MISTA: List of papers by authors

This page was developed to give a summary of the papers that have been presented at MISTA, sorted by the authors. It is provided to give you a quick way to check all the papers that you have published at MISTA (or in the post conference publication).

The papers are NOT complete references. To see the complete reference, click on the link to paper link.

You can view the papers in various ways.

  • All papers (full papers, abstracts and selected papers)
  • Only full papers from the conference proceedings
  • Only abstracts from the conference proceedings
  • Only selected papers published in the post conference volumes

There is also a menu under each author, so that you can just display the data for just one author.

    Abdullah

  1. Abdullah, S (2005) An Investigation Of Variable Neighbourhood Search For University Course Timetabling, 413--427 (Full Paper) (link to paper)
  2. Abdullah, S (2009) An Extended Great Deluge Approach to the Examination Timetabling Problem, 424--434 (Full Paper) (link to paper)
  3. Abdullah, S (2015) Bacteria Swarm Optimisation Approach for Enrolment-Based Course Timetabling Problems, 515--525 (Full Paper) (link to paper)

  4. (Menu for Abdullah) All papers - Full papers - Abstracts - Selected papers

    Adasme

  5. Adasme, P (2015) A Probabilistic Constrained Approach for Unrelated Parallel Machine Scheduling, 16--24 (Full Paper) (link to paper)
  6. Adasme, P (2011) SDP Relaxations for Two Stage OFDMA Networks with and without Probabilistic Constraints, 445--458 (Full Paper) (link to paper)
  7. Adasme, P (2013) Scheduling in Wireless OFDMA-TDMA Networks using Variable Neighborhood Search Metaheuristic, 55--64 (Full Paper) (link to paper)

  8. (Menu for Adasme) All papers - Full papers - Abstracts - Selected papers

    Adelson-Velsky

  9. Adelson-Velsky, G (2005) On Project Scheduling With And/or Precedence Constraints, 597--606 (Full Paper) (link to paper)

  10. (Menu for Adelson-Velsky) All papers - Full papers - Abstracts - Selected papers

    Aggoune

  11. Aggoune, R (2009) Recent Adavances in Solving Two-job Shop Scheduling Problems: Extensions and Improvements of the Geometric Approach, 469--478 (Full Paper) (link to paper)

  12. (Menu for Aggoune) All papers - Full papers - Abstracts - Selected papers

    Aghezzaf

  13. Aghezzaf, E-H. (2007) Aligning Frequencies in Cyclic Delivery Scheduling, 426--430 (Full Paper) (link to paper)
  14. Aghezzaf, E- (2013) Balancing and Sequencing Mixed-Model Assembly Lines to Minimize Work Overload in Real World Workstations, 230--239 (Full Paper) (link to paper)

  15. (Menu for Aghezzaf) All papers - Full papers - Abstracts - Selected papers

    Agnetis

  16. Agnetis, A (2013) Production and Interplant Batch Delivery Scheduling: Dominance and Cooperation, 133--150 (Full Paper) (link to paper)

  17. (Menu for Agnetis) All papers - Full papers - Abstracts - Selected papers

    Ahmadi

  18. Ahmadi, S (2003) Perturbation Based Variable Neighbourhood Search in Heuristic Space for Examination Timetabling Problem, 155--173 (Full Paper) (link to paper)
  19. Ahmadi, S (2015) Optimisation of a Stagger Chart for Aviation Fleet Planning, 579--589 (Full Paper) (link to paper)

  20. (Menu for Ahmadi) All papers - Full papers - Abstracts - Selected papers

    Akartunali

  21. Akartunali, K (2015) A Hybrid Constraint Integer Programming Approach to Solve Nurse Scheduling Problems, 429--442 (Full Paper) (link to paper)

  22. (Menu for Akartunali) All papers - Full papers - Abstracts - Selected papers

    Akhavizadegan

  23. Akhavizadegan, F (2015) Cross-training performance of nurse scheduling with the learning effect, 296--312 (Full Paper) (link to paper)

  24. (Menu for Akhavizadegan) All papers - Full papers - Abstracts - Selected papers

    Akrotirianakis

  25. Akrotirianakis, I (2015) An optimization-based approach for delivering radio-pharmaceuticals to medical imaging centers, 203--217 (Full Paper) (link to paper)

  26. (Menu for Akrotirianakis) All papers - Full papers - Abstracts - Selected papers

    Al-Betar

  27. Al-Betar, M. A (2009) A hybrid harmony search for university course timetabling, 157--179 (Full Paper) (link to paper)

  28. (Menu for Al-Betar) All papers - Full papers - Abstracts - Selected papers

    Alefragis

  29. Alefragis, P (2017) Exploration of Logic-Based Benders Decomposition Approach for Mapping Applications on Heterogeneous Multi-Core Platforms, 030--042 (Full Paper) (link to paper)
  30. Alefragis, P (2013) DAG Scheduling using Integer Programming in heterogenous parallel execution environments, 392--401 (Full Paper) (link to paper)

  31. (Menu for Alefragis) All papers - Full papers - Abstracts - Selected papers

    Alkan

  32. Alkan, A (2007) A Memetic Algorithm for Solving a Timetabling Problem:An Incremental Strategy, 394--401 (Full Paper) (link to paper)

  33. (Menu for Alkan) All papers - Full papers - Abstracts - Selected papers

    Allaoui

  34. Allaoui, H (2003) Two-machine Flowshop Scheduling with the Availability Constraint on the Second Machine, 279--290 (Full Paper) (link to paper)
  35. Allaoui, H (2013) Minimizing the weighted sum of maximum earlinesstardiness cost on a single machine under maintenance constraints, 240--247 (Full Paper) (link to paper)
  36. Allaoui, H (2015) Modeling the single-processor scheduling problem with time restrictions as a parallel machine scheduling problem, 325--330 (Full Paper) (link to paper)

  37. (Menu for Allaoui) All papers - Full papers - Abstracts - Selected papers

    Almeder

  38. Almeder, C (2009) Ant Colony Optimization Approaches for Scheduling Jobs with Incompatible Families on Parallel Batch Machines, 105--114 (Full Paper) (link to paper)

  39. (Menu for Almeder) All papers - Full papers - Abstracts - Selected papers

    Almgren

  40. Almgren, T (2015) Scheduling optimization of a real flexible job shop including side constraints regarding maintenance, ?xtures, and night shifts, 78--101 (Full Paper) (link to paper)

  41. (Menu for Almgren) All papers - Full papers - Abstracts - Selected papers

    Alonso-Pecina

  42. Alonso-Pecina, F (2013) A Three-Phases Based Algorithm for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem The MISTA 2013 Challenge, 812--814 (Full Paper) (link to paper)

  43. (Menu for Alonso-Pecina) All papers - Full papers - Abstracts - Selected papers

    Aloulou

  44. Aloulou, M. Al (2013) Production and Interplant Batch Delivery Scheduling: Dominance and Cooperation, 133--150 (Full Paper) (link to paper)
  45. Aloulou, M.A (2003) An Efficient Proactive Reactive Scheduling Approach to Hedge Against Shop Floor Disturbances, 337--362 (Full Paper) (link to paper)
  46. Aloulou, M.A (2015) Integrated production and outbound distribution scheduling problem with setup times and delivery time windows, 174--188 (Full Paper) (link to paper)

  47. (Menu for Aloulou) All papers - Full papers - Abstracts - Selected papers

    Alqudsi

  48. Alqudsi, A (2015) Bacteria Swarm Optimisation Approach for Enrolment-Based Course Timetabling Problems, 515--525 (Full Paper) (link to paper)

  49. (Menu for Alqudsi) All papers - Full papers - Abstracts - Selected papers

    Alsheddy

  50. Alsheddy, A (2009) Empowerment-based Workforce Scheduling Problem, 130--144 (Full Paper) (link to paper)

  51. (Menu for Alsheddy) All papers - Full papers - Abstracts - Selected papers

    Althaus

  52. Althaus, E (2015) University Course Timetabling with Con?ict Minimization and Elective Courses, 412--428 (Full Paper) (link to paper)

  53. (Menu for Althaus) All papers - Full papers - Abstracts - Selected papers

    Andres

  54. Andres, C (2007) Unrelated Parallel Machines Scheduling with Resource-Assignable Sequence Dependent Setup Times, 439--446 (Full Paper) (link to paper)

  55. (Menu for Andres) All papers - Full papers - Abstracts - Selected papers

    Angel

  56. Angel, E (2005) How good Are SPT Schedules For Fair Optimality Criteria, 244--257 (Full Paper) (link to paper)

  57. (Menu for Angel) All papers - Full papers - Abstracts - Selected papers

    Angelelli

  58. Angelelli, E (2007) Semi On-Line Scheduling on Two Uniform Processors, 51--58 (Full Paper) (link to paper)

  59. (Menu for Angelelli) All papers - Full papers - Abstracts - Selected papers

    Ansarifar

  60. Ansarifar, J (2015) Cross-training performance of nurse scheduling with the learning effect, 296--312 (Full Paper) (link to paper)

  61. (Menu for Ansarifar) All papers - Full papers - Abstracts - Selected papers

    Aparício

  62. Aparício, J (2003) A Scheduling Web Service, 540--553 (Full Paper) (link to paper)

  63. (Menu for Aparício) All papers - Full papers - Abstracts - Selected papers

    Armstrong

  64. Armstrong, R (2005) A Zero-Inventory Production-Distribution Problem with Time-Window Constraints, 428--444 (Full Paper) (link to paper)

  65. (Menu for Armstrong) All papers - Full papers - Abstracts - Selected papers

    Artiba

  66. Artiba, A (2003) Two-machine Flowshop Scheduling with the Availability Constraint on the Second Machine, 279--290 (Full Paper) (link to paper)
  67. Artiba, A (2013) Minimizing the weighted sum of maximum earlinesstardiness cost on a single machine under maintenance constraints, 240--247 (Full Paper) (link to paper)

  68. (Menu for Artiba) All papers - Full papers - Abstracts - Selected papers

    Artigues

  69. Artigues, C (2005) Lower And Upper Bounds For The Job-shop Scheduling Problem With Sequence-dependent Setup Times, 316--321 (Full Paper) (link to paper)
  70. Artigues, C (2013) MIP Relaxation and Large Neighborhood Search for a Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 815--819 (Full Paper) (link to paper)
  71. Artigues, C (2013) Line search method for solving a non-preemptive strictly periodic scheduling problem, 356--371 (Full Paper) (link to paper)

  72. (Menu for Artigues) All papers - Full papers - Abstracts - Selected papers

    Ascó

  73. Ascó, A. (2011) The Airport Baggage Sorting Station Allocation Problem, 419--444 (Full Paper) (link to paper)

  74. (Menu for Ascó) All papers - Full papers - Abstracts - Selected papers

    Asmuni

  75. Asmuni, H (2007) Determining Rules in Fuzzy Multiple Heuristic Orderings for Constructing Examination Timetables, 59--66 (Full Paper) (link to paper)
  76. Asmuni, H. bi (2013) Tackling University Timetabling Problems Using Hybridization of Swarm Based Approach, 543--548 (Full Paper) (link to paper)

  77. (Menu for Asmuni) All papers - Full papers - Abstracts - Selected papers

    Asta

  78. Asta, S (2013) Combining Monte-Carlo and Hyper-heuristic methods for the Multi-mode Resource-constrained Multi-project Scheduling Problem, 836--839 (Full Paper) (link to paper)

  79. (Menu for Asta) All papers - Full papers - Abstracts - Selected papers

    Atakan

  80. Atakan, S (2011) Minimizing Value-at-Risk in the Single-Machine Total Weighted Tardiness Problem, 215--229 (Full Paper) (link to paper)

  81. (Menu for Atakan) All papers - Full papers - Abstracts - Selected papers

    Atkin

  82. Atkin, J. A. D (2011) The Airport Baggage Sorting Station Allocation Problem, 419--444 (Full Paper) (link to paper)
  83. Atkin, J. A (2009) A comparison of two methods for reducing take-off delay at London Heathrow airport, 12--27 (Full Paper) (link to paper)
  84. Atkin, J. A. D (2011) A more realistic approach for airport ground movement optimisation with stand holding, 146--160 (Full Paper) (link to paper)
  85. Atkin, J. A (2011) A Game Theoretic Approach for the Taxi Scheduling Problem with Street Hailing, 161--172 (Full Paper) (link to paper)

  86. (Menu for Atkin) All papers - Full papers - Abstracts - Selected papers

    Ayob

  87. Ayob, M (2003) An Investigation of an Adaptive Scheduling Approach for Multi Head Placement Machines, 363--381 (Full Paper) (link to paper)
  88. Ayob, M (2013) A Hybrid of Differential Evolution and Simulated Annealing Algorithms for the Capacitated Arc Routing Problems, 549--554 (Full Paper) (link to paper)
  89. Ayob, M (2009) Solving Examination Timetabling Problems using Honey-bee Mating Optimization (ETP-HBMO), 399--408 (Full Paper) (link to paper)

  90. (Menu for Ayob) All papers - Full papers - Abstracts - Selected papers

    Baber

  91. Baber, F (2003) A Constraint Ordering Heuristic for Scheduling Problems, 476--491 (Full Paper) (link to paper)

  92. (Menu for Baber) All papers - Full papers - Abstracts - Selected papers

    Babic

  93. Babic, O (2009) Heuristic approach to the airline schedule disturbances problem: multifleet case, 311--320 (Full Paper) (link to paper)

  94. (Menu for Babic) All papers - Full papers - Abstracts - Selected papers

    Bai

  95. Bai, R (2007) A Simulated Annealing Hyper-heuristic: Adaptive Heuristic Selection for Different Vehicle Routing Problems, 67--70 (Full Paper) (link to paper)
  96. Bai, R (2011) A Game Theoretic Approach for the Taxi Scheduling Problem with Street Hailing, 161--172 (Full Paper) (link to paper)
  97. Bai, R (2017) Responsive Single Bus Corridor Scheduling Based on Machine Learning and Optimisation, 288--294 (Full Paper) (link to paper)

  98. (Menu for Bai) All papers - Full papers - Abstracts - Selected papers

    Baille

  99. Baille, F (2005) Bicriteria Parallel Task Scheduling, 585--596 (Full Paper) (link to paper)

  100. (Menu for Baille) All papers - Full papers - Abstracts - Selected papers

    Baker

  101. Baker, K. R (2009) Three Heuristic Procedures for the Stochastic Flow Shop Problem, 330--340 (Full Paper) (link to paper)

  102. (Menu for Baker) All papers - Full papers - Abstracts - Selected papers

    Balasubramanian

  103. Balasubramanian, H (2005) Bicriteria Scheduling Of Equal Length Jobs With Release Dates On Identical Parallel Machines, 112--122 (Full Paper) (link to paper)
  104. Balasubramanian, H (2009) Single Machine Scheduling with Interfering Job Sets, 357--365 (Full Paper) (link to paper)
  105. Balasubramanian, H (2005) A Bi-criteria Approach To Scheduling Wafer Fabrication Facilities, 276--287 (Full Paper) (link to paper)

  106. (Menu for Balasubramanian) All papers - Full papers - Abstracts - Selected papers

    Bampis

  107. Bampis, E (2005) How good Are SPT Schedules For Fair Optimality Criteria, 244--257 (Full Paper) (link to paper)
  108. Bampis, E (2005) Bicriteria Parallel Task Scheduling, 585--596 (Full Paper) (link to paper)

  109. (Menu for Bampis) All papers - Full papers - Abstracts - Selected papers

    Baptiste

  110. Baptiste, P (2007) Sequencing a Single Machine with Due Dates and Deadlines: an ILP-based Approach to Solve Very Large Instances, 71--79 (Full Paper) (link to paper)

  111. (Menu for Baptiste) All papers - Full papers - Abstracts - Selected papers

    Barbosa

  112. Barbosa, A (2013) Automatic Timetabling in Higher Education Institutions: a real scenario and solution, 151--170 (Full Paper) (link to paper)
  113. Barbosa, J. J. G. (2013) An Iterative Local Search Algorithm for Scheduling Precedence-Constrained Applications on Heterogeneous Machines, 472--485 (Full Paper) (link to paper)

  114. (Menu for Barbosa) All papers - Full papers - Abstracts - Selected papers

    Barbulescu

  115. Barbulescu, L. V (2007) Analyzing Basic Representation Choices in Oversubscribed Scheduling Problems, 259--266 (Full Paper) (link to paper)
  116. Barbulescu, L (2005) Random Walks And Neighborhood Bias In Oversubscribed Scheduling, 98--105 (Full Paper) (link to paper)

  117. (Menu for Barbulescu) All papers - Full papers - Abstracts - Selected papers

    Bargiela

  118. Bargiela, A (2013) An Investigation of Multistage Approaches to Examination Timetabling, 528--542 (Full Paper) (link to paper)

  119. (Menu for Bargiela) All papers - Full papers - Abstracts - Selected papers

    Barnhart

  120. Barnhart, C (2011) A Decomposition Approach for Shipment Pickup and Delivery with Time-Windows Under Uncertainty, 352--365 (Full Paper) (link to paper)

  121. (Menu for Barnhart) All papers - Full papers - Abstracts - Selected papers

    Barone

  122. Barone, R (2003) Perturbation Based Variable Neighbourhood Search in Heuristic Space for Examination Timetabling Problem, 155--173 (Full Paper) (link to paper)

  123. (Menu for Barone) All papers - Full papers - Abstracts - Selected papers

    Barták

  124. Barták, R (2017) Scheduling Models for Multi-Agent Path Finding, 189--200 (Full Paper) (link to paper)
  125. Barták, R (2003) Integrating Planning into Production Scheduling: Visopt Shopfloor System, 259--278 (Full Paper) (link to paper)
  126. Barták, R (2009) A local approach to automated correction of violated precedence and resource constraints in manually altered schedules, 507--517 (Full Paper) (link to paper)
  127. Barták, R (2009) Preemptive scheduling with precedences and alternative resources, 518--530 (Full Paper) (link to paper)
  128. Barták, R (2017) Benders Decomposition in SMT for Rescheduling of Hierarchical Workflow, 295--310 (Full Paper) (link to paper)

  129. (Menu for Barták) All papers - Full papers - Abstracts - Selected papers

    Battistutta

  130. Battistutta, M (2015) Thesis Defense Timetabling, 507--514 (Full Paper) (link to paper)

  131. (Menu for Battistutta) All papers - Full papers - Abstracts - Selected papers

    Baumann

  132. Baumann, P (2015) A lexicographic goal programming approach for staff assignment with acceptance levels, 526--540 (Full Paper) (link to paper)

  133. (Menu for Baumann) All papers - Full papers - Abstracts - Selected papers

    Beck

  134. Beck, J.C (2015) Resource-Aware Scheduling for Data Centers with Heterogenous Servers, 240--259 (Full Paper) (link to paper)

  135. (Menu for Beck) All papers - Full papers - Abstracts - Selected papers

    Bellio

  136. Bellio, R (2013) A simulated annealing approach to the curriculum-based course timetabling problem, 314--317 (Full Paper) (link to paper)

  137. (Menu for Bellio) All papers - Full papers - Abstracts - Selected papers

    Bello

  138. Bello, R (2013) A Robust Multi-Agent Reinforcement Learning Approach for Scheduling Problems, 410--423 (Full Paper) (link to paper)

  139. (Menu for Bello) All papers - Full papers - Abstracts - Selected papers

    Belouadah

  140. Belouadah, H (2009) Hybrid of the weighted minimum slack and shortest processing time dispatching rules for the total weighted tardiness single machine scheduling problem with availability constraints, 202--215 (Full Paper) (link to paper)

  141. (Menu for Belouadah) All papers - Full papers - Abstracts - Selected papers

    Benabid

  142. Benabid, A (2009) Decomposed Software Pipelining for cyclic unitary RCPSP with precedence delays, 254--265 (Full Paper) (link to paper)

  143. (Menu for Benabid) All papers - Full papers - Abstracts - Selected papers

    Benavides

  144. Benavides, A.J (2013) A simple stochastic local search for multi-mode resource-constrained multi-project scheduling, 826--830 (Full Paper) (link to paper)

  145. (Menu for Benavides) All papers - Full papers - Abstracts - Selected papers

    Benmansour

  146. Benmansour, R (2013) Minimizing the weighted sum of maximum earlinesstardiness cost on a single machine under maintenance constraints, 240--247 (Full Paper) (link to paper)
  147. Benmansour, R (2015) Modeling the single-processor scheduling problem with time restrictions as a parallel machine scheduling problem, 325--330 (Full Paper) (link to paper)

  148. (Menu for Benmansour) All papers - Full papers - Abstracts - Selected papers

    Berghe

  149. Berghe, G.Van de (2013) Algorithm preformance prediction for nurse rostering, 21--38 (Full Paper) (link to paper)

  150. (Menu for Berghe) All papers - Full papers - Abstracts - Selected papers

    Berlinska

  151. Berlinska, J (2013) Mitigating Partitioning Skew in MapReduce Computations, 80--90 (Full Paper) (link to paper)
  152. Berlinska, J (2009) Heuristics for Divisible Loads Scheduling in Systems with Limited Memory, 321--329 (Full Paper) (link to paper)

  153. (Menu for Berlinska) All papers - Full papers - Abstracts - Selected papers

    Berretta

  154. Berretta, R (2017) Optimizing Production Schedule with Energy Consumption and Demand Charges in Parallel Machine Setting, 133--143 (Full Paper) (link to paper)

  155. (Menu for Berretta) All papers - Full papers - Abstracts - Selected papers

    Bessler

  156. Bessler, S (2013) Scheduling of electric vehicle charging operations, 486--498 (Full Paper) (link to paper)

  157. (Menu for Bessler) All papers - Full papers - Abstracts - Selected papers

    Bhattacharya

  158. Bhattacharya, S (2015) Continuous Time Model for Scheduling Operations in Cascaded Continuous Processing Units with Multiple Due Dates, 63--77 (Full Paper) (link to paper)
  159. Bhattacharya, S (2005) A Heuristic Algorithm For Scheduling ‘blocked Out’ Units In Continuous Processing Industry : Preliminary Results, 258--274 (Full Paper) (link to paper)

  160. (Menu for Bhattacharya) All papers - Full papers - Abstracts - Selected papers

    Bian

  161. Bian, F (2003) Making Airline Schedules More Robust, 678--695 (Full Paper) (link to paper)

  162. (Menu for Bian) All papers - Full papers - Abstracts - Selected papers

    Bilginturk

  163. Bilginturk, Z (2007) Order Acceptance and Scheduling Decisions in Make-to-Order Systems, 80--87 (Full Paper) (link to paper)

  164. (Menu for Bilginturk) All papers - Full papers - Abstracts - Selected papers

    Billaut

  165. Billaut, J-C. (2009) Home health care problem: An extended multiple Traveling Salesman Problem, 85--92 (Full Paper) (link to paper)
  166. Billaut, J-C. (2007) Single Machine and Parallel Machine Scheduling Problems with a Common Due Date to Minimize Total Weighted Tardiness, 498--505 (Full Paper) (link to paper)

  167. (Menu for Billaut) All papers - Full papers - Abstracts - Selected papers

    Bini

  168. Bini, E (2009) Modeling Preemptive EDF and FP by Integer Variables, 77--84 (Full Paper) (link to paper)

  169. (Menu for Bini) All papers - Full papers - Abstracts - Selected papers

    Bispo

  170. Bispo, C. F (2011) Single server scheduling problem: Optimal policy for convex costs depends on arrival rates, 275--296 (Full Paper) (link to paper)

  171. (Menu for Bispo) All papers - Full papers - Abstracts - Selected papers

    Blazewicz

  172. Blazewicz, J (2007) Genetic Algorithm for Late Work Minimization in a Flow Shop System, 455--462 (Full Paper) (link to paper)

  173. (Menu for Blazewicz) All papers - Full papers - Abstracts - Selected papers

    Bora

  174. Bora, S (2007) Scheduling the Operations of an Integrated Production-Distribution Process, 316--327 (Full Paper) (link to paper)

  175. (Menu for Bora) All papers - Full papers - Abstracts - Selected papers

    Borba

  176. Borba, L.M (2013) A simple stochastic local search for multi-mode resource-constrained multi-project scheduling, 826--830 (Full Paper) (link to paper)

  177. (Menu for Borba) All papers - Full papers - Abstracts - Selected papers

    Borgulya

  178. Borgulya, I (2011) An Evolutionary Algorithm for the large Size One-Commodity Pickup and Delivery Travelling Salesman Problems, 127--136 (Full Paper) (link to paper)

  179. (Menu for Borgulya) All papers - Full papers - Abstracts - Selected papers

    Borodin

  180. Borodin, D (2011) Case study: an effective genetic algorithm for the chemical batch production scheduling, 469--482 (Full Paper) (link to paper)
  181. Borodin, D (2013) A Reinforcement Learning Approach to Solving Hybrid Flexible Flowline Scheduling Problems, 402--409 (Full Paper) (link to paper)

  182. (Menu for Borodin) All papers - Full papers - Abstracts - Selected papers

    Bose

  183. Bose, S.K (2015) Continuous Time Model for Scheduling Operations in Cascaded Continuous Processing Units with Multiple Due Dates, 63--77 (Full Paper) (link to paper)
  184. Bose, S. K. (2005) A Heuristic Algorithm For Scheduling ‘blocked Out’ Units In Continuous Processing Industry : Preliminary Results, 258--274 (Full Paper) (link to paper)

  185. (Menu for Bose) All papers - Full papers - Abstracts - Selected papers

    Boudhar

  186. Boudhar, M (2007) Scheduling with Special Case of Multipurpose Machines, 88--95 (Full Paper) (link to paper)

  187. (Menu for Boudhar) All papers - Full papers - Abstracts - Selected papers

    Bouibede-Hocine

  188. Bouibede-Hocine, K (2005) Enumeration Of Pareto Optima For Uniform Parallel Machine Scheduling With Two Criteria, 123--131 (Full Paper) (link to paper)

