  1649. (Menu for Yadrentsev) All papers - Full papers - Abstracts - Selected papers

    Yang

  1650. Yang, Z (2013) Order acceptance and scheduling problem with time-dependent revenues, 593--595 (Abstract) (link to paper)
  1651. Yang, J (2005) Scheduling The Production And Transportation Operations Subject To Dynamic Arrivals, 701--701 (Abstract) (link to paper)
  1652. Yang, X.F (2017) Modeling a Practical University Course Timetabling Problem with Reward and Penalty Objective Function: Case Study FTSM-UKM, 348--357 (Abstract) (link to paper)

  1653. (Menu for Yang) All papers - Full papers - Abstracts - Selected papers

    Yao

  1654. Yao, R. He. F (2013) Order acceptance and scheduling problem with time-dependent revenues, 593--595 (Abstract) (link to paper)

  1655. (Menu for Yao) All papers - Full papers - Abstracts - Selected papers

    Yedision

  1656. Yedision, L (2015) The resource dependent assignment problem with a convex assignment cost function and its relation to scheduling with controllable processing times, 629--634 (Abstract) (link to paper)

  1657. (Menu for Yedision) All papers - Full papers - Abstracts - Selected papers

    Yomsi

  1658. Yomsi, P. M (2009) Schedulability Analysis for non Necessarily Harmonic Real-Time Systems with Precedence and Strict Periodicity Constraints using the Exact Number of Preemptions and no Idle Time, 843--851 (Abstract) (link to paper)

  1659. (Menu for Yomsi) All papers - Full papers - Abstracts - Selected papers

    Yoon

  1660. Yoon, S.H (2005) Single Machine Product Scheduling With Outsourcing Allowed., 340--340 (Abstract) (link to paper)

  1661. (Menu for Yoon) All papers - Full papers - Abstracts - Selected papers

    Yugma

  1662. Yugma, C (2013) An unrelated parallel machine scheduling problem with auxiliary resources and sequence dependent setup times, 718--720 (Abstract) (link to paper)
  1663. Yugma, C (2015) Scheduling Complex Job-Shops using Batch Oblivious Disjunctive Graphs, 788--793 (Abstract) (link to paper)
  1664. Yugma, C (2011) Scheduling job families on parallel machines with a bi-criteria objective function under time constraints, 645--648 (Abstract) (link to paper)
  1665. Yugma, C (2017) A Batch-oblivious Approach For Scheduling Complex Job-Shops with Batching Machines: From Non-delay to Active Scheduling, 340--343 (Abstract) (link to paper)

  1666. (Menu for Yugma) All papers - Full papers - Abstracts - Selected papers

    Zajicek

  1667. Zajicek, T (2011) Flow Shop Scheduling on GPU, 532--535 (Abstract) (link to paper)

  1668. (Menu for Zajicek) All papers - Full papers - Abstracts - Selected papers

    Zdenek

  1669. Zdenek, H (2013) Roster Evaluation Based on the Classifiers for the Nurse Rostering Problem, 744--747 (Abstract) (link to paper)

  1670. (Menu for Zdenek) All papers - Full papers - Abstracts - Selected papers

    Zemmouri

  1671. Zemmouri, T (2007) Staff Rostering Problem: Choice of a Mathematical Model, 601--604 (Abstract) (link to paper)

  1672. (Menu for Zemmouri) All papers - Full papers - Abstracts - Selected papers

    Zerola

  1673. Zerola, M (2009) Planning Heuristics for Efficient Data Movement on the Grid, 768--771 (Abstract) (link to paper)

  1674. (Menu for Zerola) All papers - Full papers - Abstracts - Selected papers

    Zhang

  1675. Zhang, J (2005) Inventory Control And Scheduling With Facilities In Parallel, 740--742 (Abstract) (link to paper)
  1676. Zhang, A (2009) Workforce Planning and Scheduling for the HP IT Services Business, 720--723 (Abstract) (link to paper)

  1677. (Menu for Zhang) All papers - Full papers - Abstracts - Selected papers

    Zhao

  1678. Zhao, Y (2011) Facility layout with random demand: A reduction to the classical deterministic QAP, 605--606 (Abstract) (link to paper)

  1679. (Menu for Zhao) All papers - Full papers - Abstracts - Selected papers

    Zhaoa

  1680. Zhaoa, Y (2005) Integrated Scheduling of Different Types of Handling Equipment at Automated Container Terminals, 536--537 (Abstract) (link to paper)

  1681. (Menu for Zhaoa) All papers - Full papers - Abstracts - Selected papers

    Zigrino

  1682. Zigrino, S (2011) Deterministic and stochastic models for investment in different technologies for electricity production in the long period, 607--623 (Abstract) (link to paper)

  1683. (Menu for Zigrino) All papers - Full papers - Abstracts - Selected papers

    Zimmermann

  1684. Zimmermann, J (2009) Exact methods for the resource levelling problem, 811--820 (Abstract) (link to paper)

  1685. (Menu for Zimmermann) All papers - Full papers - Abstracts - Selected papers

    Zinder

  1686. Zinder, Y (2013) New Solvable Cases of the Maximum Lateness Problem with Preemptions, 714--717 (Abstract) (link to paper)
  1687. Zinder, Y (2003) Scheduling with Two Criteria, 468--472 (Abstract) (link to paper)

  1688. (Menu for Zinder) All papers - Full papers - Abstracts - Selected papers

    Zribi

  1689. Zribi, N (2005) Job Shop Scheduling Problem With Multi-purpose Machines And Availability Constraints, 217--231 (Abstract) (link to paper)

  1690. (Menu for Zribi) All papers - Full papers - Abstracts - Selected papers

    Özcan

  1691. Özcan, E (2013) A Grouping Hyper-heuristic for Graph Colouring, 770--773 (Abstract) (link to paper)
  1692. Özcan, E (2009) Multilevel Search for Evolving the Acceptance Criteria of a Hyper-Heuristic, 798--801 (Abstract) (link to paper)
  1693. Özcan, E (2017) Selection Hyper-heuristics for Solving the Wind Farm Layout Optimisation Problem, 393--395 (Abstract) (link to paper)
  1694. Özcan, E (2013) Initial Results on Fairness in Examination Timetabling, 777--780 (Abstract) (link to paper)
  1695. Özcan, E (2017) A Review of Selection Hyper-heuristics: Recent Advances, 010--010 (Abstract) (link to paper)
  1696. Özcan, E (2003) Towards an XML Based Standard for Timetabling Problems: TTML, 566--569 (Abstract) (link to paper)
  1697. Özcan, E (2009) Multilevel search for choosing hyper-heuristics, 788--789 (Abstract) (link to paper)
  1698. Özcan, E (2009) A self-organising hyper-heuristic framework, 784--787 (Abstract) (link to paper)

  1699. (Menu for Özcan) All papers - Full papers - Abstracts - Selected papers