  189. (Menu for Bouibede-Hocine) All papers - Full papers - Abstracts - Selected papers

    Bouly

  190. Bouly, H (2013) Evolutionary algorithm and post-processing to minimize the total delay in multi-project scheduling, 831--835 (Full Paper) (link to paper)

  191. (Menu for Bouly) All papers - Full papers - Abstracts - Selected papers

    Bouvry

  192. Bouvry, P (2013) An Iterative Local Search Algorithm for Scheduling Precedence-Constrained Applications on Heterogeneous Machines, 472--485 (Full Paper) (link to paper)
  193. Bouvry, P (2017) The Application of Nondominated Sorting Genetic Algorithm (NSGA-III) for Scientific-workflow Scheduling on Cloud, 269--287 (Full Paper) (link to paper)

  194. (Menu for Bouvry) All papers - Full papers - Abstracts - Selected papers

    Bouyahia

  195. Bouyahia, Z (2015) Stability of probabilistic scheduling problems with precedence constraints and weighted completion time objective, 189--202 (Full Paper) (link to paper)

  196. (Menu for Bouyahia) All papers - Full papers - Abstracts - Selected papers

    Bouzouia

  197. Bouzouia, B (2009) Minimizing the number of tardy jobs in single machine scheduling using MIP, 227--238 (Full Paper) (link to paper)

  198. (Menu for Bouzouia) All papers - Full papers - Abstracts - Selected papers

    Bozejko

  199. Bozejko, W (2007) A Parallel Metaheuristics for the Single Machine Total Weighted Tardiness Problem with Sequence-Dependent Setup Times, 96--103 (Full Paper) (link to paper)

  200. (Menu for Bozejko) All papers - Full papers - Abstracts - Selected papers

    Brandao

  201. Brandao, J.S (2015) A biased random-key genetic algorithm for scheduling divisible loads, 570--578 (Full Paper) (link to paper)

  202. (Menu for Brandao) All papers - Full papers - Abstracts - Selected papers

    Brandinu

  203. Brandinu, G (2011) An MILP-approach to the optimization of event-bus schedules: a scheduling application in the tourism sector, 137--145 (Full Paper) (link to paper)

  204. (Menu for Brandinu) All papers - Full papers - Abstracts - Selected papers

    Branke

  205. Branke, J (2003) Task Scheduling under Gang Constraints, 506--523 (Full Paper) (link to paper)

  206. (Menu for Branke) All papers - Full papers - Abstracts - Selected papers

    Braun

  207. Braun, O (2015) Modeling the single-processor scheduling problem with time restrictions as a parallel machine scheduling problem, 325--330 (Full Paper) (link to paper)

  208. (Menu for Braun) All papers - Full papers - Abstracts - Selected papers

    Brauner

  209. Brauner, N (2003) Multibin Packing with the Best-Fit Rule, 74--89 (Full Paper) (link to paper)

  210. (Menu for Brauner) All papers - Full papers - Abstracts - Selected papers

    Briand

  211. Briand, C (2013) Solving a cooperative project scheduling with controllable processing times, self-interested agents and equal profit sharing, 125--132 (Full Paper) (link to paper)
  212. Briand, C (2015) A mass-flow MILP formulation for energy-efficient supplying in assembly lines, 236--239 (Full Paper) (link to paper)
  213. Briand, C (2009) Minimizing the number of tardy jobs in single machine scheduling using MIP, 227--238 (Full Paper) (link to paper)

  214. (Menu for Briand) All papers - Full papers - Abstracts - Selected papers

    Brucker

  215. Brucker, P (2007) The Job-Shop Problem: Old and New Challenges, 15--22 (Full Paper) (link to paper)
  216. Brucker, P (2005) A Decomposition, Construction And Post-processing Approach For Nurse Rostering, 397--406 (Full Paper) (link to paper)

  217. (Menu for Brucker) All papers - Full papers - Abstracts - Selected papers

    Bruno

  218. Bruno, G (2007) Optimization of the Departure Schedule at a Public Transit Terminal with Multiple Destinations, 104--111 (Full Paper) (link to paper)

  219. (Menu for Bruno) All papers - Full papers - Abstracts - Selected papers

    Bräysy

  220. Bräysy, O (2007) The Cost of Scheduling Customers in Routing Problems, 136--143 (Full Paper) (link to paper)

  221. (Menu for Bräysy) All papers - Full papers - Abstracts - Selected papers

    Bucar

  222. Bucar, D (2013) Scheduling of electric vehicle charging operations, 486--498 (Full Paper) (link to paper)

  223. (Menu for Bucar) All papers - Full papers - Abstracts - Selected papers

    Bunde

  224. Bunde, D. P (2005) Scheduling On A Single Machine To Minimize Total Flow Time With Job Rejections, 562--572 (Full Paper) (link to paper)

  225. (Menu for Bunde) All papers - Full papers - Abstracts - Selected papers

    Burke

  226. Burke, E. K (2005) An Investigation Of Variable Neighbourhood Search For University Course Timetabling, 413--427 (Full Paper) (link to paper)
  227. Burke, E. K (2011) The Airport Baggage Sorting Station Allocation Problem, 419--444 (Full Paper) (link to paper)
  228. Burke, E. K (2007) Determining Rules in Fuzzy Multiple Heuristic Orderings for Constructing Examination Timetables, 59--66 (Full Paper) (link to paper)
  229. Burke, E. K (2009) A comparison of two methods for reducing take-off delay at London Heathrow airport, 12--27 (Full Paper) (link to paper)
  230. Burke, E. K (2011) A more realistic approach for airport ground movement optimisation with stand holding, 146--160 (Full Paper) (link to paper)
  231. Burke, E. K (2007) A Simulated Annealing Hyper-heuristic: Adaptive Heuristic Selection for Different Vehicle Routing Problems, 67--70 (Full Paper) (link to paper)
  232. Burke, E. (2003) Making Airline Schedules More Robust, 678--695 (Full Paper) (link to paper)
  233. Burke, E (2005) A Decomposition, Construction And Post-processing Approach For Nurse Rostering, 397--406 (Full Paper) (link to paper)
  234. Burke, E (2003) Scheduling Nurses Using a Tabu-Search Hyperheuristic, 197--219 (Full Paper) (link to paper)
  235. Burke, E. K (2003) Similarity Measures for Exam Timetabling Problems, 120--136 (Full Paper) (link to paper)
  236. Burke, E. K (2011) Using Differential Evolution to Identify Fuzzy Measures for the Exam Timetabling Problem, 335--351 (Full Paper) (link to paper)
  237. Burke, E. K (2009) Adaptive Selection of Heuristics within a GRASP for Exam Timetabling Problems, 409--423 (Full Paper) (link to paper)
  238. Burke, E. K (2011) Dynamic Data Structures for Taskgraph Scheduling Policies with Applications in OpenCL Accelerators, 322--334 (Full Paper) (link to paper)
  239. Burke, E. K (2009) An Extended Great Deluge Approach to the Examination Timetabling Problem, 424--434 (Full Paper) (link to paper)
  240. Burke, E. K (2007) Adaptive Decomposition and Construction for Examination Timetabling Problems, 418--425 (Full Paper) (link to paper)
  241. Burke, E. K (2009) Hybridizing Integer Programming Models with an Adaptive Decomposition Approach for Exam Timetabling Problems, 435--446 (Full Paper) (link to paper)
  242. Burke, E (2013) An Investigation of Multistage Approaches to Examination Timetabling, 528--542 (Full Paper) (link to paper)

  243. (Menu for Burke) All papers - Full papers - Abstracts - Selected papers

    Buscaylet

  244. Buscaylet, F (2005) Lower And Upper Bounds For The Job-shop Scheduling Problem With Sequence-dependent Setup Times, 316--321 (Full Paper) (link to paper)

  245. (Menu for Buscaylet) All papers - Full papers - Abstracts - Selected papers

    Bülbül

  246. Bülbül, K (2011) Minimizing Value-at-Risk in the Single-Machine Total Weighted Tardiness Problem, 215--229 (Full Paper) (link to paper)

  247. (Menu for Bülbül) All papers - Full papers - Abstracts - Selected papers

    Cai

  248. Cai, X (2005) Single-machine Scheduling With General Costs Under Compound-type Distributions, 630--642 (Full Paper) (link to paper)

  249. (Menu for Cai) All papers - Full papers - Abstracts - Selected papers

    Cangalovic

  250. Cangalovic, M (2009) Heuristic approach to the airline schedule disturbances problem: multifleet case, 311--320 (Full Paper) (link to paper)

  251. (Menu for Cangalovic) All papers - Full papers - Abstracts - Selected papers

    Cao

  252. Cao, B (2017) Improving Ant Colony Optimization algorithm with Levy Flight, 093--102 (Full Paper) (link to paper)

  253. (Menu for Cao) All papers - Full papers - Abstracts - Selected papers

    Carniel

  254. Carniel, G.M (2013) A simple stochastic local search for multi-mode resource-constrained multi-project scheduling, 826--830 (Full Paper) (link to paper)

  255. (Menu for Carniel) All papers - Full papers - Abstracts - Selected papers

    Carrano

  256. Carrano, E.G (2015) Improving Upper Bounds in High School Timetabling by Matheuristics, 267--275 (Full Paper) (link to paper)

  257. (Menu for Carrano) All papers - Full papers - Abstracts - Selected papers

    Carvalho

  258. Carvalho, M. A.M (2013) An Integer Programming Approach for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 840--847 (Full Paper) (link to paper)

  259. (Menu for Carvalho) All papers - Full papers - Abstracts - Selected papers

    Ceschia

  260. Ceschia, S (2015) Thesis Defense Timetabling, 507--514 (Full Paper) (link to paper)
  261. Ceschia, S (2013) A simulated annealing approach to the curriculum-based course timetabling problem, 314--317 (Full Paper) (link to paper)
  262. Ceschia, S (2009) Tabu Search Techniques for the Heterogeneous Vehicle Routing Problem with Time Windows and Carrier-Dependent Costs, 594--605 (Full Paper) (link to paper)

  263. (Menu for Ceschia) All papers - Full papers - Abstracts - Selected papers

    Cesta

  264. Cesta, A (2007) Walk the (Time-)Line: Scheduling and Execution, 23--23 (Full Paper) (link to paper)
  265. Cesta, A (2003) Constraint-Based Random Search for Solving Spacecraft Downlink Scheduling Problems, 574--597 (Full Paper) (link to paper)

  266. (Menu for Cesta) All papers - Full papers - Abstracts - Selected papers

    Chakraborty

  267. Chakraborty, A (2015) An optimization-based approach for delivering radio-pharmaceuticals to medical imaging centers, 203--217 (Full Paper) (link to paper)

  268. (Menu for Chakraborty) All papers - Full papers - Abstracts - Selected papers

    Chang

  269. Chang, P-C. (2009) Development of E ective Estimation of Distribution Algorithms for Scheduling Problems, 531--556 (Full Paper) (link to paper)

  270. (Menu for Chang) All papers - Full papers - Abstracts - Selected papers

    Chaovalitwongse

  271. Chaovalitwongse, W. Ar (2007) Scheduling the Operations of an Integrated Production-Distribution Process, 316--327 (Full Paper) (link to paper)

  272. (Menu for Chaovalitwongse) All papers - Full papers - Abstracts - Selected papers

    Chase

  273. Chase, D (2009) Optimal Pump Scheduling For Water Distribution Systems, 341--356 (Full Paper) (link to paper)

  274. (Menu for Chase) All papers - Full papers - Abstracts - Selected papers

    Chen

  275. Chen, S-H. (2009) Development of E ective Estimation of Distribution Algorithms for Scheduling Problems, 531--556 (Full Paper) (link to paper)
  276. Chen, M-C. (2009) Development of E ective Estimation of Distribution Algorithms for Scheduling Problems, 531--556 (Full Paper) (link to paper)
  277. Chen, Y-M. (2009) Development of E ective Estimation of Distribution Algorithms for Scheduling Problems, 531--556 (Full Paper) (link to paper)

  278. (Menu for Chen) All papers - Full papers - Abstracts - Selected papers

    Cheng

  279. Cheng, P (2003) Perturbation Based Variable Neighbourhood Search in Heuristic Space for Examination Timetabling Problem, 155--173 (Full Paper) (link to paper)
  280. Cheng, E (2007) A Case Study of an Integer Programming Model for Instructor Assignments and Scheduling Problem, 267--275 (Full Paper) (link to paper)
  281. Cheng, J (2011) Multi-mode Resource-Constrained Project Scheduling of Semiconductor Equipment Install/Qual Process, 408--418 (Full Paper) (link to paper)
  282. Cheng, P. C- (2005) Graphical Tools for Heuristic Visualization, 658--667 (Full Paper) (link to paper)

  283. (Menu for Cheng) All papers - Full papers - Abstracts - Selected papers

    Chou

  284. Chou, S-Y. (2005) A Sequential Pair Exchange Approach for Solving Single-Machine Scheduling Problems with General Earliness-Tardiness Penalties, 299--314 (Full Paper) (link to paper)

  285. (Menu for Chou) All papers - Full papers - Abstracts - Selected papers

    Chretienne

  286. Chretienne, V. J. P (2013) Minimizing the number of late jobs on parallel machines with alpha time windows, 206--217 (Full Paper) (link to paper)
  287. Chretienne, P (2009) Batching and Scheduling with Tardiness, 291--300 (Full Paper) (link to paper)
  288. Chretienne, P (2013) Homogeneously non-idling schedules of unit-time jobs on identical parallel machines, 39--54 (Full Paper) (link to paper)

  289. (Menu for Chretienne) All papers - Full papers - Abstracts - Selected papers

    Clement

  290. Clement, M (2017) Balanced clustering based decomposition applied to Master thesis defense timetabling problem, 214--228 (Full Paper) (link to paper)

  291. (Menu for Clement) All papers - Full papers - Abstracts - Selected papers

    Colen

  292. Colen, P (2013) Evaluation of appointment scheduling rules, 509--514 (Full Paper) (link to paper)

  293. (Menu for Colen) All papers - Full papers - Abstracts - Selected papers

    Cortellessa

  294. Cortellessa, G (2003) Constraint-Based Random Search for Solving Spacecraft Downlink Scheduling Problems, 574--597 (Full Paper) (link to paper)

  295. (Menu for Cortellessa) All papers - Full papers - Abstracts - Selected papers

    Cowling

  296. Cowling, P (2003) Perturbation Based Variable Neighbourhood Search in Heuristic Space for Examination Timetabling Problem, 155--173 (Full Paper) (link to paper)

  297. (Menu for Cowling) All papers - Full papers - Abstracts - Selected papers

    Creemers

  298. Creemers, S (2013) Evaluation of appointment scheduling rules, 509--514 (Full Paper) (link to paper)

  299. (Menu for Creemers) All papers - Full papers - Abstracts - Selected papers

    Critchley

  300. Critchley, M (2015) Optimisation of a Stagger Chart for Aviation Fleet Planning, 579--589 (Full Paper) (link to paper)

  301. (Menu for Critchley) All papers - Full papers - Abstracts - Selected papers

    Croce

  302. Croce, F. D. (2007) Sequencing a Single Machine with Due Dates and Deadlines: an ILP-based Approach to Solve Very Large Instances, 71--79 (Full Paper) (link to paper)
  303. Croce, F. D (2011) Minimizing the sum of quadratic completion times on two identical parallel machines, 240--244 (Full Paper) (link to paper)

  304. (Menu for Croce) All papers - Full papers - Abstracts - Selected papers

    Cucu

  305. Cucu, L (2005) Periodic real-time scheduling:from latency-based model to deadline-based model, 344--352 (Full Paper) (link to paper)

  306. (Menu for Cucu) All papers - Full papers - Abstracts - Selected papers

    Cui

  307. Cui, T (2017) Responsive Single Bus Corridor Scheduling Based on Machine Learning and Optimisation, 288--294 (Full Paper) (link to paper)

  308. (Menu for Cui) All papers - Full papers - Abstracts - Selected papers

    Damay

  309. Damay, J (2003) Interval Graphs, Antichain Sets and Scheduling with Temporal and Resource Constraints, 620--637 (Full Paper) (link to paper)

  310. (Menu for Damay) All papers - Full papers - Abstracts - Selected papers

    Dang

  311. Dang, D-C. (2013) Evolutionary algorithm and post-processing to minimize the total delay in multi-project scheduling, 831--835 (Full Paper) (link to paper)

  312. (Menu for Dang) All papers - Full papers - Abstracts - Selected papers

    Darties

  313. Darties, B (2009) Isomorphic coupled-task scheduling problem with compatibility constraints on a single processor, 378--388 (Full Paper) (link to paper)

  314. (Menu for Darties) All papers - Full papers - Abstracts - Selected papers

    Dasaklis

  315. Dasaklis, T (2009) A deterministic resource scheduling model in epidemic logistics, 570--580 (Full Paper) (link to paper)

  316. (Menu for Dasaklis) All papers - Full papers - Abstracts - Selected papers

    Dauzere-Peres

  317. Dauzere-Peres, S (2015) Minimizing regular criteria in the flexible job-shop scheduling problem, 443--456 (Full Paper) (link to paper)

  318. (Menu for Dauzere-Peres) All papers - Full papers - Abstracts - Selected papers

    Dauzčre-Pérčs

  319. Dauzčre-Pérčs, S (2009) Scheduling Inspection Operations subject to a Fixed Production Schedule, 581--593 (Full Paper) (link to paper)
  320. Dauzčre-Pérčs, S (2009) Scheduling Semiconductor Manufacturing Operations: Problems, Solution Techniques, and Future Challenges, 192--201 (Full Paper) (link to paper)

  321. (Menu for Dauzčre-Pérčs) All papers - Full papers - Abstracts - Selected papers

    Davenport

  322. Davenport, A (2007) Scheduling Steel Production using Mixed-Integer Programming and Constraint Programming, 120--127 (Full Paper) (link to paper)

  323. (Menu for Davenport) All papers - Full papers - Abstracts - Selected papers

    Davidovi

  324. Davidovi, T (2007) Towards the Optimal Solution of the Multiprocessor Scheduling Problem with Communication Delays, 128--135 (Full Paper) (link to paper)

  325. (Menu for Davidovi) All papers - Full papers - Abstracts - Selected papers

    De Bruyn

  326. De Bruyn, W (2011) Case study: an effective genetic algorithm for the chemical batch production scheduling, 469--482 (Full Paper) (link to paper)
  327. De Bruyn, W (2013) A Reinforcement Learning Approach to Solving Hybrid Flexible Flowline Scheduling Problems, 402--409 (Full Paper) (link to paper)

  328. (Menu for De Bruyn) All papers - Full papers - Abstracts - Selected papers

    De Causmaecker

  329. De Causmaecker, P (2007) Distributed Decision Making in Hospital Wide Nurse Rostering Problems, 192--199 (Full Paper) (link to paper)
  330. De Causmaecker, P (2013) Algorithm preformance prediction for nurse rostering, 21--38 (Full Paper) (link to paper)
  331. De Causmaecker, P (2011) A new hyper-heuristic implementation in HyFlex: a study on generality, 374--393 (Full Paper) (link to paper)
  332. De Causmaecker, P (2017) Evolving Adaptive Evolutionary Algorithms, 070--083 (Full Paper) (link to paper)

  333. (Menu for De Causmaecker) All papers - Full papers - Abstracts - Selected papers

    De Cesco

  334. De Cesco, F (2015) Thesis Defense Timetabling, 507--514 (Full Paper) (link to paper)

  335. (Menu for De Cesco) All papers - Full papers - Abstracts - Selected papers

    De Dinechin

  336. De Dinechin, B. D (2007) Time-Indexed Formulations and a Large Neighborhood Search for the Resource-Constrained Modulo Scheduling Problem, 144--151 (Full Paper) (link to paper)

  337. (Menu for De Dinechin) All papers - Full papers - Abstracts - Selected papers

    De Feyter

  338. De Feyter, T (2013) Extended Roster Quality Staffng Problem A medium term roster quality to support staffing decisions, 424--436 (Full Paper) (link to paper)

  339. (Menu for De Feyter) All papers - Full papers - Abstracts - Selected papers

    De Werra

  340. De Werra, D (2007) Robotics and Chromatic Scheduling, 42--49 (Full Paper) (link to paper)

  341. (Menu for De Werra) All papers - Full papers - Abstracts - Selected papers

    Deleplanque

  342. Deleplanque, S (2013) Transfers in the on-demand transportation: the DARPT Dial-a-Ride Problem with transfers allowed, 185--205 (Full Paper) (link to paper)

  343. (Menu for Deleplanque) All papers - Full papers - Abstracts - Selected papers

    Demange

  344. Demange, M (2007) Robotics and Chromatic Scheduling, 42--49 (Full Paper) (link to paper)

  345. (Menu for Demange) All papers - Full papers - Abstracts - Selected papers

    Demir

  346. Demir, O (2013) A GIS-Based Emergency Response System for Disaster Relief Operations, 372--378 (Full Paper) (link to paper)

  347. (Menu for Demir) All papers - Full papers - Abstracts - Selected papers

    Demirovic

  348. Demirovic, E (2017) Balanced clustering based decomposition applied to Master thesis defense timetabling problem, 214--228 (Full Paper) (link to paper)

  349. (Menu for Demirovic) All papers - Full papers - Abstracts - Selected papers

    Detienne

  350. Detienne, B (2009) Scheduling Inspection Operations subject to a Fixed Production Schedule, 581--593 (Full Paper) (link to paper)

  351. (Menu for Detienne) All papers - Full papers - Abstracts - Selected papers

    Dios

  352. Dios, M (2015) Heuristic Methods for Single Machine Scheduling with Periodic Maintenance, 473--483 (Full Paper) (link to paper)

  353. (Menu for Dios) All papers - Full papers - Abstracts - Selected papers

    Dobson

  354. Dobson, R (2011) Low Energy Scheduling with Power Heterogeneous Multiprocessor Systems, 297--307 (Full Paper) (link to paper)

  355. (Menu for Dobson) All papers - Full papers - Abstracts - Selected papers

    Dolgui

  356. Dolgui, A (2013) A Graphical Algorithm for Solving an Investment Optimization Problem, 290--299 (Full Paper) (link to paper)

  357. (Menu for Dolgui) All papers - Full papers - Abstracts - Selected papers

    Dorne

  358. Dorne, R (2007) iSchedule, an Optimisation Toolkit for Complex Scheduling, 344--352 (Full Paper) (link to paper)

  359. (Menu for Dorne) All papers - Full papers - Abstracts - Selected papers

    Dostert

  360. Dostert, M (2013) Algorithms and Complexity of Student Sectioning for Existing Timetables, 218--229 (Full Paper) (link to paper)

  361. (Menu for Dostert) All papers - Full papers - Abstracts - Selected papers

    Down

  362. Down, D. G (2015) Resource-Aware Scheduling for Data Centers with Heterogenous Servers, 240--259 (Full Paper) (link to paper)

  363. (Menu for Down) All papers - Full papers - Abstracts - Selected papers

    Dozic

  364. Dozic, S (2009) Heuristic approach to the airline schedule disturbances problem: multifleet case, 311--320 (Full Paper) (link to paper)

  365. (Menu for Dozic) All papers - Full papers - Abstracts - Selected papers

    Dridi

  366. Dridi, N (2007) The Two-Stage Assembly Flow Shop Scheduling with an Availability Constraint, 184--191 (Full Paper) (link to paper)

  367. (Menu for Dridi) All papers - Full papers - Abstracts - Selected papers

    Dror

  368. Dror, M (2009) Strong-Weak Precedence in Scheduling: Extended Order Implications, 28--42 (Full Paper) (link to paper)
  369. Dror, M (2003) Case-Based Initialisation of Metaheuristics for Examination Timetabling, 137--154 (Full Paper) (link to paper)

  370. (Menu for Dror) All papers - Full papers - Abstracts - Selected papers

    Drozdowsk

  371. Drozdowsk, M (2013) Mitigating Partitioning Skew in MapReduce Computations, 80--90 (Full Paper) (link to paper)

  372. (Menu for Drozdowsk) All papers - Full papers - Abstracts - Selected papers

    Drozdowski

  373. Drozdowski, M (2009) Heuristics for Divisible Loads Scheduling in Systems with Limited Memory, 321--329 (Full Paper) (link to paper)
  374. Drozdowski, M (2015) Energy Consumption in Single- and Multi-installment Divisible Loads Processing in Systems with Hierarchical Memory, 146--153 (Full Paper) (link to paper)

  375. (Menu for Drozdowski) All papers - Full papers - Abstracts - Selected papers

    Duenas

  376. Duenas, A (2003) Handling Preferences using Genetic Algorithms for the Nurse Scheduling Problem, 180--196 (Full Paper) (link to paper)
  377. Duenas, A (2005) An Approach To Predictive-reactive Scheduling Of Parallel Machines Subject To Disruptions, 74--91 (Full Paper) (link to paper)

  378. (Menu for Duenas) All papers - Full papers - Abstracts - Selected papers

    Dullaert

  379. Dullaert, W (2007) The Cost of Scheduling Customers in Routing Problems, 136--143 (Full Paper) (link to paper)

  380. (Menu for Dullaert) All papers - Full papers - Abstracts - Selected papers

    Dung

  381. Dung, P.Q (2017) Balanced clustering based decomposition applied to Master thesis defense timetabling problem, 214--228 (Full Paper) (link to paper)

  382. (Menu for Dung) All papers - Full papers - Abstracts - Selected papers

    Dusa

  383. Dusa, V (2009) Preemptive scheduling with precedences and alternative resources, 518--530 (Full Paper) (link to paper)

  384. (Menu for Dusa) All papers - Full papers - Abstracts - Selected papers

    Ecker

  385. Ecker, K. H (2007) Non-preemptive Scheduling of Distance Constrained Tasks Subject to Minimizing Processor Load, 200--208 (Full Paper) (link to paper)

  386. (Menu for Ecker) All papers - Full papers - Abstracts - Selected papers

    Eckersley

  387. Eckersley, A. J (2003) Similarity Measures for Exam Timetabling Problems, 120--136 (Full Paper) (link to paper)

  388. (Menu for Eckersley) All papers - Full papers - Abstracts - Selected papers

    Ekim

  389. Ekim, T (2007) Robotics and Chromatic Scheduling, 42--49 (Full Paper) (link to paper)

  390. (Menu for Ekim) All papers - Full papers - Abstracts - Selected papers

    Elliot

  391. Elliot, R. (2011) Dynamic Data Structures for Taskgraph Scheduling Policies with Applications in OpenCL Accelerators, 322--334 (Full Paper) (link to paper)

  392. (Menu for Elliot) All papers - Full papers - Abstracts - Selected papers

    Elmaghraby

  393. Elmaghraby, S.E (2003) Two-machine Flowshop Scheduling with the Availability Constraint on the Second Machine, 279--290 (Full Paper) (link to paper)

  394. (Menu for Elmaghraby) All papers - Full papers - Abstracts - Selected papers

    Elvikis

  395. Elvikis, D (2007) Scheduling and Location (ScheLoc):Makespan Problem with Variable Release Dates, 152--158 (Full Paper) (link to paper)
  396. Elvikis, D (2009) Scheduling two interfering job sets on uniform parallel machines with makespan and cost functions, 645--654 (Full Paper) (link to paper)

  397. (Menu for Elvikis) All papers - Full papers - Abstracts - Selected papers

    Emeretlis

  398. Emeretlis, A (2017) Exploration of Logic-Based Benders Decomposition Approach for Mapping Applications on Heterogeneous Multi-Core Platforms, 030--042 (Full Paper) (link to paper)

  399. (Menu for Emeretlis) All papers - Full papers - Abstracts - Selected papers

    Erramilli

  400. Erramilli, V (2005) Multiple Orders Per Job Batch Scheduling With Incompatible Jobs, 48--64 (Full Paper) (link to paper)
  401. Erramilli, V (2005) Single Machine Multiple Orders Per Job Scheduling Using Column Generation, 539--547 (Full Paper) (link to paper)

  402. (Menu for Erramilli) All papers - Full papers - Abstracts - Selected papers

    Ersoy

  403. Ersoy, E (2007) Memetic Algorithms and Hyperhill-climbers, 159--166 (Full Paper) (link to paper)

  404. (Menu for Ersoy) All papers - Full papers - Abstracts - Selected papers

    Facó

  405. Facó, J. L. D. (2007) Applying Optimal Control to Jetty Scheduling Problems, 167--174 (Full Paper) (link to paper)

  406. (Menu for Facó) All papers - Full papers - Abstracts - Selected papers

    Fagundez

  407. Fagundez, F. D. (2007) Applying Optimal Control to Jetty Scheduling Problems, 167--174 (Full Paper) (link to paper)

  408. (Menu for Fagundez) All papers - Full papers - Abstracts - Selected papers

    Fayad

  409. Fayad, C (2005) Job Shop Scheduling With Lot-sizing And Batching In An Uncertain Real-world Environment, 363--379 (Full Paper) (link to paper)

  410. (Menu for Fayad) All papers - Full papers - Abstracts - Selected papers

    Feillet

  411. Feillet, D (2005) Lower And Upper Bounds For The Job-shop Scheduling Problem With Sequence-dependent Setup Times, 316--321 (Full Paper) (link to paper)

  412. (Menu for Feillet) All papers - Full papers - Abstracts - Selected papers

    Feitelson

  413. Feitelson, D.G (2003) Bicriteria Scheduling for Parallel Jobs, 606--619 (Full Paper) (link to paper)

  414. (Menu for Feitelson) All papers - Full papers - Abstracts - Selected papers

    Fernandes

  415. Fernandes, P (2013) Automatic Timetabling in Higher Education Institutions: a real scenario and solution, 151--170 (Full Paper) (link to paper)

  416. (Menu for Fernandes) All papers - Full papers - Abstracts - Selected papers

    Fernandez-Viagas

  417. Fernandez-Viagas, V (2015) Heuristic Methods for Single Machine Scheduling with Periodic Maintenance, 473--483 (Full Paper) (link to paper)

  418. (Menu for Fernandez-Viagas) All papers - Full papers - Abstracts - Selected papers

    Finke

  419. Finke, G (2007) Scheduling with Batch Compatible Tasks, 24--26 (Full Paper) (link to paper)
  420. Finke, G (2003) Multibin Packing with the Best-Fit Rule, 74--89 (Full Paper) (link to paper)

  421. (Menu for Finke) All papers - Full papers - Abstracts - Selected papers

    Fleszar

  422. Fleszar, K (2009) Hybrid of the weighted minimum slack and shortest processing time dispatching rules for the total weighted tardiness single machine scheduling problem with availability constraints, 202--215 (Full Paper) (link to paper)

  423. (Menu for Fleszar) All papers - Full papers - Abstracts - Selected papers

    Fonseca

  424. Fonseca, G.H.G (2015) Improving Upper Bounds in High School Timetabling by Matheuristics, 267--275 (Full Paper) (link to paper)
  425. Fonseca, G. H.G (2013) A New Integer Linear Programming Formulation to the Examination Timetabling Problem, 345--355 (Full Paper) (link to paper)
  426. Fonseca, G. H.G (2013) Late Acceptance Hill-Climbing Applied to the High School Timetabling Problem, 331--344 (Full Paper) (link to paper)

  427. (Menu for Fonseca) All papers - Full papers - Abstracts - Selected papers

    Fordyce

  428. Fordyce, K (2011) The Ongoing Challenge – A Responsive Enterprise-Wide Demand Supply Network for Semiconductor Based Package Goods – Something for Everyone, 10--93 (Full Paper) (link to paper)

  429. (Menu for Fordyce) All papers - Full papers - Abstracts - Selected papers

    Fowler

  430. Fowler, J (2005) Bicriteria Scheduling Of Equal Length Jobs With Release Dates On Identical Parallel Machines, 112--122 (Full Paper) (link to paper)
  431. Fowler, J. W (2011) Multi-mode Resource-Constrained Project Scheduling of Semiconductor Equipment Install/Qual Process, 408--418 (Full Paper) (link to paper)
  432. Fowler, J (2009) Single Machine Scheduling with Interfering Job Sets, 357--365 (Full Paper) (link to paper)
  433. Fowler, J (2005) A Comparison Of Different Formulations For The Non-preemptive Single Machine Total Weighted Tardiness Scheduling Problem, 643--651 (Full Paper) (link to paper)
  434. Fowler, J. W (2007) Minimizing Makespan with Multiple Orders per Job in Mixed Flowshops, 301--308 (Full Paper) (link to paper)
  435. Fowler, J. W (2005) Minimizing Makespan With Multiple Orders Per Job In A Two Machine Flowshop With Item Processing, 288--298 (Full Paper) (link to paper)
  436. Fowler, J. W (2009) Scheduling Semiconductor Manufacturing Operations: Problems, Solution Techniques, and Future Challenges, 192--201 (Full Paper) (link to paper)
  437. Fowler, J (2005) A Bi-criteria Approach To Scheduling Wafer Fabrication Facilities, 276--287 (Full Paper) (link to paper)

  438. (Menu for Fowler) All papers - Full papers - Abstracts - Selected papers

    Framinan

  439. Framinan, J. M (2015) Heuristic Methods for Single Machine Scheduling with Periodic Maintenance, 473--483 (Full Paper) (link to paper)

  440. (Menu for Framinan) All papers - Full papers - Abstracts - Selected papers

    Francis

  441. Francis, H (2011) Dynamic Data Structures for Taskgraph Scheduling Policies with Applications in OpenCL Accelerators, 322--334 (Full Paper) (link to paper)

  442. (Menu for Francis) All papers - Full papers - Abstracts - Selected papers

    Fu

  443. Fu, L- (2013) Production and Interplant Batch Delivery Scheduling: Dominance and Cooperation, 133--150 (Full Paper) (link to paper)
  444. Fu, L- (2015) Integrated production and outbound distribution scheduling problem with setup times and delivery time windows, 174--188 (Full Paper) (link to paper)

  445. (Menu for Fu) All papers - Full papers - Abstracts - Selected papers

    Fugenschuh

  446. Fugenschuh, A (2015) Home Health Care Scheduling: A Case Study, 555--569 (Full Paper) (link to paper)

  447. (Menu for Fugenschuh) All papers - Full papers - Abstracts - Selected papers

    G"unther

  448. G"unther, M (2017) Evolutionary Bilevel Approach for Integrated Long-Term Staffing and Scheduling, 144--157 (Full Paper) (link to paper)

  449. (Menu for G"unther) All papers - Full papers - Abstracts - Selected papers

    Gafarov

  450. Gafarov, E.R (2013) A Graphical Algorithm for Solving an Investment Optimization Problem, 290--299 (Full Paper) (link to paper)

  451. (Menu for Gafarov) All papers - Full papers - Abstracts - Selected papers

    Gagn

  452. Gagn, C (2013) A new ant colony optimization for minimizing tardiness in the single machine scheduling problem with sequence-dependent setups times, 17--20 (Full Paper) (link to paper)

  453. (Menu for Gagn) All papers - Full papers - Abstracts - Selected papers

    Gao

  454. Gao, S (2005) A Zero-Inventory Production-Distribution Problem with Time-Window Constraints, 428--444 (Full Paper) (link to paper)

  455. (Menu for Gao) All papers - Full papers - Abstracts - Selected papers

    Garc?a-Leon

  456. Garc?a-Leon, A (2015) Minimizing regular criteria in the flexible job-shop scheduling problem, 443--456 (Full Paper) (link to paper)

  457. (Menu for Garc?a-Leon) All papers - Full papers - Abstracts - Selected papers

    Garcia-Sabater

  458. Garcia-Sabater, J.P (2013) In-depth analysis of the quality sequence to resolve CRSP, 515--527 (Full Paper) (link to paper)

  459. (Menu for Garcia-Sabater) All papers - Full papers - Abstracts - Selected papers

    García-Sabater

  460. García-Sabater, J. P. (2007) A Decision Support System for Scheduling a Painting Facility in an Automotive Supplier, 175--183 (Full Paper) (link to paper)
  461. García-Sabater, J. J. (2007) A Decision Support System for Scheduling a Painting Facility in an Automotive Supplier, 175--183 (Full Paper) (link to paper)

  462. (Menu for García-Sabater) All papers - Full papers - Abstracts - Selected papers

    Garibaldi

  463. Garibaldi, J. M (2007) Determining Rules in Fuzzy Multiple Heuristic Orderings for Constructing Examination Timetables, 59--66 (Full Paper) (link to paper)
  464. Garibaldi, J. M (2005) A Service Level Agreement Protocol And Tabu Search For Scheduling On Computational Grids, 238--243 (Full Paper) (link to paper)

  465. (Menu for Garibaldi) All papers - Full papers - Abstracts - Selected papers

    Gaspero

  466. Gaspero, L. D (2013) A simulated annealing approach to the curriculum-based course timetabling problem, 314--317 (Full Paper) (link to paper)

  467. (Menu for Gaspero) All papers - Full papers - Abstracts - Selected papers

    Gazdar

  468. Gazdar, A (2015) Bounding schemes for the parallel processors scheduling problem with release date, delivery time and with no-idle time constraint, 393--402 (Full Paper) (link to paper)
  469. Gazdar, A (2015) Lower bounds for the parallel processing scheduling problem with multiprocessor tasks, release date and delivery time, 403--411 (Full Paper) (link to paper)

  470. (Menu for Gazdar) All papers - Full papers - Abstracts - Selected papers

    Geiger

  471. Geiger, M.J (2013) Iterated Variable Neighborhood Search for the resource constrained multi-mode multi-project scheduling problem Some comments on our contribution to the MISTA 2013 Challenge, 807--811 (Full Paper) (link to paper)

  472. (Menu for Geiger) All papers - Full papers - Abstracts - Selected papers

    Geirsson

  473. Geirsson, E (2013) Bandit Algorithms using Monte Carlo Rollouts for Job Shop Scheduling, 318--330 (Full Paper) (link to paper)

  474. (Menu for Geirsson) All papers - Full papers - Abstracts - Selected papers

    Gelbukh

  475. Gelbukh, A (2005) On Project Scheduling With And/or Precedence Constraints, 597--606 (Full Paper) (link to paper)

  476. (Menu for Gelbukh) All papers - Full papers - Abstracts - Selected papers

    Gendreau

  477. Gendreau, M (2007) A Simulated Annealing Hyper-heuristic: Adaptive Heuristic Selection for Different Vehicle Routing Problems, 67--70 (Full Paper) (link to paper)

  478. (Menu for Gendreau) All papers - Full papers - Abstracts - Selected papers

    Giroudeau

  479. Giroudeau, R (2009) Isomorphic coupled-task scheduling problem with compatibility constraints on a single processor, 378--388 (Full Paper) (link to paper)

  480. (Menu for Giroudeau) All papers - Full papers - Abstracts - Selected papers

    Glazebrook

  481. Glazebrook, K.D (2011) Stochastic scheduling: A short history of index policies and some key recent developments, 94--112 (Full Paper) (link to paper)

  482. (Menu for Glazebrook) All papers - Full papers - Abstracts - Selected papers

    Glizer

  483. Glizer, V.Y (2015) Optimal schedule of a statistical process control with a nonlinear expected loss, 42--54 (Full Paper) (link to paper)

  484. (Menu for Glizer) All papers - Full papers - Abstracts - Selected papers

    Godard

  485. Godard, D (2007) Self-Adapting Large Neighborhood Search:Application to Single-Mode Scheduling Problems, 276--284 (Full Paper) (link to paper)

  486. (Menu for Godard) All papers - Full papers - Abstracts - Selected papers

    Gogos

  487. Gogos, C (2013) DAG Scheduling using Integer Programming in heterogenous parallel execution environments, 392--401 (Full Paper) (link to paper)

  488. (Menu for Gogos) All papers - Full papers - Abstracts - Selected papers

    Gomes

  489. Gomes, F.R.A (2017) Mathematical Formulation for Minimizing Total Tardiness in a Scheduling Problem with Parallel Machines, 201--213 (Full Paper) (link to paper)

  490. (Menu for Gomes) All papers - Full papers - Abstracts - Selected papers

    Gonzales

  491. Gonzales, C (2011) Single machine scheduling with delivery dates and cumulative payoffs, 261--274 (Full Paper) (link to paper)
  492. Gonzales, C (2013) A polynomial time OPT-1 algorithm for a scheduling problem with two delivery dates and cumulative payoffs, 268--289 (Full Paper) (link to paper)

  493. (Menu for Gonzales) All papers - Full papers - Abstracts - Selected papers

    Gonzalez

  494. Gonzalez, M.A (2017) A constraint programming approach for the energy-efficient job shop scheduling problem, 158--172 (Full Paper) (link to paper)

  495. (Menu for Gonzalez) All papers - Full papers - Abstracts - Selected papers

    González

  496. González, E. J (2003) Masplan: A Multi-Agent System for Automated Planning and Scheduling in a University Research Group Scenario, 42--55 (Full Paper) (link to paper)

  497. (Menu for González) All papers - Full papers - Abstracts - Selected papers

    Gordon

  498. Gordon, V. S (2005) Heuristic Approaches To A Common Due Date Earliness-tardiness Scheduling Problem, 132--139 (Full Paper) (link to paper)

  499. (Menu for Gordon) All papers - Full papers - Abstracts - Selected papers

    Gort

  500. Gort, E (2017) Towards improving tenders for Higher Education timetabling software: Uncovering the selection criteria of HEIs when choosing timetabling applications and using ERP as a reference, 173--188 (Full Paper) (link to paper)

  501. (Menu for Gort) All papers - Full papers - Abstracts - Selected papers

    Gosling

  502. Gosling, T (2005) Retractable Contract Network for Distributed Scheduling, 485--500 (Full Paper) (link to paper)

  503. (Menu for Gosling) All papers - Full papers - Abstracts - Selected papers

    Goulas

  504. Goulas, G (2013) DAG Scheduling using Integer Programming in heterogenous parallel execution environments, 392--401 (Full Paper) (link to paper)

  505. (Menu for Goulas) All papers - Full papers - Abstracts - Selected papers

    Gourgand

  506. Gourgand, M (2007) Solving Resource-Constrained Project Scheduling Problem with Particle Swarm Optimization, 251--258 (Full Paper) (link to paper)

  507. (Menu for Gourgand) All papers - Full papers - Abstracts - Selected papers

    Gravel

  508. Gravel, M (2013) A new ant colony optimization for minimizing tardiness in the single machine scheduling problem with sequence-dependent setups times, 17--20 (Full Paper) (link to paper)

  509. (Menu for Gravel) All papers - Full papers - Abstracts - Selected papers

    Greenwood

  510. Greenwood, J. S (2009) A comparison of two methods for reducing take-off delay at London Heathrow airport, 12--27 (Full Paper) (link to paper)

  511. (Menu for Greenwood) All papers - Full papers - Abstracts - Selected papers

    Grinshpoun

  512. Grinshpoun, T (2015) A Fixed Route Dial-a-Ride Problem, 313--324 (Full Paper) (link to paper)
  513. Grinshpoun, T (2011) A Two-Campus Transport Problem, 173--184 (Full Paper) (link to paper)

  514. (Menu for Grinshpoun) All papers - Full papers - Abstracts - Selected papers

    Groenbaek

  515. Groenbaek, J (2013) Scheduling of electric vehicle charging operations, 486--498 (Full Paper) (link to paper)

  516. (Menu for Groenbaek) All papers - Full papers - Abstracts - Selected papers

    Grosso

  517. Grosso, A (2007) Sequencing a Single Machine with Due Dates and Deadlines: an ILP-based Approach to Solve Very Large Instances, 71--79 (Full Paper) (link to paper)

  518. (Menu for Grosso) All papers - Full papers - Abstracts - Selected papers

    Guedes

  519. Guedes, A. C. B (2009) A heuristic for minimizing weighted carry-over effects in round robin tournaments, 115--129 (Full Paper) (link to paper)

  520. (Menu for Guedes) All papers - Full papers - Abstracts - Selected papers

    Guerry

  521. Guerry, M-A. (2013) Extended Roster Quality Staffng Problem A medium term roster quality to support staffing decisions, 424--436 (Full Paper) (link to paper)

  522. (Menu for Guerry) All papers - Full papers - Abstracts - Selected papers

    Guitouni

  523. Guitouni, A (2009) A Nonlinear Mixed Integer Program for Search Path Planning Problem (SPPP), 277--290 (Full Paper) (link to paper)

  524. (Menu for Guitouni) All papers - Full papers - Abstracts - Selected papers

    Gunawan

  525. Gunawan, A (2017) Home Health Care Delivery Problem, 244--255 (Full Paper) (link to paper)
  526. Gunawan, A (2015) SAILS: Hybrid Algorithm for the Team Orienteering ProblemwithTimeWindows, 276--295 (Full Paper) (link to paper)
  527. Gunawan, A (2009) Master Physician Scheduling Problem, 145--156 (Full Paper) (link to paper)
  528. Gunawan, A (2017) A Selective-Discrete Particle Swarm Optimization Algorithm for Solving a Class of Orienteering Problem, 229--243 (Full Paper) (link to paper)

  529. (Menu for Gunawan) All papers - Full papers - Abstracts - Selected papers

    Gupta

  530. Gupta, J. N.D (2007) Two-machine Shop Floor Scheduling Problem with Multi-Predecessor Constraints*, 538--545 (Full Paper) (link to paper)

  531. (Menu for Gupta) All papers - Full papers - Abstracts - Selected papers

    Habla

  532. Habla, C (2007) A Decomposition Heuristic for Planning and Scheduling of Jobs on Unrelated Parallel Machines, 112--119 (Full Paper) (link to paper)
  533. Habla, C (2007) A Decomposition Heuristic for Planning and Scheduling of Jobs on Unrelated Parallel Machines, 112--119 (Full Paper) (link to paper)

  534. (Menu for Habla) All papers - Full papers - Abstracts - Selected papers

    Hadda

  535. Hadda, H (2007) The Two-Stage Assembly Flow Shop Scheduling with an Availability Constraint, 184--191 (Full Paper) (link to paper)

  536. (Menu for Hadda) All papers - Full papers - Abstracts - Selected papers

    Hajri-Gabouj

  537. Hajri-Gabouj, S (2007) The Two-Stage Assembly Flow Shop Scheduling with an Availability Constraint, 184--191 (Full Paper) (link to paper)

  538. (Menu for Hajri-Gabouj) All papers - Full papers - Abstracts - Selected papers

    Hamacher

  539. Hamacher, H. W (2007) Scheduling and Location (ScheLoc):Makespan Problem with Variable Release Dates, 152--158 (Full Paper) (link to paper)
  540. Hamacher, H. W (2009) Scheduling two interfering job sets on uniform parallel machines with makespan and cost functions, 645--654 (Full Paper) (link to paper)

  541. (Menu for Hamacher) All papers - Full papers - Abstracts - Selected papers

    Hamilton

  542. Hamilton, A. F (2003) Masplan: A Multi-Agent System for Automated Planning and Scheduling in a University Research Group Scenario, 42--55 (Full Paper) (link to paper)

  543. (Menu for Hamilton) All papers - Full papers - Abstracts - Selected papers

    Hamilton-Bryce

  544. Hamilton-Bryce, R (2013) Directing selection within an extended great deluge optimization algorithm, 499--508 (Full Paper) (link to paper)

  545. (Menu for Hamilton-Bryce) All papers - Full papers - Abstracts - Selected papers

    Han

  546. Han, K (2017) Hyper-heuristics using Reinforcement Learning for the Examination Timetabling Problem, 256--268 (Full Paper) (link to paper)

  547. (Menu for Han) All papers - Full papers - Abstracts - Selected papers

    Hana?

  548. Hana?, S (2013) Minimizing the weighted sum of maximum earlinesstardiness cost on a single machine under maintenance constraints, 240--247 (Full Paper) (link to paper)

  549. (Menu for Hana?) All papers - Full papers - Abstracts - Selected papers

    Hanen

  550. Hanen, C (2009) Decomposed Software Pipelining for cyclic unitary RCPSP with precedence delays, 254--265 (Full Paper) (link to paper)
  551. Hanen, C (2005) Scheduling UET-UCT task systems under the out-forest precedence constraints, 445--452 (Full Paper) (link to paper)
  552. Hanen, C (2005) The Worst-case Analysis of the Carey-Johnson Algorithm for preemptive tasks on m processors, 453--470 (Full Paper) (link to paper)
  553. Hanen, C (2011) Impact of core precedences in a Cyclic RCPSP with temporal constraints, 245--260 (Full Paper) (link to paper)

  554. (Menu for Hanen) All papers - Full papers - Abstracts - Selected papers

    Hanne

  555. Hanne, T (2003) Scheduling In Software Development Using MultiObjective Evolutionary Algorithms, 438--465 (Full Paper) (link to paper)

  556. (Menu for Hanne) All papers - Full papers - Abstracts - Selected papers

    Hans

  557. Hans, E (2017) Towards improving tenders for Higher Education timetabling software: Uncovering the selection criteria of HEIs when choosing timetabling applications and using ERP as a reference, 173--188 (Full Paper) (link to paper)

  558. (Menu for Hans) All papers - Full papers - Abstracts - Selected papers

    Hanzalek

  559. Hanzalek, Z (2011) Impact of core precedences in a Cyclic RCPSP with temporal constraints, 245--260 (Full Paper) (link to paper)
  560. Hanzalek, Z (2009) Time Symmetry of Project Scheduling with Time Windows and Take-give Resources, 239--253 (Full Paper) (link to paper)
  561. Hanzalek, Z (2007) Cyclic Scheduling of Tasks with Unit Processing Time on Dedicated Sets of Parallel Identical Processors, 463--470 (Full Paper) (link to paper)

  562. (Menu for Hanzalek) All papers - Full papers - Abstracts - Selected papers

    Haouari

  563. Haouari, M (2007) Climbing Depth-bounded Discrepancy Search for Solving Flexible Job Shop Scheduling Problems, 217--224 (Full Paper) (link to paper)

  564. (Menu for Haouari) All papers - Full papers - Abstracts - Selected papers

    Harbering

  565. Harbering, J (2015) Single Track Train Scheduling, 102--117 (Full Paper) (link to paper)

  566. (Menu for Harbering) All papers - Full papers - Abstracts - Selected papers

    Hartmann

  567. Hartmann, S (2015) An Efficient Simulated Annealing for the Integrated Problem of Berth Allocation and Quay Crane Assignment in Seaside Container Terminals, 154--164 (Full Paper) (link to paper)

  568. (Menu for Hartmann) All papers - Full papers - Abstracts - Selected papers

    Hasenfuss

  569. Hasenfuss, A (2007) Non-preemptive Scheduling of Distance Constrained Tasks Subject to Minimizing Processor Load, 200--208 (Full Paper) (link to paper)

  570. (Menu for Hasenfuss) All papers - Full papers - Abstracts - Selected papers

    Haspeslagh

  571. Haspeslagh, S (2007) Distributed Decision Making in Hospital Wide Nurse Rostering Problems, 192--199 (Full Paper) (link to paper)

  572. (Menu for Haspeslagh) All papers - Full papers - Abstracts - Selected papers

    Hazir

  573. Hazir, O (2009) Batching and Scheduling with Tardiness, 291--300 (Full Paper) (link to paper)

  574. (Menu for Hazir) All papers - Full papers - Abstracts - Selected papers

    He

  575. He, F (2009) Hybridizing Integer Programming Models with an Adaptive Decomposition Approach for Exam Timetabling Problems, 435--446 (Full Paper) (link to paper)

  576. (Menu for He) All papers - Full papers - Abstracts - Selected papers

    Hebrard

  577. Hebrard, E (2013) MIP Relaxation and Large Neighborhood Search for a Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 815--819 (Full Paper) (link to paper)
  578. Hebrard, E (2017) Benders Decomposition in SMT for Rescheduling of Hierarchical Workflow, 295--310 (Full Paper) (link to paper)

  579. (Menu for Hebrard) All papers - Full papers - Abstracts - Selected papers

    Hemig

  580. Hemig, C (2007) Medium-Term Production and Staff Planning in the Automotive Industry, 209--216 (Full Paper) (link to paper)

  581. (Menu for Hemig) All papers - Full papers - Abstracts - Selected papers

    Hendel

  582. Hendel, Y (2005) The Single Machine Just-in-time Scheduling Problem With Preemptions, 140--148 (Full Paper) (link to paper)

  583. (Menu for Hendel) All papers - Full papers - Abstracts - Selected papers

    Hendriks

  584. Hendriks, M (2003) Recognizing Finite Repetitive Scheduling Patterns in Manufacturing Systems, 291--319 (Full Paper) (link to paper)

  585. (Menu for Hendriks) All papers - Full papers - Abstracts - Selected papers

    Herrmann

  586. Herrmann, J. W (2009) Generating Cyclic Fair Sequences for Multiple Servers, 628--644 (Full Paper) (link to paper)
  587. Herrmann, J. W (2011) Generating Better Cyclic Fair Sequences Faster with Aggregation, 200--214 (Full Paper) (link to paper)
  588. Herrmann, J. W (2005) A History Of Decision-making Tools For Production Scheduling, 380--389 (Full Paper) (link to paper)

  589. (Menu for Herrmann) All papers - Full papers - Abstracts - Selected papers

    Hertzler

  590. Hertzler, E. F (2011) Multi-mode Resource-Constrained Project Scheduling of Semiconductor Equipment Install/Qual Process, 408--418 (Full Paper) (link to paper)

  591. (Menu for Hertzler) All papers - Full papers - Abstracts - Selected papers

    Heydar

  592. Heydar, M (2017) Optimizing Production Schedule with Energy Consumption and Demand Charges in Parallel Machine Setting, 133--143 (Full Paper) (link to paper)

  593. (Menu for Heydar) All papers - Full papers - Abstracts - Selected papers

    Hidri

  594. Hidri, L (2015) Bounding schemes for the parallel processors scheduling problem with release date, delivery time and with no-idle time constraint, 393--402 (Full Paper) (link to paper)
  595. Hidri, L (2015) Lower bounds for the parallel processing scheduling problem with multiprocessor tasks, release date and delivery time, 403--411 (Full Paper) (link to paper)

  596. (Menu for Hidri) All papers - Full papers - Abstracts - Selected papers

    Hieu

  597. Hieu, T. T (2009) A Water Flow Algorithm for Flexible Flow Shop Scheduling with Limited Intermediate Buffers, 606--615 (Full Paper) (link to paper)

  598. (Menu for Hieu) All papers - Full papers - Abstracts - Selected papers

    Hildebrandt

  599. Hildebrandt, T (2013) A computational study of shifting bottleneck procedures for job shop total weighted tardiness scheduling problems, 437--457 (Full Paper) (link to paper)

  600. (Menu for Hildebrandt) All papers - Full papers - Abstracts - Selected papers

    Hiranaka

  601. Hiranaka, Y (2009) Lagrangian Relaxation and Cut Generation for Sequence Dependent Setup Time Flowshop Scheduling Problems, 655--659 (Full Paper) (link to paper)

  602. (Menu for Hiranaka) All papers - Full papers - Abstracts - Selected papers

    Hmida

  603. Hmida, A. Be (2007) Climbing Depth-bounded Discrepancy Search for Solving Flexible Job Shop Scheduling Problems, 217--224 (Full Paper) (link to paper)

  604. (Menu for Hmida) All papers - Full papers - Abstracts - Selected papers

    Hodge

  605. Hodge, D.J (2011) Stochastic scheduling: A short history of index policies and some key recent developments, 94--112 (Full Paper) (link to paper)

  606. (Menu for Hodge) All papers - Full papers - Abstracts - Selected papers

    Honer

  607. Honer, J (2015) An IP-based Model for the Post-Enrollment-based Course Timetabling Problem at TU Berlin, 331--344 (Full Paper) (link to paper)

  608. (Menu for Honer) All papers - Full papers - Abstracts - Selected papers

    Housos

  609. Housos, E (2013) DAG Scheduling using Integer Programming in heterogenous parallel execution environments, 392--401 (Full Paper) (link to paper)

  610. (Menu for Housos) All papers - Full papers - Abstracts - Selected papers

    Howe

  611. Howe, A. E (2005) Random Walks And Neighborhood Bias In Oversubscribed Scheduling, 98--105 (Full Paper) (link to paper)
  612. Howe, A.E (2003) A Dynamic Model of Tabu Search for the Job-Shop Scheduling Problem, 320--336 (Full Paper) (link to paper)

  613. (Menu for Howe) All papers - Full papers - Abstracts - Selected papers

    Hsieh

  614. Hsieh, F. Y (2011) Scheduling identical jobs on uniform parallel machines to minimize maximum lateness, 195--199 (Full Paper) (link to paper)

  615. (Menu for Hsieh) All papers - Full papers - Abstracts - Selected papers

    Huacuja

  616. Huacuja, H. J. F. (2013) An Iterative Local Search Algorithm for Scheduling Precedence-Constrained Applications on Heterogeneous Machines, 472--485 (Full Paper) (link to paper)

  617. (Menu for Huacuja) All papers - Full papers - Abstracts - Selected papers

    Huff

  618. Huff, J. D (2011) Multi-mode Resource-Constrained Project Scheduling of Semiconductor Equipment Install/Qual Process, 408--418 (Full Paper) (link to paper)

  619. (Menu for Huff) All papers - Full papers - Abstracts - Selected papers

    Huguet

  620. Huguet, M-J. (2007) Climbing Depth-bounded Discrepancy Search for Solving Flexible Job Shop Scheduling Problems, 217--224 (Full Paper) (link to paper)

  621. (Menu for Huguet) All papers - Full papers - Abstracts - Selected papers

    Huisman

  622. Huisman, B (2015) Exact and heuristic methods for trading-off makespan and stability in stochastic project scheduling, 25--41 (Full Paper) (link to paper)

  623. (Menu for Huisman) All papers - Full papers - Abstracts - Selected papers

    Huo

  624. Huo, Y (2005) Online Scheduling Of Precedence Constrained Tasks, 573--584 (Full Paper) (link to paper)

  625. (Menu for Huo) All papers - Full papers - Abstracts - Selected papers

    Iima

  626. Iima, H (2003) Genetic Algorithm Approach to a Multiobjective Rescheduling Problem in a Job Shop, 422--437 (Full Paper) (link to paper)

  627. (Menu for Iima) All papers - Full papers - Abstracts - Selected papers

    Ilagan

  628. Ilagan, I.F.A (2017) A Robust Crew Pairing Model for Airline Operations using Crew Swaps and Slack Times, 103--120 (Full Paper) (link to paper)

  629. (Menu for Ilagan) All papers - Full papers - Abstracts - Selected papers

    Ilani

  630. Ilani, H (2015) A Fixed Route Dial-a-Ride Problem, 313--324 (Full Paper) (link to paper)
  631. Ilani, H (2011) A Two-Campus Transport Problem, 173--184 (Full Paper) (link to paper)

  632. (Menu for Ilani) All papers - Full papers - Abstracts - Selected papers

    Improta

  633. Improta, G (2007) Optimization of the Departure Schedule at a Public Transit Terminal with Multiple Destinations, 104--111 (Full Paper) (link to paper)

  634. (Menu for Improta) All papers - Full papers - Abstracts - Selected papers

    Indra-Payoong

  635. Indra-Payoong, N (2003) Constraint-Based Local Search for Rail Container Service Planning, 660--677 (Full Paper) (link to paper)

  636. (Menu for Indra-Payoong) All papers - Full papers - Abstracts - Selected papers

    Inoue

  637. Inoue, K (2017) Balanced clustering based decomposition applied to Master thesis defense timetabling problem, 214--228 (Full Paper) (link to paper)

  638. (Menu for Inoue) All papers - Full papers - Abstracts - Selected papers

    Ishii

  639. Ishii, R (2015) Scheduling competition in the airline industry and the issue of duplicate bookings, 55--62 (Full Paper) (link to paper)

  640. (Menu for Ishii) All papers - Full papers - Abstracts - Selected papers

    Jain

  641. Jain, S (2003) Making Airline Schedules More Robust, 678--695 (Full Paper) (link to paper)

  642. (Menu for Jain) All papers - Full papers - Abstracts - Selected papers

    Jampani

  643. Jampani, J (2007) Complex Job Shop Multiple Orders per Job Scheduling, 225--233 (Full Paper) (link to paper)
  644. Jampani, J (2005) Single Machine Multiple Orders Per Job Scheduling Using Column Generation, 539--547 (Full Paper) (link to paper)

  645. (Menu for Jampani) All papers - Full papers - Abstracts - Selected papers

    Jansen

  646. Jansen, E (2017) Towards improving tenders for Higher Education timetabling software: Uncovering the selection criteria of HEIs when choosing timetabling applications and using ERP as a reference, 173--188 (Full Paper) (link to paper)

  647. (Menu for Jansen) All papers - Full papers - Abstracts - Selected papers

    Jarboui

  648. Jarboui, B (2007) New Lower Bound for the Bin Packing Problem, 234--241 (Full Paper) (link to paper)

  649. (Menu for Jarboui) All papers - Full papers - Abstracts - Selected papers

    Jat

  650. Jat, S. N (2009) A Guided Search Genetic Algorithm for the University Course Timetabling Problem, 180--191 (Full Paper) (link to paper)

  651. (Menu for Jat) All papers - Full papers - Abstracts - Selected papers

    Jewpanya

  652. Jewpanya, P (2017) A Selective-Discrete Particle Swarm Optimization Algorithm for Solving a Class of Orienteering Problem, 229--243 (Full Paper) (link to paper)

  653. (Menu for Jewpanya) All papers - Full papers - Abstracts - Selected papers

    Jolai

  654. Jolai, F (2015) Cross-training performance of nurse scheduling with the learning effect, 296--312 (Full Paper) (link to paper)

  655. (Menu for Jolai) All papers - Full papers - Abstracts - Selected papers

    Jozefowiez

  656. Jozefowiez, N (2015) A mass-flow MILP formulation for energy-efficient supplying in assembly lines, 236--239 (Full Paper) (link to paper)

  657. (Menu for Jozefowiez) All papers - Full papers - Abstracts - Selected papers

    Juraszek

  658. Juraszek, J (2009) Scheduling policy for on-line translation service, 266--276 (Full Paper) (link to paper)

  659. (Menu for Juraszek) All papers - Full papers - Abstracts - Selected papers

    Kalagnanam

  660. Kalagnanam, J (2007) Scheduling Steel Production using Mixed-Integer Programming and Constraint Programming, 120--127 (Full Paper) (link to paper)

  661. (Menu for Kalagnanam) All papers - Full papers - Abstracts - Selected papers

    Kalic

  662. Kalic, M (2009) Heuristic approach to the airline schedule disturbances problem: multifleet case, 311--320 (Full Paper) (link to paper)

  663. (Menu for Kalic) All papers - Full papers - Abstracts - Selected papers

    Kalsch

  664. Kalsch, M. T (2007) Scheduling and Location (ScheLoc):Makespan Problem with Variable Release Dates, 152--158 (Full Paper) (link to paper)

  665. (Menu for Kalsch) All papers - Full papers - Abstracts - Selected papers

    Karaesmen

  666. Karaesmen, I (2005) Scheduling Multiple Types of Time-Shared Aircraft: Models and Methods for Practice, 19--38 (Full Paper) (link to paper)
  667. Karaesmen, I. Z (2007) Optimization vs. Persistence in Scheduling: Heuristics to Manage Uncertainty in On-Demand Air Travel, 242--250 (Full Paper) (link to paper)

  668. (Menu for Karaesmen) All papers - Full papers - Abstracts - Selected papers

    Karapetyan

  669. Karapetyan, D (2013) Combining Monte-Carlo and Hyper-heuristic methods for the Multi-mode Resource-constrained Multi-project Scheduling Problem, 836--839 (Full Paper) (link to paper)

  670. (Menu for Karapetyan) All papers - Full papers - Abstracts - Selected papers

    Kedad-Sidhoum

  671. Kedad-Sidhoum, S (2009) Batching and Scheduling with Tardiness, 291--300 (Full Paper) (link to paper)
  672. Kedad-Sidhoum, S (2011) Single machine scheduling with delivery dates and cumulative payoffs, 261--274 (Full Paper) (link to paper)
  673. Kedad-Sidhoum, S (2013) A polynomial time OPT-1 algorithm for a scheduling problem with two delivery dates and cumulative payoffs, 268--289 (Full Paper) (link to paper)

  674. (Menu for Kedad-Sidhoum) All papers - Full papers - Abstracts - Selected papers

    Keha

  675. Keha, A (2005) Bicriteria Scheduling Of Equal Length Jobs With Release Dates On Identical Parallel Machines, 112--122 (Full Paper) (link to paper)
  676. Keha, A (2009) Single Machine Scheduling with Interfering Job Sets, 357--365 (Full Paper) (link to paper)
  677. Keha, A (2005) A Comparison Of Different Formulations For The Non-preemptive Single Machine Total Weighted Tardiness Scheduling Problem, 643--651 (Full Paper) (link to paper)
  678. Keha, A. B (2007) Minimizing Makespan with Multiple Orders per Job in Mixed Flowshops, 301--308 (Full Paper) (link to paper)
  679. Keha, A. B (2005) Minimizing Makespan With Multiple Orders Per Job In A Two Machine Flowshop With Item Processing, 288--298 (Full Paper) (link to paper)

  680. (Menu for Keha) All papers - Full papers - Abstracts - Selected papers

    Kemmoe-Tchomte

  681. Kemmoe-Tchomte, S (2015) An Optimization Framework for Job-shop with Energy Threshold Issue With consideration of machining operations with consumption peaks, 118--133 (Full Paper) (link to paper)

  682. (Menu for Kemmoe-Tchomte) All papers - Full papers - Abstracts - Selected papers

    Kempf

  683. Kempf, K. G (2011) Multi-mode Resource-Constrained Project Scheduling of Semiconductor Equipment Install/Qual Process, 408--418 (Full Paper) (link to paper)

  684. (Menu for Kempf) All papers - Full papers - Abstracts - Selected papers

    Kendall

  685. Kendall, G (2003) An Investigation of an Adaptive Scheduling Approach for Multi Head Placement Machines, 363--381 (Full Paper) (link to paper)
  686. Kendall, G (2007) A Simulated Annealing Hyper-heuristic: Adaptive Heuristic Selection for Different Vehicle Routing Problems, 67--70 (Full Paper) (link to paper)
  687. Kendall, G (2011) A Game Theoretic Approach for the Taxi Scheduling Problem with Street Hailing, 161--172 (Full Paper) (link to paper)
  688. Kendall, G (2003) Making Airline Schedules More Robust, 678--695 (Full Paper) (link to paper)
  689. Kendall, G (2013) A Hybrid of Differential Evolution and Simulated Annealing Algorithms for the Capacitated Arc Routing Problems, 549--554 (Full Paper) (link to paper)
  690. Kendall, G (2009) Solving Examination Timetabling Problems using Honey-bee Mating Optimization (ETP-HBMO), 399--408 (Full Paper) (link to paper)

  691. (Menu for Kendall) All papers - Full papers - Abstracts - Selected papers

    Kergosien

  692. Kergosien, Y (2009) Home health care problem: An extended multiple Traveling Salesman Problem, 85--92 (Full Paper) (link to paper)

  693. (Menu for Kergosien) All papers - Full papers - Abstracts - Selected papers

    Keskinocak

  694. Keskinocak, P (2005) Scheduling Multiple Types of Time-Shared Aircraft: Models and Methods for Practice, 19--38 (Full Paper) (link to paper)
  695. Keskinocak, P (2007) Optimization vs. Persistence in Scheduling: Heuristics to Manage Uncertainty in On-Demand Air Travel, 242--250 (Full Paper) (link to paper)

  696. (Menu for Keskinocak) All papers - Full papers - Abstracts - Selected papers

    Khader

  697. Khader, A. T (2009) A hybrid harmony search for university course timetabling, 157--179 (Full Paper) (link to paper)

  698. (Menu for Khader) All papers - Full papers - Abstracts - Selected papers

    Kheiri

  699. Kheiri, A (2013) Combining Monte-Carlo and Hyper-heuristic methods for the Multi-mode Resource-constrained Multi-project Scheduling Problem, 836--839 (Full Paper) (link to paper)

  700. (Menu for Kheiri) All papers - Full papers - Abstracts - Selected papers

    Khowala

  701. Khowala, K (2009) Single Machine Scheduling with Interfering Job Sets, 357--365 (Full Paper) (link to paper)
  702. Khowala, K (2005) A Comparison Of Different Formulations For The Non-preemptive Single Machine Total Weighted Tardiness Scheduling Problem, 643--651 (Full Paper) (link to paper)

  703. (Menu for Khowala) All papers - Full papers - Abstracts - Selected papers

    Kirkbride

  704. Kirkbride, C (2011) Stochastic scheduling: A short history of index policies and some key recent developments, 94--112 (Full Paper) (link to paper)

  705. (Menu for Kirkbride) All papers - Full papers - Abstracts - Selected papers

    Kl"ocker

  706. Kl"ocker, C (2015) Optimisation of Staff Absences, 360--369 (Full Paper) (link to paper)

  707. (Menu for Kl"ocker) All papers - Full papers - Abstracts - Selected papers

    Klos

  708. Klos, T (2013) Flexibility Metrics for Time and Resource Constrained Scheduling Problems, 555--572 (Full Paper) (link to paper)
  709. Klos, T (2015) Exact and heuristic methods for trading-off makespan and stability in stochastic project scheduling, 25--41 (Full Paper) (link to paper)
  710. Klos, T (2015) Robustness of Partial Order Schedules: Understanding the Chaining algorithm, 457--472 (Full Paper) (link to paper)

  711. (Menu for Klos) All papers - Full papers - Abstracts - Selected papers

    Konig

  712. Konig, J-C. (2009) Isomorphic coupled-task scheduling problem with compatibility constraints on a single processor, 378--388 (Full Paper) (link to paper)

  713. (Menu for Konig) All papers - Full papers - Abstracts - Selected papers

    Koole

  714. Koole, G. (2003) Making Airline Schedules More Robust, 678--695 (Full Paper) (link to paper)

  715. (Menu for Koole) All papers - Full papers - Abstracts - Selected papers

    Korosec

  716. Korosec, P (2009) Metaheuristic Approach to Loading Schedule Problem, 616--627 (Full Paper) (link to paper)

  717. (Menu for Korosec) All papers - Full papers - Abstracts - Selected papers

    Koulamas

  718. Koulamas, C (2011) Minimizing the sum of quadratic completion times on two identical parallel machines, 240--244 (Full Paper) (link to paper)

  719. (Menu for Koulamas) All papers - Full papers - Abstracts - Selected papers

    Kozik

  720. Kozik, A (2015) A novel Approximate/Exact objective based search technique for precedence constrained scheduling problems, 484--491 (Full Paper) (link to paper)

  721. (Menu for Kozik) All papers - Full papers - Abstracts - Selected papers

    Kramer

  722. Kramer, L. A (2007) Analyzing Basic Representation Choices in Oversubscribed Scheduling Problems, 259--266 (Full Paper) (link to paper)

  723. (Menu for Kramer) All papers - Full papers - Abstracts - Selected papers

    Kravchenko

  724. Kravchenko, S. A (2009) Parallel Machine Problems with Equal Processing Times, 458--468 (Full Paper) (link to paper)

  725. (Menu for Kravchenko) All papers - Full papers - Abstracts - Selected papers

    Krivulin

  726. Krivulin, N (2015) Tropical optimization problems in project scheduling, 492--506 (Full Paper) (link to paper)

  727. (Menu for Krivulin) All papers - Full papers - Abstracts - Selected papers

    Kruk

  728. Kruk, S (2007) A Case Study of an Integer Programming Model for Instructor Assignments and Scheduling Problem, 267--275 (Full Paper) (link to paper)

  729. (Menu for Kruk) All papers - Full papers - Abstracts - Selected papers

    Krumke

  730. Krumke, S. O (2005) Improved Pruningin Columngeneration Of A Vehicle Routing Problem, 705--722 (Full Paper) (link to paper)

  731. (Menu for Krumke) All papers - Full papers - Abstracts - Selected papers

    Kvaratskhelia

  732. Kvaratskhelia, A (2009) Polynomial algorithm for 1 r_j , p_j = p, pmnt SUM(w_i c_j) scheduling problem, 68--76 (Full Paper) (link to paper)

  733. (Menu for Kvaratskhelia) All papers - Full papers - Abstracts - Selected papers

    Kwan

  734. Kwan, R.S.K (2003) Constraint-Based Local Search for Rail Container Service Planning, 660--677 (Full Paper) (link to paper)
  735. Kwan, R. S. K (2009) Case studies of successful train crew scheduling optimization, 43--57 (Full Paper) (link to paper)

  736. (Menu for Kwan) All papers - Full papers - Abstracts - Selected papers

    Kyngäs

  737. Kyngäs, J (2011) A Framework for Implementation-Oriented Staff Scheduling, 308--321 (Full Paper) (link to paper)
  738. Kyngäs, J (2007) A Framework for School Timetabling Problem, 386--393 (Full Paper) (link to paper)

  739. (Menu for Kyngäs) All papers - Full papers - Abstracts - Selected papers

    Laborie

  740. Laborie, P (2007) Self-Adapting Large Neighborhood Search:Application to Single-Mode Scheduling Problems, 276--284 (Full Paper) (link to paper)
  741. Laborie, P (2013) Temporal Linear Relaxation in IBM ILOG CP Optimizer, 379--391 (Full Paper) (link to paper)

  742. (Menu for Laborie) All papers - Full papers - Abstracts - Selected papers

    Lach

  743. Lach, G (2015) An IP-based Model for the Post-Enrollment-based Course Timetabling Problem at TU Berlin, 331--344 (Full Paper) (link to paper)
  744. Lach, G (2015) Solving Huge Real-World Timetabling Instances, 360--369 (Full Paper) (link to paper)
  745. Lach, M (2015) Solving Huge Real-World Timetabling Instances, 360--369 (Full Paper) (link to paper)
  746. Lach, M (2015) Examination timetabling at Technische Universit¨at Berlin, 260--266 (Full Paper) (link to paper)
  747. Lach, G (2015) Examination timetabling at Technische Universit¨at Berlin, 260--266 (Full Paper) (link to paper)

  748. (Menu for Lach) All papers - Full papers - Abstracts - Selected papers

    Lacomme

  749. Lacomme, P (2007) A Disjunctive Graph for the Job-Shop with Several Robots, 285--292 (Full Paper) (link to paper)

  750. (Menu for Lacomme) All papers - Full papers - Abstracts - Selected papers

    Laforest

  751. Laforest, C (2005) Bicriteria Parallel Task Scheduling, 585--596 (Full Paper) (link to paper)

  752. (Menu for Laforest) All papers - Full papers - Abstracts - Selected papers

    Lambrecht

  753. Lambrecht, M (2013) Evaluation of appointment scheduling rules, 509--514 (Full Paper) (link to paper)

  754. (Menu for Lambrecht) All papers - Full papers - Abstracts - Selected papers

    Lamy

  755. Lamy, D (2015) An Optimization Framework for Job-shop with Energy Threshold Issue With consideration of machining operations with consumption peaks, 118--133 (Full Paper) (link to paper)

  756. (Menu for Lamy) All papers - Full papers - Abstracts - Selected papers

    Lancia

  757. Lancia, G (2007) A Compact Optimization Approach for Job-Shop Problems, 293--300 (Full Paper) (link to paper)

  758. (Menu for Lancia) All papers - Full papers - Abstracts - Selected papers

    Larabi

  759. Larabi, M (2007) A Disjunctive Graph for the Job-Shop with Several Robots, 285--292 (Full Paper) (link to paper)

  760. (Menu for Larabi) All papers - Full papers - Abstracts - Selected papers

    Lau

  761. Lau, H.C (2017) Home Health Care Delivery Problem, 244--255 (Full Paper) (link to paper)
  762. Lau, H.C (2015) SAILS: Hybrid Algorithm for the Team Orienteering ProblemwithTimeWindows, 276--295 (Full Paper) (link to paper)
  763. Lau, H. C (2009) Master Physician Scheduling Problem, 145--156 (Full Paper) (link to paper)
  764. Lau, H.C. (2017) A Selective-Discrete Particle Swarm Optimization Algorithm for Solving a Class of Orienteering Problem, 229--243 (Full Paper) (link to paper)
  765. Lau, H. C. (2007) Generating Job Schedules for Vessel Operations in a Container Terminal, 328--335 (Full Paper) (link to paper)

  766. (Menu for Lau) All papers - Full papers - Abstracts - Selected papers

    Laub

  767. Laub, J. D (2007) Minimizing Makespan with Multiple Orders per Job in Mixed Flowshops, 301--308 (Full Paper) (link to paper)
  768. Laub, J. D (2005) Minimizing Makespan With Multiple Orders Per Job In A Two Machine Flowshop With Item Processing, 288--298 (Full Paper) (link to paper)

  769. (Menu for Laub) All papers - Full papers - Abstracts - Selected papers

    Lavangnananda

  770. Lavangnananda, K (2017) The Application of Nondominated Sorting Genetic Algorithm (NSGA-III) for Scientific-workflow Scheduling on Cloud, 269--287 (Full Paper) (link to paper)

  771. (Menu for Lavangnananda) All papers - Full papers - Abstracts - Selected papers

    Lazarev

  772. Lazarev, A. A (2013) A Graphical Algorithm for Solving an Investment Optimization Problem, 290--299 (Full Paper) (link to paper)
  773. Lazarev, A (2009) Polynomial algorithm for 1 r_j , p_j = p, pmnt SUM(w_i c_j) scheduling problem, 68--76 (Full Paper) (link to paper)
  774. Lazarev, A. A (2007) Estimation of Absolute Error for Minimization Maximum Lateness, 309--315 (Full Paper) (link to paper)

  775. (Menu for Lazarev) All papers - Full papers - Abstracts - Selected papers

    Lei

  776. Lei, L (2005) A Zero-Inventory Production-Distribution Problem with Time-Window Constraints, 428--444 (Full Paper) (link to paper)
  777. Lei, L (2007) Scheduling the Operations of an Integrated Production-Distribution Process, 316--327 (Full Paper) (link to paper)

  778. (Menu for Lei) All papers - Full papers - Abstracts - Selected papers

    Lemaire

  779. Lemaire, P (2003) Multibin Packing with the Best-Fit Rule, 74--89 (Full Paper) (link to paper)

  780. (Menu for Lemaire) All papers - Full papers - Abstracts - Selected papers

    Lente

  781. Lente, C (2009) Home health care problem: An extended multiple Traveling Salesman Problem, 85--92 (Full Paper) (link to paper)

  782. (Menu for Lente) All papers - Full papers - Abstracts - Selected papers

    Leong

  783. Leong, T (2007) Generating Job Schedules for Vessel Operations in a Container Terminal, 328--335 (Full Paper) (link to paper)

  784. (Menu for Leong) All papers - Full papers - Abstracts - Selected papers

    Lesaint

  785. Lesaint, D (2007) iSchedule, an Optimisation Toolkit for Complex Scheduling, 344--352 (Full Paper) (link to paper)

  786. (Menu for Lesaint) All papers - Full papers - Abstracts - Selected papers

    Leung

  787. Leung, J (2015) A Probabilistic Constrained Approach for Unrelated Parallel Machine Scheduling, 16--24 (Full Paper) (link to paper)
  788. Leung, J. Y-T. (2005) Online Scheduling Of Precedence Constrained Tasks, 573--584 (Full Paper) (link to paper)
  789. Leung, J. Y-T. (2003) Ordering Scheduling Models with Applications in Practice, 2--10 (Full Paper) (link to paper)
  790. Leung, J. Y-T. (2005) Scheduling Orders In Dedicated And Flexible Machine Environments, 471--484 (Full Paper) (link to paper)
  791. Leung, J. Y-T. (2005) Scheduling Algorithms for Master-Slave System, 501--513 (Full Paper) (link to paper)
  792. Leung, J. Y.-T (2007) Competitive Agent Scheduling with Controllable Processing Times, 514--522 (Full Paper) (link to paper)

  793. (Menu for Leung) All papers - Full papers - Abstracts - Selected papers

    Levine

  794. Levine, J (2015) A Hybrid Constraint Integer Programming Approach to Solve Nurse Scheduling Problems, 429--442 (Full Paper) (link to paper)

  795. (Menu for Levine) All papers - Full papers - Abstracts - Selected papers

    Levner

  796. Levner, E (2005) On Project Scheduling With And/or Precedence Constraints, 597--606 (Full Paper) (link to paper)

  797. (Menu for Levner) All papers - Full papers - Abstracts - Selected papers

    Li

  798. Li, J (2011) A Game Theoretic Approach for the Taxi Scheduling Problem with Street Hailing, 161--172 (Full Paper) (link to paper)
  799. Li, X (2017) Responsive Single Bus Corridor Scheduling Based on Machine Learning and Optimisation, 288--294 (Full Paper) (link to paper)
  800. Li, H (2003) Ordering Scheduling Models with Applications in Practice, 2--10 (Full Paper) (link to paper)
  801. Li, H (2005) Scheduling Orders In Dedicated And Flexible Machine Environments, 471--484 (Full Paper) (link to paper)
  802. Li, H (2017) Customer Order Scheduling on Unrelated Parallel Machines to Minimize Total Weighted Completion Time, 013--029 (Full Paper) (link to paper)
  803. Li, H (2015) Resource-Aware Scheduling for Data Centers with Heterogenous Servers, 240--259 (Full Paper) (link to paper)

  804. (Menu for Li) All papers - Full papers - Abstracts - Selected papers

    Liberti

  805. Liberti, L (2007) Towards the Optimal Solution of the Multiprocessor Scheduling Problem with Communication Delays, 128--135 (Full Paper) (link to paper)
  806. Liberti, L (2007) Towards the Optimal Solution of the Multiprocessor Scheduling Problem with Communication Delays, 128--135 (Full Paper) (link to paper)

  807. (Menu for Liberti) All papers - Full papers - Abstracts - Selected papers

    Limtanyakul

  808. Limtanyakul, K (2007) Scheduling Tests on Vehicle Prototypes using Constraint Programming, 336--343 (Full Paper) (link to paper)

  809. (Menu for Limtanyakul) All papers - Full papers - Abstracts - Selected papers

    Limčre

  810. Limčre, V (2013) Balancing and Sequencing Mixed-Model Assembly Lines to Minimize Work Overload in Real World Workstations, 230--239 (Full Paper) (link to paper)

  811. (Menu for Limčre) All papers - Full papers - Abstracts - Selected papers

    Lin

  812. Lin, S-W. (2005) A Sequential Pair Exchange Approach for Solving Single-Machine Scheduling Problems with General Earliness-Tardiness Penalties, 299--314 (Full Paper) (link to paper)
  813. Lin, Y.K (2011) Scheduling identical jobs on uniform parallel machines to minimize maximum lateness, 195--199 (Full Paper) (link to paper)
  814. Lin, G. J (2011) Scheduling identical jobs on uniform parallel machines to minimize maximum lateness, 195--199 (Full Paper) (link to paper)

  815. (Menu for Lin) All papers - Full papers - Abstracts - Selected papers

    Lingireddy

  816. Lingireddy, S (2009) Optimal Pump Scheduling For Water Distribution Systems, 341--356 (Full Paper) (link to paper)

  817. (Menu for Lingireddy) All papers - Full papers - Abstracts - Selected papers

    Liret

  818. Liret, A (2007) iSchedule, an Optimisation Toolkit for Complex Scheduling, 344--352 (Full Paper) (link to paper)

  819. (Menu for Liret) All papers - Full papers - Abstracts - Selected papers

    Lisser

  820. Lisser, A (2015) A Probabilistic Constrained Approach for Unrelated Parallel Machine Scheduling, 16--24 (Full Paper) (link to paper)
  821. Lisser, A (2011) SDP Relaxations for Two Stage OFDMA Networks with and without Probabilistic Constraints, 445--458 (Full Paper) (link to paper)
  822. Lisser, A (2013) Scheduling in Wireless OFDMA-TDMA Networks using Variable Neighborhood Search Metaheuristic, 55--64 (Full Paper) (link to paper)

  823. (Menu for Lisser) All papers - Full papers - Abstracts - Selected papers

    Liu

  824. Liu, Y (2017) Improving Ant Colony Optimization algorithm with Levy Flight, 093--102 (Full Paper) (link to paper)

  825. (Menu for Liu) All papers - Full papers - Abstracts - Selected papers

    Lokhmotov

  826. Lokhmotov, A (2011) Dynamic Data Structures for Taskgraph Scheduling Policies with Applications in OpenCL Accelerators, 322--334 (Full Paper) (link to paper)

  827. (Menu for Lokhmotov) All papers - Full papers - Abstracts - Selected papers

    Lopez

  828. Lopez, P (2007) Climbing Depth-bounded Discrepancy Search for Solving Flexible Job Shop Scheduling Problems, 217--224 (Full Paper) (link to paper)

  829. (Menu for Lopez) All papers - Full papers - Abstracts - Selected papers

    Lopez-Ibanez

  830. Lopez-Ibanez, M (2013) Automatic Design of a Hybrid Iterated Local Search for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 820--825 (Full Paper) (link to paper)

  831. (Menu for Lopez-Ibanez) All papers - Full papers - Abstracts - Selected papers

    Loucks

  832. Loucks, W. M (2007) EDF Feasibility and Hardware Accelerators, 368--376 (Full Paper) (link to paper)

  833. (Menu for Loucks) All papers - Full papers - Abstracts - Selected papers

    Lu

  834. Lu, K (2017) Home Health Care Delivery Problem, 244--255 (Full Paper) (link to paper)
  835. Lu, K (2015) SAILS: Hybrid Algorithm for the Team Orienteering ProblemwithTimeWindows, 276--295 (Full Paper) (link to paper)

  836. (Menu for Lu) All papers - Full papers - Abstracts - Selected papers

    Lucarelli

  837. Lucarelli, G (2007) On a Generalized Graph Coloring/Batch Scheduling Problem, 353--360 (Full Paper) (link to paper)

  838. (Menu for Lucarelli) All papers - Full papers - Abstracts - Selected papers

    Marecek

  839. Marecek, J (2011) Dynamic Data Structures for Taskgraph Scheduling Policies with Applications in OpenCL Accelerators, 322--334 (Full Paper) (link to paper)

  840. (Menu for Marecek) All papers - Full papers - Abstracts - Selected papers

    Marichal

  841. Marichal, R. L (2003) Masplan: A Multi-Agent System for Automated Planning and Scheduling in a University Research Group Scenario, 42--55 (Full Paper) (link to paper)

  842. (Menu for Marichal) All papers - Full papers - Abstracts - Selected papers

    Marla

  843. Marla, L (2011) A Decomposition Approach for Shipment Pickup and Delivery with Time-Windows Under Uncertainty, 352--365 (Full Paper) (link to paper)

  844. (Menu for Marla) All papers - Full papers - Abstracts - Selected papers

    Marmion

  845. Marmion, M-E. (2013) Automatic Design of a Hybrid Iterated Local Search for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 820--825 (Full Paper) (link to paper)

  846. (Menu for Marmion) All papers - Full papers - Abstracts - Selected papers

    Marszalkowski

  847. Marszalkowski, J (2015) Energy Consumption in Single- and Multi-installment Divisible Loads Processing in Systems with Hierarchical Memory, 146--153 (Full Paper) (link to paper)

  848. (Menu for Marszalkowski) All papers - Full papers - Abstracts - Selected papers

    Martineau

  849. Martineau, P (2017) Fixed jobs scheduling on a single machine with renewable resources, 084--092 (Full Paper) (link to paper)

  850. (Menu for Martineau) All papers - Full papers - Abstracts - Selected papers

    Martinez

  851. Martinez, Y (2013) A Robust Multi-Agent Reinforcement Learning Approach for Scheduling Problems, 410--423 (Full Paper) (link to paper)

  852. (Menu for Martinez) All papers - Full papers - Abstracts - Selected papers

    Mascia

  853. Mascia, F (2013) Automatic Design of a Hybrid Iterated Local Search for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 820--825 (Full Paper) (link to paper)

  854. (Menu for Mascia) All papers - Full papers - Abstracts - Selected papers

    Mason

  855. Mason, S. J (2005) Multiple Orders Per Job Batch Scheduling With Incompatible Jobs, 48--64 (Full Paper) (link to paper)
  856. Mason, S. J (2007) Complex Job Shop Multiple Orders per Job Scheduling, 225--233 (Full Paper) (link to paper)
  857. Mason, S. J (2005) Single Machine Multiple Orders Per Job Scheduling Using Column Generation, 539--547 (Full Paper) (link to paper)
  858. Mason, S. J (2009) Scheduling Semiconductor Manufacturing Operations: Problems, Solution Techniques, and Future Challenges, 192--201 (Full Paper) (link to paper)
  859. Mason, a. S (2005) A Bi-criteria Approach To Scheduling Wafer Fabrication Facilities, 276--287 (Full Paper) (link to paper)

  860. (Menu for Mason) All papers - Full papers - Abstracts - Selected papers

    Masri

  861. Masri, H (2009) A Nonlinear Mixed Integer Program for Search Path Planning Problem (SPPP), 277--290 (Full Paper) (link to paper)

  862. (Menu for Masri) All papers - Full papers - Abstracts - Selected papers

    Mateus

  863. Mateus, G.R (2017) Mathematical Formulation for Minimizing Total Tardiness in a Scheduling Problem with Parallel Machines, 201--213 (Full Paper) (link to paper)

  864. (Menu for Mateus) All papers - Full papers - Abstracts - Selected papers

    Mathirajan

  865. Mathirajan, M (2015) Simulation Based Cause and Effect analysis of Input Variables in Wafer Fabrication, 345--359 (Full Paper) (link to paper)

  866. (Menu for Mathirajan) All papers - Full papers - Abstracts - Selected papers

    Mati

  867. Mati, Y (2009) Recent Adavances in Solving Two-job Shop Scheduling Problems: Extensions and Improvements of the Geometric Approach, 469--478 (Full Paper) (link to paper)
  868. Mati, Y (2015) Minimizing regular criteria in the flexible job-shop scheduling problem, 443--456 (Full Paper) (link to paper)

  869. (Menu for Mati) All papers - Full papers - Abstracts - Selected papers

    Mattfield

  870. Mattfield, D.C (2003) Task Scheduling under Gang Constraints, 506--523 (Full Paper) (link to paper)

  871. (Menu for Mattfield) All papers - Full papers - Abstracts - Selected papers

    Mauergauz

  872. Mauergauz, Y (2015) Production Scheduling Based on Order Utility Functions, 134--145 (Full Paper) (link to paper)

  873. (Menu for Mauergauz) All papers - Full papers - Abstracts - Selected papers

    McCollum

  874. McCollum, B (2005) An Investigation Of Variable Neighbourhood Search For University Course Timetabling, 413--427 (Full Paper) (link to paper)
  875. McCollum, B (2003) Perturbation Based Variable Neighbourhood Search in Heuristic Space for Examination Timetabling Problem, 155--173 (Full Paper) (link to paper)
  876. McCollum, B (2007) Determining Rules in Fuzzy Multiple Heuristic Orderings for Constructing Examination Timetables, 59--66 (Full Paper) (link to paper)
  877. McCollum, B (2003) Similarity Measures for Exam Timetabling Problems, 120--136 (Full Paper) (link to paper)
  878. McCollum, B (2013) Directing selection within an extended great deluge optimization algorithm, 499--508 (Full Paper) (link to paper)
  879. McCollum, B (2009) An Extended Great Deluge Approach to the Examination Timetabling Problem, 424--434 (Full Paper) (link to paper)
  880. McCollum, B (2013) Tackling University Timetabling Problems Using Hybridization of Swarm Based Approach, 543--548 (Full Paper) (link to paper)

  881. (Menu for McCollum) All papers - Full papers - Abstracts - Selected papers

    McMullan

  882. McMullan, P (2013) Directing selection within an extended great deluge optimization algorithm, 499--508 (Full Paper) (link to paper)
  883. McMullan, P (2017) Hyper-heuristics using Reinforcement Learning for the Examination Timetabling Problem, 256--268 (Full Paper) (link to paper)
  884. McMullan, P. J (2009) An Extended Great Deluge Approach to the Examination Timetabling Problem, 424--434 (Full Paper) (link to paper)

  885. (Menu for McMullan) All papers - Full papers - Abstracts - Selected papers

    Mecl

  886. Mecl, R (2003) Integrating Planning into Production Scheduling: Visopt Shopfloor System, 259--278 (Full Paper) (link to paper)

  887. (Menu for Mecl) All papers - Full papers - Abstracts - Selected papers

    Melo

  888. Melo, R. A (2007) Scheduling Single Round Robin Tournaments with Fixed Venues, 431--438 (Full Paper) (link to paper)

  889. (Menu for Melo) All papers - Full papers - Abstracts - Selected papers

    Messelis

  890. Messelis, T (2013) Algorithm preformance prediction for nurse rostering, 21--38 (Full Paper) (link to paper)

  891. (Menu for Messelis) All papers - Full papers - Abstracts - Selected papers

    Michel

  892. Michel, S (2007) Inventory Routing Problem Solved by Heuristic Based on Column Generation, 361--367 (Full Paper) (link to paper)

  893. (Menu for Michel) All papers - Full papers - Abstracts - Selected papers

    Milis

  894. Milis, I (2007) On a Generalized Graph Coloring/Batch Scheduling Problem, 353--360 (Full Paper) (link to paper)

  895. (Menu for Milis) All papers - Full papers - Abstracts - Selected papers

    Ming

  896. Ming, N. K (2009) A Water Flow Algorithm for Flexible Flow Shop Scheduling with Limited Intermediate Buffers, 606--615 (Full Paper) (link to paper)

  897. (Menu for Ming) All papers - Full papers - Abstracts - Selected papers

    Minty

  898. Minty, R.J (2011) Stochastic scheduling: A short history of index policies and some key recent developments, 94--112 (Full Paper) (link to paper)

  899. (Menu for Minty) All papers - Full papers - Abstracts - Selected papers

    Miralles

  900. Miralles, C (2007) A Decision Support System for Scheduling a Painting Facility in an Automotive Supplier, 175--183 (Full Paper) (link to paper)

  901. (Menu for Miralles) All papers - Full papers - Abstracts - Selected papers

    Misir

  902. Misir, M (2011) A new hyper-heuristic implementation in HyFlex: a study on generality, 374--393 (Full Paper) (link to paper)

  903. (Menu for Misir) All papers - Full papers - Abstracts - Selected papers

    Mladenovi

  904. Mladenovi, N (2007) Towards the Optimal Solution of the Multiprocessor Scheduling Problem with Communication Delays, 128--135 (Full Paper) (link to paper)

  905. (Menu for Mladenovi) All papers - Full papers - Abstracts - Selected papers

    Mokotoff

  906. Mokotoff, E (2009) Minimizing the Makespan and Total Flow Time on the Permutation Flow Shop Scheduling Problem, 479--506 (Full Paper) (link to paper)

  907. (Menu for Mokotoff) All papers - Full papers - Abstracts - Selected papers

    Moll

  908. Moll, M (2017) Optimal Interdiction of Vehicle Routing on a Dynamic Network, 059--069 (Full Paper) (link to paper)

  909. (Menu for Moll) All papers - Full papers - Abstracts - Selected papers

    Monch

  910. Monch, L (2009) Ant Colony Optimization Approaches for Scheduling Jobs with Incompatible Families on Parallel Batch Machines, 105--114 (Full Paper) (link to paper)
  911. Monch, L (2009) Scheduling Semiconductor Manufacturing Operations: Problems, Solution Techniques, and Future Challenges, 192--201 (Full Paper) (link to paper)

  912. (Menu for Monch) All papers - Full papers - Abstracts - Selected papers

    Montana

  913. Montana, D (2005) A Comparison of Combinatorial Optimization and Dispatch Rules for Online Scheduling, 353--361 (Full Paper) (link to paper)

  914. (Menu for Montana) All papers - Full papers - Abstracts - Selected papers

    Moreno

  915. Moreno, L (2003) Masplan: A Multi-Agent System for Automated Planning and Scheduling in a University Research Group Scenario, 42--55 (Full Paper) (link to paper)

  916. (Menu for Moreno) All papers - Full papers - Abstracts - Selected papers

    Moris

  917. Moris, M.U (2015) A mass-flow MILP formulation for energy-efficient supplying in assembly lines, 236--239 (Full Paper) (link to paper)

  918. (Menu for Moris) All papers - Full papers - Abstracts - Selected papers

    Mort

  919. Mort, N (2003) Handling Preferences using Genetic Algorithms for the Nurse Scheduling Problem, 180--196 (Full Paper) (link to paper)

  920. (Menu for Mort) All papers - Full papers - Abstracts - Selected papers

    Morton

  921. Morton, A (2007) EDF Feasibility and Hardware Accelerators, 368--376 (Full Paper) (link to paper)

  922. (Menu for Morton) All papers - Full papers - Abstracts - Selected papers

    Mosquera

  923. Mosquera, F (2017) Integer programming for home care scheduling with flexible task frequency and controllable processing times, 121--132 (Full Paper) (link to paper)

  924. (Menu for Mosquera) All papers - Full papers - Abstracts - Selected papers

    Moukrim

  925. Moukrim, A (2013) Evolutionary algorithm and post-processing to minimize the total delay in multi-project scheduling, 831--835 (Full Paper) (link to paper)

  926. (Menu for Moukrim) All papers - Full papers - Abstracts - Selected papers

    Mouloua

  927. Mouloua, Z (2007) A Window Time Negotiation Approach at the Scheduling Level inside Supply Chains, 410--417 (Full Paper) (link to paper)

  928. (Menu for Mouloua) All papers - Full papers - Abstracts - Selected papers

    Mountakis

  929. Mountakis, S (2015) Exact and heuristic methods for trading-off makespan and stability in stochastic project scheduling, 25--41 (Full Paper) (link to paper)

  930. (Menu for Mountakis) All papers - Full papers - Abstracts - Selected papers

    Moura

  931. Moura, A (2013) Container Stowage and Short Sea Ship Routing Problem Optimization, 111--124 (Full Paper) (link to paper)

  932. (Menu for Moura) All papers - Full papers - Abstracts - Selected papers

    Mualem

  933. Mualem, A (2003) Bicriteria Scheduling for Parallel Jobs, 606--619 (Full Paper) (link to paper)

  934. (Menu for Mualem) All papers - Full papers - Abstracts - Selected papers

    Muguerza

  935. Muguerza, M (2015) A mass-flow MILP formulation for energy-efficient supplying in assembly lines, 236--239 (Full Paper) (link to paper)

  936. (Menu for Muguerza) All papers - Full papers - Abstracts - Selected papers

    Muhlenthaler

  937. Muhlenthaler, M (2013) A Decomposition of the Max-min Fair Curriculum-based Course Timetabling Problem: The Impact of Solving Subproblems to Optimality, 300--313 (Full Paper) (link to paper)

  938. (Menu for Muhlenthaler) All papers - Full papers - Abstracts - Selected papers

    Mulder

  939. Mulder, J (2003) Making Airline Schedules More Robust, 678--695 (Full Paper) (link to paper)

  940. (Menu for Mulder) All papers - Full papers - Abstracts - Selected papers

    Muller

  941. Muller, T (2013) Real-life Examination Timetabling, 248--267 (Full Paper) (link to paper)

  942. (Menu for Muller) All papers - Full papers - Abstracts - Selected papers

    Munier-Kordon

  943. Munier-Kordon, A (2007) An Approximation Algorithm for the UET Two-Machine Open-Shop Problem with Time Delays, 377--385 (Full Paper) (link to paper)

  944. (Menu for Munier-Kordon) All papers - Full papers - Abstracts - Selected papers

    Musliu

  945. Musliu, N (2013) Scheduling of electric vehicle charging operations, 486--498 (Full Paper) (link to paper)

  946. (Menu for Musliu) All papers - Full papers - Abstracts - Selected papers

    Muttray

  947. Muttray, U (2015) University Course Timetabling with Con?ict Minimization and Elective Courses, 412--428 (Full Paper) (link to paper)

  948. (Menu for Muttray) All papers - Full papers - Abstracts - Selected papers

    Mönch

  949. Mönch, L (2007) A Decomposition Heuristic for Planning and Scheduling of Jobs on Unrelated Parallel Machines, 112--119 (Full Paper) (link to paper)
  950. Mönch, L (2007) A Decomposition Heuristic for Planning and Scheduling of Jobs on Unrelated Parallel Machines, 112--119 (Full Paper) (link to paper)
  951. Mönch, L (2011) Hybridized Genetic Algorithms to Schedule Interfering Job Sets on a Single Machine, 185--194 (Full Paper) (link to paper)

  952. (Menu for Mönch) All papers - Full papers - Abstracts - Selected papers

    Nakagawa

  953. Nakagawa, K (2015) Scheduling competition in the airline industry and the issue of duplicate bookings, 55--62 (Full Paper) (link to paper)

  954. (Menu for Nakagawa) All papers - Full papers - Abstracts - Selected papers

    Nakase

  955. Nakase, R (2003) Genetic Algorithm Approach to a Multiobjective Rescheduling Problem in a Job Shop, 422--437 (Full Paper) (link to paper)

  956. (Menu for Nakase) All papers - Full papers - Abstracts - Selected papers

    Nezami

  957. Nezami, F.G (2017) Optimizing Production Schedule with Energy Consumption and Demand Charges in Parallel Machine Setting, 133--143 (Full Paper) (link to paper)

  958. (Menu for Nezami) All papers - Full papers - Abstracts - Selected papers

    Ng

  959. Ng, T. S. A (2011) Robust Target Achievement for Decision-Making with Application to Workforce-Inventory Planning, 394--407 (Full Paper) (link to paper)

  960. (Menu for Ng) All papers - Full papers - Abstracts - Selected papers

    Ngueveu

  961. Ngueveu, S. U. (2013) Solving a cooperative project scheduling with controllable processing times, self-interested agents and equal profit sharing, 125--132 (Full Paper) (link to paper)
  962. Ngueveu, S. U (2015) A mass-flow MILP formulation for energy-efficient supplying in assembly lines, 236--239 (Full Paper) (link to paper)

  963. (Menu for Ngueveu) All papers - Full papers - Abstracts - Selected papers

    Nickel

  964. Nickel, S (2003) Scheduling In Software Development Using MultiObjective Evolutionary Algorithms, 438--465 (Full Paper) (link to paper)

  965. (Menu for Nickel) All papers - Full papers - Abstracts - Selected papers

    Nieuwelaar

  966. Nieuwelaar, B. v. (2003) Recognizing Finite Repetitive Scheduling Patterns in Manufacturing Systems, 291--319 (Full Paper) (link to paper)

  967. (Menu for Nieuwelaar) All papers - Full papers - Abstracts - Selected papers

    Nishi

  968. Nishi, T (2009) Lagrangian Relaxation and Cut Generation for Sequence Dependent Setup Time Flowshop Scheduling Problems, 655--659 (Full Paper) (link to paper)
  969. Nishi, T (2013) Bilevel Decomposition Approach for Cyclic Staff Scheduling Problems, 65--79 (Full Paper) (link to paper)

  970. (Menu for Nishi) All papers - Full papers - Abstracts - Selected papers

    Nissen

  971. Nissen, V (2017) Evolutionary Bilevel Approach for Integrated Long-Term Staffing and Scheduling, 144--157 (Full Paper) (link to paper)

  972. (Menu for Nissen) All papers - Full papers - Abstracts - Selected papers

    Noronha

  973. Noronha, T.F (2015) A biased random-key genetic algorithm for scheduling divisible loads, 570--578 (Full Paper) (link to paper)

  974. (Menu for Noronha) All papers - Full papers - Abstracts - Selected papers

    Nourmohmmadzadeh

  975. Nourmohmmadzadeh, A (2015) An Efficient Simulated Annealing for the Integrated Problem of Berth Allocation and Quay Crane Assignment in Seaside Container Terminals, 154--164 (Full Paper) (link to paper)

  976. (Menu for Nourmohmmadzadeh) All papers - Full papers - Abstracts - Selected papers

    Nowe

  977. Nowe, A (2013) A Robust Multi-Agent Reinforcement Learning Approach for Scheduling Problems, 410--423 (Full Paper) (link to paper)
  978. Nowe, A (2013) A Reinforcement Learning Approach to Solving Hybrid Flexible Flowline Scheduling Problems, 402--409 (Full Paper) (link to paper)

  979. (Menu for Nowe) All papers - Full papers - Abstracts - Selected papers

    Noyan

  980. Noyan, N (2011) Minimizing Value-at-Risk in the Single-Machine Total Weighted Tardiness Problem, 215--229 (Full Paper) (link to paper)

  981. (Menu for Noyan) All papers - Full papers - Abstracts - Selected papers

    Nurmi

  982. Nurmi, K (2011) A Framework for Implementation-Oriented Staff Scheduling, 308--321 (Full Paper) (link to paper)
  983. Nurmi, K (2007) A Framework for School Timetabling Problem, 386--393 (Full Paper) (link to paper)

  984. (Menu for Nurmi) All papers - Full papers - Abstracts - Selected papers

    Oddi

  985. Oddi, A (2003) Constraint-Based Random Search for Solving Spacecraft Downlink Scheduling Problems, 574--597 (Full Paper) (link to paper)
  986. Oddi, A (2017) A constraint programming approach for the energy-efficient job shop scheduling problem, 158--172 (Full Paper) (link to paper)

  987. (Menu for Oddi) All papers - Full papers - Abstracts - Selected papers

    Oguz

  988. Oguz, C (2007) Order Acceptance and Scheduling Decisions in Make-to-Order Systems, 80--87 (Full Paper) (link to paper)
  989. Oguz, C (2003) A Lagrangian Relaxation Method for Hybrid Flow-Shop Scheduling with Multiprocessor Tasks to Minimize Total Weighted Completion Time, 638--655 (Full Paper) (link to paper)
  990. Oguz, C (2005) A Branch-and-bound Algorithm For Single Machine Total Tardiness Problem With Release Dates, 162--168 (Full Paper) (link to paper)

  991. (Menu for Oguz) All papers - Full papers - Abstracts - Selected papers

    Oliveira

  992. Oliveira, J (2013) Container Stowage and Short Sea Ship Routing Problem Optimization, 111--124 (Full Paper) (link to paper)

  993. (Menu for Oliveira) All papers - Full papers - Abstracts - Selected papers

    Ong

  994. Ong, W.E (2017) A Weight Assignment Approach for Solving Multicriteria Global Path Planning of Unmanned Combat Vehicles, 043--058 (Full Paper) (link to paper)

  995. (Menu for Ong) All papers - Full papers - Abstracts - Selected papers

    Ormsbee

  996. Ormsbee, L (2009) Optimal Pump Scheduling For Water Distribution Systems, 341--356 (Full Paper) (link to paper)

  997. (Menu for Ormsbee) All papers - Full papers - Abstracts - Selected papers

    Osman

  998. Osman, I. H (2009) Hybrid of the weighted minimum slack and shortest processing time dispatching rules for the total weighted tardiness single machine scheduling problem with availability constraints, 202--215 (Full Paper) (link to paper)

  999. (Menu for Osman) All papers - Full papers - Abstracts - Selected papers

    Ostler

  1000. Ostler, J (2015) Optimisation of Staff Absences, 360--369 (Full Paper) (link to paper)

  1001. (Menu for Ostler) All papers - Full papers - Abstracts - Selected papers

    Oude Vrielink

  1002. Oude Vrielink, R (2017) Towards improving tenders for Higher Education timetabling software: Uncovering the selection criteria of HEIs when choosing timetabling applications and using ERP as a reference, 173--188 (Full Paper) (link to paper)

  1003. (Menu for Oude Vrielink) All papers - Full papers - Abstracts - Selected papers

    Ouelhadj

  1004. Ouelhadj, D (2005) A Service Level Agreement Protocol And Tabu Search For Scheduling On Computational Grids, 238--243 (Full Paper) (link to paper)

  1005. (Menu for Ouelhadj) All papers - Full papers - Abstracts - Selected papers

    Ourari

  1006. Ourari, S (2009) Minimizing the number of tardy jobs in single machine scheduling using MIP, 227--238 (Full Paper) (link to paper)

  1007. (Menu for Ourari) All papers - Full papers - Abstracts - Selected papers

    Owusu

  1008. Owusu, G (2005) Retractable Contract Network for Distributed Scheduling, 485--500 (Full Paper) (link to paper)

  1009. (Menu for Owusu) All papers - Full papers - Abstracts - Selected papers

    Ozdamar

  1010. Ozdamar, L (2013) A GIS-Based Emergency Response System for Disaster Relief Operations, 372--378 (Full Paper) (link to paper)

  1011. (Menu for Ozdamar) All papers - Full papers - Abstracts - Selected papers

    Paelinck

  1012. Paelinck, M.C.E (2003) Making Airline Schedules More Robust, 678--695 (Full Paper) (link to paper)

  1013. (Menu for Paelinck) All papers - Full papers - Abstracts - Selected papers

    Pais

  1014. Pais, T. C (2011) Using Differential Evolution to Identify Fuzzy Measures for the Exam Timetabling Problem, 335--351 (Full Paper) (link to paper)

  1015. (Menu for Pais) All papers - Full papers - Abstracts - Selected papers

    Papa

  1016. Papa, G (2009) Metaheuristic Approach to Loading Schedule Problem, 616--627 (Full Paper) (link to paper)

  1017. (Menu for Papa) All papers - Full papers - Abstracts - Selected papers

    Pappis

  1018. Pappis, C. P (2007) Scheduling in a Multi-Processor Environment with Deteriorating Job Processing Times and Decreasing Values: the Case of Forest Fires, 402--409 (Full Paper) (link to paper)
  1019. Pappis, C. P (2009) A deterministic resource scheduling model in epidemic logistics, 570--580 (Full Paper) (link to paper)

  1020. (Menu for Pappis) All papers - Full papers - Abstracts - Selected papers

    Parkes

  1021. Parkes, A. J (2013) Combining Monte-Carlo and Hyper-heuristic methods for the Multi-mode Resource-constrained Multi-project Scheduling Problem, 836--839 (Full Paper) (link to paper)
  1022. Parkes, A. J (2011) Dynamic Data Structures for Taskgraph Scheduling Policies with Applications in OpenCL Accelerators, 322--334 (Full Paper) (link to paper)
  1023. Parkes, A. J (2009) An Extended Great Deluge Approach to the Examination Timetabling Problem, 424--434 (Full Paper) (link to paper)

  1024. (Menu for Parkes) All papers - Full papers - Abstracts - Selected papers

    Paschos

  1025. Paschos, V. Th (2007) On a Generalized Graph Coloring/Batch Scheduling Problem, 353--360 (Full Paper) (link to paper)

  1026. (Menu for Paschos) All papers - Full papers - Abstracts - Selected papers

    Pascual

  1027. Pascual, F (2005) How good Are SPT Schedules For Fair Optimality Criteria, 244--257 (Full Paper) (link to paper)

  1028. (Menu for Pascual) All papers - Full papers - Abstracts - Selected papers

    Patriksson

  1029. Patriksson, M (2015) Scheduling optimization of a real flexible job shop including side constraints regarding maintenance, ?xtures, and night shifts, 78--101 (Full Paper) (link to paper)

  1030. (Menu for Patriksson) All papers - Full papers - Abstracts - Selected papers

    Pecero

  1031. Pecero, J. E (2013) A Three-Phases Based Algorithm for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem The MISTA 2013 Challenge, 812--814 (Full Paper) (link to paper)
  1032. Pecero, J. E (2013) An Iterative Local Search Algorithm for Scheduling Precedence-Constrained Applications on Heterogeneous Machines, 472--485 (Full Paper) (link to paper)

  1033. (Menu for Pecero) All papers - Full papers - Abstracts - Selected papers

    Pereira

  1034. Pereira, C.S (2013) Automatic Timetabling in Higher Education Institutions: a real scenario and solution, 151--170 (Full Paper) (link to paper)

  1035. (Menu for Pereira) All papers - Full papers - Abstracts - Selected papers

    Perez-Gonzalez

  1036. Perez-Gonzalez, P (2015) Heuristic Methods for Single Machine Scheduling with Periodic Maintenance, 473--483 (Full Paper) (link to paper)

  1037. (Menu for Perez-Gonzalez) All papers - Full papers - Abstracts - Selected papers

    Pesch

  1038. Pesch, E (2007) Genetic Algorithm for Late Work Minimization in a Flow Shop System, 455--462 (Full Paper) (link to paper)

  1039. (Menu for Pesch) All papers - Full papers - Abstracts - Selected papers

    Petrovic

  1040. Petrovic, S (2003) Similarity Measures for Exam Timetabling Problems, 120--136 (Full Paper) (link to paper)
  1041. Petrovic, D (2003) Handling Preferences using Genetic Algorithms for the Nurse Scheduling Problem, 180--196 (Full Paper) (link to paper)
  1042. Petrovic, D (2005) An Approach To Predictive-reactive Scheduling Of Parallel Machines Subject To Disruptions, 74--91 (Full Paper) (link to paper)
  1043. Petrovic, S (2005) Job Shop Scheduling With Lot-sizing And Batching In An Uncertain Real-world Environment, 363--379 (Full Paper) (link to paper)
  1044. Petrovic, D (2005) Job Shop Scheduling With Lot-sizing And Batching In An Uncertain Real-world Environment, 363--379 (Full Paper) (link to paper)
  1045. Petrovic, S (2003) Case-Based Initialisation of Metaheuristics for Examination Timetabling, 137--154 (Full Paper) (link to paper)
  1046. Petrovic, S (2007) A Combined Meta-Heuristic with Hyper-Heuristic Approach to the Scheduling of the Hybrid Flow Shop with Sequence Dependent Setup Times and Uniform Machines, 506--513 (Full Paper) (link to paper)

  1047. (Menu for Petrovic) All papers - Full papers - Abstracts - Selected papers

    Pfund

  1048. Pfund, M (2005) A Bi-criteria Approach To Scheduling Wafer Fabrication Facilities, 276--287 (Full Paper) (link to paper)

  1049. (Menu for Pfund) All papers - Full papers - Abstracts - Selected papers

    Pickl

  1050. Pickl, S (2017) Optimal Interdiction of Vehicle Routing on a Dynamic Network, 059--069 (Full Paper) (link to paper)

  1051. (Menu for Pickl) All papers - Full papers - Abstracts - Selected papers

    Pillay

  1052. Pillay, N (2009) Evolving Hyper-Heuristics for the Uncapacitated Examination Timetabling Problem, 447--457 (Full Paper) (link to paper)

  1053. (Menu for Pillay) All papers - Full papers - Abstracts - Selected papers

    Pimenta

  1054. Pimenta, V (2015) Reliability Oriented DARP Models Involving Autonomous Vehicles, 218--235 (Full Paper) (link to paper)

  1055. (Menu for Pimenta) All papers - Full papers - Abstracts - Selected papers

    Pineda

  1056. Pineda, A. A. S. (2013) An Iterative Local Search Algorithm for Scheduling Precedence-Constrained Applications on Heterogeneous Machines, 472--485 (Full Paper) (link to paper)

  1057. (Menu for Pineda) All papers - Full papers - Abstracts - Selected papers

    Pinedo

  1058. Pinedo, M (2003) Ordering Scheduling Models with Applications in Practice, 2--10 (Full Paper) (link to paper)
  1059. Pinedo, M (2005) Scheduling Orders In Dedicated And Flexible Machine Environments, 471--484 (Full Paper) (link to paper)
  1060. Pinedo, M (2007) Competitive Agent Scheduling with Controllable Processing Times, 514--522 (Full Paper) (link to paper)

  1061. (Menu for Pinedo) All papers - Full papers - Abstracts - Selected papers

    Pira

  1062. Pira, C (2013) Line search method for solving a non-preemptive strictly periodic scheduling problem, 356--371 (Full Paper) (link to paper)

  1063. (Menu for Pira) All papers - Full papers - Abstracts - Selected papers

    Policella

  1064. Policella, N (2003) Constraint-Based Random Search for Solving Spacecraft Downlink Scheduling Problems, 574--597 (Full Paper) (link to paper)

  1065. (Menu for Policella) All papers - Full papers - Abstracts - Selected papers

    Politz

  1066. Politz, A (2013) Algorithms and Complexity of Student Sectioning for Existing Timetables, 218--229 (Full Paper) (link to paper)

  1067. (Menu for Politz) All papers - Full papers - Abstracts - Selected papers

    Portmann

  1068. Portmann, M- (2003) An Efficient Proactive Reactive Scheduling Approach to Hedge Against Shop Floor Disturbances, 337--362 (Full Paper) (link to paper)
  1069. Portmann, M-C. (2007) A Window Time Negotiation Approach at the Scheduling Level inside Supply Chains, 410--417 (Full Paper) (link to paper)

  1070. (Menu for Portmann) All papers - Full papers - Abstracts - Selected papers

    Post

  1071. Post, G (2005) A Decomposition, Construction And Post-processing Approach For Nurse Rostering, 397--406 (Full Paper) (link to paper)

  1072. (Menu for Post) All papers - Full papers - Abstracts - Selected papers

    Proll

  1073. Proll, L (2003) Constraint-Based Local Search for Rail Container Service Planning, 660--677 (Full Paper) (link to paper)

  1074. (Menu for Proll) All papers - Full papers - Abstracts - Selected papers

    Péridy

  1075. Péridy, L (2003) Improving Immediate Selections Adjustments, 244--258 (Full Paper) (link to paper)

  1076. (Menu for Péridy) All papers - Full papers - Abstracts - Selected papers

    Qu

  1077. Qu, R (2005) A Decomposition, Construction And Post-processing Approach For Nurse Rostering, 397--406 (Full Paper) (link to paper)
  1078. Qu, R (2003) Similarity Measures for Exam Timetabling Problems, 120--136 (Full Paper) (link to paper)
  1079. Qu, R (2009) Adaptive Selection of Heuristics within a GRASP for Exam Timetabling Problems, 409--423 (Full Paper) (link to paper)
  1080. Qu, R (2007) Adaptive Decomposition and Construction for Examination Timetabling Problems, 418--425 (Full Paper) (link to paper)
  1081. Qu, R (2009) Hybridizing Integer Programming Models with an Adaptive Decomposition Approach for Exam Timetabling Problems, 435--446 (Full Paper) (link to paper)
  1082. Qu, R (2009) A GRASP approach for the delay-constrained multicast routing problem, 93--104 (Full Paper) (link to paper)

  1083. (Menu for Qu) All papers - Full papers - Abstracts - Selected papers

    Quesnelle

  1084. Quesnelle, J (2015) Scheduling a conference to minimize attendee preference Conflicts, 379--392 (Full Paper) (link to paper)

  1085. (Menu for Quesnelle) All papers - Full papers - Abstracts - Selected papers

    Quilliot

  1086. Quilliot, A (2013) Transfers in the on-demand transportation: the DARPT Dial-a-Ride Problem with transfers allowed, 185--205 (Full Paper) (link to paper)
  1087. Quilliot, A (2015) Reliability Oriented DARP Models Involving Autonomous Vehicles, 218--235 (Full Paper) (link to paper)
  1088. Quilliot, A (2013) Homogeneously non-idling schedules of unit-time jobs on identical parallel machines, 39--54 (Full Paper) (link to paper)
  1089. Quilliot, A (2003) Interval Graphs, Antichain Sets and Scheduling with Temporal and Resource Constraints, 620--637 (Full Paper) (link to paper)
  1090. Quilliot, A (2013) RCPSP with Resource Transfers and Money Management, 91--110 (Full Paper) (link to paper)
  1091. Quilliot, A (2007) Solving Resource-Constrained Project Scheduling Problem with Particle Swarm Optimization, 251--258 (Full Paper) (link to paper)

  1092. (Menu for Quilliot) All papers - Full papers - Abstracts - Selected papers

    Raa

  1093. Raa, B (2007) Aligning Frequencies in Cyclic Delivery Scheduling, 426--430 (Full Paper) (link to paper)

  1094. (Menu for Raa) All papers - Full papers - Abstracts - Selected papers

    Raap

  1095. Raap, M (2017) Optimal Interdiction of Vehicle Routing on a Dynamic Network, 059--069 (Full Paper) (link to paper)

  1096. (Menu for Raap) All papers - Full papers - Abstracts - Selected papers

    Rachaniotis

  1097. Rachaniotis, N. P (2007) Scheduling in a Multi-Processor Environment with Deteriorating Job Processing Times and Decreasing Values: the Case of Forest Fires, 402--409 (Full Paper) (link to paper)
  1098. Rachaniotis, N. P (2009) A deterministic resource scheduling model in epidemic logistics, 570--580 (Full Paper) (link to paper)

  1099. (Menu for Rachaniotis) All papers - Full papers - Abstracts - Selected papers

    Rahimian

  1100. Rahimian, E (2015) A Hybrid Constraint Integer Programming Approach to Solve Nurse Scheduling Problems, 429--442 (Full Paper) (link to paper)

  1101. (Menu for Rahimian) All papers - Full papers - Abstracts - Selected papers

    Rahman

  1102. Rahman, S. A (2013) An Investigation of Multistage Approaches to Examination Timetabling, 528--542 (Full Paper) (link to paper)
  1103. Rahman, A (2017) A Weight Assignment Approach for Solving Multicriteria Global Path Planning of Unmanned Combat Vehicles, 043--058 (Full Paper) (link to paper)

  1104. (Menu for Rahman) All papers - Full papers - Abstracts - Selected papers

    Ramacher

  1105. Ramacher, R (2011) Hybridized Genetic Algorithms to Schedule Interfering Job Sets on a Single Machine, 185--194 (Full Paper) (link to paper)

  1106. (Menu for Ramacher) All papers - Full papers - Abstracts - Selected papers

    Ranade

  1107. Ranade, A (2015) Single Track Train Scheduling, 102--117 (Full Paper) (link to paper)

  1108. (Menu for Ranade) All papers - Full papers - Abstracts - Selected papers

    Ranson

  1109. Ranson, D (2005) Graphical Tools for Heuristic Visualization, 658--667 (Full Paper) (link to paper)

  1110. (Menu for Ranson) All papers - Full papers - Abstracts - Selected papers

    Rapine

  1111. Rapine, C (2005) Bicriteria Parallel Task Scheduling, 585--596 (Full Paper) (link to paper)

  1112. (Menu for Rapine) All papers - Full papers - Abstracts - Selected papers

    Rasconi

  1113. Rasconi, R (2017) A constraint programming approach for the energy-efficient job shop scheduling problem, 158--172 (Full Paper) (link to paper)

  1114. (Menu for Rasconi) All papers - Full papers - Abstracts - Selected papers

    Rashidi

  1115. Rashidi, H (2005) Applying The Extended Network Simplex Algorithm To Dynamic Automated Guided Vehicle Scheduling, 677--692 (Full Paper) (link to paper)

  1116. (Menu for Rashidi) All papers - Full papers - Abstracts - Selected papers

    Ravizza

  1117. Ravizza, S (2011) A more realistic approach for airport ground movement optimisation with stand holding, 146--160 (Full Paper) (link to paper)

  1118. (Menu for Ravizza) All papers - Full papers - Abstracts - Selected papers

    Rebaine

  1119. Rebaine, D (2007) An Approximation Algorithm for the UET Two-Machine Open-Shop Problem with Time Delays, 377--385 (Full Paper) (link to paper)

  1120. (Menu for Rebaine) All papers - Full papers - Abstracts - Selected papers

    Redi

  1121. Redi, A.A.N.P (2017) A Selective-Discrete Particle Swarm Optimization Algorithm for Solving a Class of Orienteering Problem, 229--243 (Full Paper) (link to paper)

  1122. (Menu for Redi) All papers - Full papers - Abstracts - Selected papers

    Reeves

  1123. Reeves, C (2003) Making Airline Schedules More Robust, 678--695 (Full Paper) (link to paper)
  1124. Reeves, C (2003) Handling Preferences using Genetic Algorithms for the Nurse Scheduling Problem, 180--196 (Full Paper) (link to paper)

  1125. (Menu for Reeves) All papers - Full papers - Abstracts - Selected papers

    Resende

  1126. Resende, M.G.C (2015) A biased random-key genetic algorithm for scheduling divisible loads, 570--578 (Full Paper) (link to paper)

  1127. (Menu for Resende) All papers - Full papers - Abstracts - Selected papers

    Riane

  1128. Riane, F (2003) Two-machine Flowshop Scheduling with the Availability Constraint on the Second Machine, 279--290 (Full Paper) (link to paper)

  1129. (Menu for Riane) All papers - Full papers - Abstracts - Selected papers

    Ribeiro

  1130. Ribeiro, C. C (2015) A biased random-key genetic algorithm for scheduling divisible loads, 570--578 (Full Paper) (link to paper)
  1131. Ribeiro, C. C (2009) A heuristic for minimizing weighted carry-over effects in round robin tournaments, 115--129 (Full Paper) (link to paper)
  1132. Ribeiro, C. C (2007) Scheduling Single Round Robin Tournaments with Fixed Venues, 431--438 (Full Paper) (link to paper)

  1133. (Menu for Ribeiro) All papers - Full papers - Abstracts - Selected papers

    Righter

  1134. Righter, R (2007) Scheduling in Highly Uncertain Environments, 27--32 (Full Paper) (link to paper)

  1135. (Menu for Righter) All papers - Full papers - Abstracts - Selected papers

    Rihm

  1136. Rihm, T (2015) A lexicographic goal programming approach for staff assignment with acceptance levels, 526--540 (Full Paper) (link to paper)

  1137. (Menu for Rihm) All papers - Full papers - Abstracts - Selected papers

    Rinaldi

  1138. Rinaldi, F (2007) A Compact Optimization Approach for Job-Shop Problems, 293--300 (Full Paper) (link to paper)

  1139. (Menu for Rinaldi) All papers - Full papers - Abstracts - Selected papers

    Ritt

  1140. Ritt, M (2013) A simple stochastic local search for multi-mode resource-constrained multi-project scheduling, 826--830 (Full Paper) (link to paper)

  1141. (Menu for Ritt) All papers - Full papers - Abstracts - Selected papers

    Rivreau

  1142. Rivreau, D (2003) Improving Immediate Selections Adjustments, 244--258 (Full Paper) (link to paper)

  1143. (Menu for Rivreau) All papers - Full papers - Abstracts - Selected papers

    Rizzo

  1144. Rizzo, L. M (2011) A GRASP Heuristic to the Extended Car Sequencing Problem, 366--373 (Full Paper) (link to paper)

  1145. (Menu for Rizzo) All papers - Full papers - Abstracts - Selected papers

    Roberts

  1146. Roberts, M (2005) Random Walks And Neighborhood Bias In Oversubscribed Scheduling, 98--105 (Full Paper) (link to paper)

  1147. (Menu for Roberts) All papers - Full papers - Abstracts - Selected papers

    Rodr?guez

  1148. Rodr?guez, V (2015) A mass-flow MILP formulation for energy-efficient supplying in assembly lines, 236--239 (Full Paper) (link to paper)

  1149. (Menu for Rodr?guez) All papers - Full papers - Abstracts - Selected papers

    Rodrigues

  1150. Rodrigues, L. U (2013) Local search techniques applied to the Unrelated Parallel Machine Scheduling Problem with Sequence Dependent Setup Time, 458--471 (Full Paper) (link to paper)

  1151. (Menu for Rodrigues) All papers - Full papers - Abstracts - Selected papers

    Rodriguez

  1152. Rodriguez, J. A. V. (2007) A Combined Meta-Heuristic with Hyper-Heuristic Approach to the Scheduling of the Hybrid Flow Shop with Sequence Dependent Setup Times and Uniform Machines, 506--513 (Full Paper) (link to paper)

  1153. (Menu for Rodriguez) All papers - Full papers - Abstracts - Selected papers

    Rogerie

  1154. Rogerie, J (2013) Temporal Linear Relaxation in IBM ILOG CP Optimizer, 379--391 (Full Paper) (link to paper)

  1155. (Menu for Rogerie) All papers - Full papers - Abstracts - Selected papers

    Romano

  1156. Romano, C. A. (2007) A Decision Support System for Scheduling a Painting Facility in an Automotive Supplier, 175--183 (Full Paper) (link to paper)

  1157. (Menu for Romano) All papers - Full papers - Abstracts - Selected papers

    Romero

  1158. Romero, D (2013) A Three-Phases Based Algorithm for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem The MISTA 2013 Challenge, 812--814 (Full Paper) (link to paper)

  1159. (Menu for Romero) All papers - Full papers - Abstracts - Selected papers

    Rose

  1160. Rose, O (2009) Scheduling Semiconductor Manufacturing Operations: Problems, Solution Techniques, and Future Challenges, 192--201 (Full Paper) (link to paper)
  1161. Rose, O (2011) A Multi Species Evolutionary Algorithm for Tool Group Scheduling in Semiconductor Manufacturing, 459--468 (Full Paper) (link to paper)

  1162. (Menu for Rose) All papers - Full papers - Abstracts - Selected papers

    Rudek

  1163. Rudek, R (2015) A novel Approximate/Exact objective based search technique for precedence constrained scheduling problems, 484--491 (Full Paper) (link to paper)

  1164. (Menu for Rudek) All papers - Full papers - Abstracts - Selected papers

    Ruiz

  1165. Ruiz, R (2007) Unrelated Parallel Machines Scheduling with Resource-Assignable Sequence Dependent Setup Times, 439--446 (Full Paper) (link to paper)

  1166. (Menu for Ruiz) All papers - Full papers - Abstracts - Selected papers

    Runarsson

  1167. Runarsson, T.P (2013) Bandit Algorithms using Monte Carlo Rollouts for Job Shop Scheduling, 318--330 (Full Paper) (link to paper)

  1168. (Menu for Runarsson) All papers - Full papers - Abstracts - Selected papers

    Rusdi

  1169. Rusdi, I (2003) Making Airline Schedules More Robust, 678--695 (Full Paper) (link to paper)

  1170. (Menu for Rusdi) All papers - Full papers - Abstracts - Selected papers

    Sabar

  1171. Sabar, N.R (2013) A Hybrid of Differential Evolution and Simulated Annealing Algorithms for the Capacitated Arc Routing Problems, 549--554 (Full Paper) (link to paper)
  1172. Sabar, N. R (2009) Solving Examination Timetabling Problems using Honey-bee Mating Optimization (ETP-HBMO), 399--408 (Full Paper) (link to paper)

  1173. (Menu for Sabar) All papers - Full papers - Abstracts - Selected papers

    Sadykov

  1174. Sadykov, R (2007) Computing Lower Bounds for the Schedule of a Multifunction Radar, 523--530 (Full Paper) (link to paper)

  1175. (Menu for Sadykov) All papers - Full papers - Abstracts - Selected papers

    Saffar

  1176. Saffar, M (2009) Hybrid of the weighted minimum slack and shortest processing time dispatching rules for the total weighted tardiness single machine scheduling problem with availability constraints, 202--215 (Full Paper) (link to paper)

  1177. (Menu for Saffar) All papers - Full papers - Abstracts - Selected papers

    Sakellariou

  1178. Sakellariou, R (2005) A Service Level Agreement Protocol And Tabu Search For Scheduling On Computational Grids, 238--243 (Full Paper) (link to paper)

  1179. (Menu for Sakellariou) All papers - Full papers - Abstracts - Selected papers

    Salehipour

  1180. Salehipour, A (2007) The Cost of Scheduling Customers in Routing Problems, 136--143 (Full Paper) (link to paper)

  1181. (Menu for Salehipour) All papers - Full papers - Abstracts - Selected papers

    Salhi

  1182. Salhi, A (2007) A Combined Meta-Heuristic with Hyper-Heuristic Approach to the Scheduling of the Hybrid Flow Shop with Sequence Dependent Setup Times and Uniform Machines, 506--513 (Full Paper) (link to paper)

  1183. (Menu for Salhi) All papers - Full papers - Abstracts - Selected papers

    Salido

  1184. Salido, M.A (2003) A Constraint Ordering Heuristic for Scheduling Problems, 476--491 (Full Paper) (link to paper)

  1185. (Menu for Salido) All papers - Full papers - Abstracts - Selected papers

    Salman

  1186. Salman, S (2007) Order Acceptance and Scheduling Decisions in Make-to-Order Systems, 80--87 (Full Paper) (link to paper)

  1187. (Menu for Salman) All papers - Full papers - Abstracts - Selected papers

    Sannomiya

  1188. Sannomiya, N (2003) Genetic Algorithm Approach to a Multiobjective Rescheduling Problem in a Job Shop, 422--437 (Full Paper) (link to paper)

  1189. (Menu for Sannomiya) All papers - Full papers - Abstracts - Selected papers

    Santos

  1190. Santos, H.G (2015) Improving Upper Bounds in High School Timetabling by Matheuristics, 267--275 (Full Paper) (link to paper)
  1191. Santos, H. G (2013) A New Integer Linear Programming Formulation to the Examination Timetabling Problem, 345--355 (Full Paper) (link to paper)
  1192. Santos, H. G (2013) Late Acceptance Hill-Climbing Applied to the High School Timetabling Problem, 331--344 (Full Paper) (link to paper)
  1193. Santos, H. G (2013) Local search techniques applied to the Unrelated Parallel Machine Scheduling Problem with Sequence Dependent Setup Time, 458--471 (Full Paper) (link to paper)
  1194. Santos, H. G (2013) An Integer Programming Approach for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 840--847 (Full Paper) (link to paper)

  1195. (Menu for Santos) All papers - Full papers - Abstracts - Selected papers

    Sato

  1196. Sato, S (2009) An exact algorithm for the precedence-constrained single-machine scheduling problem, 216--226 (Full Paper) (link to paper)

  1197. (Menu for Sato) All papers - Full papers - Abstracts - Selected papers

    Saw

  1198. Saw, V (2017) A Weight Assignment Approach for Solving Multicriteria Global Path Planning of Unmanned Combat Vehicles, 043--058 (Full Paper) (link to paper)

  1199. (Menu for Saw) All papers - Full papers - Abstracts - Selected papers

    Schaerf

  1200. Schaerf, A (2015) Thesis Defense Timetabling, 507--514 (Full Paper) (link to paper)
  1201. Schaerf, A (2013) A simulated annealing approach to the curriculum-based course timetabling problem, 314--317 (Full Paper) (link to paper)
  1202. Schaerf, A (2009) Tabu Search Techniques for the Heterogeneous Vehicle Routing Problem with Time Windows and Carrier-Dependent Costs, 594--605 (Full Paper) (link to paper)

  1203. (Menu for Schaerf) All papers - Full papers - Abstracts - Selected papers

    Schmidt

  1204. Schmidt, M (2015) Single Track Train Scheduling, 102--117 (Full Paper) (link to paper)

  1205. (Menu for Schmidt) All papers - Full papers - Abstracts - Selected papers

    Schmitz

  1206. Schmitz, H (2013) Algorithms and Complexity of Student Sectioning for Existing Timetables, 218--229 (Full Paper) (link to paper)

  1207. (Menu for Schmitz) All papers - Full papers - Abstracts - Selected papers

    Schnell

  1208. Schnell, A (2013) A hybrid local search algorithm integrating an exact CP-SAT approach to solve the multi-mode resource-constrained multi-project scheduling problem, 802--806 (Full Paper) (link to paper)

  1209. (Menu for Schnell) All papers - Full papers - Abstracts - Selected papers

    Scholz-Reiter

  1210. Scholz-Reiter, B (2013) A computational study of shifting bottleneck procedures for job shop total weighted tardiness scheduling problems, 437--457 (Full Paper) (link to paper)

  1211. (Menu for Scholz-Reiter) All papers - Full papers - Abstracts - Selected papers

    Schulte

  1212. Schulte, J (2017) Evolutionary Bilevel Approach for Integrated Long-Term Staffing and Scheduling, 144--157 (Full Paper) (link to paper)

  1213. (Menu for Schulte) All papers - Full papers - Abstracts - Selected papers

    Schwarzfischer

  1214. Schwarzfischer, T (2003) Using Value Dependencies to Schedule Complex Soft-Real-Time Applications with Precedence Constraints, 92--113 (Full Paper) (link to paper)

  1215. (Menu for Schwarzfischer) All papers - Full papers - Abstracts - Selected papers

    Schwiegelshohn

  1216. Schwiegelshohn, U (2007) Scheduling Tests on Vehicle Prototypes using Constraint Programming, 336--343 (Full Paper) (link to paper)
  1217. Schwiegelshohn, U (2009) An Owner-centric Metric for the Evaluation of Online Job Schedules, 557--569 (Full Paper) (link to paper)

  1218. (Menu for Schwiegelshohn) All papers - Full papers - Abstracts - Selected papers

    Schwindt

  1219. Schwindt, C (2007) Large-Scale Short-Term Planning in Chemical Batch Production, 490--497 (Full Paper) (link to paper)

  1220. (Menu for Schwindt) All papers - Full papers - Abstracts - Selected papers

    Seddik

  1221. Seddik, Y (2011) Single machine scheduling with delivery dates and cumulative payoffs, 261--274 (Full Paper) (link to paper)
  1222. Seddik, Y (2013) A polynomial time OPT-1 algorithm for a scheduling problem with two delivery dates and cumulative payoffs, 268--289 (Full Paper) (link to paper)

  1223. (Menu for Seddik) All papers - Full papers - Abstracts - Selected papers

    Serafini

  1224. Serafini, P (2007) A Compact Optimization Approach for Job-Shop Problems, 293--300 (Full Paper) (link to paper)
  1225. Serafini, P (2009) On some combinatorial properties of PESP, 59--67 (Full Paper) (link to paper)

  1226. (Menu for Serafini) All papers - Full papers - Abstracts - Selected papers

    Sgalambro

  1227. Sgalambro, A (2007) Optimization of the Departure Schedule at a Public Transit Terminal with Multiple Destinations, 104--111 (Full Paper) (link to paper)

  1228. (Menu for Sgalambro) All papers - Full papers - Abstracts - Selected papers

    Shabtay

  1229. Shabtay, D (2009) Bicriteria models to minimize the total weighted number of tardy jobs with convex controllable processing times and common due date assignment, 301--310 (Full Paper) (link to paper)
  1230. Shabtay, D (2005) The Single-machine Earliness-tardiness Scheduling Problem With Due Date Assignment And Resource-dependent Processing Times, 149--161 (Full Paper) (link to paper)

  1231. (Menu for Shabtay) All papers - Full papers - Abstracts - Selected papers

    Shaker

  1232. Shaker, K (2015) Bacteria Swarm Optimisation Approach for Enrolment-Based Course Timetabling Problems, 515--525 (Full Paper) (link to paper)

  1233. (Menu for Shaker) All papers - Full papers - Abstracts - Selected papers

    Shchepin

  1234. Shchepin, E (2005) New Tight Np-hardness Of Preemptive Multiprocessor And Open Shop Scheduling, 606--629 (Full Paper) (link to paper)

  1235. (Menu for Shchepin) All papers - Full papers - Abstracts - Selected papers

    Shufan

  1236. Shufan, E (2015) A Fixed Route Dial-a-Ride Problem, 313--324 (Full Paper) (link to paper)
  1237. Shufan, E (2011) A Two-Campus Transport Problem, 173--184 (Full Paper) (link to paper)

  1238. (Menu for Shufan) All papers - Full papers - Abstracts - Selected papers

    Silva

  1239. Silva, J.D. L. (2003) Making Airline Schedules More Robust, 678--695 (Full Paper) (link to paper)
  1240. Silva, C. L.T.F. (2013) Local search techniques applied to the Unrelated Parallel Machine Scheduling Problem with Sequence Dependent Setup Time, 458--471 (Full Paper) (link to paper)
  1241. Silva, S. (2003) A Scheduling Web Service, 540--553 (Full Paper) (link to paper)

  1242. (Menu for Silva) All papers - Full papers - Abstracts - Selected papers

    Simonin

  1243. Simonin, G (2009) Isomorphic coupled-task scheduling problem with compatibility constraints on a single processor, 378--388 (Full Paper) (link to paper)

  1244. (Menu for Simonin) All papers - Full papers - Abstracts - Selected papers

    Singh

  1245. Singh, R (2015) Simulation Based Cause and Effect analysis of Input Variables in Wafer Fabrication, 345--359 (Full Paper) (link to paper)

  1246. (Menu for Singh) All papers - Full papers - Abstracts - Selected papers

    Sioud

  1247. Sioud, A (2013) A new ant colony optimization for minimizing tardiness in the single machine scheduling problem with sequence-dependent setups times, 17--20 (Full Paper) (link to paper)

  1248. (Menu for Sioud) All papers - Full papers - Abstracts - Selected papers

    Skalicky

  1249. Skalicky, T (2009) A local approach to automated correction of violated precedence and resource constraints in manually altered schedules, 507--517 (Full Paper) (link to paper)

  1250. (Menu for Skalicky) All papers - Full papers - Abstracts - Selected papers

    Smet

  1251. Smet, P (2017) Integer programming for home care scheduling with flexible task frequency and controllable processing times, 121--132 (Full Paper) (link to paper)

  1252. (Menu for Smet) All papers - Full papers - Abstracts - Selected papers

    Smith

  1253. Smith, S. F (2007) Analyzing Basic Representation Choices in Oversubscribed Scheduling Problems, 259--266 (Full Paper) (link to paper)
  1254. Smith, S. F (2003) Is Scheduling a Solved Problem?, 11--20 (Full Paper) (link to paper)

  1255. (Menu for Smith) All papers - Full papers - Abstracts - Selected papers

    Soares

  1256. Soares, J.A (2013) An Integer Programming Approach for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 840--847 (Full Paper) (link to paper)

  1257. (Menu for Soares) All papers - Full papers - Abstracts - Selected papers

    Soghier

  1258. Soghier, A (2009) Adaptive Selection of Heuristics within a GRASP for Exam Timetabling Problems, 409--423 (Full Paper) (link to paper)

  1259. (Menu for Soghier) All papers - Full papers - Abstracts - Selected papers

    Solis

  1260. Solis, Y. A. R. (2005) Large Neighborhood For A Parallel Scheduling Problem With Earlinesstardiness Penalties And A Common Due Date, 169--184 (Full Paper) (link to paper)

  1261. (Menu for Solis) All papers - Full papers - Abstracts - Selected papers

    Sorel

  1262. Sorel, Y (2005) Periodic real-time scheduling:from latency-based model to deadline-based model, 344--352 (Full Paper) (link to paper)

  1263. (Menu for Sorel) All papers - Full papers - Abstracts - Selected papers

    Soto

  1264. Soto, I (2011) SDP Relaxations for Two Stage OFDMA Networks with and without Probabilistic Constraints, 445--458 (Full Paper) (link to paper)
  1265. Soto, I (2013) Scheduling in Wireless OFDMA-TDMA Networks using Variable Neighborhood Search Metaheuristic, 55--64 (Full Paper) (link to paper)

  1266. (Menu for Soto) All papers - Full papers - Abstracts - Selected papers

    Soubeiga

  1267. Soubeiga, E (2003) Scheduling Nurses Using a Tabu-Search Hyperheuristic, 197--219 (Full Paper) (link to paper)

  1268. (Menu for Soubeiga) All papers - Full papers - Abstracts - Selected papers

    Soukhal

  1269. Soukhal, A (2007) Single Machine and Parallel Machine Scheduling Problems with a Common Due Date to Minimize Total Weighted Tardiness, 498--505 (Full Paper) (link to paper)
  1270. Soukhal, A (2017) Fixed jobs scheduling on a single machine with renewable resources, 084--092 (Full Paper) (link to paper)

  1271. (Menu for Soukhal) All papers - Full papers - Abstracts - Selected papers

    Sourd

  1272. Sourd, F (2005) The Single Machine Just-in-time Scheduling Problem With Preemptions, 140--148 (Full Paper) (link to paper)
  1273. Sourd, F (2005) Large Neighborhood For A Parallel Scheduling Problem With Earlinesstardiness Penalties And A Common Due Date, 169--184 (Full Paper) (link to paper)

  1274. (Menu for Sourd) All papers - Full papers - Abstracts - Selected papers

    Speranza

  1275. Speranza, M. G. (2007) Semi On-Line Scheduling on Two Uniform Processors, 51--58 (Full Paper) (link to paper)

  1276. (Menu for Speranza) All papers - Full papers - Abstracts - Selected papers

    Spieksma

  1277. Spieksma, F. C.R (2007) Interval Scheduling, 33--40 (Full Paper) (link to paper)

  1278. (Menu for Spieksma) All papers - Full papers - Abstracts - Selected papers

    Srour

  1279. Srour, A (2017) Evolving Adaptive Evolutionary Algorithms, 070--083 (Full Paper) (link to paper)

  1280. (Menu for Srour) All papers - Full papers - Abstracts - Selected papers

    Steffy

  1281. Steffy, D (2015) Scheduling a conference to minimize attendee preference Conflicts, 379--392 (Full Paper) (link to paper)

  1282. (Menu for Steffy) All papers - Full papers - Abstracts - Selected papers

    Steiner

  1283. Steiner, G (2009) Strong-Weak Precedence in Scheduling: Extended Order Implications, 28--42 (Full Paper) (link to paper)
  1284. Steiner, G (2009) Bicriteria models to minimize the total weighted number of tardy jobs with convex controllable processing times and common due date assignment, 301--310 (Full Paper) (link to paper)
  1285. Steiner, G (2005) The Single-machine Earliness-tardiness Scheduling Problem With Due Date Assignment And Resource-dependent Processing Times, 149--161 (Full Paper) (link to paper)
  1286. Steiner, G (2007) Minimizing the Total Weighted Number of Late Jobs with Late Deliveries in Two-Level Supply Chains, 447--454 (Full Paper) (link to paper)

  1287. (Menu for Steiner) All papers - Full papers - Abstracts - Selected papers

    Steinhöfel

  1288. Steinhöfel, K (2011) Low Energy Scheduling with Power Heterogeneous Multiprocessor Systems, 297--307 (Full Paper) (link to paper)

  1289. (Menu for Steinhöfel) All papers - Full papers - Abstracts - Selected papers

    Sterna

  1290. Sterna, M (2007) Genetic Algorithm for Late Work Minimization in a Flow Shop System, 455--462 (Full Paper) (link to paper)
  1291. Sterna, M (2009) Scheduling policy for on-line translation service, 266--276 (Full Paper) (link to paper)

  1292. (Menu for Sterna) All papers - Full papers - Abstracts - Selected papers

    Stromberg

  1293. Stromberg, A-B. (2015) Scheduling optimization of a real flexible job shop including side constraints regarding maintenance, ?xtures, and night shifts, 78--101 (Full Paper) (link to paper)

  1294. (Menu for Stromberg) All papers - Full papers - Abstracts - Selected papers

    Stutzle

  1295. Stutzle, T (2013) Automatic Design of a Hybrid Iterated Local Search for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 820--825 (Full Paper) (link to paper)

  1296. (Menu for Stutzle) All papers - Full papers - Abstracts - Selected papers

    Střlevik

  1297. Střlevik, M (2011) A Framework for Implementation-Oriented Staff Scheduling, 308--321 (Full Paper) (link to paper)

  1298. (Menu for Střlevik) All papers - Full papers - Abstracts - Selected papers

    Sucha

  1299. Sucha, P (2013) Solving a cooperative project scheduling with controllable processing times, self-interested agents and equal profit sharing, 125--132 (Full Paper) (link to paper)
  1300. Sucha, P (2009) Time Symmetry of Project Scheduling with Time Windows and Take-give Resources, 239--253 (Full Paper) (link to paper)
  1301. Sucha, P (2007) Cyclic Scheduling of Tasks with Unit Processing Time on Dedicated Sets of Parallel Identical Processors, 463--470 (Full Paper) (link to paper)

  1302. (Menu for Sucha) All papers - Full papers - Abstracts - Selected papers

    Sugiyama

  1303. Sugiyama, T (2013) Bilevel Decomposition Approach for Cyclic Staff Scheduling Problems, 65--79 (Full Paper) (link to paper)

  1304. (Menu for Sugiyama) All papers - Full papers - Abstracts - Selected papers

    Suleman

  1305. Suleman, M.O (2003) Making Airline Schedules More Robust, 678--695 (Full Paper) (link to paper)

  1306. (Menu for Suleman) All papers - Full papers - Abstracts - Selected papers

    Svancara

  1307. Svancara, J. (2017) Scheduling Models for Multi-Agent Path Finding, 189--200 (Full Paper) (link to paper)

  1308. (Menu for Svancara) All papers - Full papers - Abstracts - Selected papers

    Sy

  1309. Sy, C.L (2017) A Robust Crew Pairing Model for Airline Operations using Crew Swaps and Slack Times, 103--120 (Full Paper) (link to paper)
  1310. Sy, C. L (2011) Robust Target Achievement for Decision-Making with Application to Workforce-Inventory Planning, 394--407 (Full Paper) (link to paper)

  1311. (Menu for Sy) All papers - Full papers - Abstracts - Selected papers

    Szczerbicka

  1312. Szczerbicka, H (2007) Evaluating Online Scheduling Techniques in Uncertain Environments, 471--479 (Full Paper) (link to paper)

  1313. (Menu for Szczerbicka) All papers - Full papers - Abstracts - Selected papers

    T'kindt

  1314. T'kindt, V (2009) Scheduling two interfering job sets on uniform parallel machines with makespan and cost functions, 645--654 (Full Paper) (link to paper)

  1315. (Menu for T'kindt) All papers - Full papers - Abstracts - Selected papers

    Tan

  1316. Tan, Y (2013) A computational study of shifting bottleneck procedures for job shop total weighted tardiness scheduling problems, 437--457 (Full Paper) (link to paper)

  1317. (Menu for Tan) All papers - Full papers - Abstracts - Selected papers

    Tanaka

  1318. Tanaka, S (2013) The single-machine scheduling problem with a finite capacity input buffer, 171--184 (Full Paper) (link to paper)
  1319. Tanaka, S (2009) An exact algorithm for the precedence-constrained single-machine scheduling problem, 216--226 (Full Paper) (link to paper)

  1320. (Menu for Tanaka) All papers - Full papers - Abstracts - Selected papers

    Tang

  1321. Tang, L (2003) A Lagrangian Relaxation Method for Hybrid Flow-Shop Scheduling with Multiprocessor Tasks to Minimize Total Weighted Completion Time, 638--655 (Full Paper) (link to paper)

  1322. (Menu for Tang) All papers - Full papers - Abstracts - Selected papers

    Tarasevich

  1323. Tarasevich, A. A (2005) Heuristic Approaches To A Common Due Date Earliness-tardiness Scheduling Problem, 132--139 (Full Paper) (link to paper)

  1324. (Menu for Tarasevich) All papers - Full papers - Abstracts - Selected papers

    Tavakkoli-Moghaddam

  1325. Tavakkoli-Moghaddam, R (2015) Cross-training performance of nurse scheduling with the learning effect, 296--312 (Full Paper) (link to paper)

  1326. (Menu for Tavakkoli-Moghaddam) All papers - Full papers - Abstracts - Selected papers

    Tayur

  1327. Tayur, S (2005) Scheduling Multiple Types of Time-Shared Aircraft: Models and Methods for Practice, 19--38 (Full Paper) (link to paper)

  1328. (Menu for Tayur) All papers - Full papers - Abstracts - Selected papers

    Tchernev

  1329. Tchernev, N (2015) An Optimization Framework for Job-shop with Energy Threshold Issue With consideration of machining operations with consumption peaks, 118--133 (Full Paper) (link to paper)
  1330. Tchernev, N (2007) A Disjunctive Graph for the Job-Shop with Several Robots, 285--292 (Full Paper) (link to paper)

  1331. (Menu for Tchernev) All papers - Full papers - Abstracts - Selected papers

    Tchikou

  1332. Tchikou, H (2007) Scheduling with Special Case of Multipurpose Machines, 88--95 (Full Paper) (link to paper)

  1333. (Menu for Tchikou) All papers - Full papers - Abstracts - Selected papers

    Tchomt´e

  1334. Tchomt´e, S. K. (2007) Solving Resource-Constrained Project Scheduling Problem with Particle Swarm Optimization, 251--258 (Full Paper) (link to paper)

  1335. (Menu for Tchomt´e) All papers - Full papers - Abstracts - Selected papers

    Tezel

  1336. Tezel, B (2011) Minimizing Value-at-Risk in the Single-Machine Total Weighted Tardiness Problem, 215--229 (Full Paper) (link to paper)

  1337. (Menu for Tezel) All papers - Full papers - Abstracts - Selected papers

    Theodoridis

  1338. Theodoridis, G (2017) Exploration of Logic-Based Benders Decomposition Approach for Mapping Applications on Heterogeneous Multi-Core Platforms, 030--042 (Full Paper) (link to paper)

  1339. (Menu for Theodoridis) All papers - Full papers - Abstracts - Selected papers

    Thomas

  1340. Thomas, M (2007) Evaluating Online Scheduling Techniques in Uncertain Environments, 471--479 (Full Paper) (link to paper)

  1341. (Menu for Thomas) All papers - Full papers - Abstracts - Selected papers

    Thornblad

  1342. Thornblad, K (2015) Scheduling optimization of a real flexible job shop including side constraints regarding maintenance, ?xtures, and night shifts, 78--101 (Full Paper) (link to paper)

  1343. (Menu for Thornblad) All papers - Full papers - Abstracts - Selected papers

    To?olo

  1344. To?olo, T. A.M (2013) Late Acceptance Hill-Climbing Applied to the High School Timetabling Problem, 331--344 (Full Paper) (link to paper)
  1345. To?olo, T. A.M (2013) Local search techniques applied to the Unrelated Parallel Machine Scheduling Problem with Sequence Dependent Setup Time, 458--471 (Full Paper) (link to paper)
  1346. To?olo, T. A.M (2013) An Integer Programming Approach for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem, 840--847 (Full Paper) (link to paper)

  1347. (Menu for To?olo) All papers - Full papers - Abstracts - Selected papers

    Toffolo

  1348. Toffolo, T.A.M (2017) Integer programming for home care scheduling with flexible task frequency and controllable processing times, 121--132 (Full Paper) (link to paper)

  1349. (Menu for Toffolo) All papers - Full papers - Abstracts - Selected papers

    Torres

  1350. Torres, S (2003) Masplan: A Multi-Agent System for Automated Planning and Scheduling in a University Research Group Scenario, 42--55 (Full Paper) (link to paper)

  1351. (Menu for Torres) All papers - Full papers - Abstracts - Selected papers

    Touati

  1352. Touati, S-A. (2007) Optimal and Approximate Periodic Task Scheduling with Storage Requirement Minimization, 480--489 (Full Paper) (link to paper)

  1353. (Menu for Touati) All papers - Full papers - Abstracts - Selected papers

    Toussaint

  1354. Toussaint, H (2015) Reliability Oriented DARP Models Involving Autonomous Vehicles, 218--235 (Full Paper) (link to paper)
  1355. Toussaint, H (2013) RCPSP with Resource Transfers and Money Management, 91--110 (Full Paper) (link to paper)

  1356. (Menu for Toussaint) All papers - Full papers - Abstracts - Selected papers

    Tran

  1357. Tran, T. T (2015) Resource-Aware Scheduling for Data Centers with Heterogenous Servers, 240--259 (Full Paper) (link to paper)

  1358. (Menu for Tran) All papers - Full papers - Abstracts - Selected papers

    Trautmann

  1359. Trautmann, N (2011) An MILP-approach to the optimization of event-bus schedules: a scheduling application in the tourism sector, 137--145 (Full Paper) (link to paper)
  1360. Trautmann, N (2007) Large-Scale Short-Term Planning in Chemical Batch Production, 490--497 (Full Paper) (link to paper)
  1361. Trautmann, N (2015) A list-scheduling approach for the planning of assessment centers, 541--554 (Full Paper) (link to paper)

  1362. (Menu for Trautmann) All papers - Full papers - Abstracts - Selected papers

    Trietsch

  1363. Trietsch, D (2009) Three Heuristic Procedures for the Stochastic Flow Shop Problem, 330--340 (Full Paper) (link to paper)

  1364. (Menu for Trietsch) All papers - Full papers - Abstracts - Selected papers

    Triki

  1365. Triki, C (2015) Integrated production and outbound distribution scheduling problem with setup times and delivery time windows, 174--188 (Full Paper) (link to paper)

  1366. (Menu for Triki) All papers - Full papers - Abstracts - Selected papers

    Trung

  1367. Trung, H.T (2017) Balanced clustering based decomposition applied to Master thesis defense timetabling problem, 214--228 (Full Paper) (link to paper)

  1368. (Menu for Trung) All papers - Full papers - Abstracts - Selected papers

    Tsang

  1369. Tsang, E (2009) Empowerment-based Workforce Scheduling Problem, 130--144 (Full Paper) (link to paper)
  1370. Tsang, E. P. K (2005) Applying The Extended Network Simplex Algorithm To Dynamic Automated Guided Vehicle Scheduling, 677--692 (Full Paper) (link to paper)
  1371. Tsang, E.P.K (2005) Retractable Contract Network for Distributed Scheduling, 485--500 (Full Paper) (link to paper)

  1372. (Menu for Tsang) All papers - Full papers - Abstracts - Selected papers

    Tuong

  1373. Tuong, N. H. (2007) Single Machine and Parallel Machine Scheduling Problems with a Common Due Date to Minimize Total Weighted Tardiness, 498--505 (Full Paper) (link to paper)

  1374. (Menu for Tuong) All papers - Full papers - Abstracts - Selected papers

    Turetsky

  1375. Turetsky, V (2015) Optimal schedule of a statistical process control with a nonlinear expected loss, 42--54 (Full Paper) (link to paper)

  1376. (Menu for Turetsky) All papers - Full papers - Abstracts - Selected papers

    Tuza

  1377. Tuza, Z (2007) Semi On-Line Scheduling on Two Uniform Processors, 51--58 (Full Paper) (link to paper)

  1378. (Menu for Tuza) All papers - Full papers - Abstracts - Selected papers

    T’kindt

  1379. T’kindt, V (2007) Sequencing a Single Machine with Due Dates and Deadlines: an ILP-based Approach to Solve Very Large Instances, 71--79 (Full Paper) (link to paper)
  1380. T’kindt, V (2005) Enumeration Of Pareto Optima For Uniform Parallel Machine Scheduling With Two Criteria, 123--131 (Full Paper) (link to paper)

  1381. (Menu for T’kindt) All papers - Full papers - Abstracts - Selected papers

    Uhlig

  1382. Uhlig, T (2011) A Multi Species Evolutionary Algorithm for Tool Group Scheduling in Semiconductor Manufacturing, 459--468 (Full Paper) (link to paper)

  1383. (Menu for Uhlig) All papers - Full papers - Abstracts - Selected papers

    Urli

  1384. Urli, T. (2013) A simulated annealing approach to the curriculum-based course timetabling problem, 314--317 (Full Paper) (link to paper)

  1385. (Menu for Urli) All papers - Full papers - Abstracts - Selected papers

    Urrutia

  1386. Urrutia, S (2007) Scheduling Single Round Robin Tournaments with Fixed Venues, 431--438 (Full Paper) (link to paper)
  1387. Urrutia, S (2011) A GRASP Heuristic to the Extended Car Sequencing Problem, 366--373 (Full Paper) (link to paper)

  1388. (Menu for Urrutia) All papers - Full papers - Abstracts - Selected papers

    Uyar

  1389. Uyar, A. S. (2007) Memetic Algorithms and Hyperhill-climbers, 159--166 (Full Paper) (link to paper)

  1390. (Menu for Uyar) All papers - Full papers - Abstracts - Selected papers

    Vaandrager

  1391. Vaandrager, F (2003) Recognizing Finite Repetitive Scheduling Patterns in Manufacturing Systems, 291--319 (Full Paper) (link to paper)

  1392. (Menu for Vaandrager) All papers - Full papers - Abstracts - Selected papers

    Vakhania

  1393. Vakhania, N (2005) New Tight Np-hardness Of Preemptive Multiprocessor And Open Shop Scheduling, 606--629 (Full Paper) (link to paper)
  1394. Vakhania, N (2009) An effcient implicit enumeration for scheduling equal-length jobs with release times on a single processor to maximize throughput, 366--377 (Full Paper) (link to paper)
  1395. Vakhania, N (2009) Scheduling jobs with release times preemptively on a single machine to minimize the number of late jobs, 389--398 (Full Paper) (link to paper)
  1396. Vakhania, N (2011) Minimizing the maximal lateness on a single-machine: a new polynomially solvable case, 230--239 (Full Paper) (link to paper)

  1397. (Menu for Vakhania) All papers - Full papers - Abstracts - Selected papers

    Valero-Herrero

  1398. Valero-Herrero, M (2013) In-depth analysis of the quality sequence to resolve CRSP, 515--527 (Full Paper) (link to paper)

  1399. (Menu for Valero-Herrero) All papers - Full papers - Abstracts - Selected papers

    Valouxis

  1400. Valouxis, C (2013) DAG Scheduling using Integer Programming in heterogenous parallel execution environments, 392--401 (Full Paper) (link to paper)

  1401. (Menu for Valouxis) All papers - Full papers - Abstracts - Selected papers

    Van Vreckem

  1402. Van Vreckem, B (2011) Case study: an effective genetic algorithm for the chemical batch production scheduling, 469--482 (Full Paper) (link to paper)
  1403. Van Vreckem, B (2013) A Reinforcement Learning Approach to Solving Hybrid Flexible Flowline Scheduling Problems, 402--409 (Full Paper) (link to paper)

  1404. (Menu for Van Vreckem) All papers - Full papers - Abstracts - Selected papers

    Vanden Berghe

  1405. Vanden Berghe, G (2007) Distributed Decision Making in Hospital Wide Nurse Rostering Problems, 192--199 (Full Paper) (link to paper)
  1406. Vanden Berghe, G (2013) Extended Roster Quality Staffng Problem A medium term roster quality to support staffing decisions, 424--436 (Full Paper) (link to paper)
  1407. Vanden Berghe, G (2011) A new hyper-heuristic implementation in HyFlex: a study on generality, 374--393 (Full Paper) (link to paper)
  1408. Vanden Berghe, G (2017) Integer programming for home care scheduling with flexible task frequency and controllable processing times, 121--132 (Full Paper) (link to paper)

  1409. (Menu for Vanden Berghe) All papers - Full papers - Abstracts - Selected papers

    Vanderbeck

  1410. Vanderbeck, F (2007) Inventory Routing Problem Solved by Heuristic Based on Column Generation, 361--367 (Full Paper) (link to paper)

  1411. (Menu for Vanderbeck) All papers - Full papers - Abstracts - Selected papers

    Varela

  1412. Varela, L (2003) A Scheduling Web Service, 540--553 (Full Paper) (link to paper)

  1413. (Menu for Varela) All papers - Full papers - Abstracts - Selected papers

    Verbeeck

  1414. Verbeeck, K (2011) A new hyper-heuristic implementation in HyFlex: a study on generality, 374--393 (Full Paper) (link to paper)

  1415. (Menu for Verbeeck) All papers - Full papers - Abstracts - Selected papers

    Vidal-Carreras

  1416. Vidal-Carreras, P.I (2013) In-depth analysis of the quality sequence to resolve CRSP, 515--527 (Full Paper) (link to paper)

  1417. (Menu for Vidal-Carreras) All papers - Full papers - Abstracts - Selected papers

    Vigo

  1418. Vigo, D (2015) Reliability Oriented DARP Models Involving Autonomous Vehicles, 218--235 (Full Paper) (link to paper)

  1419. (Menu for Vigo) All papers - Full papers - Abstracts - Selected papers

    Virginas

  1420. Virginas, B (2005) Retractable Contract Network for Distributed Scheduling, 485--500 (Full Paper) (link to paper)

  1421. (Menu for Virginas) All papers - Full papers - Abstracts - Selected papers

    Vlk

  1422. Vlk, M (2017) Scheduling Models for Multi-Agent Path Finding, 189--200 (Full Paper) (link to paper)
  1423. Vlk, M (2017) Benders Decomposition in SMT for Rescheduling of Hierarchical Workflow, 295--310 (Full Paper) (link to paper)

  1424. (Menu for Vlk) All papers - Full papers - Abstracts - Selected papers

    Voros

  1425. Voros, N (2017) Exploration of Logic-Based Benders Decomposition Approach for Mapping Applications on Heterogeneous Multi-Core Platforms, 030--042 (Full Paper) (link to paper)
  1426. Voros, N (2013) DAG Scheduling using Integer Programming in heterogenous parallel execution environments, 392--401 (Full Paper) (link to paper)

  1427. (Menu for Voros) All papers - Full papers - Abstracts - Selected papers

    Voudouris

  1428. Voudouris, C (2007) iSchedule, an Optimisation Toolkit for Complex Scheduling, 344--352 (Full Paper) (link to paper)
  1429. Voudouris, C (2005) Retractable Contract Network for Distributed Scheduling, 485--500 (Full Paper) (link to paper)

  1430. (Menu for Voudouris) All papers - Full papers - Abstracts - Selected papers

    Wan

  1431. Wan, G (2007) Competitive Agent Scheduling with Controllable Processing Times, 514--522 (Full Paper) (link to paper)

  1432. (Menu for Wan) All papers - Full papers - Abstracts - Selected papers

    Wang

  1433. Wang, C (2013) Scheduling in Wireless OFDMA-TDMA Networks using Variable Neighborhood Search Metaheuristic, 55--64 (Full Paper) (link to paper)

  1434. (Menu for Wang) All papers - Full papers - Abstracts - Selected papers

    Wangsom

  1435. Wangsom, P (2017) The Application of Nondominated Sorting Genetic Algorithm (NSGA-III) for Scientific-workflow Scheduling on Cloud, 269--287 (Full Paper) (link to paper)

  1436. (Menu for Wangsom) All papers - Full papers - Abstracts - Selected papers

    Wanka

  1437. Wanka, R (2013) A Decomposition of the Max-min Fair Curriculum-based Course Timetabling Problem: The Impact of Solving Subproblems to Optimality, 300--313 (Full Paper) (link to paper)

  1438. (Menu for Wanka) All papers - Full papers - Abstracts - Selected papers

    Watson

  1439. Watson, J-P. (2003) A Dynamic Model of Tabu Search for the Job-Shop Scheduling Problem, 320--336 (Full Paper) (link to paper)

  1440. (Menu for Watson) All papers - Full papers - Abstracts - Selected papers

    Weedon

  1441. Weedon, R (2015) Optimisation of a Stagger Chart for Aviation Fleet Planning, 579--589 (Full Paper) (link to paper)

  1442. (Menu for Weedon) All papers - Full papers - Abstracts - Selected papers

    Weng

  1443. Weng, F.C (2013) Tackling University Timetabling Problems Using Hybridization of Swarm Based Approach, 543--548 (Full Paper) (link to paper)

  1444. (Menu for Weng) All papers - Full papers - Abstracts - Selected papers

    Werner

  1445. Werner, F (2013) A Graphical Algorithm for Solving an Investment Optimization Problem, 290--299 (Full Paper) (link to paper)
  1446. Werner, F (2009) Parallel Machine Problems with Equal Processing Times, 458--468 (Full Paper) (link to paper)

  1447. (Menu for Werner) All papers - Full papers - Abstracts - Selected papers

    Westphal

  1448. Westphal, S (2005) Improved Pruningin Columngeneration Of A Vehicle Routing Problem, 705--722 (Full Paper) (link to paper)

  1449. (Menu for Westphal) All papers - Full papers - Abstracts - Selected papers

    Whitley

  1450. Whitley, L. D (2005) Random Walks And Neighborhood Bias In Oversubscribed Scheduling, 98--105 (Full Paper) (link to paper)
  1451. Whitley, D (2003) A Dynamic Model of Tabu Search for the Job-Shop Scheduling Problem, 320--336 (Full Paper) (link to paper)
  1452. Whitley, D (2011) Quasi-Elementary Landscapes, 113--125 (Full Paper) (link to paper)

  1453. (Menu for Whitley) All papers - Full papers - Abstracts - Selected papers

    Wilke

  1454. Wilke, P (2015) Optimisation of Staff Absences, 360--369 (Full Paper) (link to paper)

  1455. (Menu for Wilke) All papers - Full papers - Abstracts - Selected papers

    Wilmer

  1456. Wilmer, D (2015) Robustness of Partial Order Schedules: Understanding the Chaining algorithm, 457--472 (Full Paper) (link to paper)

  1457. (Menu for Wilmer) All papers - Full papers - Abstracts - Selected papers

    Wilson

  1458. Wilson, M (2013) Flexibility Metrics for Time and Resource Constrained Scheduling Problems, 555--572 (Full Paper) (link to paper)

  1459. (Menu for Wilson) All papers - Full papers - Abstracts - Selected papers

    Winter

  1460. Winter, E (2007) Computing Lower Bounds for the Schedule of a Multifunction Radar, 523--530 (Full Paper) (link to paper)

  1461. (Menu for Winter) All papers - Full papers - Abstracts - Selected papers

    Witteveen

  1462. Witteveen, C (2013) Flexibility Metrics for Time and Resource Constrained Scheduling Problems, 555--572 (Full Paper) (link to paper)
  1463. Witteveen, C (2015) Exact and heuristic methods for trading-off makespan and stability in stochastic project scheduling, 25--41 (Full Paper) (link to paper)

  1464. (Menu for Witteveen) All papers - Full papers - Abstracts - Selected papers

    Wodecki

  1465. Wodecki, M (2007) A Parallel Metaheuristics for the Single Machine Total Weighted Tardiness Problem with Sequence-Dependent Setup Times, 96--103 (Full Paper) (link to paper)

  1466. (Menu for Wodecki) All papers - Full papers - Abstracts - Selected papers

    Woeginger

  1467. Woeginger, G. J (2003) Formulations, Relaxations, Approximations, and Gaps in the World of Scheduling, 21--41 (Full Paper) (link to paper)

  1468. (Menu for Woeginger) All papers - Full papers - Abstracts - Selected papers

    Wu

  1469. Wu, X (2005) Single-machine Scheduling With General Costs Under Compound-type Distributions, 630--642 (Full Paper) (link to paper)

  1470. (Menu for Wu) All papers - Full papers - Abstracts - Selected papers

    Xu

  1471. Xu, H (2013) Evolutionary algorithm and post-processing to minimize the total delay in multi-project scheduling, 831--835 (Full Paper) (link to paper)
  1472. Xu, X (2017) Customer Order Scheduling on Unrelated Parallel Machines to Minimize Total Weighted Completion Time, 013--029 (Full Paper) (link to paper)
  1473. Xu, Y (2009) A GRASP approach for the delay-constrained multicast routing problem, 93--104 (Full Paper) (link to paper)

  1474. (Menu for Xu) All papers - Full papers - Abstracts - Selected papers

    Xue

  1475. Xue, N (2017) Responsive Single Bus Corridor Scheduling Based on Machine Learning and Optimisation, 288--294 (Full Paper) (link to paper)

  1476. (Menu for Xue) All papers - Full papers - Abstracts - Selected papers

    Yang

  1477. Yang, S (2009) A Guided Search Genetic Algorithm for the University Course Timetabling Problem, 180--191 (Full Paper) (link to paper)
  1478. Yang, We (2005) Scheduling Multiple Types of Time-Shared Aircraft: Models and Methods for Practice, 19--38 (Full Paper) (link to paper)
  1479. Yang, W (2007) Optimization vs. Persistence in Scheduling: Heuristics to Manage Uncertainty in On-Demand Air Travel, 242--250 (Full Paper) (link to paper)

  1480. (Menu for Yang) All papers - Full papers - Abstracts - Selected papers

    Yong

  1481. Yong, Y (2003) Case-Based Initialisation of Metaheuristics for Examination Timetabling, 137--154 (Full Paper) (link to paper)

  1482. (Menu for Yong) All papers - Full papers - Abstracts - Selected papers

    Youssef

  1483. Youssef, B. Be (2015) Lower bounds for the parallel processing scheduling problem with multiprocessor tasks, release date and delivery time, 403--411 (Full Paper) (link to paper)

  1484. (Menu for Youssef) All papers - Full papers - Abstracts - Selected papers

    Yu

  1485. Yu, V.F (2017) A Selective-Discrete Particle Swarm Optimization Algorithm for Solving a Class of Orienteering Problem, 229--243 (Full Paper) (link to paper)

  1486. (Menu for Yu) All papers - Full papers - Abstracts - Selected papers

    Yuan

  1487. Yuan, Z (2015) Home Health Care Scheduling: A Case Study, 555--569 (Full Paper) (link to paper)

  1488. (Menu for Yuan) All papers - Full papers - Abstracts - Selected papers

    Yucel

  1489. Yucel, E (2005) A Branch-and-bound Algorithm For Single Machine Total Tardiness Problem With Release Dates, 162--168 (Full Paper) (link to paper)

  1490. (Menu for Yucel) All papers - Full papers - Abstracts - Selected papers

    Yugma

  1491. Yugma, C (2009) Scheduling Inspection Operations subject to a Fixed Production Schedule, 581--593 (Full Paper) (link to paper)

  1492. (Menu for Yugma) All papers - Full papers - Abstracts - Selected papers

    Zahout

  1493. Zahout, B (2017) Fixed jobs scheduling on a single machine with renewable resources, 084--092 (Full Paper) (link to paper)

  1494. (Menu for Zahout) All papers - Full papers - Abstracts - Selected papers

    Zeltzer

  1495. Zeltzer, L (2013) Balancing and Sequencing Mixed-Model Assembly Lines to Minimize Work Overload in Real World Workstations, 230--239 (Full Paper) (link to paper)

  1496. (Menu for Zeltzer) All papers - Full papers - Abstracts - Selected papers

    Zhang

  1497. Zhang, Q (2009) Development of E ective Estimation of Distribution Algorithms for Scheduling Problems, 531--556 (Full Paper) (link to paper)
  1498. Zhang, R (2007) Minimizing the Total Weighted Number of Late Jobs with Late Deliveries in Two-Level Supply Chains, 447--454 (Full Paper) (link to paper)
  1499. Zhang, P. Y (2015) Resource-Aware Scheduling for Data Centers with Heterogenous Servers, 240--259 (Full Paper) (link to paper)
  1500. Zhang, X (2007) Two-machine Shop Floor Scheduling Problem with Multi-Predecessor Constraints*, 538--545 (Full Paper) (link to paper)

  1501. (Menu for Zhang) All papers - Full papers - Abstracts - Selected papers

    Zhao

  1502. Zhao, H (2005) Scheduling Algorithms for Master-Slave System, 501--513 (Full Paper) (link to paper)
  1503. Zhao, Y (2017) Customer Order Scheduling on Unrelated Parallel Machines to Minimize Total Weighted Completion Time, 013--029 (Full Paper) (link to paper)

  1504. (Menu for Zhao) All papers - Full papers - Abstracts - Selected papers

    Zhou

  1505. Zhou, X (2005) Single-machine Scheduling With General Costs Under Compound-type Distributions, 630--642 (Full Paper) (link to paper)

  1506. (Menu for Zhou) All papers - Full papers - Abstracts - Selected papers

    Zimmermann

  1507. Zimmermann, J (2007) Medium-Term Production and Staff Planning in the Automotive Industry, 209--216 (Full Paper) (link to paper)
  1508. Zimmermann, A (2015) A list-scheduling approach for the planning of assessment centers, 541--554 (Full Paper) (link to paper)

  1509. (Menu for Zimmermann) All papers - Full papers - Abstracts - Selected papers

    Zinder

  1510. Zinder, Y (2005) Scheduling UET-UCT task systems under the out-forest precedence constraints, 445--452 (Full Paper) (link to paper)
  1511. Zinder, Y (2005) The Worst-case Analysis of the Carey-Johnson Algorithm for preemptive tasks on m processors, 453--470 (Full Paper) (link to paper)
  1512. Zinder, Y (2007) The Strength of Priority Algorithms, 531--537 (Full Paper) (link to paper)

  1513. (Menu for Zinder) All papers - Full papers - Abstracts - Selected papers

    Zorn

  1514. Zorn, E (2015) An IP-based Model for the Post-Enrollment-based Course Timetabling Problem at TU Berlin, 331--344 (Full Paper) (link to paper)
  1515. Zorn, E (2015) Solving Huge Real-World Timetabling Instances, 360--369 (Full Paper) (link to paper)
  1516. Zorn, E (2015) Examination timetabling at Technische Universit¨at Berlin, 260--266 (Full Paper) (link to paper)

  1517. (Menu for Zorn) All papers - Full papers - Abstracts - Selected papers

    Zsifkovits

  1518. Zsifkovits, M (2017) Optimal Interdiction of Vehicle Routing on a Dynamic Network, 059--069 (Full Paper) (link to paper)

  1519. (Menu for Zsifkovits) All papers - Full papers - Abstracts - Selected papers

    Zubaran

  1520. Zubaran, T (2013) A simple stochastic local search for multi-mode resource-constrained multi-project scheduling, 826--830 (Full Paper) (link to paper)

  1521. (Menu for Zubaran) All papers - Full papers - Abstracts - Selected papers

    omarudin

  1522. omarudin, K. (2013) Extended Roster Quality Staffng Problem A medium term roster quality to support staffing decisions, 424--436 (Full Paper) (link to paper)

  1523. (Menu for omarudin) All papers - Full papers - Abstracts - Selected papers

    van Hillegersberg

  1524. van Hillegersberg, J (2017) Towards improving tenders for Higher Education timetabling software: Uncovering the selection criteria of HEIs when choosing timetabling applications and using ERP as a reference, 173--188 (Full Paper) (link to paper)

  1525. (Menu for van Hillegersberg) All papers - Full papers - Abstracts - Selected papers

    Ásgeirsson

  1526. Ásgeirsson, E. I (2011) A Framework for Implementation-Oriented Staff Scheduling, 308--321 (Full Paper) (link to paper)

  1527. (Menu for Ásgeirsson) All papers - Full papers - Abstracts - Selected papers

    Özcan

  1528. Özcan, E (2013) Combining Monte-Carlo and Hyper-heuristic methods for the Multi-mode Resource-constrained Multi-project Scheduling Problem, 836--839 (Full Paper) (link to paper)
  1529. Özcan, E (2007) Memetic Algorithms and Hyperhill-climbers, 159--166 (Full Paper) (link to paper)
  1530. Özcan, E (2007) A Memetic Algorithm for Solving a Timetabling Problem:An Incremental Strategy, 394--401 (Full Paper) (link to paper)
  1531. Özcan, B. M. E (2013) An Investigation of Multistage Approaches to Examination Timetabling, 528--542 (Full Paper) (link to paper)

  1532. (Menu for Özcan) All papers - Full papers - Abstracts - Selected papers